PT KIK, BATCHING PLANT

Actual Concrete Supplied


013797 Prepared By : HRP

Concrete Req Approval Concrete Time Volume (m3)


No Project Cost Center Req No. Location Contractor Work Type Remarks
Grade by Start Finish Req Actual
0

24-Feb-21 17 FL3B (P1E01_ON PO. 9100000180 (11) 04702 Woodyard (328) PT TKM Bore Plie Conveyor Leg 11 K300 Heriandi B. - - 7.5 - P1E01-ON-PC1120
25-Feb-21 3 FL3B (P1E01_ON PO. 9100000180 (11) 04702 Woodyard (328) PT TKM Bore Plie Conveyor Leg 11 K300 Heriandi B. 16:50 17:05 7.5 7.5 P1E01-ON-PC1120

26-Feb-21 10 PO. 9100000180 (11) 04703 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 16:05 17:30 15.0 8.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
27-Feb-21 12 FL3B (P1E01_ON PO. 9100000180 (11) 04704 Woodyard (328) PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 15:20 18:20 15.0 15.0 P1E01-ON-PC1120

1-Mar-21 14 PO. 9100000180 (11) 04705 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 13:35 18:10 15.0 16.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
2-Mar-21 15 PO. 9100000180 (11) 04706 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 15:25 16:25 16.0 7.5 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
3-Mar-21 9 FL3B (P1E01_ON PO. 9100000180 (11) 04708 Woodyard (328) PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 14:05 16:00 15.0 15.0 P1E01-ON-PC1120

4-Mar-21 11 PO. 9100000180 (11) 04709 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. - - 16.0 - P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
5-Mar-21 2 FL3B (P1E01_ON PO. 9100000180 (11) 04709 Woodyard (328) PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 11:00 11:30 16.0 7.5 P1E01-ON-PC1120

6-Mar-21 17 PO. 9100000180 (11) 04710 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 17:15 18:15 8.5 7.5 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
Bore Plie Conveyor Leg 10, Leg 26 &
8-Mar-21 23 PO. 9100000180 (11) 04711 PT TKM K300 Heriandi B. 20:10 20:25 25.5 8.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328) Leg 27
Bore Plie Conveyor Leg 10, Leg
9-Mar-21 18 PO. 9100000180 (11) 04712 PT TKM K300 Heriandi B. 16:25 19:50 33.0 17.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328) 26 ,Leg 27 & Leg 28
Bore Plie Conveyor Leg 10, Leg
10-Mar-21 21 PO. 9100000180 (11) 04713 PT TKM K300 Heriandi B. 13:50 20:20 33.0 25.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328) 26 ,Leg 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 ,Leg
12-Mar-21 14 PO. 9100000180 (11) 04714 PT TKM K300 Heriandi B. 14:30 18:35 33.0 24.5 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328) 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 ,Leg
13-Mar-21 15 PO. 9100000180 (11) 04715 PT TKM K300 Heriandi B. 15:10 18:30 33.0 33.0
FL3B (P1E01_ON Woodyard (328) 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 ,Leg
15-Mar-21 14 PO. 9100000180 (11) 04716 PT TKM K300 Heriandi B. 14:05 18:20 33.0 34.0
FL3B (P1E01_ON Woodyard (328) 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 ,Leg
16-Mar-21 14 PO. 9100000180 (11) 04717 PT TKM K300 Heriandi B. 16:30 20:25 33.0 25.5
FL3B (P1E01_ON Woodyard (328) 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 &
17-Mar-21 20 PO. 9100000180 (11) 04718 PT TKM K300 Vincent C. 17:20 19:30 24.5 24.5
FL3B (P1E01_ON Woodyard (328) Leg 27
22-Mar-21 12 FL3B (P1E01_ON PO. 9100000180 (13) 04722 Woodyard (328) PT TKM BorPile Leg 2, 4, 5 & 26B K300 Vincent C. 12:00 17:20 54.5 37.5
23-Mar-21 18 FL3B (P1E01_ON PO. 9100000180 (13) 04723 Woodyard (328) PT TKM BorPile Leg 26, 29, 4 & 5 K300 Vincent C. 19:10 23:10 55.0 46.5
24-Mar-21 11 FL3B (P1E01_ON PO. 9100000180 (13) 04724 Woodyard (328) PT TKM BorPile Leg 26B, 29, 4 & 5 K300 Vincent C. 14:30 20:10 55.0 29.5
25-Mar-21 13 FL3B (P1E01_ON PO. 9100000180 (13) 04725 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 14:00 19:00 55.0 38.0
26-Mar-21 13 FL3B (P1E01_ON PO. 9100000180 (13) 04726 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 14:50 18:05 55.0 38.0
28-Mar-21 10 FL3B (P1E01_ON PO. 9100000180 (13) 04727 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 13:10 21:20 55.0 55.0
28-Mar-21 14 FL3B (P1E01_ON PO. 9100000180 (19) 04730 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 21:20 21:20 2.0 2.0
29-Mar-21 20 FL3B (P1E01_ON PO. 9100000180 (13) 04728 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 17:45 17:45 5.5 5.5
29-Mar-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 04729 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 17:05 19:25 49.5 21.5
30-Mar-21 15 FL3B (P1E01_ON PO. 9100000180 (19) 04731 Woodyard (328) PT TKM BorPile Leg 26Brace, 2, 4, 4 fixed K300 Vincent C. 18:05 22:30 55.0 46.5
31-Mar-21 11 FL3B (P1E01_ON PO. 9100000180 (19) 04733 Woodyard (328) PT TKM BorPile Leg 26Brace, 2, 4, 4 fixed K300 Vincent C. - - 46.5 -
1-Apr-21 1 FL3B (P1E01_ON PO. 9100000180 (19) 04733 Woodyard (328) PT TKM BorPile Leg 26Brace, 2, 4, 4 fixed K300 Vincent C. 16:30 21:55 46.5 38.0
3-Apr-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 04735 Woodyard (328) PT TKM BorPile Leg 26Brace & 4 fixed K300 Vincent C. 17:45 20:20 19.0 19.0
5-Apr-21 14 FL3B (P1E01_ON PO. 9100000180 (19) 04739 Woodyard (328) PT TKM BorPile Leg 26Brace & 4 fixed K300 Vincent C. 13:25 17:35 53.0 30.5
6-Apr-21 20 FL3B (P1E01_ON PO. 9100000180 (19) 04741 Woodyard (328) PT TKM BorPile Leg 3, 4 Fixed, 19 K300 Vincent C. 19:40 22:50 34.0 34.0
7-Apr-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 04742 Woodyard (328) PT TKM BorPile Leg 3, 4 Fixed, 19, 20,21 K300 Vincent C. 17:10 17:50 42.5 8.5
8-Apr-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 04743 Woodyard (328) PT TKM BorPile Leg 3, 4 Fixed, 19, 20,21 K300 Vincent C. 10:55 19:35 42.5 42.5
9-Apr-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 04744 Woodyard (328) PT TKM BorPile Leg 4 Fixed, 19, 20,21 K300 Vincent C. 15:55 18:55 42.5 25.5
10-Apr-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 04745 Woodyard (328) PT TKM BorPile Leg 4 Fixed, 19, 20,21,3 K300 Vincent C. 11:30 18:55 42.5 25.5
11-Apr-21 15 FL3B (P1E01_ON PO. 9100000180 (19) 04746 Woodyard (328) PT TKM BorPile Leg 4 Fixed, 19, 20,21,3 K300 Vincent C. 13:35 18:25 42.5 25.5
12-Apr-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 04747 Woodyard (328) PT TKM BorPile Leg 4 Fixed, 19, 20,21 K300 Vincent C. 17:45 21:00 42.5 25.5
14-Apr-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 04750 Woodyard (328) PT TKM BorPile Leg 19, 20 & 21 K300 Vincent C. 13:55 15:25 25.5 9.0
15-Apr-21 28 FL3B (P1E01_ON PO. 9100000180 (19) 05904 Woodyard (328) PT TKM BorPile Leg 18, 20 K300 Vincent C. 17:10 21:00 17.0 16.5
16-Apr-21 20 FL3B (P1E01_ON PO. 9100000180 (19) 05905 Woodyard (328) PT TKM BorPile Leg 18, 19, 20, 21 K300 Vincent C. 19:05 20:05 34.0 8.5
17-Apr-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 05906 Woodyard (328) PT TKM BorPile Leg 18, 19, 21 K300 Vincent C. 13:50 15:00 25.5 8.5
18-Apr-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 05908 Woodyard (328) PT TKM BorPile Leg 18, 19, 21 K300 Vincent C. 14:50 18:15 25.5 25.5
19-Apr-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 05909 Woodyard (328) PT TKM BorPile Leg 18, 20, 21 K300 Vincent C. 16:35 17:30 25.5 8.5
20-Apr-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 05911 Woodyard (328) PT TKM BorPile Leg 18, 20, 21 K300 Vincent C. 17:10 20:10 25.5 25.5
21-Apr-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 05913 Woodyard (328) PT TKM BorePile Leg 18, 20 K300 Vincent C. 16:30 19:25 17.0 17.0
22-Apr-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 05914 Woodyard (328) PT TKM BorePile Leg 18, 20 K300 Vincent C. 16:20 16:55 17.0 8.5
23-Apr-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 05915 Woodyard (328) PT TKM BorePile Leg 18, 20, 25 K300 Vincent C. - - 34.0 -
24-Apr-21 3 FL3B (P1E01_ON PO. 9100000180 (19) 05915 Woodyard (328) PT TKM BorePile Leg 18, 20, 25 K300 Vincent C. 12:15 14:30 34.0 25.5
26-Apr-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 05917 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. - - 25.5 -
27-Apr-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 05917 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. 12:45 18:50 25.5 26.5
28-Apr-21 12 FL3B (P1E01_ON PO. 9100000180 (19) 05918 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. 13:25 14:25 25.5 17.0
29-Apr-21 27 FL3B (P1E01_ON PO. 9100000180 (19) 05919 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. 13:35 19:00 25.5 25.5
30-Apr-21 22 FL3B (P1E01_ON PO. 9100000180 (19) 05920 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. 17:10 20:40 25.5 25.5
2-May-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 05921 Woodyard (328) PT TKM BorePile Leg 25 K300 Vincent C. 14:40 15:20 8.5 8.5
3-May-21 16 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05924 Water Intake (273) PT TKM BorePile K400 Eko Subagyo 13:25 15:10 8.0 7.0
3-May-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 05922 Pipe Bridge (186) PT TKM BorePile Pipe Bridge K300 Vincent C. - - 15.0 -
4-May-21 5 FL3B (P1E01_ON PO. 9100000180 (19) 05922 Pipe Bridge (186) PT TKM BorePile Pipe Bridge K300 Vincent C. 16:45 18:30 15.0 7.5
19-May-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05925 Water Intake (273) PT TKM BorePile Point 2 & 3 K400 Kevin K. 14:55 14:55 16.0 5.5
20-May-21 15 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06252 Water Intake (273) PT TKM BorePile Grid A1 K400 Kevin K. 14:10 14:10 8.0 5.0
22-May-21 26 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06253 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 15:30 15:30 8.0 5.5
24-May-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06255 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 17:15 17:15 8.0 5.5
24-May-21 14 FL3B (P1E01_ON PO. 9100000180 (3) 06256 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge K300 Brian C. 17:45 18:40 7.5 8.0
25-May-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06257 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 16:50 16:50 8.0 5.5
25-May-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 06260 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 1-5 Point 60 K300 Vincent C. 16:50 17:35 7.5 7.5
25-May-21 25 FL3B (P1E01_ON PO. 9100000180 (3) 06261 Pipe Bridge (186) PT TKM BorePile SPG 37 K300 Brian C. 20:30 21:00 7.5 7.5
26-May-21 16 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06258 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 15:15 15:15 8.0 5.5
26-May-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 06264 Water Intake (273) PT TKM BorePile Grid l-5 Point 61 K300 Vincent C. - - 7.5 -
27-May-21 5 FL3B (P1E01_ON PO. 9100000180 (19) 06264 Water Intake (273) PT TKM BorePile Grid l-5 Point 61 K300 Vincent C. - - 7.5 -
27-May-21 18 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06259 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 17:20 17:20 8.0 5.5
27-May-21 19 FL3B (P1E01_ON PO. 9100000180 (3) 06262 Fiberline (414) PT TKM Bore Pile K300 Brian C. - - 7.5 -
28-May-21 1 FL3B (P1E01_ON PO. 9100000180 (19) 06264 Water Intake (273) PT TKM BorePile Grid l-5 Point 61 K300 Vincent C. 17:45 18:20 7.5 7.5
28-May-21 2 FL3B (P1E01_ON PO. 9100000180 (3) 06262 Fiberline (414) PT TKM Bore Pile K300 Brian C. 18:35 19:50 7.5 7.5
28-May-21 14 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06265 Water Intake (273) PT TKM BorePile Grid C K400 Kevin K. 16:10 16:10 8.0 5.5
29-May-21 27 FL3B (P1E01_ON PO. 9100000180 (19) 06451 Water Intake (273) PT TKM BorePile Grid l-5 Point 57 K300 Vincent C. 15:55 16:55 7.5 7.5
29-May-21 28 FL3B (P1E01_ON PO. 9100000180 (3) 06454 Fiberline (414) PT TKM Bore Pile SPA K300 Brian C. 17:35 18:30 7.5 8.0
29-May-21 29 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06266 Water Intake (273) PT TKM BorePile Grid C K400 Kevin K. 15:40 15:40 8.0 5.5
30-May-21 21 FL3B (P1E01_ON PO. 9100000180 (3) 06455 Fiberline (414) PT TKM Bore Pile BPA 377 K300 Brian C. 16:25 17:20 7.5 7.5
30-May-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06267 Water Intake (273) PT TKM BorePile Grid C K400 Kevin K. - - 8.0 -
Bore Pile Pipe Bridge Grid 1-5 Point
30-May-21 23 PO. 9100000180 (19) 06452 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Pipe Bridge (186) 56
31-May-21 2 FL3B (P1E01_ON PO. 9100000180 (34) 06457 Recausticizing (474) PT TKM Bore Pile BPA-05 K300 Poltak 17:00 20:10 7.5 7.5
31-May-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 06452 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 1-5 Point 56 K300 Vincent C. 14:25 15:30 7.5 8.5
31-May-21 10 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06267 Water Intake (273) PT TKM BorePile Grid C K400 Kevin K. 15:00 15:00 8.0 5.5
31-May-21 29 FL3B (P1E01_ON PO. 9100000180 (3) 06456 Fiberline (414) PT TKM Bore Pile BPA 373 K300 Brian C. - - 7.5 -
1-Jun-21 3 FL3B (P1E01_ON PO. 9100000180 (3) 06456 Fiberline (414) PT TKM Bore Pile BPA 373 K300 Brian C. 18:00 18:25 7.5 7.5
1-Jun-21 14 FL3B (P1E01_ON PO. 9100000180 (34) 06474 Recausticizing (474) PT TKM BorePile BPA-06 K300 Poltak - - 7.5 -
1-Jun-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 06463 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-4 K300 Vincent C. 17:05 17:50 7.5 7.5

1-Jun-21 19 P1D12-ON-PC1618 (3) 06485 Water Intake (273) PT TKM BorePile MCC Room & Pipe Slipper K400 Kevin K. 16:05 16:05 16.0 5.5
FL3B (P1E01_ON
2-Jun-21 5 FL3B (P1E01_ON PO. 9100000180 (34) 06474 Recausticizing (474) PT TKM BorePile BPA-06 K300 Poltak 15:05 16:05 7.5 7.5
2-Jun-21 24 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06268 Water Intake (273) PT TKM BorePile MCC Room & Pipe Slipper K400 Kevin K. 13:45 13:45 16.0 5.5
2-Jun-21 25 FL3B (P1E01_ON PO. 9100000180 (3) 06492 Fiberline (414) PT TKM Bore Pile BPA 374 K300 Brian C. 17:20 17:50 7.5 7.5
2-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 06464 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-4 K300 Vincent C. 15:10 16:40 7.5 7.5
3-Jun-21 20 FL3B (P1E01_ON PO. 9100000180 (34) 06484 Recausticizing (474) PT TKM BorePile BPA-01 & 05 K300 Nico B. 19:00 20:05 15.0 7.5
3-Jun-21 24 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06486 Water Intake (273) PT TKM BorePile MCC Room & Pipe Slipper K400 Kevin K. 12:10 12:10 16.0 5.5

3-Jun-21 25 PO. 9100000180 (19) 06465 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-4 K300 Vincent C. 19:25 20:40 7.5 7.5
FL3B (P1E01_ON
3-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (3) 06468 Fiberline (414) PT TKM BorePile BPA 375 K300 Brian C. - - 7.5 -
4-Jun-21 2 FL3B (P1E01_ON PO. 9100000180 (3) 06468 Fiberline (414) PT TKM BorePile BPA 375 K300 Brian C. 13:40 14:35 7.5 7.5
4-Jun-21 13 FL3B (P1E01_ON PO. 9100000180 (34) 06478 Recausticizing (474) PT TKM BorePile BPA-02 K300 Nico B. - - 7.5 -

4-Jun-21 17 PO. 9100000180 (19) 06453 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-3 K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON
4-Jun-21 18 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06487 Water Intake (273) PT TKM BorePile Pipe Slipper K400 Kevin K. - - 8.0 -
5-Jun-21 8 FL3B (P1E01_ON PO. 9100000180 (34) 06478 Recausticizing (474) PT TKM BorePile BPA-02 K300 Nico B. 13:25 14:20 7.5 7.5
5-Jun-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 06453 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-3 K300 Vincent C. 16:55 17:30 7.5 7.5
5-Jun-21 10 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06487 Water Intake (273) PT TKM BorePile Pipe Slipper K400 Kevin K. 17:05 17:05 8.0 5.5
5-Jun-21 28 FL3B (P1E01_ON PO. 9100000180 (34) 06476 Recausticizing (474) PT TKM BorePile BPA-02 K300 Nico B. 14:00 15:25 7.5 7.5
7-Jun-21 8 FL3B (P1E01_ON PO. 9100000180 (34) 06475 Recausticizing (474) PT TKM BorePile BPA-03 K300 Nico B. 18:25 19:00 7.5 7.5
7-Jun-21 9 FL3B (P1E01_ON PO. 9100000180 (3) 06473 Fiberline (414) PT TKM BorePile K300 Brian C. - - 7.5 -
7-Jun-21 10 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06488 Water Intake (273) PT TKM BorePile Pipe Slipper K400 Kevin K. 15:45 15:45 8.0 5.5
7-Jun-21 29 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06480 Water Intake (273) PT TKM BorePile MCC Room & Pipe Slipper K400 Kevin K. - - 16.0 -
7-Jun-21 30 FL3B (P1E01_ON PO. 9100000180 (3) 06469 Fiberline (414) PT TKM BorePile BPA 1 K300 Brian C. - - 7.5 -
7-Jun-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 06467 Pipe Bridge (186) PT TKM BorePile Pipe Bridge & Conveyor Leg 12 K300 Vincent C. 16:15 17:10 15.0 7.5
8-Jun-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 06490 Pipe Bridge (186) PT TKM BorePile Pipe Bridge & Leg 12 K300 Vincent C. 20:30 22:25 15.0 7.5
8-Jun-21 24 FL3B (P1E01_ON PO. 9100000180 (3) 06470 Fiberline (414) PT TKM BorePile BPP 1 K300 Brian C. - - 7.5 -
8-Jun-21 26 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06483 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 17:55 17:55 5.5 5.5
8-Jun-21 27 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06482 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 8.0 -
9-Jun-21 4 FL3B (P1E01_ON PO. 9100000180 (3) 06470 Fiberline (414) PT TKM BorePile BPP 1 K300 Brian C. 13:30 14:10 7.5 7.5
9-Jun-21 5 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06482 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 15:20 15:20 8.0 5.5
9-Jun-21 22 FL3B (P1E01_ON PO. 9100000180 (19) 06491 Pipe Bridge (186) PT TKM BorePile Pipe Bridge & Leg 12 K300 Vincent C. 18:05 18:40 15.0 7.5
9-Jun-21 23 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06489 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 18:05 18:05 5.5 5.5
10-Jun-21 27 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06497 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 16:45 16:45 8.0 5.5
10-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06498 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 19:10 19:10 5.5 5.5
10-Jun-21 29 FL3B (P1E01_ON PO. 9100000180 (3) 06471 Fiberline (414) PT TKM BorePile BPP 3 K300 Brian C. 17:45 18:30 7.5 7.5
BorePile Pipe Bridge FR-3 Grid 3-19 &
10-Jun-21 30 PO. 9100000180 (19) 06494 Pipe Bridge (186) PT TKM K300 Vincent C. 18:55 20:15 15.0 7.5
FL3B (P1E01_ON FR-2 Grid 1-3
BorePile Leg 12 Conveyor 3060, 3061
10-Jun-21 31 PO. 9100000180 (19) 06495 PT TKM K300 Vincent C. 20:35 21:45 7.5 7.5
FL3B (P1E01_ON Woodyard (328) & 3071
11-Jun-21 15 FL3B (P1E01_ON PO. 9100000180 (34) 07051 Recausticizing (474) PT TKM BorePile BPA K300 Nico B. 14:30 15:15 7.5 7.5
11-Jun-21 16 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06500 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 8.0 -
11-Jun-21 17 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06499 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 5.5 -
11-Jun-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 07054 Woodyard (328) PT TKMBorePile Leg 12 Conveyor 3060, 3061 & 3071 K300 Vincent C. 18:20 19:25 7.5 7.5
BorePile Pipe Bridge Grid 3-18 & 3-19
11-Jun-21 19 PO. 9100000180 (19) 06493 Pipe Bridge (186) PT TKM K300 Vincent C. 16:00 16:45 22.5 7.5
FL3B (P1E01_ON (FR-3)
12-Jun-21 2 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06500 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 17:10 17:10 8.0 5.5
12-Jun-21 3 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06499 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 5.5 -
BorePile Pipe Bridge FR3 Grid 3-20 &
12-Jun-21 24 PO. 9100000180 (19) 07055 Pipe Bridge (186) PT TKM K300 Vincent C. 17:55 21:37 22.5 22.5
FL3B (P1E01_ON 3-21
BorePile Conveyor 3060, 3061 &
12-Jun-21 25 PO. 9100000180 (19) 07056 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Woodyard (328) 3071 Leg 12
12-Jun-21 32 FL3B (P1E01_ON PO. 9100000180 (34) 07052 Recausticizing (474) PT TKM Bore Pile BPB K300 Nico B. 17:25 18:30 7.5 7.5
14-Jun-21 8 FL3B (P1E01_ON PO. 9100000180 (34) 07053 Recausticizing (474) PT TKM Bore Pile BPC K300 Nico B. 13:45 13:45 7.5 6.0
14-Jun-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 07057 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR3 Grid 3-20 & 3-21 K300 Vincent C. 15:20 15:55 22.5 7.5
14-Jun-21 10 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07062 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 12:20 12:20 5.5 5.5
14-Jun-21 11 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07059 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 13:00 13:00 8.0 5.5
14-Jun-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06499 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 5.5 -
14-Jun-21 13 FL3B (P1E01_ON PO. 9100000180 (19) 07056 Woodyard (328) PT TKMBorePile Conveyor 3060, 3061 & 3071 Leg 12 K300 Vincent C. - - 7.5 -
14-Jun-21 32 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07060 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 8.0 -
15-Jun-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 07056 Woodyard (328) PT TKMBorePile Conveyor 3060, 3061 & 3071 Leg 12 K300 Vincent C. 15:30 16:35 7.5 7.5
15-Jun-21 29 FL3B (P1E01_ON PO. 9100000180 (34) 07063 Recausticizing (474) PT TKM Bore Pile BRP 4 K300 Nico B. 13:55 15:00 7.5 7.5
15-Jun-21 31 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07082 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 12:50 13:45 12.0 11.0
15-Jun-21 32 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07078 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 18:20 19:00 11.0 11.0
BorePile Pipe Bridge FR3 Grid 3-17 &
15-Jun-21 34 PO. 9100000180 (19) 07067 Pipe Bridge (186) PT TKM K300 Vincent C. 14:45 15:20 15.0 7.5
FL3B (P1E01_ON 3-20
16-Jun-21 28 FL3B (P1E01_ON PO. 9100000180 (34) 07064 Recausticizing (474) PT TKM Bore Pile BRP 7 K300 Nico B. 16:05 16:45 7.5 7.5
16-Jun-21 29 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07061 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 17:00 18:45 11.0 11.0
16-Jun-21 30 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07077 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 12.0 -
16-Jun-21 31 FL3B (P1E01_ON PO. 9100000180 (19) 07070 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-17, 3-19 & 3-20K300 Vincent C. 14:20 19:55 22.5 15.0
16-Jun-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 07071 Woodyard (328) PT TKMBorePile Conveyor 3060, 3061 & 3071 Leg 12 K300 Vincent C. - - 7.5 -
BorePile Conveyor 3060, 3061 &
17-Jun-21 10 PO. 9100000180 (19) 07071 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Woodyard (328) 3071 Leg 12
17-Jun-21 24 FL3B (P1E01_ON PO. 9100000180 (34) 07065 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. - - 7.5 -
17-Jun-21 25 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07079 Water Intake (273) PT TKM BorePile MCC Room Grid C & D K400 Kevin K. 16:15 17:50 22.0 11.0
17-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07073 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-17, 3-19, 3-20 & 3-9
K300 Vincent C. 13:45 15:00 30.0 7.5
18-Jun-21 6 FL3B (P1E01_ON PO. 9100000180 (34) 07065 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. - - 7.5 -
BorePile Conveyor 3060, 3061 &
18-Jun-21 7 PO. 9100000180 (19) 07071 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Woodyard (328) 3071 Leg 12
BorePile Pipe Bridge FR3 Grid 3-17, 3-
18-Jun-21 25 PO. 9100000180 (19) 07072 Pipe Bridge (186) PT TKM K300 Vincent C. 16:15 18:45 30.0 15.0
FL3B (P1E01_ON 19, 3-20 & 3-9
18-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (34) 07066 Recausticizing (474) PT TKM Bore Pile BRP 1 K300 Nico B. - - 7.5 -
18-Jun-21 29 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07069 Water Intake (273) PT TKM BorePile MCC Room Grid C & D K400 Kevin K. 17:15 17:15 22.0 7.5
19-Jun-21 3 FL3B (P1E01_ON PO. 9100000180 (34) 07065 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. 12:25 13:40 7.5 7.5
BorePile Conveyor 3060, 3061 &
19-Jun-21 4 PO. 9100000180 (19) 07071 PT TKM K300 Vincent C. 19:00 19:50 7.5 8.0
FL3B (P1E01_ON Woodyard (328) 3071 Leg 12
19-Jun-21 5 FL3B (P1E01_ON PO. 9100000180 (34) 07066 Recausticizing (474) PT TKM Bore Pile BRP 1 K300 Nico B. - - 7.5 -
19-Jun-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07080 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 17:50 18:30 22.0 9.0
BorePile Pipe Bridge FR3 Grid 3-9, 3-
19-Jun-21 23 PO. 9100000180 (19) 07074 Pipe Bridge (186) PT TKM K300 Vincent C. 16:15 18:40 30.0 15.0
FL3B (P1E01_ON 17, 3-19, 3-20
19-Jun-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 07050 Woodyard (328) PT TKMBorePile Conveyor 3060, 3061 & 3071 Leg 12 K300 Vincent C. 21:25 21:25 3.0
20-Jun-21 2 FL3B (P1E01_ON PO. 9100000180 (34) 07066 Recausticizing (474) PT TKM Bore Pile BRP 1 K300 Nico B. - - 7.5 -
20-Jun-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07081 Water Intake (273) PT TKM BorePile MCC Room Grid C & D K400 Kevin K. 15:05 15:05 11.0 5.5
20-Jun-21 13 FL3B (P1E01_ON PO. 9100000180 (19) 07075 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-9, 3-17, 3-19, 3-20
K300 Vincent C. 12:55 13:35 30.0 7.5
21-Jun-21 5 FL3B (P1E01_ON PO. 9100000180 (34) 07066 Recausticizing (474) PT TKM Bore Pile BRP 1 K300 Nico B. 15:35 17:05 7.5 7.5
21-Jun-21 24 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07098 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 13:25 18:50 17.0 16.5
BorePile Pipe Bridge FR3 Grid 3-9, 3-
21-Jun-21 25 PO. 9100000180 (19) 07076 Pipe Bridge (186) PT TKM K300 Vincent C. 13:25 20:25 37.5 22.5
FL3B (P1E01_ON 17, 3-19, 3-21
22-Jun-21 24 FL3B (P1E01_ON PO. 9100000180 (34) 07091 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. - - 7.5 -
22-Jun-21 25 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07097 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 17:50 17:50 11.0 5.5
22-Jun-21 26 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07096 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 13:45 13:45 11.0 5.5
BorePile Pipe Bridge FR3 Grid 3-9, 3-
22-Jun-21 27 PO. 9100000180 (19) 07083 Pipe Bridge (186) PT TKM K300 Vincent C. - - 30.0 -
FL3B (P1E01_ON 18, 3-19, 3-21
22-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07092 FWT (142) PT TKM BorePile Condensation Collection Tank K400 Darwin 13:45 17:45 11.0 11.0
23-Jun-21 10 FL3B (P1E01_ON PO. 9100000180 (34) 07091 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. 17:00 17:55 7.5 7.5
BorePile Pipe Bridge FR3 Grid 3-9, 3-
23-Jun-21 11 PO. 9100000180 (19) 07083 Pipe Bridge (186) PT TKM K300 Vincent C. 16:40 17:30 30.0 7.5
FL3B (P1E01_ON 18, 3-19, 3-21
23-Jun-21 32 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05926 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 5.5 -
23-Jun-21 33 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05927 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
23-Jun-21 34 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07093 FWT (142) PT TKM BorePile Condensation Collection Tank K400 Darwin 13:00 13:00 11.0 5.5
23-Jun-21 36 FL3B (P1E01_ON PO. 9100000180 (19) 05923 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-9, 3-18, 3-19, 3-20
K300 Vincent C. - - 30.0 -
24-Jun-21 5 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05926 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 16:00 16:00 5.5 5.5
24-Jun-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05927 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
24-Jun-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07094 FWT (142) PT TKMBorePile Condensation Collection Tank RB#5 K400 Darwin 13:55 18:25 11.0 11.0
BorePile Pipe Bridge FR3 Grid 3-9, 3-
24-Jun-21 23 PO. 9100000180 (19) 07085 Pipe Bridge (186) PT TKM K300 Vincent C. 16:30 19:10 30.0 15.5
FL3B (P1E01_ON 18, 3-19, 3-20
BorePile Conveyor 3060,3061,3071
24-Jun-21 24 PO. 9100000180 (19) 07086 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Woodyard (328) Leg 4
25-Jun-21 5 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05927 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
25-Jun-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 07086 Woodyard (328) PT TKM BorePile Conveyor 3060,3061,3071 Leg 4 K300 Vincent C. - - 7.5 -
25-Jun-21 24 FL3B (P1E01_ON PO. 9100000180 (3) 07099 Fiberline (414) PT TKM BorePile BPP37 K300 Brian C. 15:20 16:20 7.5 7.5
25-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07087 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-9, 3-18, 3-19, 3-20
K300 Vincent C. 16:40 17:25 30.0 7.5
25-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07095 FWT (142) PT TKMBorePile Condensation Collection Tank RB#5 K400 Darwin 14:15 14:15 11.0 5.5
26-Jun-21 3 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05927 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
BorePile Conveyor 3060,3061,3071
26-Jun-21 4 PO. 9100000180 (19) 07086 PT TKM K300 Vincent C. 21:05 22:20 7.5 7.5
FL3B (P1E01_ON Woodyard (328) Leg 4
26-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (3) 07100 Fiberline (414) PT TKM BorePile BPP36 K300 Brian C. 15:10 16:15 7.5 7.5
BorePile Pipe Bridge FR3 Grid 3-9, 3-
26-Jun-21 27 PO. 9100000180 (19) 07088 Pipe Bridge (186) PT TKM K300 Vincent C. 17:00 22:00 30.0 22.5
FL3B (P1E01_ON 18, 3-20
28-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05928 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
BorePile Pipe Bridge FR3 Grid 3-9, 3-
28-Jun-21 29 PO. 9100000180 (19) 07553 Pipe Bridge (186) PT TKM K300 Vincent C. 11:50 15:50 30.0 15.0
FL3B (P1E01_ON 18, 3-20
28-Jun-21 30 FL3B (P1E01_ON PO. 9100000180 (19) 07554 Woodyard (328) PT TKM BorePile Conveyor 3060,3061,3071 Leg 4 K300 Vincent C. 11:30 12:20 7.5 7.5
29-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07555 Pipe Bridge (186) PT TKMBorePile Pipe Bridge FR3 Grid 3-8, 3-18, 3-20 K300 Vincent C. 14:20 18:15 30.0 15.0
Bore Pile Conveyor 3060, 3061, 3071
29-Jun-21 27 PO. 9100000180 (19) 07556 PT TKM K300 Vincent C. 18:50 19:50 7.5 7.5
FL3B (P1E01_ON Woodyard (328) Leg 4
29-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07566 Woodyard (328) PT TKM BorePile Pipe Support K400 Kevin K. - - 22.0 -
30-Jun-21 25 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07567 Woodyard (328) PT TKM BorePile Pipe Support K400 Kevin K. 13:45 14:55 22.0 11.0
30-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07558 Woodyard (328) PT TKM Bore Pile Conveyor 3060, 3061, 3071 Leg 4 K300 Vincent C. 17:20 17:55 7.5 7.5
BorePile Pipe Bridge FR3 Grid 3-8, 3-
30-Jun-21 27 PO. 9100000180 (19) 07559 Pipe Bridge (186) PT TKM K300 Vincent C. 17:30 20:30 37.5 22.5
FL3B (P1E01_ON 18, 3-20
1-Jul-21 31 FL3B (P1E01_ON PO. 9100000180 (19) 07562 Pipe Bridge (186) BorePile
PT TKMPipe Bridge FR3 Grid 3-8, 3-18, 3-21 & FR3A Grid
K300
3A-2E Vincent C. 14:05 17:30 37.5 16.0
1-Jul-21 32 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07551 Woodyard (328) PT TKM BorePile Pipe Support K400 Kevin K. - - 22.0 -
2-Jul-21 5 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07551 Woodyard (328) PT TKM BorePile Pipe Support K400 Kevin K. - - 22.0 -
2-Jul-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07563 Pipe Bridge (186) BorePile
PT TKMPipe Bridge FR3 Grid 3-8, 3-18, 3-21 & FR3A Grid
K300
3A-2E Vincent C. 14:05 15:15 37.5 15.0
3-Jul-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07564 Pipe Bridge (186) BorePile
PT TKMPipe Bridge FR3A Grid 3A-D, 3A-F, 3A-G & FR3 Grid
K3003-8 Vincent C. 16:00 19:00 37.5 16.0
3-Jul-21 27 FL3B (P1E01_ON PO. 9100000766 (6) 07752 Woodyard (328) PT TKM Bore Pile Pipe Support K400 Kevin K. 15:55 16:35 22.0 11.0 P1G01-ON-CPPU0011 (6)
4-Jul-21 18 FL3B (P1E01_ON PO. 9100000766 (6) 07568 Woodyard (328) PT TKM Bore Pile Pipe Support K400 Kevin K. 16:00 19:00 22.0 17.5 P1G01-ON-CPPU0011 (6)

BorePile Pipe Bridge FR3A Grid 3A-D,


4-Jul-21 19 PO. 9100000180 (19) 07565 PT TKM K300 Vincent C. 11:50 16:10 30.0 30.0
3A-E, 3A-H, 3A-J & FR3 Grid 3-8
FL3B (P1E01_ON Woodyard (328)
5-Jul-21 29 FL3B (P1E01_ON PO. 9100000766 (6) 07569 Woodyard (328) PT TKM Bore Pile Pipe Support K400 Kevin K. 14:50 14:50 22.0 5.5 P1G01-ON-CPPU0011 (6)
5-Jul-21 30 FL3B (P1E01_ON PO. 9100000180 (19) 07571 Woodyard (328) PT TKM BorePile Pipe Bridge FR3A K300 Vincent C. 14:55 16:55 37.5 15.0
6-Jul-21 25 FL3B (P1E01_ON PO. 9100000766 (6) 07570 Woodyard (328) PT TKM Bore Pile Pipe Support K400 Kevin K. - - 22.0 - P1G01-ON-CPPU0011 (6)
BorePile Pipe Bridge FR3A Grid 3-8 &
6-Jul-21 26 PO. 9100000180 (19) 07572 PT TKM K300 Vincent C. 13:15 15:45 37.5 15.0
FL3B (P1E01_ON Woodyard (328) FR3A Grid 3A-D, 3A-G & 3A-J
7-Jul-21 4 FL3B (P1E01_ON PO. 9100000766 (6) 07570 Woodyard (328) PT TKM Bore Pile Pipe Support K400 Kevin K. 15:45 16:55 22.0 11.5 P1G01-ON-CPPU0011 (6)
7-Jul-21 36 FL3B (P1E01_ON PO. 9100000180 (19) 07560 Woodyard (328) BorePile
PT TKMPipe Bridge FR3A Grid 3-8 & FR3A Grid 3A-D, 3A-G
K300
& 3A-J Vincent C. 15:35 21:05 30.0 30.0
8-Jul-21 25 FL3B (P1E01_ON PO. 9100000766 (6) 07579 Woodyard (328) PT TKM BorePile Pipe Support Grid 18, 19 K400 Kevin K. 16:40 16:40 22.0 5.5 P1G01-ON-CPPU0011 (6)
8-Jul-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 07573 Woodyard (328) BorePile
PT TKMPipe Bridge FR3 Grid 3-8 & FR3A Grid 3A-D, 3A-BK300
& 3A-H Vincent C. 17:35 21:30 30.0 22.5

9-Jul-21 28 PO. 9100000766 (6) 07580 PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 15:20 15:20 16.5 5.5
FL3B (P1E01_ON Woodyard (328)
9-Jul-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 07574 Woodyard (328) PT TKM
BorePile Pipe Bridge FR3 Grid 3-8 & FR3A Grid 3A-D
K300 Vincent C. - - 15.0 -
10-Jul-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 07574 Woodyard (328) PT TKM
BorePile Pipe Bridge FR3 Grid 3-8 & FR3A Grid 3A-D
K300 Vincent C. 15:05 15:45 15.0 7.5

10-Jul-21 27 PO. 9100000766 (6) 07581 PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 13:50 13:50 16.5 5.5
FL3B (P1E01_ON Woodyard (328)
10-Jul-21 28 FL3B (P1E01_ON PO. 9100000180 (19) 07583 Pipe Bridge (186) PT TKM BorePile FR12 K300 Delvin S. - - 22.5 -
11-Jul-21 1 FL3B (P1E01_ON PO. 9100000180 (19) 07583 Pipe Bridge (186) PT TKM BorePile FR12 K300 Delvin S. - - 22.5 -
BorePile Pipe Bridge FR3A Grid 3A-E,
11-Jul-21 7 PO. 9100000180 (19) 07576 PT TKM K300 Vincent C. 15:35 17:50 15.0 7.5
FL3B (P1E01_ON Woodyard (328) 3A-M
11-Jul-21 8 FL3B (P1E01_ON PO. 9100000766 (6) 07587 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 14:45 14:45 11.0 5.5
12-Jul-21 5 FL3B (P1E01_ON PO. 9100000180 (19) 07583 Pipe Bridge (186) PT TKM BorePile FR12 K300 Delvin S. - - 22.5 -
BorePile Pipe Bridge FR3A Grid 3A-E,
12-Jul-21 27 PO. 9100000180 (19) 07577 PT TKM K300 Vincent C. 13:05 14:30 15.0 7.5
FL3B (P1E01_ON Woodyard (328) 3A-M
12-Jul-21 28 FL3B (P1E01_ON PO. 9100000766 (6) 07582 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. - - 16.5 -
12-Jul-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 07584 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12 K300 Delvin S. - - 22.5 -
13-Jul-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 07585 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12 K300 Delvin S. 16:20 18:00 30.0 15.0
13-Jul-21 30 FL3B (P1E01_ON PO. 9100000180 (19) 07578 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR3A Grid 3A-M K300 Vincent C. 17:20 18:20 7.5 7.5
13-Jul-21 33 FL3B (P1E01_ON PO. 9100000766 (6) 07588 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 16:35 16:35 16.5 5.5
BorePile Pipe Bridge FR12 Grid 12A-
14-Jul-21 31 PO. 9100000180 (19) 07586 Pipe Bridge (186) PT TKM K300 Delvin S. 15:05 19:45 30.0 22.5
FL3B (P1E01_ON 3, 12A-5, 12A-7, 12A-9
14-Jul-21 32 FL3B (P1E01_ON PO. 9100000766 (6) 07589 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. - - 16.5 -
15-Jul-21 2 FL3B (P1E01_ON PO. 9100000766 (6) 07589 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. - - 16.5 -
BorePile Pipe Bridge FR12 Grid 3A-3,
15-Jul-21 23 PO. 9100000180 (19) 07595 Pipe Bridge (186) PT TKM K300 Delvin S. 16:50 19:05 30.0 30.0
FL3B (P1E01_ON 3A-5, 3A-7 & 3A-9
BorePile Pipe Bridge Grid 12A-3, 12A-
16-Jul-21 14 PO. 9100000180 (19) 07597 Pipe Bridge (186) PT TKM K300 Delvin S. 15:25 19:45 30.0 15.0
FL3B (P1E01_ON 5, 12A-8, 12A-9

17-Jul-21 14 PO. 9100000766 (6) 07589 PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 15:05 15:05 16.5 5.5
FL3B (P1E01_ON Woodyard (328)
BorePile Pipe Bridge Grid 12A-3, 12A-
17-Jul-21 41 PO. 9100000180 (19) 07598 Pipe Bridge (186) PT TKM K300 Delvin S. 13:55 20:10 30.0 30.0
FL3B (P1E01_ON 5, 12A-8, 12A-9
17-Jul-21 42 FL3B (P1E01_ON PO. 9100000180 (19) 08301 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 16:25 19:00 15.0 16.0
17-Jul-21 49 FL3B (P1E01_ON PO. 9100000180 (19) 08303 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 21:15 21:15 3.0 3.0

18-Jul-21 26 PO. 9100000766 (6) 07592 PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 15:00 15:00 11.0 5.5
FL3B (P1E01_ON Woodyard (328)
18-Jul-21 28 FL3B (P1E01_ON PO. 9100000180 (19) 08302 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3A Grid 3A-C K300 Vincent C. 15:35 16:25 15.0 7.5
BorePile Pipe Bridge Grid 12A-3, 12A-
18-Jul-21 29 PO. 9100000180 (19) 07599 Pipe Bridge (186) PT TKM K300 Delvin S. 12:55 17:10 30.0 30.0
FL3B (P1E01_ON 5, 12A-8, 12A-9
BorePile Pipe Bridge Grid 12A-3, 12A-
19-Jul-21 29 PO. 9100000180 (19) 07600 Pipe Bridge (186) PT TKM K300 Delvin S. 15:40 18:55 30.0 15.0
FL3B (P1E01_ON 4, 12A-7, 12A-9

19-Jul-21 30 PO. 9100000766 (6) 07594 PT TKM Borepile Pipe Support Grid 18 & 19 K400 Kevin K. - - 11.0 -
FL3B (P1E01_ON Woodyard (328)
19-Jul-21 33 FL3B (P1E01_ON PO. 9100000180 (19) 08304 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 16:10 17:35 15.0 7.5
21-Jul-21 6 FL3B (P1E01_ON PO. 9100000766 (6) 07594 Woodyard (328) PT TKM Borepile Pipe Support Grid 18 & 19 K400 Kevin K. 17:10 17:10 11.0 5.5
21-Jul-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 08314 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 15:30 19:05 15.0 15.0
21-Jul-21 40 FL3B (P1E01_ON PO. 9100000180 (19) 08311 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-3 K300 Delvin S. 15:50 16:20 7.5 7.5

22-Jul-21 36 PO. 9100000766 (6) 08317 PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. - - 11.0 -
FL3B (P1E01_ON Woodyard (328)
BorePile Pipe Bridge Grid 12A-4, 12A-
22-Jul-21 37 PO. 9100000180 (19) 08310 Pipe Bridge (186) PT TKM K300 Delvin S. 15:00 16:10 15.0 7.5
FL3B (P1E01_ON 7
22-Jul-21 38 FL3B (P1E01_ON PO. 9100000180 (19) 08315 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 17:45 18:25 7.5 7.5
23-Jul-21 6 FL3B (P1E01_ON PO. 9100000766 (6) 08317 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. - - 11.0 -
23-Jul-21 25 FL3B (P1E01_ON PO. 9100000180 (19) 08312 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-7 & 12A-4 K300 Delvin S. 15:50 16:35 15.0 7.5

23-Jul-21 26 PO. 9100000180 (19) 08316 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR3A Grid 3A-C K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON
24-Jul-21 5 PO. 9100000766 (6) 08317 PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. 13:10 13:10 11.0 6.0
FL3B (P1E01_ON Woodyard (328)
24-Jul-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 08316 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR3A Grid 3A-C K300 Vincent C. - - 7.5 -
BorePile Pipe Bridge Grid 12A-4 &
24-Jul-21 29 PO. 9100000180 (19) 08313 Pipe Bridge (186) PT TKM K300 Delvin S. 15:15 16:10 15.0 7.5
FL3B (P1E01_ON 12A-6
24-Jul-21 31 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08324 ETP (135) PT TKM BorePile BP1 & BP9 Area Primary Clarifier K400 Andri - - 17.0 -
26-Jul-21 8 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08324 ETP (135) PT TKM BorePile BP1 & BP9 Area Primary Clarifier K400 Andri - - 17.0 -
26-Jul-21 31 FL3B (P1E01_ON PO. 9100000766 (6) 08319 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. - - 11.0 -
26-Jul-21 32 FL3B (P1E01_ON PO. 9100000766 (6) 08320 Water Intake (273) PT TKM Bore Pile Pipe Support Grid 227 K400 Kevin K. 21:00 21:00 11.0 5.5
BorePile Pipe Bridge Grid 12A-4 &
26-Jul-21 33 PO. 9100000180 (19) 08333 Pipe Bridge (186) PT TKM K300 Delvin S. 15:10 16:10 15.0 7.5
FL3B (P1E01_ON 12A-6
26-Jul-21 38 FL3B (P1E01_ON PO. 9100000180 (19) 08336 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C, Point F K300 Benny 14:55 16:00 7.5 7.5
BorePile BP1 & BP9 Area Primary
27-Jul-21 7 P1D12-ON-PC1618 (3) 08324 ETP (135) PT TKM K400 Andri - - 17.0 -
FL3B (P1E01_ON Clarifier
27-Jul-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 08334 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-4 & 12A-6 K300 Delvin S. 17:05 17:50 15.0 7.5
27-Jul-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08326 ETP (135) PT TKM Bore Pile BP3 & BP7 Area Primary Clarifier K400 Andri 16:50 17:55 17.0 8.5
27-Jul-21 23 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08327 ETP (135) PT TKM Bore Pile Screening BPA2 K400 Andri - - 8.5 -
27-Jul-21 24 FL3B (P1E01_ON PO. 9100000766 (6) 08338 Water Intake (273) PT TKM Borepile Pipe Support Grid 226 K400 Kevin K. - - 11.0 -
27-Jul-21 25 FL3B (P1E01_ON PO. 9100000766 (6) 08337 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 K400 Kevin K. - - 11.0 -
28-Jul-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08327 ETP (135) PT TKM Bore Pile Screening BPA2 K400 Andri - - 8.5 -
28-Jul-21 23 FL3B (P1E01_ON PO. 9100000766 (6) 08338 Water Intake (273) PT TKM Borepile Pipe Support Grid 226 K400 Kevin K. - - 11.0 -
28-Jul-21 24 FL3B (P1E01_ON PO. 9100000766 (6) 08337 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 K400 Kevin K. 15:10 15:10 11.0 5.5
28-Jul-21 40 FL3B (P1E01_ON PO. 9100000180 (19) 08335 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-4 K300 Delvin S. - - 15.0 -
28-Jul-21 41 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08328 ETP (135) PT TKM Bore Pile BP3 & BP7 K400 Andri 18:15 19:35 17.0 8.5
29-Jul-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08327 ETP (135) PT TKM Bore Pile Screening BPA2 K400 Andri 20:25 21:05 8.5 8.5
29-Jul-21 7 FL3B (P1E01_ON PO. 9100000766 (6) 08338 Water Intake (273) PT TKM Borepile Pipe Support Grid 226 K400 Kevin K. - - 11.0 -
29-Jul-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 08335 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-4 K300 Delvin S. - - 15.0 -
29-Jul-21 21 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08341 ETP (135) PT TKM Bore Pile BP3 & BP7 K400 Andri - - 17.0 -
29-Jul-21 22 FL3B (P1E01_ON PO. 9100000766 (6) 08340 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 K400 Kevin K. 17:45 17:45 11.0 6.0
29-Jul-21 23 FL3B (P1E01_ON PO. 9100000766 (6) 08339 Water Intake (273) PT TKM Borepile Pipe Support Grid 226 K400 Kevin K. 18:00 18:00 11.0 6.0
30-Jul-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 08702 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid FR15 K300 Delvin S. - - 7.5 -
30-Jul-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 08701 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid FR12C K300 Delvin S. 16:25 17:10 7.5 7.5
30-Jul-21 21 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08342 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge BP4&BP6 K400 Andri 18:05 21:05 17.0 17.0
30-Jul-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08343 ETP (135) PT TKM Bore Pile Screening BPA3 K400 Andri - - 8.5 -
30-Jul-21 37 FL3B (P1E01_ON PO. 9100000766 (6) 08709 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. 15:40 15:40 5.5 5.5
31-Jul-21 4 FL3B (P1E01_ON PO. 9100000180 (19) 08702 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid FR15 K300 Delvin S. 15:40 15:40 7.5 5.5
31-Jul-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 08703 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C-3 &12A-4 K300 Delvin S. - - 15.0 -
31-Jul-21 17 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08344 ETP (135) PT TKM Bore Pile Clarifier BP5&BP6 K400 Andri - - 17.0 -
31-Jul-21 18 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08345 ETP (135) PT TKM Bore Pile Screening BPA K400 Andri 18:15 19:30 8.5 8.5
31-Jul-21 23 FL3B (P1E01_ON PO. 9100000766 (6) 08708 Water Intake (273) PT TKM Borepile Pipe Support Grid 228 K400 Kevin K. 20:20 20:20 11.0 6.0
2-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 08703 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C-3 &12A-4 K300 Delvin S. - - 15.0 -
2-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 08705 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15A-E K300 Delvin S. 11:30 18:20 11.0 11.0
2-Aug-21 11 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08344 ETP (135) PT TKM BorePile Clarifier BP5&BP6 K400 Andri - - 17.0 -
2-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08347 ETP (135) PT TKM BorePile Screening BPA K400 Andri - - 8.5 -
2-Aug-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08346 ETP (135) PT TKM BorePile Clarifier BP5 & BP7 K400 Andri - - 17.0 -
2-Aug-21 25 FL3B (P1E01_ON PO. 9100000766 (6) 08712 Water Intake (273) PT TKM Borepile Pipe Support Grid 227 K400 Kevin K. 20:45 20:45 11.0 5.5

2-Aug-21 26 PO. 9100000766 (6) 08711 PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. - - 11.0 -
FL3B (P1E01_ON Woodyard (328)
2-Aug-21 30 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08348 ETP (135) PT TKM Bore Pile Screening BPA K400 Andri - - 8.5 -
3-Aug-21 11 PO. 9100000766 (6) 08711 PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. 15:40 15:40 11.0 5.5
FL3B (P1E01_ON Woodyard (328)
3-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08346 ETP (135) PT TKM BorePile Clarifier BP5 & BP7 K400 Andri 15:15 16:10 17.0 8.5
3-Aug-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08348 ETP (135) PT TKM Bore Pile Screening BPA K400 Andri 20:10 20:55 8.5 8.5
BorePile Pipe Bridge Grid 15A-4 &
3-Aug-21 29 PO. 9100000180 (19) 08723 Pipe Bridge (186) PT TKM K300 Delvin S. - - 15.0 -
FL3B (P1E01_ON 15C-4
3-Aug-21 30 FL3B (P1E01_ON PO. 9100000180 (19) 08707 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-E K300 Delvin S. - - 11.0 -
BorePile Pipe Bridge Grid 15A-4 &
4-Aug-21 5 PO. 9100000180 (19) 08723 Pipe Bridge (186) PT TKM K300 Delvin S. 16:35 17:45 15.0 7.5
FL3B (P1E01_ON 15C-4
4-Aug-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 08707 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-E K300 Delvin S. 13:10 13:10 11.0 5.5
4-Aug-21 13 FL3B (P1E01_ON PO. 9100000766 (6) 08713 Woodyard (328) PT TKM Borepile Pipe Support Grid 11 K400 Kevin K. 18:25 18:25 11.0 5.5
4-Aug-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08734 ETP (135) PT TKM BorePile Clarifier BPA5 & BPA6 K400 Andri - - 17.0 -
4-Aug-21 23 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08735 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri - - 8.5 -
5-Aug-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08734 ETP (135) PT TKM BorePile Clarifier BPA5 & BPA6 K400 Andri - - 17.0 -
5-Aug-21 7 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08735 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri - - 8.5 -
5-Aug-21 15 FL3B (P1E01_ON PO. 9100000180 (19) 08725 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C-4 K300 Delvin S. - - 15.0 -
5-Aug-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 08724 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-E K300 Delvin S. 13:15 13:15 11.0 5.5
5-Aug-21 17 FL3B (P1E01_ON PO. 9100000766 (6) 08730 Woodyard (328) PT TKM Borepile Pipe Support Grid 11 K400 Kevin K. 17:25 17:25 11.0 5.5
6-Aug-21 4 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08734 ETP (135) PT TKM BorePile Clarifier BPA5 & BPA6 K400 Andri - - 17.0 -
6-Aug-21 5 FL3B (P1E01_ON PO. 9100000180 (19) 08725 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C-4 K300 Delvin S. 15:35 16:10 15.0 7.5
6-Aug-21 18 FL3B (P1E01_ON PO. 9100000766 (6) 08731 Woodyard (328) PT TKM Borepile Pipe Support Grid 11 K400 Kevin K. 15:15 15:15 11.0 5.5
6-Aug-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 08726 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-C K300 Delvin S. 16:05 16:05 11.0 5.5
6-Aug-21 24 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08736 ETP (135) PT TKM BorePile Screening BPB1 K400 Andri - - 7.5 -
7-Aug-21 3 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08734 ETP (135) PT TKM BorePile Clarifier BPA5 & BPA6 K400 Andri - - 17.0 -
7-Aug-21 4 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08736 ETP (135) PT TKM BorePile Screening BPB1 K400 Andri - - 7.5 -
7-Aug-21 11 FL3B (P1E01_ON PO. 9100000180 (19) 08728 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C K300 Delvin S. 15:20 16:20 15.0 7.5
7-Aug-21 12 FL3B (P1E01_ON PO. 9100000180 (19) 08727 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-D K300 Delvin S. 13:05 13:05 11.0 5.5
7-Aug-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08737 ETP (135) PT TKM BorePile Screening BPA8 & BPA7 K400 Andri 14:05 16:35 17.0 17.0
7-Aug-21 14 FL3B (P1E01_ON PO. 9100000766 (6) 08733 Woodyard (328) PT TKM Borepile Pipe Support Grid 12 31 K400 Kevin K. 14:45 15:00 11.0 11.0
9-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 08726 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-D K300 Delvin S. 13:40 13:40 11.0 5.5
9-Aug-21 11 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08738 ETP (135) PT TKM BorePile Screening BPB2 K400 Andri 15:05 15:55 7.5 7.5
9-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08743 ETP (135) PT TKM BorePile Screening BPA7 & 6 K400 Andri - - 17.0 -
9-Aug-21 13 FL3B (P1E01_ON PO. 9100000766 (6) 08732 Woodyard (328) PT TKMBorepile Pipe Support Grid 12 Point 29 & 27 K400 Kevin K. 12:25 16:05 11.0 11.0
9-Aug-21 34 FL3B (P1E01_ON PO. 9100000180 (19) 08744 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12 K300 Delvin S. 18:15 19:00 15.0 7.5
10-Aug-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 08746 ETP (135) PT TKM BorePile FR-15 Grid C K300 Delvin S. - - 11.0 -
10-Aug-21 20 FL3B (P1E01_ON PO. 9100000180 (19) 08747 Pipe Bridge (186) PT TKM BorePile FR-12 Grid A & C K300 Delvin S. 15:30 20:25 15.0 15.0
10-Aug-21 21 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09251 ETP (135) PT TKM BorePile Clarifier BPA07 K400 Andri 13:30 14:10 8.5 8.5
10-Aug-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09252 ETP (135) PT TKM BorePile Screening BPB2 K400 Andri - - 7.5 -
12-Aug-21 7 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09252 ETP (135) PT TKM BorePile Screening BPB2 K400 Andri - - 7.5 -
12-Aug-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09253 ETP (135) PT TKM BorePile Point BP7 Clarifier K400 Andri 17:30 19:20 8.5 10.0
12-Aug-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 08750 Pipe Bridge (186) PT TKM BorePile FR-12 K300 Delvin S. 13:15 16:40 22.5 15.0
12-Aug-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 08745 Pipe Bridge (186) PT TKM BorePile FR-15 Grid C K300 Delvin S. - - 11.0 -
13-Aug-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 09259 Pipe Bridge (186) PT TKM BorePile FR-12 K300 Delvin S. 15:55 17:40 30.0 15.0
13-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 08745 Pipe Bridge (186) PT TKM BorePile FR-15 Grid C K300 Delvin S. - - 11.0 - Reschedule
BorePile BP6 Clarifier & BPA5
13-Aug-21 10 P1D12-ON-PC1618 (3) 09254 ETP (135) PT TKM K400 Andri 15:40 16:20 16.0 8.5
FL3B (P1E01_ON Screening
14-Aug-21 6 FL3B (P1E01_ON PO. 9100000180 (21) 09268 Recausticizing (474) PT TKM Bore Pile Make Up Building BP11 K300 Poltak - - 7.5 -
14-Aug-21 8 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09255 ETP (135) PT TKM BorePile BP7 Clarifier & BPB4 Screening K400 Andri - - 16.0 -
14-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 09261 Pipe Bridge (186) PT TKM BorePile FR-15C K300 Delvin S. - - 11.0 -
14-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 09260 Pipe Bridge (186) PT TKM BorePile FR-12 C-6, A-1 K300 Delvin S. 15:25 17:10 30.0 15.0
15-Aug-21 4 FL3B (P1E01_ON PO. 9100000180 (21) 09268 Recausticizing (474) PT TKM Bore Pile Make Up Building BP11 K300 Poltak 13:25 14:25 7.5 7.5 Reschedule
BorePile BP7 Clarifier & BPB4
15-Aug-21 5 P1D12-ON-PC1618 (3) 09255 ETP (135) PT TKM K400 Andri 18:00 18:30 16.0 7.5 Reschedule
FL3B (P1E01_ON Screening
15-Aug-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09256 ETP (135) PT TKM BorePile BP6 Clarifier & BPB5 Screening K400 Andri - - 16.0 -
15-Aug-21 7 FL3B (P1E01_ON PO. 9100000180 (15) 09263 Pipe Bridge (186) PT TKM BorePile FR-15C K300 Delvin S. 16:25 16:25 11.0 5.5
15-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 09262 Pipe Bridge (186) PT TKM BorePile FR-12 C-6, A-1 K300 Delvin S. 11:35 20:05 30.0 30.0
16-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 09266 Pipe Bridge (186) PT TKM BorePile FR-12 K300 Delvin S. 17:15 18:25 30.0 7.5 Late Request
16-Aug-21 11 FL3B (P1E01_ON PO. 9100000180 (19) 09267 Pipe Bridge (186) PT TKM BorePile FR-15 K300 Delvin S. 17:40 17:40 11.0 5.5 Late Request
16-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09256 ETP (135) PT TKM BorePile BP6 Clarifier & BPB5 Screening K400 Andri 16:45 17:35 16.0 8.5 Reschedule
16-Aug-21 13 FL3B (P1E01_ON PO. 9100000180 (21) 09265 Recausticizing (474) PT TKM Borepile BRP 12, BRP 17 K300 Poltak 16:30 17:40 15.0 7.5 Late Request
18-Aug-21 4 FL3B (P1E01_ON PO. 9100000180 (21) 09274 Recausticizing (474) PT TKM Borepile BRP 13, BRP 14 K300 Nico B. 19:55 21:15 15.0 7.5
18-Aug-21 8 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri - - 16.0 -
18-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 09264 Pipe Bridge (186) PT TKM BorePile FR-15 K300 Delvin S. 20:00 20:00 11.0 5.5
18-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 09269 Pipe Bridge (186) PT TKM BorePile FR-12 K300 Delvin S. 18:20 19:45 30.0 7.5
19-Aug-21 4 FL3B (P1E01_ON PO. 9100000180 (21) 09275 Recausticizing (474) PT TKM Borepile Makeup Building BRP 9 K300 Nico B. - - 7.5 -
19-Aug-21 17 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri - - 16.0 - Reschedule
19-Aug-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 09271 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-C K300 Delvin S. 15:40 15:40 11.0 5.5
BorePile Pipe Bridge Grid 12A-1, 12A-
19-Aug-21 20 PO. 9100000180 (19) 09270 Pipe Bridge (186) PT TKM K300 Delvin S. 15:05 20:10 22.5 15.0
FL3B (P1E01_ON B, 12A-C
20-Aug-21 7 FL3B (P1E01_ON PO. 9100000180 (21) 09275 Recausticizing (474) PT TKM Borepile Makeup Building BRP 9 K300 Nico B. - - 7.5 - Reschedule
BorePile Pipe Bridge Grid 12A-6, 12A-
20-Aug-21 15 PO. 9100000180 (19) 09272 Pipe Bridge (186) PT TKM K300 Delvin S. 16:05 18:55 30.0 15.0
FL3B (P1E01_ON B, 12A-C, 12A-D
20-Aug-21 16 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09281 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri 14:10 15:25 7.5 7.5

20-Aug-21 17 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 -
FL3B (P1E01_ON
20-Aug-21 18 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri - - 16.0 - Reschedule
20-Aug-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 09280 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR7A K300 Dapot M. - - 5.5 -
21-Aug-21 2 FL3B (P1E01_ON PO. 9100000180 (19) 09277 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12C-6, 12A-B, 12A-D K300 Delvin S. 12:40 19:45 22.5 15.0
21-Aug-21 5 FL3B (P1E01_ON PO. 9100000180 (21) 09275 Recausticizing (474) PT TKM Borepile Makeup Building BRP 9 K300 Nico B. 10:55 11:55 7.5 7.5 Reschedule
21-Aug-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
21-Aug-21 17 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri - - 16.0 - Reschedule
21-Aug-21 26 FL3B (P1E01_ON PO. 9100000766 (6) 09290 Woodyard (328) PT TKM BorePile Pipe Support Grid 15 K400 Kevin K. - - 11.0 -
21-Aug-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 09280 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR7A K300 Dapot M. 18:55 18:55 5.5 5.5 Reschedule
23-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 09279 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12C-6, 12A-A, 12A-D K300 Delvin S. - - 22.5 -
23-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri 9:20 11:10 16.0 7.5 Reschedule
23-Aug-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09284 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri - - 7.5 -

23-Aug-21 14 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
23-Aug-21 33 FL3B (P1E01_ON PO. 9100000766 (6) 09290 Woodyard (328) PT TKM BorePile Pipe Support Grid 15 K400 Kevin K. - - 11.0 - Reschedule
23-Aug-21 36 FL3B (P1E01_ON PO. 9100000180 (19) 09292 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 7A K300 Dapot M. - - 5.5 -
24-Aug-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 09279 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12C-6, 12A-A, 12A-D K300 Delvin S. - - 22.5 - Reschedule
24-Aug-21 9 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09284 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri 13:50 14:45 7.5 7.5 Reschedule

24-Aug-21 10 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
24-Aug-21 22 FL3B (P1E01_ON PO. 9100000766 (6) 09290 Woodyard (328) PT TKM BorePile Pipe Support Grid 15 K400 Kevin K. 14:55 14:55 11.0 5.5 Reschedule
24-Aug-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 09292 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 7A K300 Dapot M. - - 5.5 - Reschedule
25-Aug-21 20 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09285 ETP (135) PT TKM BorePile Screening BPB8 K400 Andri - - 7.5 -
25-Aug-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
BorePile Pipe Bridge Grid 12C-6, 12A-
25-Aug-21 24 PO. 9100000180 (19) 09279 Pipe Bridge (186) PT TKM K300 Delvin S. 12:10 19:25 22.5 22.5 Reschedule
FL3B (P1E01_ON A, 12A-D
25-Aug-21 35 FL3B (P1E01_ON PO. 9100000766 (6) 09295 Woodyard (328) PT TKM BorePile Pipe Support Grid 14 K400 Kevin K. 16:15 16:15 11.0 5.5
25-Aug-21 38 FL3B (P1E01_ON PO. 9100000180 (19) 09292 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 7A K300 Dapot M. 11:55 11:55 5.5 6.0 Reschedule
26-Aug-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09285 ETP (135) PT TKM BorePile Screening BPB8 K400 Andri 17:40 18:40 7.5 7.5 Reschedule

26-Aug-21 23 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
BorePile Pipe Bridge Grid 12A-4, 12C-
26-Aug-21 26 PO. 9100000180 (19) 09297 Pipe Bridge (186) PT TKM K300 Delvin S. 16:20 19:10 15.0 15.0
FL3B (P1E01_ON 6
26-Aug-21 34 FL3B (P1E01_ON PO. 9100000180 (19) 09296 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR7A K300 Dapot M. 12:00 12:00 5.5 5.5
26-Aug-21 37 FL3B (P1E01_ON PO. 9100000766 (2) 09951 Woodyard (328) PT TKM BorePile Pipe Support Grid 14 K300 Kevin K. 17:15 17:15 11.0 5.5 PO. 9100000766 (6)
27-Aug-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09286 ETP (135) PT TKM BorePile Screening BPB4 K400 Andri - - 7.5 -

27-Aug-21 7 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
27-Aug-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 09298 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-4, 12C-5 K300 Delvin S. 15:55 16:50 15.0 7.5
27-Aug-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 09299 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 7A K300 Dapot M. 15:15 15:15 5.5 5.5
27-Aug-21 32 FL3B (P1E01_ON PO. 9100000766 (6) 09952 Woodyard (328) PT TKM BorePile Pipe Support Grid 14 K400 Kevin K. 11:30 11:30 11.0 5.5
28-Aug-21 2 FL3B (P1E01_ON PO. 9100000180 (19) 09953 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-5, 12A-A K300 Delvin S. 17:00 20:25 15.0 15.0
28-Aug-21 3 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09286 ETP (135) PT TKM BorePile Screening BPB4 K400 Andri 17:30 18:10 7.5 7.5 Reschedule

28-Aug-21 4 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
29-Aug-21 4 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09287 ETP (135) PT TKM BorePile Screening BPA5 K400 Andri - - 8.5 -
29-Aug-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 09954 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12C-5, 12C-2, 12A-1 K300 Delvin S. 15:35 16:15 22.5 7.5
30-Aug-21 46 FL3B (P1E01_ON PO. 9100000180 (19) 09955 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12A-1, 12C-1, 12C-5 K300 Delvin S. 14:45 15:40 22.5 7.5
BorePile Pipe Bridge Grid 12A-1, 12C-
31-Aug-21 19 PO. 9100000180 (19) 09956 Pipe Bridge (186) PT TKM K300 Delvin S. - - 22.5 -
FL3B (P1E01_ON 2, 12C-4
1-Sep-21 4 FL3B (P1E01_ON PO. 9100000766 (6) 09962 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. - - 15.0 -
1-Sep-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 09956 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12A-1, 12C-2, 12C-4 K300 Delvin S. 14:15 17:10 22.5 15.0 Reschedule
2-Sep-21 11 FL3B (P1E01_ON PO. 9100000766 (6) 09962 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. - - 15.0 - Reschedule
BorePile Pipe Bridge Grid 12C-2, 12C-
2-Sep-21 28 PO. 9100000180 (19) 09957 Pipe Bridge (186) PT TKM K300 Delvin S. 16:05 21:10 15.0 15.0
FL3B (P1E01_ON 4
3-Sep-21 13 FL3B (P1E01_ON PO. 9100000766 (6) 09963 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 16:55 18;50 22.5 7.5
3-Sep-21 31 FL3B (P1E01_ON PO. 9100000180 (19) 09958 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12A-4,12C-2, 12C-4 K300 Delvin S. 19:55 19:55 22.5 5.5
4-Sep-21 5 FL3B (P1E01_ON PO. 9100000766 (6) 09964 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 17:55 18:45 22.5 12.0
4-Sep-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 09959 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 122C-2 K300 Delvin S. 17:00 17:35 7.5 7.5
5-Sep-21 2 FL3B (P1E01_ON PO. 9100000766 (6) 09965 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. - - 22.5 -
6-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09966 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. - - 22.5 -
6-Sep-21 4 FL3B (P1E01_ON PO. 9100000766 (6) 09965 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 9:50 14:10 22.5 17.0 Reschedule
6-Sep-21 43 FL3B (P1E01_ON PO. 9100000180 (19) 09960 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 -
7-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09966 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 14:30 16:55 22.5 11.5 Reschedule
7-Sep-21 36 FL3B (P1E01_ON PO. 9100000180 (19) 09960 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 - Reschedule
8-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09970 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 14:15 17:45 22.5 16.5
8-Sep-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 09960 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 - Reschedule
8-Sep-21 25 FL3B (P1E01_ON PO. 9100000180 (19) 09967 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-2 K300 Delvin S. 11:40 17:20 11.0 11.0
9-Sep-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 09960 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. 13:00 13:00 11.0 5.5
10-Sep-21 7 FL3B (P1E01_ON PO. 9100000766 (6) 09971 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 15:30 18:05 30.0 24.5 Reschedule
10-Sep-21 22 FL3B (P1E01_ON PO. 9100000180 (19) 09968 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15-4 K300 Delvin S. - - 11.0 -
11-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09973 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. - - 37.5 -
11-Sep-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 -
11-Sep-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 09968 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15-4 K300 Delvin S. 13:25 13:25 11.0 5.5 Reschedule
13-Sep-21 11 FL3B (P1E01_ON PO. 9100000766 (6) 09980 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 11:25 10:35 37.5 20.5
13-Sep-21 38 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
14-Sep-21 6 FL3B (P1E01_ON PO. 9100000766 (6) 09981 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 15:00 19:30 37.5 24.0
14-Sep-21 35 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
15-Sep-21 5 FL3B (P1E01_ON PO. 9100000766 (6) 09982 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 20:55 22:05 37.5 12.0
15-Sep-21 39 FL3B (P1E01_ON PO. 9100000180 (19) 09976 Pipe Bridge (186) PT TKM BorePile FR15D K300 Delvin S. 19:25 20:10 15.0 7.5 P1G01-ON-CPPU0023 (2)
15-Sep-21 43 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - P1G01-ON-CPPU0023 (2)
16-Sep-21 17 FL3B (P1E01_ON PO. 9100000766 (6) 09983 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 18:00 21:35 37.5 13.0 P1G01-ON-CPPU0023 (2)
16-Sep-21 39 FL3B (P1E01_ON PO. 9100001764 (24) 09987 Pipe Bridge (186) PT TKM Borepile FR9 K300 Dapot M. - - 7.5 - P1E01-ON-CPPU0124 (24)
16-Sep-21 46 FL3B (P1E01_ON PO. 9100000180 (19) 09977 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12D-8 K300 Delvin S. 18:20 20:15 7.5 7.5 PO. 9100000180 (17)
16-Sep-21 47 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
17-Sep-21 4 FL3B (P1E01_ON PO. 9100000766 (6) 09984 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 15:25 15:25 30.0 5.5
17-Sep-21 35 FL3B (P1E01_ON PO. 9100001764 (24) 09987 Pipe Bridge (186) PT TKM Borepile FR9 K300 Dapot M. - - 7.5 - P1E01-ON-CPPU0124 (24) Reschedule
17-Sep-21 36 FL3B (P1E01_ON PO. 9100000180 (17) 09978 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 -
17-Sep-21 37 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
18-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09985 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 14:35 22:45 30.0 20.5
18-Sep-21 30 FL3B (P1E01_ON PO. 9100000180 (17) 09978 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. 15:35 18:15 7.5 7.5 Reschedule
18-Sep-21 31 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
18-Sep-21 47 FL3B (P1E01_ON PO. 9100001764 (24) 09990 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 K300 Delvin S. 15:20 16:25 7.5 7.5 P1E01-ON-CPPU0124 (24)
19-Sep-21 5 FL3B (P1E01_ON PO. 9100000766 (3) 09986 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. - - 30.0 - PO. 9100000766 (6)
19-Sep-21 29 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 -
19-Sep-21 33 FL3B (P1E01_ON PO. 9100001764 (24) 09989 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 K300 Mustainul - - 7.5 - P1E01-ON-CPPU0124 (24)
20-Sep-21 8 FL3B (P1E01_ON PO. 9100000766 (3) 09986 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 14:40 21:20 30.0 23.5 PO. 9100000766 (6) Reschedule
20-Sep-21 39 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
20-Sep-21 40 FL3B (P1E01_ON PO. 9100000180 (17) 09994 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 -
20-Sep-21 42 FL3B (P1E01_ON PO. 9100001764 (24) 09988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 9M-2 K300 Mustainul - - 7.5 - P1E01-ON-CPPU0124 (24)
20-Sep-21 43 FL3B (P1E01_ON PO. 9100001764 (24) 09989 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 K300 Mustainul 16:05 17:30 7.5 7.5 P1E01-ON-CPPU0124 (24) Reschedule
21-Sep-21 11 FL3B (P1E01_ON PO. 9100000766 (3) 011102 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 10:25 5:45 47.0 33.0 PO. 9100000766 (6)
21-Sep-21 27 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
21-Sep-21 28 FL3B (P1E01_ON PO. 9100000180 (17) 09994 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
21-Sep-21 30 FL3B (P1E01_ON PO. 9100001764 (24) 09988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 9M-2 K300 Mustainul - - 7.5 - P1E01-ON-CPPU0124 (24) Reschedule
22-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (3) 011101 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 21:50 21:50 47.0 5.5 PO. 9100000766 (6)
22-Sep-21 35 FL3B (P1E01_ON PO. 9100001764 (24) 09988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 9M-2 K300 Mustainul - - 7.5 - P1E01-ON-CPPU0124 (24) Reschedule
22-Sep-21 40 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
22-Sep-21 41 FL3B (P1E01_ON PO. 9100000180 (17) 09994 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
23-Sep-21 5 FL3B (P1E01_ON PO. 9100000766 (6) 011104 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 9:30 11:05 30.0 6.0
23-Sep-21 38 FL3B (P1E01_ON PO. 9100000180 (15) 011106 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 -
23-Sep-21 39 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
23-Sep-21 41 FL3B (P1E01_ON PO. 9100001764 (24) 011206 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul - - 15.0 - P1E01-ON-CPPU0124 (24)
24-Sep-21 33 FL3B (P1E01_ON PO. 9100000180 (15) 011106 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
24-Sep-21 34 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
24-Sep-21 35 FL3B (P1E01_ON PO. 9100001764 (24) 011206 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul 13:45 14:50 15.0 7.5 P1E01-ON-CPPU0124 (24) Reschedule
25-Sep-21 36 FL3B (P1E01_ON PO. 9100000180 (15) 011106 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
25-Sep-21 37 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
25-Sep-21 38 FL3B (P1E01_ON PO. 9100001764 (24) 09995 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul - - 15.0 - P1E01-ON-CPPU0124 (24)
25-Sep-21 52 FL3B (P1E01_ON PO. 9100000180 (15) 09997 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. 13:55 18:25 11.0 11.0
27-Sep-21 41 FL3B (P1E01_ON PO. 9100000180 (15) 09998 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 - Reschedule
27-Sep-21 42 FL3B (P1E01_ON PO. 9100000180 (15) 011106 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
27-Sep-21 43 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
27-Sep-21 44 FL3B (P1E01_ON PO. 9100001764 (24) 09995 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul 12:15 12;15 15.0 7.5 P1E01-ON-CPPU0124 (24) Reschedule
27-Sep-21 45 FL3B (P1E01_ON PO. 9100001764 (24) 09996 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul - - 15.0 - P1E01-ON-CPPU0124 (24) Reschedule
28-Sep-21 28 FL3B (P1E01_ON PO. 9100000180 (15) 010000 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 15.0 -
28-Sep-21 29 FL3B (P1E01_ON PO. 9100000180 (15) 011113 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 -
28-Sep-21 35 FL3B (P1E01_ON PO. 9100001764 (24) 09996 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul - - 15.0 - P1E01-ON-CPPU0124 (24) Reschedule
29-Sep-21 29 FL3B (P1E01_ON PO. 9100001764 (24) 011116 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 Grid FR9M K300 Mustainul 14:10 17:30 15.0 7.5 P1E01-ON-CPPU0124 (24)
29-Sep-21 51 FL3B (P1E01_ON PO. 9100000180 (15) 011115 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12D K300 Delvin S. 13:10 14:15 15.0 7.5

29-Sep-21 52 PO. 9100000180 (15) 011114 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Delvin S. 13:55 17:05 11.0 11.0
FL3B (P1E01_ON
29-Sep-21 55 FL3B (P1E01_ON PO. 9100001764 (24) 010408 Pipe Bridge (186) PT TKM Borepile Pipe Bridge K300 18:10 19:50 7.5 7.5 P1E01-ON-CPPU0124 (24)
30-Sep-21 36 FL3B (P1E01_ON PO. 9100001764 (24) 011112 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 20:45 23:10 15.0 12.5 P1E01-ON-CPPU0124 (24)

30-Sep-21 37 PO. 9100001764 (24) 011117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - P1E01-ON-CPPU0124 (24)
FL3B (P1E01_ON
Borepile Pipe Bridge FR-9 Grid 9Q &
30-Sep-21 40 PO. 9100001764 (24) 011119 Pipe Bridge (186) PT TKM K300 Mustainul 17:25 22:20 15.0 15.0 P1E01-ON-CPPU0124 (24)
FL3B (P1E01_ON 9M
1-Oct-21 34 FL3B (P1E01_ON PO. 9100001764 (13) 011120 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 18:30 19:25 22.5 7.5 P1E01-ON-CPPU0124 (24)
1-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (13) 011125 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 Grid 9Q & 9M K300 Darwin H. - - 15.0 - P1E01-ON-CPPU0124 (24)

1-Oct-21 36 PO. 9100001764 (13) 011117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - P1E01-ON-CPPU0124 (24) Reschedule
FL3B (P1E01_ON
Borepile Pipe Bridge FR22 Grid 22-2,
2-Oct-21 40 PO. 9100000731 (4) 011121 Pipe Bridge (186) PT TKM K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON 22-4, 22-5
Borepile Pipe Bridge FR-9 Grid 9Q &
2-Oct-21 41 PO. 9100001764 (13) 011125 Pipe Bridge (186) PT TKM K300 Darwin H. 16:35 19:40 15.0 15.0 P1E01-ON-CPPU0124 (24) Reschedule
FL3B (P1E01_ON 9M
2-Oct-21 42 FL3B (P1E01_ON PO. 9100001764 (13) 011117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - P1E01-ON-CPPU0124 (24) Reschedule
3-Oct-21 26 FL3B (P1E01_ON PO. 9100001764 (13) 011122 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 16:30 17:00 22.5 7.5 PO. 9100000731 (4)
3-Oct-21 27 FL3B (P1E01_ON PO. 9100000731 (4) 011128 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 9Q & 9N, 9B K300 Darwin H. 13:20 14:30 22.5 7.5
4-Oct-21 45 FL3B (P1E01_ON PO. 9100000731 (4) 011129 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q, 9N & 9B K300 Darwin H. 21:40 23:10 22.5 11.5
4-Oct-21 46 FL3B (P1E01_ON PO. 9100001764 (13) 011124 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 22:50 22:50 22.5 4.0 PO. 9100000731 (4)

4-Oct-21 47 PO. 9100001764 (13) 011117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - P1E01-ON-CPPU0124 (24) Reschedule
FL3B (P1E01_ON
5-Oct-21 39 FL3B (P1E01_ON PO. 9100000180 (31) 011123 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR22 Grid 22-3, 22-4, 22-5K300 Darwin H. 11:35 17:45 22.5 20.5
5-Oct-21 40 FL3B (P1E01_ON PO. 9100000180 (31) 011130 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR K300 Darwin H. 18:15 19:00 30.0 7.5
6-Oct-21 42 FL3B (P1E01_ON PO. 9100001764 (24) 011132 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 19:30 22:05 22.5 15.0 PO. 9100000731 (4)
6-Oct-21 43 FL3B (P1E01_ON PO. 9100000731 (4) 011131 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 K300 Darwin H. - - 11.0 -
Borepile Pipe Bridge FR9 Grid 9A, 9B
6-Oct-21 47 PO. 9100000180 (31) 011136 Pipe Bridge (186) PT TKM K300 Mustainul 13:05 19:05 22.5 22.5
FL3B (P1E01_ON & 9Q
7-Oct-21 33 FL3B (P1E01_ON PO. 9100000731 (4) 011134 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 K300 Darwin H. 12:00 12:00 11.0 5.5
Borepile Pipe Bridge FR22 Grid 22-4,
7-Oct-21 34 PO. 9100000731 (4) 011135 Pipe Bridge (186) PT TKM K300 Darwin H. 12:35 18:10 22.5 15.0
FL3B (P1E01_ON 22-3
Borepile Pipe Bridge FR9 Grid 9A, 9B
7-Oct-21 37 PO. 9100000731 (4) 011137 Pipe Bridge (186) PT TKM K300 Mustainul 14:55 18:40 22.5 15.0
FL3B (P1E01_ON & 9P
8-Oct-21 35 FL3B (P1E01_ON PO. 9100000731 (4) 011141 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9A & 9P K300 Mustainul - - 15.0 -
8-Oct-21 36 FL3B (P1E01_ON PO. 9100000731 (4) 011140 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 K300 Darwin H. - - 11.0 -
Borepile Pipe Bridge FR22 Grid 22-4,
8-Oct-21 37 PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON 22-3

9-Oct-21 26 PO. 9100000731 (4) 011143 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-2 & 22-4 K300 Darwin H. 14:15 19:10 22.5 22.5
FL3B (P1E01_ON
Borepile Pipe Bridge FR22 Grid 22-4,
9-Oct-21 28 PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM K300 Darwin H. - - 22.5 - Reschedule
FL3B (P1E01_ON 22-3
Borepile Pipe Bridge FR9 Grid 9A &
9-Oct-21 34 PO. 9100000731 (4) 011141 Pipe Bridge (186) PT TKM K300 Mustainul 19:40 20:35 15.0 7.5 Reschedule
FL3B (P1E01_ON 9P
10-Oct-21 25 FL3B (P1E01_ON PO. 9100000731 (4) 011144 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-4, 22-3 K300 Darwin H. 17:40 18:20 22.5 7.5

10-Oct-21 28 PO. 9100000731 (4) 011147 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 -
FL3B (P1E01_ON
11-Oct-21 27 FL3B (P1E01_ON PO. 9100000731 (4) 011148 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-2, 22-3, 22-4 K300 Darwin H. 17:45 18:45 22.5 7.5
11-Oct-21 30 FL3B (P1E01_ON PO. 9100000731 (4) 012101 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9A & 9P K300 Darwin H. 18:40 19:55 15.0 7.5
11-Oct-21 31 FL3B (P1E01_ON PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-4, 22-3 K300 Darwin H. - - 22.5 - Reschedule

11-Oct-21 34 PO. 9100000731 (4) 011147 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
FL3B (P1E01_ON
12-Oct-21 32 FL3B (P1E01_ON PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-4, 22-3 K300 Darwin H. - - 22.5 - Reschedule

12-Oct-21 34 PO. 9100000731 (4) 011147 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
FL3B (P1E01_ON
13-Oct-21 35 FL3B (P1E01_ON PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-4, 22-3 K300 Darwin H. 16:45 19:35 22.5 15.0 Reschedule

13-Oct-21 37 PO. 9100000731 (4) 011147 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
FL3B (P1E01_ON
Borepile Pipe Bridge FR22 Grid 22-3,
14-Oct-21 36 PO. 9100000731 (4) 012104 Pipe Bridge (186) PT TKM K300 Darwin H. 18:50 21:05 22.5 11.5
FL3B (P1E01_ON 22-7 & 22-8
14-Oct-21 37 FL3B (P1E01_ON PO. 9100000731 (4) 012105 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
14-Oct-21 39 FL3B (P1E01_ON PO. 9100001764 (4) 012113 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul - - 7.5 -
15-Oct-21 27 FL3B (P1E01_ON PO. 9100001764 (27) 012110 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 -

15-Oct-21 28 PO. 9100001764 (27) 012108 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON
15-Oct-21 31 FL3B (P1E01_ON PO. 9100000731 (4) 012105 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 14:30 20:35 7.5 7.5 Reschedule
15-Oct-21 32 FL3B (P1E01_ON PO. 9100001764 (27) 012115 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul 18:40 20:20 7.5 9.0
15-Oct-21 33 FL3B (P1E01_ON PO. 9100001764 (27) 012116 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3A K300 Mustainul 19:25 20:20 7.5 7.5
16-Oct-21 33 FL3B (P1E01_ON PO. 9100001764 (27) 012111 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -

16-Oct-21 34 PO. 9100001764 (27) 012124 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 -
FL3B (P1E01_ON
16-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012110 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule

16-Oct-21 36 PO. 9100001764 (27) 012108 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. 16:50 18:10 22.5 7.5 Reschedule
FL3B (P1E01_ON
16-Oct-21 40 FL3B (P1E01_ON PO. 9100001764 (27) 012118 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul 17:25 18:35 7.5 7.5
16-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul 19:20 20:15 7.5 7.5
17-Oct-21 26 FL3B (P1E01_ON PO. 9100001764 (27) 012122 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
17-Oct-21 27 FL3B (P1E01_ON PO. 9100001764 (27) 012121 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-3, 22-8 K300 Darwin H. - - 15.0 -

17-Oct-21 28 PO. 9100001764 (27) 012124 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
FL3B (P1E01_ON
17-Oct-21 30 FL3B (P1E01_ON PO. 9100001764 (27) 012125 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 -
17-Oct-21 34 FL3B (P1E01_ON PO. 9100001764 (27) 012120 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul - - 7.5 -
17-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012119 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul - - 7.5 -
18-Oct-21 32 FL3B (P1E01_ON PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 -

18-Oct-21 33 PO. 9100001764 (27) 012121 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-3, 22-8 K300 Darwin H. 15:20 16:10 15.0 7.5 Reschedule
FL3B (P1E01_ON
18-Oct-21 34 PO. 9100001764 (27) 012128 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-M K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON
18-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012122 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 18:25 19:05 7.5 7.5 Reschedule
18-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012120 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul - - 7.5 - Reschedule
18-Oct-21 42 FL3B (P1E01_ON PO. 9100001764 (27) 012119 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul 15:55 17:05 7.5 7.5 Reschedule
19-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 - Reschedule

19-Oct-21 36 PO. 9100001764 (27) 012128 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-M K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON
21-Oct-21 34 PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON
21-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012128 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-M K300 Darwin H. 17:20 22:35 15.0 15.0 Reschedule

21-Oct-21 36 PO. 9100001764 (27) 012134 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 14-L & 14-N K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON
22-Oct-21 43 FL3B (P1E01_ON PO. 9100001764 (27) 0121242 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Darwin H. 21:50 22:20 7.5 7.5
Borepile Pipe Bridge FR22 grid 22-7 &
22-Oct-21 44 PO. 9100001764 (27) 0121240 Pipe Bridge (186) PT TKM K300 Darwin H. 18:55 19:40 15.0 7.5
FL3B (P1E01_ON 22-8
22-Oct-21 46 FL3B (P1E01_ON PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 - Reschedule

22-Oct-21 47 PO. 9100001764 (27) 012134 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 14-L & 14-N K300 Darwin H. 20:25 21:15 15.0 7.5 Reschedule
FL3B (P1E01_ON
23-Oct-21 6 FL3B (P1E01_ON PO. 9100001764 (2) 012141 Fiberline (414) PT TKM Borepile Fiberline BP3 K300 Hadi R. - - 7.5 -
23-Oct-21 25 FL3B (P1E01_ON PO. 9100001764 (27) 012143 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-L & 14-M K300 Darwin H. 16:35 17:15 15.0 7.5
23-Oct-21 30 FL3B (P1E01_ON PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 - Reschedule
24-Oct-21 10 FL3B (P1E01_ON PO. 9100001764 (2) 012141 Fiberline (414) PT TKM Borepile Fiberline BP3 K300 Hadi R. - - 7.5 - Reschedule

24-Oct-21 23 PO. 9100001764 (27) 012144 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-6 K300 Darwin H. - - 7.5 -
FL3B (P1E01_ON
Borepile Pipe Bridge FR14 Grid 14-M
24-Oct-21 24 PO. 9100001764 (27) 012145 Pipe Bridge (186) PT TKM K300 Darwin H. 14:20 15:50 15.0 7.5
FL3B (P1E01_ON & 14-K
25-Oct-21 4 FL3B (P1E01_ON PO. 9100000731 (2) 012951 Fiberline (414) PT TKM Borepile Fiberline BP2 K300 Hadi R. 19:25 22:25 7.5 7.5 PO. 9100001764 (2)
25-Oct-21 39 FL3B (P1E01_ON PO. 9100001764 (27) 012144 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-6 K300 Darwin H. 19:35 21:15 7.5 7.5 Reschedule
25-Oct-21 40 FL3B (P1E01_ON PO. 9100001764 (27) 012150 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR2 K300 Darwin H. 16:30 17:35 7.5 7.5
25-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012149 Pipe Bridge (186) PT TKMBorepile Pipe Bridge FR14 Grid 14-K & 14-M K300 Darwin H. 0:25 1:25 15.0 7.5
25-Oct-21 42 FL3B (P1E01_ON PO. 9100001764 (27) 012148 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. - - 7.5 -
26-Oct-21 9 FL3B (P1E01_ON PO. 9100000731 (3) 012959 Fiberline (414) PT TKM Borepile Fiberline BP2 K500 Hadi R. - - 7.5 -
26-Oct-21 37 FL3B (P1E01_ON PO. 9100001764 (27) 012957 Pipe Bridge (186) PT TKM Borepile FR2A Pipe Bridge K300 Darwin H. - - 7.5 -
26-Oct-21 38 FL3B (P1E01_ON PO. 9100001764 (27) 012956 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-K & 15-L K300 Darwin H. 17:45 18:45 15.0 7.5
26-Oct-21 39 FL3B (P1E01_ON PO. 9100001764 (27) 012955 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-L K300 Darwin H. - - 11.0 -

26-Oct-21 40 PO. 9100001764 (27) 012954 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON
27-Oct-21 13 FL3B (P1E01_ON PO. 9100000731 (3) 012959 Fiberline (414) PT TKM Borepile Fiberline BP2 K500 Hadi R. 0:15 1:55 7.5 7.5 Reschedule
27-Oct-21 40 FL3B (P1E01_ON PO. 9100001764 (27) 012957 Pipe Bridge (186) PT TKM Borepile FR2A Pipe Bridge K300 Darwin H. - - 7.5 - Reschedule
27-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012955 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-L K300 Darwin H. - - 11.0 - Reschedule

27-Oct-21 42 PO. 9100001764 (27) 012954 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. 14:15 19:10 15.0 15.0 Reschedule
FL3B (P1E01_ON
27-Oct-21 43 FL3B (P1E01_ON PO. 9100001764 (27) 012960 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-K & 14-L K300 Darwin H. - - 15.0 -

27-Oct-21 44 PO. 9100001764 (27) 012961 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. 19:50 20:35 15.0 7.5
FL3B (P1E01_ON
28-Oct-21 14 PO. 9100000731 (3) 012962 PT TKM Borepile Pipe Bridge North Point BP1 K500 Hadi R. - - 7.5 -
FL3B (P1E01_ON Fiberline (414)
28-Oct-21 38 FL3B (P1E01_ON PO. 9100001764 (27) 012964 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-K & 14-L K300 Darwin H. 17:05 17:40 15.0 7.5

28-Oct-21 40 PO. 9100001764 (27) 012965 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. 15:05 20:25 15.0 15.0
FL3B (P1E01_ON
28-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012963 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-2 K300 Darwin H. - - 11.0 -

29-Oct-21 11 PO. 9100000731 (3) 012962 PT TKM Borepile Pipe Bridge North Point BP1 K500 Hadi R. - - 7.5 - Reschedule
FL3B (P1E01_ON Fiberline (414)
29-Oct-21 30 FL3B (P1E01_ON PO. 9100001764 (27) 012969 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-2 K300 Darwin H. - - 11.0 -
29-Oct-21 31 FL3B (P1E01_ON PO. 9100001764 (27) 012968 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-K & 14-L K300 Darwin H. 14:05 15:15 15.0 15.0
29-Oct-21 32 FL3B (P1E01_ON PO. 9100001764 (27) 012967 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. - - 22.5 -

30-Oct-21 11 PO. 9100000731 (3) 012979 PT TKM Borepile Pipe Bridge North Point BP1 K500 Hadi R. 22:25 23:45 7.5 7.5 Reschedule
FL3B (P1E01_ON Fiberline (414)
Borepile Pipe Bridge FR14 Grid 14-K
30-Oct-21 33 PO. 9100001764 (27) 012971 Pipe Bridge (186) PT TKM K300 Darwin H. - - 15.0 - PO. 9100001764 (13)
FL3B (P1E01_ON & 14-L

30-Oct-21 34 PO. 9100001764 (27) 012969 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-2 K300 Darwin H. - - 11.0 - PO. 9100001764 (13)
FL3B (P1E01_ON
30-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012967 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. 12:25 20:20 22.5 20.5 PO. 9100001764 (13)
Borepile Pipe Bridge FR14 Grid 14-K
31-Oct-21 24 PO. 9100001764 (27) 012972 Pipe Bridge (186) PT TKM K300 Darwin H. 14:00 16:25 15.0 15.0
FL3B (P1E01_ON & 14-L
Borepile Pipe Bridge FR12C Grid 12C-
31-Oct-21 40 PO. 9100001764 (27) 012978 Pipe Bridge (186) PT TKM K300 Darwin H. 18:15 19:15 7.5 7.5
FL3B (P1E01_ON 7

1-Nov-21 34 PO. 9100001764 (27) 012976 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR 12C & FR22 K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON
1-Nov-21 35 FL3B (P1E01_ON PO. 9100002335 (26) 012975 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-K & 14-L K300 Darwin H. 17:25 21:15 15.0 15.0 PO. 9100001764 (27)
Borepile Pipe Bridge FR14 Grid 14-K
1-Nov-21 37 PO. 9100001764 (27) 012971 Pipe Bridge (186) PT TKM K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON & 14-L
2-Nov-21 39 FL3B (P1E01_ON PO. 9100001764 (27) 012985 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 & 15-2 K300 Darwin H. - - 11.0 -
Borepile Pipe Bridge FR14 Grid 14-M
2-Nov-21 40 PO. 9100002335 (26) 012984 Pipe Bridge (186) PT TKM K300 Darwin H. 14:10 16:50 22.5 15.0 PO. 9100001764 (27)
FL3B (P1E01_ON & 14-K

3-Nov-21 33 PO. 9100001764 (27) 012990 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON
3-Nov-21 36 PO. 9100002335 (26) 012988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. 16:25 18:50 15.0 15.0 PO. 9100001764 (27)
FL3B (P1E01_ON
4-Nov-21 59 FL3B (P1E01_ON PO. 9100001764 (27) 012902 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. 15:10 17:50 22.5 15.0
5-Nov-21 28 FL3B (P1E01_ON PO. 9100001764 (27) 012992 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul - - 7.5 -
5-Nov-21 29 FL3B (P1E01_ON PO. 9100001764 (27) 012991 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 & FR4 K300 Mustainul 16:25 17:25 15.0 7.5
5-Nov-21 31 FL3B (P1E01_ON PO. 9100001764 (27) 012994 Pipe Bridge (186) PT TKM Bore Pipe Bridge FR12A-1 K300 Darwin H. - - 7.5 -
5-Nov-21 32 FL3B (P1E01_ON PO. 9100001764 (27) 012993 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. - - 15.0 -
6-Nov-21 38 FL3B (P1E01_ON PO. 9100001764 (27) 012999 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 -
6-Nov-21 47 FL3B (P1E01_ON PO. 9100001764 (27) 027601 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 K300 Dapot M. 20:10 21:40 15.0 7.5
6-Nov-21 50 FL3B (P1E01_ON PO. 9100001764 (27) 012995 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. 11:45 16:10 15.0 15.0
6-Nov-21 51 FL3B (P1E01_ON PO. 9100001764 (27) 012994 Pipe Bridge (186) PT TKM Bore Pipe Bridge FR12A-1 K300 Darwin H. - - 7.5 - Reschedule
6-Nov-21 52 FL3B (P1E01_ON PO. 9100001764 (27) 012993 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. - - 15.0 - Reschedule
7-Nov-21 31 FL3B (P1E01_ON PO. 9100001764 (27) 013000 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 -
7-Nov-21 34 FL3B (P1E01_ON PO. 9100001764 (27) 027602 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 K300 Dapot M. 15:10 18:30 15.0 15.0
7-Nov-21 38 FL3B (P1E01_ON PO. 9100001764 (27) 012996 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - PO. 9100001764 (27)
8-Nov-21 33 FL3B (P1E01_ON PO. 9100002335 (26) 013000 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 13:50 14:40 7.5 7.5 PO. 9100001764 (27) Reschedule
Borepile Pipe Bridge FR7 Grid 7-C &
8-Nov-21 37 PO. 9100002335 (26) 027604 Pipe Bridge (186) PT TKM K300 Vincent C. 17:25 18:50 15.0 15.0 PO. 9100001764 (27)
FL3B (P1E01_ON 7-B
8-Nov-21 38 FL3B (P1E01_ON PO. 9100002335 (26) 027603 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Vincent C. 17:45 18:30 7.5 7.5 PO. 9100001764 (27)
8-Nov-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012994 Pipe Bridge (186) PT TKM Bore Pipe Bridge FR12A-1 K300 Darwin H. - - 7.5 - Reschedule

8-Nov-21 42 PO. 9100001764 (27) 027607 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON Pipe Bridge (186)
8-Nov-21 43 FL3B (P1E01_ON PO. 9100001764 (27) 012993 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. - - 15.0 - Reschedule

8-Nov-21 44 PO. 9100001764 (27) 012996 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON Pipe Bridge (186)
8-Nov-21 70 FL3B (P1E01_ON PO. 9100002335 (26) 027613 Pipe Bridge (186) PT TKM Borepile Grid 3-19 K300 Mustainul 19:25 19:25 7.5 7.5 PO. 9100001764 (13)
9-Nov-21 27 FL3B (P1E01_ON PO. 9100001764 (4) 027611 Woodyard (328) PT TKM
Borepile Woodyard Warehouse 11A, 12A Grid 7AK300 Nur Jaya - - 11.0 -
9-Nov-21 30 FL3B (P1E01_ON PO. 9100003018 (3) 027610 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 - P1E01_ON CPPU0147 (3)
9-Nov-21 31 FL3B (P1E01_ON PO. 9100002335 (26) 027605 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-17 & 3-19 K300 Vincent C. 18:40 19:20 15.0 15.0
9-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (26) 027606 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. - - 15.0 -

9-Nov-21 36 PO. 9100002335 (26) 012993 PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. 15:50 16:30 15.0 7.5 Reschedule
FL3B (P1E01_ON Pipe Bridge (186)
9-Nov-21 37 PO. 9100002335 (26) 012996 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON Pipe Bridge (186)
10-Nov-21 27 FL3B (P1E01_ON PO. 9100001764 (4) 027611 Woodyard (328) PT TKM
Borepile Woodyard Warehouse 11A, 12A Grid 7AK300 Nur Jaya 13:35 13;35 11.0 5.5 Reschedule
10-Nov-21 38 FL3B (P1E01_ON PO. 9100003018 (3) 027610 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 19:10 19:40 7.5 7.5 P1E01_ON CPPU0147 (3) Reschedule
10-Nov-21 41 FL3B (P1E01_ON PO. 9100002335 (26) 012996 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. 14:15 15:15 15.0 8.0 Reschedule

10-Nov-21 42 PO. 9100002335 (26) 027606 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. 17:30 18;50 15.0 7.5 Reschedule
FL3B (P1E01_ON
Borepile Woodyard Warehouse 11A,
11-Nov-21 23 PO. 9100001764 (4) 027620 PT TKM K300 Nur Jaya 16:30 16:30 5.5 5.5
FL3B (P1E01_ON Woodyard (328) 12A
11-Nov-21 31 FL3B (P1E01_ON PO. 9100003018 (3) 027621 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 - P1E01_ON CPPU0147 (3)

11-Nov-21 33 PO. 9100002335 (26) 027616 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. 17:25 19:30 15.0 15.0
FL3B (P1E01_ON
11-Nov-21 35 FL3B (P1E01_ON PO. 9100002335 (26) 027617 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 3-18 & 3-19 K300 Mustainul 17:25 20:25 15.0 15.0
11-Nov-21 38 FL3B (P1E01_ON PO. 9100002335 (26) 027619 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. 13:30 15:00 15.0 15.0
12-Nov-21 30 FL3B (P1E01_ON PO. 9100003018 (3) 027621 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 16:10 17:35 7.5 7.5 P1E01_ON CPPU0147 (3) Reschedule
12-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (26) 027624 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-18 & 3-19 K300 Vincent C. 16:55 17:45 15.0 7.5

12-Nov-21 34 PO. 9100002335 (26) 027618 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Mustainul 19:55 21:35 15.0 15.0
FL3B (P1E01_ON
12-Nov-21 36 PO. 9100002335 (26) 027623 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. 13:50 14:35 15.0 7.5
FL3B (P1E01_ON Pipe Bridge (186)
12-Nov-21 61 FL3B (P1E01_ON PO. 9100003018 (3) 027631 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 Grid 4-G K300 Kevin 17:35 18:20 7.5 7.5 P1E01_ON CPPU0147 (3)
Borepile Pipe Bridge FR4 Grid 4-G &
13-Nov-21 33 PO. 9100003018 (3) 027632 Pipe Bridge (186) PT TKM K300 Kevin 19:50 20:45 15.0 15.0 P1E01_ON CPPU0147 (3)
FL3B (P1E01_ON 4-H
13-Nov-21 38 FL3B (P1E01_ON PO. 9100002335 (26) 027634 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 -
13-Nov-21 41 FL3B (P1E01_ON PO. 9100002335 (26) 027625 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. - - 15.0 -

13-Nov-21 44 PO. 9100002335 (26) 027626 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-18 K300 Mustainul - - 7.5 -
FL3B (P1E01_ON
14-Nov-21 15 PO. 9100002335 (17) 027635 PT TKM Borepile Pipe Bridge FR14 Grid 14-I K300 Darwin H. 14:25 15:10 7.5 7.5
FL3B (P1E01_ON Pipe Bridge (186)
14-Nov-21 16 FL3B (P1E01_ON PO. 9100002335 (17) 027627 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-18 & 3-20 K300 Vincent C. 15:35 17:05 15.0 7.5

14-Nov-21 17 PO. 9100002335 (26) 027629 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON
14-Nov-21 36 FL3B (P1E01_ON PO. 9100003018 (3) 027647 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 16:05 17:20 7.5 7.5 P1E01_ON CPPU0147 (3)
14-Nov-21 37 FL3B (P1E01_ON PO. 9100002335 (26) 013302 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid I K300 Darwin H. 15:10 16:15 7.5 7.5
15-Nov-21 25 FL3B (P1E01_ON PO. 9100003018 (3) 027640 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 Grid SP8 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3)
15-Nov-21 27 FL3B (P1E01_ON PO. 9100002335 (26) 027634 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
15-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (26) 027626 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-18 K300 Mustainul - - 7.5 - Reschedule

15-Nov-21 36 PO. 9100002335 (17) 027625 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. 17:45 18:00 15.0 7.5 Reschedule
FL3B (P1E01_ON
15-Nov-21 37 PO. 9100002335 (26) 027629 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. - - 7.5 - Reschedule
FL3B (P1E01_ON
16-Nov-21 17 FL3B (P1E01_ON PO. 9100003018 (3) 027648 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3)
16-Nov-21 24 FL3B (P1E01_ON PO. 9100002335 (17) 027641 Pipe Bridge (186) PT TKM Borepile FR3A K300 Vincent C. 14:25 14:35 7.5 7.5
16-Nov-21 26 FL3B (P1E01_ON PO. 9100002335 (17) 027639 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 17:25 17:50 7.5 7.5
16-Nov-21 27 FL3B (P1E01_ON PO. 9100002335 (26) 027634 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
16-Nov-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 027628 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul 14:35 15:20 15.0 7.5
16-Nov-21 30 FL3B (P1E01_ON PO. 9100002335 (17) 027630 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Mustainul 16:05 17:55 15.0 15.0
17-Nov-21 25 FL3B (P1E01_ON PO. 9100003018 (3) 027648 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3) Reschedule
17-Nov-21 27 FL3B (P1E01_ON PO. 9100002335 (26) 027643 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3A, FR7 K300 Vincent C. - - 30.0 -
17-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (26) 027634 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
18-Nov-21 29 FL3B (P1E01_ON PO. 9100003018 (3) 027648 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3) Reschedule

18-Nov-21 36 PO. 9100002335 (26) 027634 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON Pipe Bridge (186)
18-Nov-21 37 PO. 9100002335 (17) 027643 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3A, FR7 K300 Vincent C. 15:05 19;15 30.0 22.5 Reschedule
FL3B (P1E01_ON
19-Nov-21 25 FL3B (P1E01_ON PO. 9100003018 (3) 013407 Pipe Bridge (186) PT TKM Borepile FR4 Grid 4-I K300 Kevin 20:45 21:05 7.5 7.5 P1E01_ON CPPU0147 (3)
19-Nov-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 027645 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7-3, FR3A K300 Vincent C. 19:20 21:50 30.0 22.5
19-Nov-21 31 FL3B (P1E01_ON PO. 9100002335 (17) 013410 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. 17:35 18:40 7.5 9.5
20-Nov-21 30 FL3B (P1E01_ON PO. 9100003018 (3) 013418 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 18:45 19:45 7.5 7.5 P1E01_ON CPPU0147 (3)
20-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (17) 013413 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. 19:00 19:00 7.5 8.5
20-Nov-21 33 FL3B (P1E01_ON PO. 9100002335 (17) 013415 Pipe Bridge (186) PT TKM Borepile FR13 K300 Darwin H. 17:50 19:00 9.5 9.5
20-Nov-21 34 FL3B (P1E01_ON PO. 9100002335 (17) 027646 Pipe Bridge (186) PT TKM Borepile FR7, FR3 & FR3A K300 Vincent C. - - 30.0 -
20-Nov-21 57 FL3B (P1E01_ON PO. 9100002335 (17) 013425 Pipe Bridge (186) PT TKM Borepile FR14 K300 Darwin H. 20:05 20:05 7.5 6.0
22-Nov-21 31 FL3B (P1E01_ON PO. 9100003018 (3) 013419 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 17:25 18:20 7.5 7.5 P1E01_ON CPPU0147 (3)
22-Nov-21 34 FL3B (P1E01_ON PO. 9100002335 (17) 013414 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. - - 7.5 -
22-Nov-21 35 FL3B (P1E01_ON PO. 9100002335 (17) 013416 Pipe Bridge (186) PT TKM Borepile FR13 K300 Darwin H. 16:45 17:35 9.5 9.5
22-Nov-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 013424 Pipe Bridge (186) PT TKM Borepile FR13 & FR14 K300 Darwin H. - - 17.0 -
22-Nov-21 40 FL3B (P1E01_ON PO. 9100002335 (17) 013420 Pipe Bridge (186) PT TKM Borepile FR7, FR3 & FR3A K300 Vincent C. 18:10 19:40 30.0 15.0
22-Nov-21 69 FL3B (P1E01_ON PO. 9100003018 (3) 013428 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 18:20 19:10 7.5 7.5 P1E01_ON CPPU0147 (3)
23-Nov-21 37 FL3B (P1E01_ON PO. 9100003018 (3) 013429 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 19:05 21:25 15.0 15.0 P1E01_ON CPPU0147 (3)
23-Nov-21 38 FL3B (P1E01_ON PO. 9100002335 (17) 013430 Pipe Bridge (186) PT TKM Borepile FR13 & FR14 K300 Darwin H. 18:10 19:05 17.0 9.5
23-Nov-21 39 FL3B (P1E01_ON PO. 9100002335 (17) 013431 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. - - 7.5 -
23-Nov-21 41 FL3B (P1E01_ON PO. 9100002335 (17) 013414 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. - - 7.5 - Reschedule
23-Nov-21 42 FL3B (P1E01_ON PO. 9100002335 (17) 013421 Pipe Bridge (186) PT TKM Borepile FR7 & FR3A K300 Vincent C. - - 22.5 -
24-Nov-21 34 FL3B (P1E01_ON PO. 9100003018 (3) 013433 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3)
24-Nov-21 41 FL3B (P1E01_ON PO. 9100002335 (17) 013431 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. - - 7.5 - Reschedule
24-Nov-21 42 FL3B (P1E01_ON PO. 9100002335 (17) 013421 Pipe Bridge (186) PT TKM Borepile FR7 & FR3A K300 Vincent C. - - 22.5 - Reschedule
25-Nov-21 40 FL3B (P1E01_ON PO. 9100003018 (3) 013433 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 17:55 18:25 15.0 7.5 P1E01_ON CPPU0147 (3) Reschedule
25-Nov-21 44 FL3B (P1E01_ON PO. 9100002335 (17) 013437 Pipe Bridge (186) PT TKM Borepile FR14 K300 Darwin H. - - 7.5 -
25-Nov-21 49 FL3B (P1E01_ON PO. 9100002335 (17) 013431 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. 18:25 18:30 7.5 7.5 Reschedule
25-Nov-21 50 FL3B (P1E01_ON PO. 9100002335 (17) 013422 Pipe Bridge (186) PT TKM Borepile FR7 & FR3A K300 Vincent C. 13;10 19:05 30.0 15.0
26-Nov-21 40 FL3B (P1E01_ON PO. 9100003018 (3) 013444 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 20:15 21:00 15.0 7.5 P1E01_ON CPPU0147 (3)
Borepile FR7 Grid 7-3 & 7-6 & FR3 &
26-Nov-21 42 PO. 9100002335 (17) 013441 Pipe Bridge (186) PT TKM K300 Vincent C. - - 30.0 -
FL3B (P1E01_ON FR3A
26-Nov-21 47 FL3B (P1E01_ON PO. 9100002335 (17) 013446 Pipe Bridge (186) PT TKM Borepile Flash Tank Grid 13 K300 Darwin H. 19:00 19:00 9.5 9.5
26-Nov-21 49 FL3B (P1E01_ON PO. 9100002335 (17) 013448 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12A K300 Darwin H. - - 7.5 -
26-Nov-21 50 FL3B (P1E01_ON PO. 9100002335 (17) 013437 Pipe Bridge (186) PT TKM Borepile FR14 K300 Darwin H. 19:00 19:40 7.5 7.5 Reschedule
27-Nov-21 36 FL3B (P1E01_ON PO. 9100003018 (3) 013449 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 - P1E01_ON CPPU0147 (3)
27-Nov-21 43 FL3B (P1E01_ON PO. 9100002335 (17) 013441 Pipe Bridge (186) PT TKM Borepile FR7 Grid 7-3 & 7-6 & FR3 & FR3A K300 Vincent C. 18::25 19:45 30.0 7.5 Reschedule
27-Nov-21 46 FL3B (P1E01_ON PO. 9100002335 (17) 013448 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12A K300 Darwin H. - - 7.5 - Reschedule
28-Nov-21 28 FL3B (P1E01_ON PO. 9100003018 (3) 013449 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 13:05 14:25 7.5 7.5 P1E01_ON CPPU0147 (3) Reschedule
28-Nov-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 013448 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12A K300 Darwin H. - - 7.5 - Reschedule
28-Nov-21 37 FL3B (P1E01_ON PO. 9100002335 (17) 013442 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-5 K300 Vincent C. 11:55 12:45 7.5 7.5
28-Nov-21 51 FL3B (P1E01_ON PO. 9100002335 (17) 014407 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3A K300 Vincent C. 17:25 17:55 7.5 7.5
29-Nov-21 35 FL3B (P1E01_ON PO. 9100003018 (3) 013450 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 17:55 18:10 7.5 7.5 P1E01_ON CPPU0147 (3)
29-Nov-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 014406 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3A & FR7 K300 Vincent C. 16:15 17:40 30.0 7.5
29-Nov-21 39 FL3B (P1E01_ON PO. 9100002335 (17) 013448 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12A K300 Darwin H. 17:00 17:45 7.5 7.5 Reschedule
29-Nov-21 61 FL3B (P1E01_ON PO. 9100003018 (3) 014418 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 Grid 4-D & 4-E K300 Kevin 18:10 19:20 13.5 13.5 P1E01_ON CPPU0147 (3)
30-Nov-21 26 FL3B (P1E01_ON PO. 9100003018 (3) 014412 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 18:10 20:55 21.0 21.0 P1E01_ON CPPU0147 (3)

30-Nov-21 33 PO. 9100002335 (17) 014408 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR5 K300 Vincent C. 16:15 21:15 30.0 22.5
FL3B (P1E01_ON
Borepile Pipe Bridge FR4 Grid 4-D &
1-Dec-21 33 PO. 9100003018 (3) 014421 Pipe Bridge (186) PT TKM K300 Kevin 17:10 22:20 21.0 21.0 P1E01_ON CPPU0147 (3)
FL3B (P1E01_ON 4-E
1-Dec-21 40 PO. 9100002335 (17) 013443 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR5 K300 Vincent C. 14:35 18:25 30.0 15.0
FL3B (P1E01_ON
Borepile Pipe Bridge FR4 Grid 4-D &
2-Dec-21 20 PO. 9100003018 (3) 014422 Pipe Bridge (186) PT TKM K300 Kevin 20:20 22:50 21.0 21.0 P1E01_ON CPPU0147 (3)
FL3B (P1E01_ON 4-E
2-Dec-21 31 FL3B (P1E01_ON PO. 9100002335 (17) 014413 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR3A K300 Vincent C. 15:10 16:05 30.0 12.0
3-Dec-21 29 FL3B (P1E01_ON PO. 9100003018 (3) 014424 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 4-D 4-E K300 Kevin - - 21.0 - P1E01_ON CPPU0147 (3)
3-Dec-21 35 FL3B (P1E01_ON PO. 9100002335 (17) 014415 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR3A K300 Vincent C. 14:35 17:40 30.0 23.0
4-Dec-21 27 FL3B (P1E01_ON PO. 9100003018 (3) 014424 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 4-D 4-E K300 Kevin 19;00 20:35 21.0 21.0 P1E01_ON CPPU0147 (3) Reschedule
4-Dec-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 014416 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR3A K300 Vincent C. 12:45 19;15 30.0 28.0
5-Dec-21 13 FL3B (P1E01_ON PO. 9100003018 (3) 014429 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 21.0 - P1E01_ON CPPU0147 (3)
5-Dec-21 16 FL3B (P1E01_ON PO. 9100002335 (17) 014425 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 K300 Mustainul 13:10 13:10 15.0 5.5
6-Dec-21 29 FL3B (P1E01_ON PO. 9100003018 (3) 014429 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 15:55 19:25 21.0 18.0 P1E01_ON CPPU0147 (3) Reschedule
6-Dec-21 34 FL3B (P1E01_ON PO. 9100002335 (17) 014426 Pipe Bridge (186) PT TKM Borepile FR3, FR7, FR2A K300 Vincent C. 16:15 17:40 30.0 20.5
7-Dec-21 26 FL3B (P1E01_ON PO. 9100001764 (4) 014434 Woodyard (328) PT TKM Bore Pile Lighting Foundation 2 K300 Fendy Tan - - 7.5 -
7-Dec-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 014435 Pipe Bridge (186) PT TKM Borepile FR7, FR2A, FR3 K300 Vincent C. 14:15 18:35 28.0 21.0
8-Dec-21 25 FL3B (P1E01_ON PO. 9100001764 (4) 014434 Woodyard (328) PT TKM Bore Pile Lighting Foundation 2 K300 Fendy Tan - - 7.5 - Reschedule
8-Dec-21 33 FL3B (P1E01_ON PO. 9100002335 (17) 014436 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3 & FR2 K300 Vincent C. - - 20.5 -

9-Dec-21 4 PO. 9100003017 (4) 014441 PT TKM BorePile PD5/ Pipe Rack Grid 14/B K400 Gonggom P. - - 7.5 -
FL3B (P1E01_ON PD5 (855)
9-Dec-21 26 FL3B (P1E01_ON PO. 9100001764 (4) 014434 Woodyard (328) PT TKM Bore Pile Lighting Foundation 2 K300 Fendy Tan 17:10 17:10 7.5 6.0 Reschedule

9-Dec-21 31 PO. 9100002335 (17) 014436 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3 & FR2 K300 Vincent C. - - 20.5 - Reschedule
FL3B (P1E01_ON
10-Dec-21 8 FL3B (P1E01_ON PO. 9100003017 (4) 014441 PD5 (855) PT TKM BorePile PD5/ Pipe Rack Grid 14/B K400 Gonggom P. 20:45 21:30 7.5 7.5 Reschedule
10-Dec-21 29 FL3B (P1E01_ON PO. 9100001764 (4) 014444 Woodyard (328) PT TKM BorePile Lighting Tower K300 Fendy T. 18:05 18:05 6.0 6.0

10-Dec-21 35 PO. 9100002335 (17) 014436 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3 & FR2 K300 Vincent C. 17:50 19:30 20.5 7.5 Reschedule
FL3B (P1E01_ON
Borepile Area Woodyard Lighting
11-Dec-21 26 PO. 9100001764 (4) 014443 PT TKM K300 Fendy T. - - 6.0 -
FL3B (P1E01_ON Woodyard (328) Tower 2
11-Dec-21 32 FL3B (P1E01_ON PO. 9100002335 (17) 014447 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 16:20 16:45 7.5 7.5
11-Dec-21 53 FL3B (P1E01_ON PO. 9100002335 (17) 014449 NaOH (613) PT TKM Borepile Tower Crane K300 Darwin H. 16:45 17:40 7.5 7.5

13-Dec-21 26 PO. 9100001764 (4) 015252 PT TKM Borepile Woodyard Lighting Tower2 K300 Fendy T. - - 6.0 -
FL3B (P1E01_ON Woodyard (328)
Borepile Pipe Bridge FR22 & Tower
13-Dec-21 35 PO. 9100002335 (17) 015251 Pipe Bridge (186) PT TKM K300 Darwin H. 14:50 18;40 37.5 30.0
FL3B (P1E01_ON Crane
Borepile Pipe Bridge FR22, Tower
13-Dec-21 37 PO. 9100002335 (17) 014448 Pipe Bridge (186) PT TKM K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON Crane & FR10
13-Dec-21 38 FL3B (P1E01_ON PO. 9100002335 (17) 014437 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-F K300 Vincent C. 16:55 17:50 7.5 7.5

13-Dec-21 61 PO. 9100001764 (4) 014443 PT TKM Borepile Woodyard Lighting Tower2 K300 Fendy T. 12:35 12:35 6.0 6.0
FL3B (P1E01_ON Woodyard (328)
14-Dec-21 28 PO. 9100001764 (4) 015252 PT TKM Borepile Woodyard Lighting Tower2 K300 Fendy T. 18:40 18:40 6.0 6.0 Reschedule
FL3B (P1E01_ON Woodyard (328)
14-Dec-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 015253 Pipe Bridge (186) PTBorepile
TKM Pipe Bridge FR10, FR10, FR12C & Crane Tower
K300 Darwin H. 14:15 20:50 52.5 26.5
14-Dec-21 32 FL3B (P1E01_ON PO. 9100002335 (17) 015255 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-F K300 Vincent C. 14:50 15:45 7.5 7.5
Borepile Pipe Bridge FR10, FR22,
15-Dec-21 34 PO. 9100002335 (17) 015256 Pipe Bridge (186) PT TKM K300 Darwin H. 13:05 22:10 52.5 34.0
FL3B (P1E01_ON FR11B & Tower Crane
16-Dec-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 015260 Pipe Bridge (186) Borepile
PT TKMPipe Bridge FR10, FR11B, FR22, FR12C & CraneK300
Tower Darwin H. 12:45 16:00 52.5 30.0
16-Dec-21 31 FL3B (P1E01_ON PO. 9100002335 (17) 015261 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Vincent C. - - 7.5 -
17-Dec-21 26 FL3B (P1E01_ON PO. 9100002335 (17) 015262 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Vincent C. 17:55 18:40 7.5 7.5
Borepile Pipe Bridge FR10, FR11B,
17-Dec-21 28 PO. 9100002335 (17) 015264 Pipe Bridge (186) PT TKM K300 Darwin H. 13:35 18:50 45.0 15.0
FL3B (P1E01_ON FR12C & Tower Crane
18-Dec-21 30 FL3B (P1E01_ON PO. 9100002335 (17) 015263 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Vincent C. - - 7.5 -
Borepile Pipe Bridge FR10, FR11B,
18-Dec-21 31 PO. 9100002335 (17) 015267 Pipe Bridge (186) PT TKM K300 Darwin H. 13:10 17:50 37.5 30.0
FL3B (P1E01_ON FR11A
19-Dec-21 18 FL3B (P1E01_ON PO. 9100002335 (17) 015268 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 14:55 18:25 30.0 30.0
20-Dec-21 25 FL3B (P1E01_ON PO. 9100002335 (17) 015274 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 15.0 -
Borepile Pipe Bridge FR10, FR1A &
20-Dec-21 26 PO. 9100002335 (17) 015273 Pipe Bridge (186) PT TKM K300 Darwin H. 15:10 20:40 37.5 22.5
FL3B (P1E01_ON FR1B
20-Dec-21 33 FL3B (P1E01_ON PO. 9100002335 (17) 015263 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Vincent C. 14:50 15:50 7.5 7.5 Reschedule
21-Dec-21 43 FL3B (P1E01_ON PO. 9100002335 (17) 015278 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Mustainul 17:50 19:00 7.5 7.5
21-Dec-21 48 FL3B (P1E01_ON PO. 9100002335 (17) 015275 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR1B K300 Darwin H. 10:35 19:15 37.5 30.0
21-Dec-21 49 FL3B (P1E01_ON PO. 9100002335 (17) 015276 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 18:30 19:35 15.0 7.5
22-Dec-21 32 FL3B (P1E01_ON PO. 9100002335 (17) 015282 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
22-Dec-21 33 FL3B (P1E01_ON PO. 9100002335 (17) 015281 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 14:20 18:15 45.0 22.5
Borepile Pipe Bridge FR10, FR11A,
23-Dec-21 26 PO. 9100002335 (17) 015286 Pipe Bridge (186) PT TKM K300 Darwin H. 13:25 16:55 45.0 37.5
FL3B (P1E01_ON FR11B & FR22
23-Dec-21 27 FL3B (P1E01_ON PO. 9100002335 (17) 015282 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 14-1 K300 Darwin H. - - 7.5 -
24-Dec-21 38 FL3B (P1E01_ON PO. 9100002335 (17) 015291 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
24-Dec-21 39 FL3B (P1E01_ON PO. 9100002335 (17) 015290 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 13:05 18:20 52.5 28.0
26-Dec-21 21 FL3B (P1E01_ON PO. 9100002335 (17) 015292 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. - - 37.5 -
26-Dec-21 23 FL3B (P1E01_ON PO. 9100002335 (17) 015291 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 - Reschedule
27-Dec-21 37 FL3B (P1E01_ON PO. 9100002335 (17) 015292 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 17:20 19:20 37.5 22.5 Reschedule
27-Dec-21 39 FL3B (P1E01_ON PO. 9100002335 (17) 015291 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 - Reschedule
28-Dec-21 30 FL3B (P1E01_ON PO. 9100002335 (17) 016001 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 12:45 18:35 45.0 37.5
29-Dec-21 27 FL3B (P1E01_ON PO. 9100002335 (17) 016002 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11A, FR11B & FR22K300 Darwin H. 12:05 18:45 45.0 30.0
30-Dec-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 016006 Pipe Bridge (186) PTBorepile
TKM Pipe Bridge FR10, FR11A, FR11B, FR12C & FR22K300 Darwin H. 19:45 20:45 45.0 22.5
Borepile Pipe Bridge FR10, FR11A,
31-Dec-21 39 PO. 9100002335 (17) 016009 Pipe Bridge (186) PT TKM K300 Darwin H. - - 45.0 -
FL3B (P1E01_ON FR11B, FR22 & FR12C
3-Jan-22 37 FL3B (P1E01_ON PO. 9100003017 (3) 016015 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A, FR11B K300 Darwin H. 16:50 20:40 37.5 37.5
3-Jan-22 59 FL3B (P1E01_ON PO. 9100003017 (3) 016019 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10 K300 Delvin S. 21:45 21:45 7.5 7.5
Borepile Pipe Bridge FR12C, FR11A,
4-Jan-22 32 PO. 9100003017 (3) 016018 Pipe Bridge (186) PT TKM K300 Darwin H. 16:05 17:50 45.0 22.5
FL3B (P1E01_ON FR11B & FR10
Borepile Pipe Bridge FR10, FR11,
5-Jan-22 41 PO. 9100003017 (3) 016020 Pipe Bridge (186) PT TKM K300 Darwin H. 14:25 18:30 45.0 30.0
FL3B (P1E01_ON FR11A & FR12C
Borepile Pipe Bridge FR10, FR11,
6-Jan-22 32 PO. 9100003017 (3) 016026 Pipe Bridge (186) PT TKM K300 Darwin H. 15:20 21:00 45.0 45.0
FL3B (P1E01_ON FR11A & FR12C
6-Jan-22 37 FL3B (P1E01_ON PO. 9100002335 (17) 016025 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
Borepile Pipe Bridge FR10, FR11,
7-Jan-22 35 PO. 9100003017 (3) 016027 Pipe Bridge (186) PT TKM K300 Darwin H. 16:10 19:20 52.5 37.5
FL3B (P1E01_ON FR11A & FR12C
7-Jan-22 36 FL3B (P1E01_ON PO. 9100002335 (17) 016028 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
7-Jan-22 37 FL3B (P1E01_ON PO. 9100002335 (17) 016025 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 - Reschedule
Borepile Pipe Bridge FR10, FR11,
8-Jan-22 44 PO. 9100003017 (3) 016032 Pipe Bridge (186) PT TKM K300 William 15:20 21:15 52.5 30.0
FL3B (P1E01_ON FR11A & FR12C
9-Jan-22 29 FL3B (P1E01_ON PO. 9100003017 (3) 016037 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR12CK300 Darwin H. 15:50 19:30 37.5 37.5
9-Jan-22 40 FL3B (P1E01_ON PO. 9100003017 (3) 016044 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11 K300 Darwin H. 19:30 19:50 15.0 7.5
10-Jan-22 34 FL3B (P1E01_ON PO. 9100003017 (3) 016041 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR12CK300 William 18:30 21:05 45.0 22.5
Borepile Pipe Bridge FR10, FR11,
11-Jan-22 28 PO. 9100003017 (3) 016045 Pipe Bridge (186) PT TKM K300 William 12:00 18:45 52.5 45.0
FL3B (P1E01_ON FR11A
11-Jan-22 29 FL3B (P1E01_ON PO. 9100002335 (17) 016046 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 William - - 15.0 -
12-Jan-22 21 FL3B (P1E01_ON PO. 9100003017 (3) 016702 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 13:45 18:10 52.5 22.5
12-Jan-22 23 FL3B (P1E01_ON PO. 9100003017 (3) 016703 Pipe Bridge (186) PT TKM Borepile Pedestal 12D-8 K300 Darwin H. 19:10 19:10 4.0 6.0
12-Jan-22 28 FL3B (P1E01_ON PO. 9100003017 (3) 016046 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 William 19:30 20:25 15.0 7.5 Reschedule
Borepile Pipe Bridge FR10, FR11,
13-Jan-22 44 PO. 9100003017 (3) 016704 Pipe Bridge (186) PT TKM K300 William 14:15 0:15 45.0 30.0
FL3B (P1E01_ON FR11A & FR11B
13-Jan-22 45 FL3B (P1E01_ON PO. 9100003017 (3) 016705 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 William 17:50 18:55 20.5 18.5
Borepile Pipe Bridge FR10, FR11,
14-Jan-22 32 PO. 9100003017 (3) 016712 Pipe Bridge (186) PT TKM K300 Darwin H. 17:00 21:45 52.5 30.0
FL3B (P1E01_ON FR11A & FR1B
14-Jan-22 33 FL3B (P1E01_ON PO. 9100003017 (3) 016711 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 Darwin H. 18:10 19:00 20.5 7.5
15-Jan-22 29 FL3B (P1E01_ON PO. 9100003017 (3) 016715 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 13:00 20:55 52.5 30.0
16-Jan-22 22 FL3B (P1E01_ON PO. 9100003017 (3) 016721 Pipe Bridge (186) PT TKMBorepile Pipe Bridge FR14 & FR15 Pipe Bridge K300 Darwin H. 14:50 15:30 20.5 22.5
Borepile Pipe Bridge FR10, FR11,
16-Jan-22 23 PO. 9100003017 (3) 016720 Pipe Bridge (186) PT TKM K300 Darwin H. 15:30 18:40 45.0 30.0
FL3B (P1E01_ON FR11A & FR11B
17-Jan-22 43 FL3B (P1E01_ON PO. 9100002335 (17) 016727 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 Darwin H. - - 20.5 -
17-Jan-22 44 FL3B (P1E01_ON PO. 9100003017 (3) 016726 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 19:05 19;35 52.5 7.5
18-Jan-22 40 FL3B (P1E01_ON PO. 9100003017 (3) 016731 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 18:05 18:25 15.0 10.5
18-Jan-22 41 FL3B (P1E01_ON PO. 9100003017 (3) 016730 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 12:35 21:40 52.5 45.0
Borepile Pipe Bridge FR10, FR11,
19-Jan-22 38 PO. 9100003017 (3) 016733 Pipe Bridge (186) PT TKM K300 William 15:25 20:20 52.5 48.0
FL3B (P1E01_ON FR11A & FR11B
19-Jan-22 39 FL3B (P1E01_ON PO. 9100002335 (17) 016732 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 William - - 15.0 -
Borepile Pipe Bridge FR10, FR11,
20-Jan-22 46 PO. 9100003017 (3) 016739 Pipe Bridge (186) PT TKM K300 Darwin H. 17:50 21:55 52.5 22.0 Salah Buat Vol di buat 22.5 M3
FL3B (P1E01_ON FR11A & FR11B
20-Jan-22 47 FL3B (P1E01_ON PO. 9100003017 (3) 016738 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 14-N & 14-S K300 Darwin H. 16:00 17:20 15.0 7.5
21-Jan-22 36 FL3B (P1E01_ON PO. 9100003288 (3) 016743 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 William 14:05 21:10 52.5 37.5
21-Jan-22 37 FL3B (P1E01_ON PO. 9100003288 (3) 016744 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 William 16:10 17:00 7.5 7.5
22-Jan-22 25 FL3B (P1E01_ON PO. 9100003288 (3) 016747 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14-5 K300 Delvin S. 20;25 21:05 7.5 7.5
Borepile Pipe Bridge FR10, FR11,
22-Jan-22 26 PO. 9100003288 (3) 016746 Pipe Bridge (186) PT TKM K300 Darwin H. 17:50 21:05 45.0 31.0
FL3B (P1E01_ON FR11A & FR11B
23-Jan-22 21 FL3B (P1E01_ON PO. 9100000766 (2) 016748 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Delvin S. 12:50 19:00 45.0 37.5 PO. 9100003288 (3)
Borepile Pipe Bridge Grid 14-N & 14-
24-Jan-22 31 PO. 9100000766 (2) 017202 Pipe Bridge (186) PT TKM K300 Darwin H. 13:10 13:50 15.0 7.5 PO. 9100003288 (3)
FL3B (P1E01_ON S
Borepile Pipe Bridge FR10, FR11,
24-Jan-22 32 PO. 9100000766 (2) 017201 Pipe Bridge (186) PT TKM K300 Darwin H. 15:45 19;20 52.5 45.0 PO. 9100003288 (3)
FL3B (P1E01_ON FR11A & FR11B
25-Jan-22 33 FL3B (P1E01_ON PO. 9100002158 017204 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 17:10 19:35 52.5 30.0
25-Jan-22 34 FL3B (P1E01_ON PO. 9100002158 017203 Pipe Bridge (186) PT TKM Borepile Pipe Bridege FR14 K300 Darwin H. 17:25 17:25 7.5 3.0
Borepile Pipe Bridge FR10, FR11,
26-Jan-22 31 PO. 9100002158 017208 Pipe Bridge (186) PT TKM K300 William 13:35 20:45 52.5 52.5
FL3B (P1E01_ON FR11A & FR11B
26-Jan-22 32 FL3B (P1E01_ON PO. 9100002158 017207 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
27-Jan-22 25 FL3B (P1E01_ON PO. 9100002158 017209 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 William 14:15 20:40 52.5 30.0
27-Jan-22 30 FL3B (P1E01_ON PO. 9100002158 017210 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 15.0 -
28-Jan-22 29 FL3B (P1E01_ON PO. 9100002158 017211 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 William 15:05 19:00 52.5 37.5
28-Jan-22 38 FL3B (P1E01_ON PO. 9100002158 017210 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 14:20 15:20 15.0 7.5 Reschedule
29-Jan-22 30 FL3B (P1E01_ON PO. 9100002158 017216 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 William 17:15 22:25 52.5 37.5

29-Jan-22 32 PO. 9100002158 017217 PT TKM Bore Pile Pipe Bridge FR14 & FR15 K300 William 16:55 18:50 20.5 6.0
FL3B (P1E01_ON Pipe Bridge (186)
Borepile Pipe Bridge FR10, FR11,
30-Jan-22 32 PO. 9100002158 017218 Pipe Bridge (186) PT TKM K300 William - - 45.0 -
FL3B (P1E01_ON FR11A, FR11B
30-Jan-22 33 FL3B (P1E01_ON PO. 9100000766 (2) 017219 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 William 15:15 18:45 20.5 18.0 PO. 9100002158
31-Jan-22 29 FL3B (P1E01_ON PO. 9100000766 (2) 017221 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 William 19:00 19:35 20.5 7.5 PO. 9100002158
31-Jan-22 30 FL3B (P1E01_ON PO. 9100000766 (2) 017220 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A, FR11BK300 William 13:35 19:45 52.5 52.5 PO. 9100002158
Borepile Pipe Bridge FR10, FR11,
31-Jan-22 45 PO. 9100002158 017218 Pipe Bridge (186) PT TKM K300 William - - 45.0 - Reschedule
FL3B (P1E01_ON FR11A, FR11B
2-Feb-22 63 FL3B (P1E01_ON PO. 9100000766 (2) 017225 Pipe Bridge (186) PT TKMBore Pile Bridge FR10, FR11, FR 11A & FR 11B K300 William 19:05 22:40 52.5 22.5 PO. 9100002158
2-Feb-22 64 FL3B (P1E01_ON PO. 9100000766 (2) 017224 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 14 & FR 15 K300 William 21:05 21:45 20.5 10.5 PO. 9100002158
Bore Pile Bridge FR 10, FR 11, FR 11A
3-Feb-22 30 PO. 9100000766 (2) 017231 Pipe Bridge (186) PT TKM K300 Darwin 17:00 19:35 52.5 22.5 P1E01_ON-CPPU0162 (2)
FL3B (P1E01_ON & FR 11B
3-Feb-22 32 FL3B (P1E01_ON PO. 9100000766 (2) 017232 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 William 17:45 19:25 20.5 12.5 P1E01_ON-CPPU0162 (2)
Bore Pile Bridge FR 10, FR 11A, FR 11
4-Feb-22 33 PO. 9100000766 (2) 017236 Pipe Bridge (186) PT TKM K300 Delvin 14:35 20:25 52.5 37.5 P1E01_ON-CPPU0162 (2)
FL3B (P1E01_ON & FR 11B
4-Feb-22 34 FL3B (P1E01_ON PO. 9100000766 (2) 017237 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 Delvin 17:10 18:55 13.0 10.5 P1E01_ON-CPPU0162 (2)
Bore Pile Bridge FR 10, FR 11A & FR
5-Feb-22 26 PO. 9100001252 017242 Pipe Bridge (186) PT TKM K300 Delvin 13:30 20:50 52.5 37.5
FL3B (P1E01_ON 11B

5-Feb-22 27 P1E01_ON-CPPU0162 (2) 017243 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 Delvin - - 13.0 -
FL3B (P1E01_ON
6-Feb-22 25 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 017244 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR11, FR11A & FR 11B K300 Delvin - - 52.5 - Pump
Bore Pile Pipe Bridge FR11, FR11A &
7-Feb-22 33 PO. 9100001252 017244 Pipe Bridge (186) PT TKM K300 Delvin 17:05 22:15 52.5 37.5 Reschedule
FL3B (P1E01_ON FR 11B
8-Feb-22 69 FL3B (P1E01_ON PO. 9100001252 026604 Pipe Bridge (186) PT TKM Bore Pile Bridge FR 11, FR 11A, & FR 11B K300 Delvin 16:55 20:25 52.5 30.0
9-Feb-22 41 FL3B (P1E01_ON PO. 9100001252 026607 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge T K300 Darwin 17:00 20:30 52.5 37.5
9-Feb-22 42 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 026608 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A, FR K300 Darwin - - 7.5 -
10-Feb-22 28 FL3B (P1E01_ON PO. 9100001252 026611 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A, FR11B K300 Darwin 15:35 20:15 52.5 45.0
11-Feb-22 21 FL3B (P1E01_ON PO. 9100002922 026615 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A, FR11B K300 Darwin 15:50 19:10 52.5 52.5
11-Feb-22 61 FL3B (P1E01_ON PO. 9100002922 026623 Pipe Bridge (186) PT TKM Borepile K300 Darwin 19:00 19:25 7.5 7.5
Bore Pile Pipe Bridge FR 11, FR11A,
12-Feb-22 30 PO. 9100002922 026622 Pipe Bridge (186) PT TKM K300 Darwin 17:30 23:00 52.5 45.0
FL3B (P1E01_ON FR11B
12-Feb-22 36 FL3B (P1E01_ON PO. 9100005271 (4) 026624 Pipe Bridge (186) PT TKM Bore Pile Pipe Slipper FS 1 K300 Delvin 18:15 19:30 22.5 15.0
13-Feb-22 19 FL3B (P1E01_ON PO. 9100002922 026628 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Darwin 17:10 17:45 22.5 15.0
Bore Pile Pipe Bridge FR 11, FR11A,
13-Feb-22 20 PO. 9100002922 026627 Pipe Bridge (186) PT TKM K300 Darwin 15:40 21:15 52.5 52.5
FL3B (P1E01_ON FR11B
14-Feb-22 30 FL3B (P1E01_ON PO. 9100002922 026630 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Darwin 18:25 18:40 22.5 15.0
Bore Pile Pipe Bridge FR 11, FR11A,
14-Feb-22 31 PO. 9100002922 026629 Pipe Bridge (186) PT TKM K300 Darwin 11:30 18:00 52.5 30.0
FL3B (P1E01_ON FR11B
15-Feb-22 44 FL3B (P1E01_ON PO. 9100005271 (2) 026635 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 18:35 18:50 15.0 15.0
Bore Pile Pipe Bridge FR10, FR 11,
15-Feb-22 45 PO. 9100005271 (2) 026634 Pipe Bridge (186) PT TKM K300 Delvin S. 16:00 20:55 52.5 37.5
FL3B (P1E01_ON FR11A & FR11B
16-Feb-22 36 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 026637 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. - - 15.0 -
Bore Pile Pipe Bridge FR10, FR 11,
16-Feb-22 37 PO. 9100005271 (2) 026636 Pipe Bridge (186) PT TKM K300 Delvin S. 16:05 17:40 52.5 22.5 P1E01_ON-CPPU0162 (2)
FL3B (P1E01_ON FR11A & FR11B
17-Feb-22 44 FL3B (P1E01_ON PO. 9100005271 (2) 026645 Pipe Bridge (186) PT TKM
Bore Pile Pipe Bridge FR10, FR 11, FR11A & FR11B
K300 Delvin S. 11:05 18:20 52.5 52.5
17-Feb-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 026637 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 0:30 0:45 15.0 7.5 Reschedule
17-Feb-22 91 PO. 9100005271 (2) 026649 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11 & FR11B K300 Delvin S. 18:35 18:45 15.0 7.5
FL3B (P1E01_ON
17-Feb-22 94 FL3B (P1E01_ON PO. 9100005271 (2) 026646 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Delvin S. 21:40 22:16 8.0 8.0
Bore Pile Pipe Bridge FR 11, FR11A &
18-Feb-22 45 PO. 9100005271 (2) 026648 Pipe Bridge (186) PT TKM K300 Darwin 19:15 21:45 52.5 37.5
FL3B (P1E01_ON FR11B
18-Feb-22 76 FL3B (P1E01_ON PO. 9100005271 (2) 017243 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS1 K300 Delvin S. 21:15 21:25 15.0 7.5
Bore Pile Pipe Bridge FR 11, FR11A &
19-Feb-22 40 PO. 9100005271 (2) 028051 Pipe Bridge (186) PT TKM K300 Darwin 17:25 18:40 60.0 22.5
FL3B (P1E01_ON FR11B
19-Feb-22 41 FL3B (P1E01_ON PO. 9100005271 (2) 028053 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 18:45 19:05 15.0 15.0
19-Feb-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 028052 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR333 K300 Delvin S. 18:00 18:25 7.5 7.5
20-Feb-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 028059 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 15:55 16:50 15.0 7.5
20-Feb-22 32 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 028058 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR333 K300 Delvin S. - - 7.5 -
Bore Pile Pipe Bridge FR 11, FR11A &
20-Feb-22 33 PO. 9100005271 (2) 028057 Pipe Bridge (186) PT TKM K300 Delvin S. 12:55 20:25 45.0 37.5
FL3B (P1E01_ON FR11B
21-Feb-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 028061 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 13:00 13:35 15.0 7.5
21-Feb-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 028060 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A & FR11B K300 Delvin S. 18:05 21:35 45.0 37.5
21-Feb-22 71 FL3B (P1E01_ON PO. 9100005271 (2) 028058 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR333 K300 Delvin S. 21:00 21:25 7.5 7.5
22-Feb-22 34 FL3B (P1E01_ON PO. 9100005271 (2) 028069 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Darwin 18:10 19:05 7.5 7.5
22-Feb-22 35 FL3B (P1E01_ON PO. 9100005271 (2) 028068 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:50 17:15 15.0 7.5
Bore Pile Pipe Bridge FR 11, FR11A &
22-Feb-22 36 PO. 9100005271 (2) 028067 Pipe Bridge (186) PT TKM K300 Darwin 16:20 20:25 52.5 37.5
FL3B (P1E01_ON FR11B
23-Feb-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 028074 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A & FR11B K300 Delvin S. 14:45 19:20 52.5 22.5
23-Feb-22 43 FL3B (P1E01_ON PO. 9100005271 (2) 028073 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Delvin S. 17:20 17:50 15.0 15.0 Reschedule
Borepile Pipe Bridge FR11, FR11A &
24-Feb-22 31 PO. 9100005271 (2) 028076 Pipe Bridge (186) PT TKM K300 Darwin 12:05 18;40 37.5 22.5
FL3B (P1E01_ON FR11B
24-Feb-22 32 FL3B (P1E01_ON) PO. 9100005271 (2) 028075 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:25 18:00 30.0 30.0
25-Feb-22 35 FL3B (P1E01_ON) PO. 9100005271 (2) 028080 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 13:45 15:45 37.5 22.5
25-Feb-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 028079 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11A & FR11B K300 Darwin 14:00 17:00 22.5 22.5
26-Feb-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 028083 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11A & FR11B K300 Darwin 13:05 18:45 37.5 22.5
26-Feb-22 40 FL3B (P1E01_ON) PO. 9100005271 (2) 028084 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:35 17:20 37.5 22.5
27-Feb-22 32 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 028088 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11A & FR11B K300 Darwin - - 22.5 -
27-Feb-22 33 FL3B (P1E01_ON) PO. 9100005271 (2) 028087 Pipe Bridge (186) PT TKM Borepile Pipe bridge FR23 K300 Darwin 13:50 16:35 37.5 30.0
28-Feb-22 27 FL3B (P1E01_ON) PO. 9100005271 (2) 028094 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 12:50 16:25 37.5 30.0
28-Feb-22 28 FL3B (P1E01_ON PO. 9100005271 (2) 028093 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11B & Evaporator#6K300 Darwin 16:45 18:00 22.5 22.5
28-Feb-22 32 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 028088 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11A & FR11B K300 Darwin - - 22.5 - Reschedule
28-Feb-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 028099 Pipe Bridge (186) PT TKM Borepile Area FR11B & Evaporator#6 K300 Darwin 18:05 18:05 4.0
1-Mar-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 028096 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR11A, FR11B & Evaporator#6K300 Darwin 20:35 21:15 26.5 9.5
1-Mar-22 33 FL3B (P1E01_ON) PO. 9100005271 (6) 028097 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 13:45 16:10 37.5 30.0
Borepile Pipe Bridge FR10, FR11B &
2-Mar-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 027401 Pipe Bridge (186) PT TKM K300 Darwin 17:05 19:10 26.5 19.0
Evaporator#6
2-Mar-22 37 FL3B (P1E01_ON) PO. 9100005271 (2) 027402 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:45 19:30 37.5 22.5
Borepile Evaporator#6 & Borepile
3-Mar-22 24 PO. 9100005271 (2) 027411 Pipe Bridge (186) PT TKM K300 Darwin 16:30 17:40 19.0 17.0
FL3B (P1E01_ON FR11B
3-Mar-22 25 FL3B (P1E01_ON) PO. 9100005271 (2) 027409 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 14:45 15:30 37.5 7.5
4-Mar-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 027414 Pipe Bridge (186) PT TKM Borepile Evaporator#6 K300 Darwin 17:15 17:45 19.0 9.5
4-Mar-22 33 FL3B (P1E01_ON) PO. 9100005271 (2) 027413 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:50 17:35 30.0 22.5
5-Mar-22 44 FL3B (P1E01_ON) PO. 9100005271 (2) 027415 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:55 18;05 37.5 15.0
5-Mar-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 027416 Pipe Bridge (186) PT TKM Borepile Evaporator#6, FR11, FR11A K300 Darwin 16:25 18:40 34.0 15.0
6-Mar-22 29 FL3B (P1E01_ON) PO. 9100005271 (2) 027419 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:20 17:55 37.5 15.0
6-Mar-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 027420 Pipe Bridge (186) PT TKM Borepile Evaporator#6, FR11, FR11A K300 Darwin 18:20 19:25 34.0 15.0
7-Mar-22 47 FL3B (P1E01_ON) PO. 9100005271 (2) 027423 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 13:25 18:50 30.0 30.0
Borepile FR11, FR11A &
7-Mar-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 027425 Pipe Bridge (186) PT TKM K300 Darwin 16:45 18:50 22.5 22.5
Evaporator#6
7-Mar-22 72 FL3B (P1E01_ON PO. 9100005271 (2) 027426 Pipe Bridge (186) PT TKM Borepile FR11, FR26 K300 Darwin 17:10 17:10 17.0 7.5
8-Mar-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 027427 Pipe Bridge (186) PT TKM Borepile FR11, FR11A & FR11B K300 Darwin 14:50 18:35 22.5 17.0
8-Mar-22 49 FL3B (P1E01_ON) PO. 9100005271 (2) 027428 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 16:35 17:40 30.0 15.0
8-Mar-22 50 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027429 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin - - 7.5 -
9-Mar-22 33 FL3B (P1E01_ON PO. 9100005271 (2) 027433 Pipe Bridge (186) PT TKM Borepile FR11 & FR11B K300 Darwin 17:10 17:45 15.0 7.5
9-Mar-22 34 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027434 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin - - 7.5 -
9-Mar-22 35 FL3B (P1E01_ON) PO. 9100005271 (2) 027435 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 15:10 20:40 30.0 22.5
9-Mar-22 38 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027429 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin - - 7.5 - Reschedule
10-Mar-22 44 FL3B (P1E01_ON) PO. 9100005271 (2) 027437 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 16:20 18:30 30.0 15.0
10-Mar-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 027438 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 14:00 14:00 15.0 7.5
10-Mar-22 46 PO. 9100005271 (2) 027439 Pipe Bridge (186) PT TKM Borepile FR11 & FR11B K300 Darwin 16:15 18:05 22.5 22.5
FL3B (P1E01_ON
11-Mar-22 46 FL3B (P1E01_ON) PO. 9100005271 (2) 027444 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 12:35 18:20 22.5 22.5

11-Mar-22 47 FL3B (P1E01_ON PO. 9100005271 (2) 027440 Pipe Bridge (186) PT TKM Borepile FR11B K300 Darwin 17:05 17:40 15.0 15.0
11-Mar-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 027443 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 11:15 11:15 15.0 7.5
12-Mar-22 37 FL3B (P1E01_ON) PO. 9100005271 (2) 027445 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 15:10 16:20 22.5 22.5
12-Mar-22 38 FL3B (P1E01_ON PO. 9100005271 (2) 027446 Pipe Bridge (186) PT TKM Borepile FR11B K300 Darwin 17:15 18:10 7.5 7.5
12-Mar-22 39 FL3B (P1E01_ON PO. 9100005271 (2) 027447 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 18:55 19:05 15.0 7.5
13-Mar-22 25 FL3B (P1E01_ON PO. 9100005271 (2) 027449 Pipe Bridge (186) PT TKM Borepile FR11B K300 Darwin 17:20 17:35 7.5 7.5
13-Mar-22 26 FL3B (P1E01_ON PO. 9100005271 (2) 027450 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 15:05 15:15 15.0 7.5
13-Mar-22 30 FL3B (P1E01_ON) PO. 9100005271 (2) 027448 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 13:20 14:30 15.0 15.0
14-Mar-22 50 FL3B (P1E01_ON PO. 9100005271 (2) 017684 Pipe Bridge (186) PT TKM Borepile FR11B K300 Darwin 16:10 16:50 7.5 7.5
14-Mar-22 51 FL3B (P1E01_ON) PO. 9100005271 (2) 017685 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 13:10 13:15 15.0 15.0
14-Mar-22 52 FL3B (P1E01_ON PO. 9100005271 (2) 017686 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 11:25 18:45 15.0 15.0
14-Mar-22 84 FL3B (P1E01_ON PO. 9100005271 (2) 027957 Pipe Bridge (186) PT TKM Borepile Pipe Birdge FR26 K300 Darwin 18:05 18;10 7.5 7.5
15-Mar-22 48 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027953 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 15.0 -
15-Mar-22 49 FL3B (P1E01_ON PO. 9100005271 (2) 027952 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin 15:00 15:50 7.5 7.5
15-Mar-22 50 FL3B (P1E01_ON) PO. 9100005271 (2) 027951 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:35 16:45 15.0 15.0
16-Mar-22 33 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027959 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 15.0 -
16-Mar-22 34 FL3B (P1E01_ON) PO. 9100005271 (2) 027958 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:45 17:00 15.0 15.0
16-Mar-22 35 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027961 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin - - 7.5 -
16-Mar-22 39 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027953 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 15.0 - Reschedule
17-Mar-22 45 FL3B (P1E01_ON) PO. 9100005271 (2) 027966 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:45 16:55 7.5 7.5

17-Mar-22 46 P1E01_ON-CPPU0162 (2) 027965 PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 -
FL3B (P1E01_ON DNCG (492)
17-Mar-22 48 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027963 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 15.0 -
18-Mar-22 54 FL3B (P1E01_ON) PO. 9100005271 (2) 027971 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:40 16:35 7.5 7.5
18-Mar-22 55 FL3B (P1E01_ON PO. 9100005271 (2) 027970 Pipe Bridge (186) PT TKM Borepile Pipe Evaporator#6 & FR26 K300 Darwin 17:15 18:05 22.5 22.5
18-Mar-22 58 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027965 DNCG (492) PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 - Reschedule
19-Mar-22 38 FL3B (P1E01_ON) PO. 9100005271 (2) 027978 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:05 17:40 15.0 7.5
19-Mar-22 39 FL3B (P1E01_ON PO. 9100005271 (2) 027977 Pipe Bridge (186) PT TKM
Borepile Pipe Evaporator#6 & Pipe Bridge FR26K300 Darwin 17:05 19:40 22.5 15.0
Borepile Pipe Bridge Fr26 &
20-Mar-22 26 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027982 Pipe Bridge (186) PT TKM K300 Darwin - - 22.5 -
Evaporator#6
20-Mar-22 27 FL3B (P1E01_ON) PO. 9100005271 (2) 027981 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:55 16:35 15.0 7.5
20-Mar-22 28 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027980 DNCG (492) PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 -
21-Mar-22 49 FL3B (P1E01_ON PO. 9100005271 (2) 027986 Pipe Bridge (186) PT TKM
Borepile Pipe Evaporator#6 & Pipe Bridge FR26K300 Darwin 12:55 16:35 22.5 22.5
21-Mar-22 50 FL3B (P1E01_ON) PO. 9100005271 (2) 027985 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 14:20 18:15 15.0 15.0
21-Mar-22 53 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027980 DNCG (492) PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 - Reschedule
21-Mar-22 75 FL3B (P1E01_ON PO. 9100005271 (2) 027991 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin 18:40 19:15 7.5 7.5
22-Mar-22 41 FL3B (P1E01_ON) PO. 9100005271 (2) 027990 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:20 19:00 15.0 15.0
22-Mar-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 027989 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin 19:20 19:40 7.5 7.5
22-Mar-22 43 FL3B (P1E01_ON PO. 9100005271 (2) 027988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin 14:40 18:10 22.5 20.5

22-Mar-22 46 P1E01_ON-CPPU0162 (2) 027980 PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 - Reschedule
FL3B (P1E01_ON DNCG (492)
23-Mar-22 44 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027993 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B & FR26 K300 Darwin - - 22.5 -
23-Mar-22 45 FL3B (P1E01_ON) PO. 9100005271 (2) 027992 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 18:48 19:15 15.0 7.5
Borepile Pipe Bridge FR26 &
24-Mar-22 46 PO. 9100005271 (2) 028000 Pipe Bridge (186) PT TKM K300 Darwin 17:00 17:30 22.5 7.5
FL3B (P1E01_ON Evaporator#6
24-Mar-22 49 FL3B (P1E01_ON) PO. 9100005271 (2) 027997 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:40 16:35 15.0 7.5
25-Mar-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 018154 Pipe Bridge (186) PT TKM Borepile Evaporator#6 & Pipe Bridge K300 Darwin 17:35 20;35 22.5 22.5
25-Mar-22 44 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 018152 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 7.5 -
26-Mar-22 41 FL3B (P1E01_ON PO. 9100005271 (2) 018168 Pipe Bridge (186) PT TKM Borepile Evaporator#6 K300 Darwin 18:50 18:55 7.5 7.5
26-Mar-22 42 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 018167 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 7.5 -
27-Mar-22 30 FL3B (P1E01_ON) PO. 9100005271 (2) 018169 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:15 18:00 7.5 7.5
28-Mar-22 51 FL3B (P1E01_ON PO. 9000575508 (1) 018179 Pipe Bridge (186) PT TKM Borepile Evaporator#6 K300 Darwin - - 7.5 -
28-Mar-22 55 FL3B (P1E01_ON) PO. 9100005271 (2) 018167 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:05 17:30 7.5 7.5 Reschedule
29-Mar-22 50 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 018190 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin - - 7.5 -
29-Mar-22 52 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 018188 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 7.5 -
29-Mar-22 56 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 018179 Pipe Bridge (186) PT TKM Borepile Evaporator#6 K300 Darwin - - 7.5 - Reschedule
30-Mar-22 53 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 018196 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 7.5 -
30-Mar-22 54 FL3B (P1E01_ON PO. 9100005271 (2) 018195 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin 18:25 19:20 7.5 7.5
31-Mar-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 019055 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin 15:45 15:45 7.5 7.5
31-Mar-22 47 FL3B (P1E01_ON) PO. 9100005271 (2) 019056 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 13:50 14:00 7.5 7.5
31-Mar-22 50 FL3B (P1E01_ON PO. 9100005271 (2) 019062 Pipe Bridge (186) PT TKM Borepile Fiberline K300 Delvin S. 15:05 16:05 7.5 7.5
Borepile Pipe Bridge
1-Apr-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 019066 Pipe Bridge (186) PT TKM K300 Delvin S. 18:35 19:15 7.5 7.5
West/FiberLine#3
1-Apr-22 51 FL3B (P1E01_ON) PO. 9100005271 (2) 019065 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 14:15 15z:10 15.0 7.5
2-Apr-22 35 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 019071 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 7.5 -
2-Apr-22 36 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 019070 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 15.0 -
2-Apr-22 40 FL3B (P1E01_ON PO. 9100005271 (2) 019073 DNCG (492) PT TKM Borepile Fiberline #2 DNCG K300 Darwin 17:45 17:45 7.5 7.5
2-Apr-22 41 FL3B (P1E01_ON PO. 9100005271 (2) 019072 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FiberLine#3 K300 Delvin S. 16:25 16:30 7.5 7.5
4-Apr-22 39 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 019071 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 7.5 - Reschedule
4-Apr-22 42 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 019078 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 Grid F & H K300 Darwin - - 8.0 -
4-Apr-22 44 FL3B (P1E01_ON) PO. 9100005271 (2) 019075 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 19:25 20:00 7.5 7.5
4-Apr-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 019074 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FiberLine#3 & DNCG K300 Delvin S. 14:30 19:35 15.0 15.0
5-Apr-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 019081 DNCG (492) PT TKM Borepile DNCG & Pipe Bridge West K300 Darwin 17:50 18:10 15.0 15.0
5-Apr-22 47 FL3B (P1E01_ON PO. 9100005271 (2) 019082 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin 18:05 18:20 7.5 7.5
6-Apr-22 36 FL3B (P1E01_ON) PO. 9100005271 (2) 019087 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:05 17:25 7.5 7.5
6-Apr-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 019086 DNCG (492) PT TKM Borepile Pipe Bridge & DNCG K300 Darwin 15:45 16:30 15.0 7.5
7-Apr-22 46 FL3B (P1E01_ON) PO. 9100005271 (2) 019089 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:15 17:55 7.5 7.5
7-Apr-22 47 FL3B (P1E01_ON PO. 9100005271 (2) 019088 DNCG (492) PT TKM Borepile Pipe Bridge & DNCG K300 Darwin 14:25 17:00 15.0 15.0
8-Apr-22 46 FL3B (P1E01_ON PO. 9100005271 (2) 019095 Pipe Bridge (186) PT TKM Borepile Pipe Bridge /FiberLine #3 K300 Darwin 19:50 20:35 7.5 7.5
8-Apr-22 47 FL3B (P1E01_ON) PO. 9100005271 (2) 019094 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:55 17:35 7.5 7.5
9-Apr-22 45 FL3B (P1E01_ON) PO. 9100005271 (2) 018904 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:10 17:00 7.5 7.5
10-Apr-22 31 FL3B (P1E01_ON) PO. 9100005271 (2) 018905 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:35 18:10 7.5 7.5
10-Apr-22 53 FL3B (P1E01_ON PO. 9100005271 (2) 018917 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR8A K300 Darwin 18:35 19:30 7.5
11-Apr-22 48 FL3B (P1E01_ON) PO. 9100005271 (2) 018916 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:10 16:20 7.5 7.5
13-Apr-22 37 FL3B (P1E01_ON) PO. 9100005271 (2) 018925 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:05 16:25 7.5 7.5
14-Apr-22 37 FL3B (P1E01_ON) PO. 9100005271 (2) 018926 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:30 15:55 7.5 7.5
15-Apr-22 33 FL3B (P1E01_ON) PO. 9100005271 (2) 018933 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:05 16:40 7.5 7.5
16-Apr-22 40 FL3B (P1E01_ON) PO. 9100005271 (2) 018936 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 15:05 16:15 7.5 7.5
17-Apr-22 40 FL3B (P1E01_ON) PO. 9100005271 (2) 018939 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 14:40 15:00 7.5 7.5
18-Apr-22 50 FL3B (P1E01_ON) PO. 9100005271 (2) 018943 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:20 18:00 7.5 7.5 P1E01_ON-CPPU0162 (2)
19-Apr-22 41 FL3B (P1E01_ON) PO. 9100005271 (2) 018947 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:15 16:35 7.5 7.5 P1E01_ON-CPPU0162 (2)
20-Apr-22 44 FL3B (P1E01_ON) PO. 9100005271 (2) 018949 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:50 15:50 7.5 7.5
21-Apr-22 31 FL3B (P1E01_ON) PO. 9100005271 (2) 021856 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 18:55 19:40 7.5 7.5
21-Apr-22 70 FL3B (P1E01_ON PO. 9100005271 (2) 021864 General (100) PT TKM Borepile Cable Tray K300 Darwin 20:25 20:35 7.5
22-Apr-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 021863 General (100) PT TKM Borepile Cable Tray K300 Kevin 17:15 18;05 7.5 7.5
22-Apr-22 43 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 021862 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 7.5 -
23-Apr-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 021866 General (100) PT TKM Borepile Cable Tray TG K300 Kevin 16:10 16:30 7.5 7.5
23-Apr-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 021862 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 14:55 14:55 7.5 7.5 Reschedule
23-Apr-22 81 FL3B (P1E01_ON PO. 9100005271 (2) 021872 General (100) PT TKM Borepile Cable Tray TG K300 Kevin 16:40 17:25 7.5
23-Apr-22 84 FL3B (P1E01_ON PO. 9100005271 (2) 021873 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 19:05 19:25 7.5
24-Apr-22 35 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 021870 General (100) PT TKM Borepile Cable Tray TG K300 Kevin - - 7.5 -
24-Apr-22 39 FL3B (P1E01_ON PO. 9100005271 (2) 021869 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 17:20 17:20 7.5 7.5
24-Apr-22 66 FL3B (P1E01_ON PO. 9100005271 (2) 021877 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 21:50 22:25 7.5
25-Apr-22 52 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 021870 General (100) PT TKM Borepile Cable Tray TG K300 Kevin - - 7.5 - Reschedule

25-Apr-22 55 P1E01_ON-CPPU0162 (2) 021875 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 30.0 -
FL3B (P1E01_ON
14-May-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 021911 Pipe Bridge (186) PT TKM Borepile FR23 & 16 K300 Darwin - - 22.5 -
15-May-22 22 FL3B (P1E01_ON PO. 9100005271 (2) 021909 Pipe Bridge (186) PT TKM Borepile FR23 & 16 K300 Darwin 13:10 15:30 15.0 15.0
16-May-22 21 FL3B (P1E01_ON PO. 9100005271 (2) 021882 General (100) PT TKM Borepile Cable Tray K300 Kevin 18:05 19:05 7.5 7.5
16-May-22 29 FL3B (P1E01_ON PO. 9100005271 (2) 021911 Pipe Bridge (186) PT TKM Borepile FR23 & 16 K300 Darwin 15:55 17:10 22.5 15.0 Reschedule
17-May-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 021887 General (100) PT TKM Borepile Cable Tray K300 Kevin 16:45 17:35 7.5 7.5
17-May-22 35 FL3B (P1E01_ON PO. 9100005271 (2) 021885 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 16:30 16:50 7.5 7.5
18-May-22 23 FL3B (P1E01_ON PO. 9100005271 (2) 021890 General (100) PT TKM Borepile Cable Tray 150Kv K300 Kevin 16:45 17:30 6.0 7.5
18-May-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 021889 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 15:25 16;05 7.5 7.5
19-May-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 021893 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 19:05 19:30 7.5 7.5
20-May-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 021895 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 16:30 16:45 7.5 7.5
20-May-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 021894 Woodyard (328) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 16:05 16:35 7.5 7.5
21-May-22 20 FL3B (P1E01_ON PO. 9100005271 (2) 027727 ETP (135) PT TKM Borepile ETP K300 Poltak 17:10 17:10 5.5 5.5
21-May-22 43 FL3B (P1E01_ON PO. 9100005271 (2) 027731 Woodyard (328) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 16:05 16:30 7.5 7.5
21-May-22 44 FL3B (P1E01_ON PO. 9100005271 (2) 027730 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 15:50 16:30 7.5 7.5
22-May-22 4 FL3B (P1E01_ON PO. 9100005271 (2) 027736 ETP (135) PT TKM Borepile ETP K300 Poltak 16:35 16:35 5.5 4.5
22-May-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 027735 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 7.5 -
22-May-22 35 FL3B (P1E01_ON PO. 9100005271 (2) 027734 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 12:50 13:00 7.5 7.5
23-May-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 -
23-May-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 027740 TG9 (296) PT TKM Borepile Cable Tray TG#9 K300 Kevin - - 7.5 -
23-May-22 43 FL3B (P1E01_ON PO. 9100005271 (2) 027739 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 -
24-May-22 12 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
24-May-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 021900 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
24-May-22 38 FL3B (P1E01_ON PO. 9100005271 (2) 027740 TG9 (296) PT TKM Borepile Cable Tray TG#9 K300 Kevin 18:30 19:05 7.5 7.5 Reschedule
24-May-22 44 FL3B (P1E01_ON PO. 9100005271 (2) 027742 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 17:00 17:35 7.5 7.5
25-May-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
25-May-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 021900 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
25-May-22 41 FL3B (P1E01_ON PO. 9100005271 (2) 027747 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin 18:25 18:50 7.5 7.5
25-May-22 47 FL3B (P1E01_ON PO. 9100005271 (2) 027746 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 14:05 14:40 7.5 7.5
26-May-22 8 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
26-May-22 9 FL3B (P1E01_ON PO. 9100005271 (2) 021900 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 15:10 15:10 4.5 4.5 Reschedule
26-May-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 027749 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin - - 7.5 -
26-May-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 020401 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 16:10 16:30 7.5 7.5
27-May-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
27-May-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 027749 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin 16:35 17:15 7.5 7.5 Reschedule
27-May-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 020403 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 -
28-May-22 7 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
28-May-22 35 FL3B (P1E01_ON PO. 9100005271 (2) 020410 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin 13:40 16:00 12.0 7.5
28-May-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 020408 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin 16:15 16:55 7.5 7.5
28-May-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 020403 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 - Reschedule
29-May-22 8 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
30-May-22 6 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
31-May-22 6 FL3B (P1E01_ON PO. 9100005271 (2) 020417 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 17:15 17:15 4.5 4.5
1-Jun-22 6 FL3B (P1E01_ON PO. 9100005271 (2) 020428 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
2-Jun-22 9 FL3B (P1E01_ON PO. 9100005271 (2) 020428 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 15:35 15:35 4.5 4.5 Reschedule
3-Jun-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 020441 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 19:00 19:00 4.5 4.5
4-Jun-22 15 FL3B (P1E01_ON 9100005271 (1) 020449 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
4-Jun-22 45 FL3B (P1E01_ON 9100005271 (1) 020443 General (100) PT TKM Borepile Tray 150 kV K300 Kevin - - 7.5 -
5-Jun-22 20 FL3B (P1E01_ON 9100005271 (1) 020449 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
5-Jun-22 21 FL3B (P1E01_ON 9100005271 (1) 020450 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
5-Jun-22 47 FL3B (P1E01_ON 9100005271 (1) 020444 General (100) PT TKM Borepile Tray 150 kV K300 Kevin - - 7.5 -
6-Jun-22 19 FL3B (P1E01_ON PO. 9100005271 (2) 020449 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
6-Jun-22 20 FL3B (P1E01_ON PO. 9100005271 (2) 020450 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
6-Jun-22 60 FL3B (P1E01_ON PO. 9100005271 (2) 022551 General (100) PT TKM Borepile Tray 150 kV K300 Kevin - - 6.0 -
7-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
7-Jun-22 34 FL3B (P1E01_ON PO. 9100005271 (2) 022551 General (100) PT TKM Borepile Tray 150 kV K300 Kevin - - 6.0 - Reschedule
8-Jun-22 7 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
8-Jun-22 52 FL3B (P1E01_ON PO. 9100005271 (2) 022551 General (100) PT TKM Borepile Tray 150 kV K300 Kevin 18:15 18:15 6.0 4.5 Reschedule
9-Jun-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
9-Jun-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 022570 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 19:00 19:50 7.5 7.5
9-Jun-22 33 FL3B (P1E01_ON PO. 9100005271 (2) 022569 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 7.5 -
10-Jun-22 6 FL3B (P1E01_ON PO. 9100003018 (11) 022566 Pipe Bridge (186) PT TKM Borepile Poin 1 K300 Johannes S. 17:30 17:30 5.0 5.0 PO. 9100005271 (4)
10-Jun-22 14 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
10-Jun-22 26 FL3B (P1E01_ON PO. 9100005271 (2) 022585 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 18:40 18:40 7.5 7.5
11-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 17:55 17:55 4.5 4.5 Reschedule
11-Jun-22 15 FL3B (P1E01_ON PO. 9100005271 (2) 022575 Pipe Bridge (186) PT TKM Borepile Poin 2 K300 Johannes S. 16:30 16:30 5.0 5.0
11-Jun-22 26 FL3B (P1E01_ON PO. 9100005271 (2) 022705 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 15:10 15:30 7.5 7.5
11-Jun-22 77 FL3B (P1E01_ON PO. 9100005271 (2) 022587 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 & FR30 K300 Darwin 19:25 20:05 15.0
12-Jun-22 4 FL3B (P1E01_ON PO. 9100005271 (4) 022576 Pipe Bridge (186) PT TKM Borepile Poin 3 K300 Johannes S. - - 5.0 -
12-Jun-22 29 FL3B (P1E01_ON PO. 9100005271 (2) 022706 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 -
13-Jun-22 7 FL3B (P1E01_ON PO. 9100005271 (2) 022576 Pipe Bridge (186) PT TKM Borepile Poin 3 K300 Johannes S. 17:55 17:55 5.0 5.0 Reschedule
13-Jun-22 20 FL3B (P1E01_ON PO. 9100005271 (2) 022589 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 -
13-Jun-22 21 FL3B (P1E01_ON PO. 9100005271 (2) 022590 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 7.5 -
14-Jun-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 022582 ETP (135) - Cooling Tower PT TKM Borepile Pump House Fondation K300 Poltak 9:15 9:40 10.0 10.0
14-Jun-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 022589 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 - Reschedule
14-Jun-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 022590 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 18:25 18:25 7.5 4.5 Reschedule
15-Jun-22 1 FL3B (P1E01_ON PO. 9100005271 (2) 022577 Pipe Bridge (186) PT TKM Borepile Point 5 K300 Johannes S. 16:20 16:20 5.0 5.0
15-Jun-22 15 FL3B (P1E01_ON PO. 9100005271 (2) 022595 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower ETP K300 Poltak - - 5.5 -
15-Jun-22 29 FL3B (P1E01_ON PO. 9100005271 (2) 022589 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 19:05 19:40 7.5 7.5 Reschedule
16-Jun-22 2 FL3B (P1E01_ON PO. 9100005271 (2) 022578 Pipe Bridge (186) PT TKM Borepile Point 7 K300 Johannes S. 18:01 18:10 5.0 5.0
16-Jun-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 022595 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower ETP K300 Poltak 19:55 19:55 5.5 5.0 Reschedule
16-Jun-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 022707 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 18:00 18:55 7.5 7.5
17-Jun-22 7 FL3B (P1E01_ON PO. 9100005271 (2) 022710 Pipe Bridge (186) PT TKM Borepile Point 8 K300 Johannes S. 14:00 14:00 5.0 5.0
17-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 022708 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower ETP K300 Poltak 17:40 17:40 5.5 4.0
18-Jun-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 022713 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower ETP K300 Poltak 17:30 17:30 5.5 5.5
18-Jun-22 22 FL3B (P1E01_ON PO. 9100005271 (2) 022711 Pipe Bridge (186) PT TKM Borepile Piep Bridge FR30 K300 Delvin S. - - 7.5 -
19-Jun-22 19 FL3B (P1E01_ON PO. 9100005271 (2) 022711 Pipe Bridge (186) PT TKM Borepile Piep Bridge FR30 K300 Delvin S. 18:30 18:30 7.5 5.5 Reschedule
20-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 022560 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 18:50 18:50 5.5 5.0
20-Jun-22 27 FL3B (P1E01_ON PO. 9100005271 (2) 022562 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 17:00 17:25 7.5 7.5
21-Jun-22 12 FL3B (P1E01_ON PO. 9100005271 (2) 023415 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak - - 5.5 5.0
21-Jun-22 33 FL3B (P1E01_ON PO. 9100005271 (2) 023401 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 16:00 16:30 7.5 7.5
21-Jun-22 90 FL3B (P1E01_ON PO. 9100005271 (2) 023424 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Delvin S. 16:30 18:15 7.5 7.5
22-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 023416 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak - - 5.5 -
22-Jun-22 27 FL3B (P1E01_ON PO. 9100005271 (2) 023425 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 17:50 18:20 7.5 7.5
22-Jun-22 28 FL3B (P1E01_ON PO. 9100005271 (2) 023426 Pipe Bridge (186) PT TKM Borepile FR16 K300 Delvin S. 18:20 18:25 7.5 7.5
23-Jun-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 023416 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak - - 5.5 - Reschedule
23-Jun-22 26 FL3B (P1E01_ON PO. 9100005271 (2) 023427 Pipe Bridge (186) PT TKM Borepile FR16 K300 Delvin S. 18:50 19:40 7.5 7.5
23-Jun-22 27 FL3B (P1E01_ON PO. 9100005271 (2) 023428 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 19:40 20:35 7.5 7.5
24-Jun-22 14 FL3B (P1E01_ON PO. 9100005271 (2) 023416 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 19:45 19:45 5.5 5.0 Reschedule
24-Jun-22 27 FL3B (P1E01_ON PO. 9100005271 (2) 023430 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 17:40 17:55 7.5 7.5
24-Jun-22 28 FL3B (P1E01_ON PO. 9100005271 (2) 023431 Pipe Bridge (186) PT TKM Borepile FR16 K300 Delvin S. 17:55 19:05 7.5 7.5
25-Jun-22 6 FL3B (P1E01_ON PO. 9100005271 (2) 023417 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 18:40 18:40 5.5 5.0
25-Jun-22 28 FL3B (P1E01_ON PO. 9100005271 (2) 023433 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 18:25 18:50 7.5 7.5
26-Jun-22 12 FL3B (P1E01_ON PO. 9100005271 (2) 023419 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak - - 5.5 -
26-Jun-22 23 FL3B (P1E01_ON PO. 9100005271 (2) 023434 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. - - 7.5 -
27-Jun-22 19 FL3B (P1E01_ON PO. 9100005271 (2) 023419 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 15:25 15:25 5.5 5.5 Reschedule
27-Jun-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 023434 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 15:15 15:40 7.5 7.5 Reschedule
27-Jun-22 94 FL3B (P1E01_ON PO. 9100005271 (2) 023422 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 18:15 18:15 6.0
28-Jun-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 023421 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 19:20 19:20 5.5 5.0
28-Jun-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 023435 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 16:05 16:10 7.5 7.5
29-Jun-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 023436 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 17:00 18:00 7.5 7.5
30-Sep 5 FL3B PO. 9100005271 (2) 031988 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 Darwin - - 7.5 -
1-Oct 5 FL3B PO. 9100005271 (2) 031988 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 Darwin 15:25 16:05 7.5 7.5 Reschedule
2-Oct 3 FL3B PO. 9100005271 (2) 031113 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 Darwin 16:45 16:55 7.5 7.5
3-Oct 4 FL3B PO. 9100005271 (2) 031116 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 Darwin - - 7.5 -
4-Sep 6 FL3B PO. 9100005271 (2) 031116 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 15:00 15:35 16:30 7.5 7.5 Reschedule
5-Sep 7 FL3B PO. 9100005271 (2) 031990 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 15:00 17:10 17:50 7.5 7.5
6-Sep 4 FL3B PO. 9100005271 (2) 031120 FL3B-Fiber Line 1 PT TKM Borepile DNCG K300 15:00 18:20 19:35 7.5 7.5
17-Oct 19 FL3B PO. 9100005271 (2) 031991 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 15:00 19:30 20:15 7.5 7.5
18-Oct 19 FL3B PO. 9100005271 (2) 031912 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 17:10 18:35 7.5 7.5
19-Oct 24 FL3B PO. 9100005271 (2) 031913 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 17:25 18:25 7.5 7.5
20-Sep 22 FL3B PO. 9100005271 (2) 031136 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 Darwin - - 7.5 -
21-Oct 14 FL3B PO. 9100005271 (2) 031915 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 15:55 17:00 7.5 7.5
22-Oct 15 FL3B PO. 9100005271 (2) 031916 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 15:45 16:45 7.5 7.5
23-Oct 9 FL3B PO. 9100005271 (2) 031917 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 16:05 16:25 7.5 7.5
2-Nov 18 FL3B PO. 9100005271 (2) 031918 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin - - 7.5 -
3-Nov 16 FL3B PO. 9100005271 (2) 031939 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin 17:25 18:45 15.0 7.5
4-Nov 17 FL3B PO. 9100005271 (2) 031940 FL3B-PD#5 Fengshui Wall PT TKM Borepile K300 Darwin 17:10 17:10 7.5 7.5
5-Nov 10 FL3B PO. 9100005271 (2) 031946 FL3B-PD#5 Fengshui Wall PT TKM Borepile K300 Darwin 16:20 17:10 7.5 7.5
6-Nov 10 FL3B PO. 9100005271 (2) 031947 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin 12:10 13:40 7.5 7.5
7-Nov 12 FL3B PO. 9100005271 (2) 034618 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin 11:45 12:05 7.5 7.5
8-Nov 13 FL3B PO. 9100005271 (2) 034608 FL3B-Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin 12:15 12:50 7.5 7.5
Total 18,516.0 9,610.5
No PO Area Qty PO (m) Qty Final (m) Qty Actual Claim(m) Concrete Qty PO (m3) Concrete Qty Actual (m3) Concrete Qty Claim (m3)

Pipe Bridge 32000 31762 31762 6280 6233.2925 6168.9225

Pipe Bridge FR 4 (D600) 0 422 422 119.2572 0

Conveyor 4790 4790 4790 940.0375 940.0375 940.0375


1 9100000143
Chip Screening 344 1080 1080 1080 211.95 211.95 211.95

TG9 (Cable Tray) 432 432 432 84.78 84.78 84.78

DNCG 180 396 180 35.325 77.715 35.325

2 9100000147 Water Intake 1853 1853 1853 363.65125 363.65125 363.65125

3 9100003151 Warehouse 72 42 42 14.13 8.2425 8.2425

4 9100003604 WoodHandling 288 144 144 56.52 28.26 28.26

5 9100003603 Evaporator 6 576 984 576 113.04 193.11 113.04

6 9100008705 Fengshui Wall 432 432 432 84.78 84.78 84.78

432 432 432 84.78 84.78 84.78


FiberLine
7
640 640 640 125.6 125.6 125.6
9100000603 Recaustic
1476 1201 1165 289.665 235.69625 228.63125
PD5
1512 519 519 296.73 101.85375 101.85375
ETP ( Pump Foundation)
8 9100002505 534 440 440 104.7975 86.35 86.35
Screening
440 440 440 86.35 86.35 86.35
Clarifier 6
144 144 144 28.26 28.26 28.26
CPU 3 UpGrade

TOTAL 46881 46153 45493 9200.39625 9093.96595000001 8780.81375


PT KIK, BATCHING PLANT
Actual Concrete Supplied
013797 Prepared By : HRP

Concrete Req Approval Concrete Time Volume (m3)


No Project Cost Center Req No. PO Billing Work Type Remarks
Grade by Start Finish Req Actual
0

15-Mar-22 47 POWER (P1G02_ PO. 9100005271 (2) 027954 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 19:10 19:10 7.5 5.5
16-Mar-22 70 POWER (P1G02_ PO. 9100005271 (2) 027962 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 17:15 17:15 11.0 5.5
17-Mar-22 47 POWER (P1G02_ PO. 9100005271 (2) 027964 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 16:45 18:25 11.0 13.0
18-Mar-22 53 POWER (P1G02_ PO. 9100005271 (2) 027972 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 15:50 15:50 11.0 5.5
19-Mar-22 37 POWER (P1G02_ P1E01_ON-CPPU0162 (2) 027979 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin - - 11.0 -

20-Mar-22 24 P1E01_ON-CPPU0162 (2) 027979 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin - - 11.0 - Reschedule
POWER (P1G02_
23-Mar-22 43 POWER (P1G02_ PO. 9100005271 (2) 027994 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 18:45 18:45 11.0 5.5
24-Mar-22 47 POWER (P1G02_ PO. 9100005271 (2) 027998 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 17:20 17:20 11.0 5.5
24-Mar-22 48 POWER (P1G02_ P1E01_ON-CPPU0162 (2) 027999 CT TG10 (29C) PT TKM Borepile RB5 K300 Darwin - - 7.5 -
25-Mar-22 43 POWER (P1G02_ P1E01_ON-CPPU0162 (2) 018153 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin - - 11.0 -
25-Mar-22 69 BCTMP (P1R01_ PO. 9100005271 (2) 018171 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 15:30 15:35 7.5 7.5
26-Mar-22 7 BCTMP (P1R01_ PO. 9100005271 (2) 018160 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 21:00 21:20 7.5 7.5
26-Mar-22 8 BCTMP (P1R01_ PO. 9100005271 (2) 018158 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 15:05 16:05 7.5 7.5
26-Mar-22 43 POWER (P1G02_ PO. 9100005271 (2) 018166 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 16:45 16:45 11.0 5.5
27-Mar-22 5 BCTMP (P1R01_ PO. 9100005271 (2) 018161 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 19:15 19;35 7.5 7.5
27-Mar-22 6 BCTMP (P1R01_ PO. 9100005271 (2) 018159 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 20:00 20:05 7.5 7.5
27-Mar-22 29 POWER (P1G02_ PO. 9100005271 (2) 018170 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 16:00 16:55 11.0 13.0
28-Mar-22 27 BCTMP (P1R01_ PO. 9100005271 (2) 018181 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 18:10 19:40 7.5 7.5
28-Mar-22 28 BCTMP (P1R01_ PO. 9000575508 (1) 018182 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 -
28-Mar-22 50 POWER (P1G02_ PO. 9100005271 (2) 018180 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 15:30 15:30 11.0 5.5
29-Mar-22 26 BCTMP (P1R01_ PO. 9100005271 (2) 018184 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 19:45 20:15 7.5 7.5
29-Mar-22 27 BCTMP (P1R01_ PO. 9100005271 (2) 018183 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 19:10 19:25 7.5 7.5
29-Mar-22 28 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018182 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 - Reschedule
29-Mar-22 51 POWER (P1G02_ PO. 9100005271 (2) 018189 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 21:15 21:15 11.0 5.5
30-Mar-22 25 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018198 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 -
30-Mar-22 26 BCTMP (P1R01_ PO. 9100005271 (2) 018182 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 18:10 19:10 7.5 7.5 Reschedule
30-Mar-22 55 POWER (P1G02_ PO. 9100005271 (2) 018194 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 15:10 15:10 5.5 5.5
31-Mar-22 18 BCTMP (P1R01_ PO. 9100005271 (2) 018199 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 14:45 15:25 7.5 7.5

31-Mar-22 19 P1E01_ON-CPPU0162 (2) 018198 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 - Reschedule
BCTMP (P1R01_
31-Mar-22 42 POWER (P1G02_ PO. 9100005271 (2) 019054 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 19:25 19:25 5.5 5.5
1-Apr-22 26 BCTMP (P1R01_ PO. 9100005271 (2) 018198 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 14:55 15:45 7.5 7.5 Reschedule
4-Apr-22 22 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 019076 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 -
9-Apr-22 27 BCTMP (P1R01_ PO. 9100005271 (2) 018908 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 14:55 15:15 7.5 7.5

10-Apr-22 19 PO. 9100005271 (2) 018911 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 16:25 17:15 7.5 7.5
BCTMP (P1R01_
11-Apr-22 24 BCTMP (P1R01_ PO. 9100005271 (2) 018912 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 17:50 19:00 7.5 7.5
12-Apr-22 20 BCTMP (P1R01_ PO. 9100005271 (2) 018921 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 14:35 14:45 7.5 7.5
13-Apr-22 16 BCTMP (P1R01_ PO. 9100005271 (2) 018922 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 16:20 16:45 7.5 7.5
19-Apr-22 20 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018946 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. - - 7.5 - Pump

20-Apr-22 19 PO. 9100005271 (2) 018948 BCTMP (441) PT TKM Borepile Pipe bridge North K300 Hadi R. 21:35 21:35 7.5 7.5
BCTMP (P1R01_
20-Apr-22 20 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018946 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. - - 7.5 - Reschedule (Pump)
21-Apr-22 15 BCTMP (P1R01_ PO. 9100005474 (9) 018283 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. - - 7.5 - PO. 9100003017 (3) Reschedule (Pump)
21-Apr-22 16 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018946 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. - - 7.5 - Reschedule (Pump)
22-Apr-22 21 BCTMP (P1R01_ PO. 9100005271 (2) 018946 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. 22:45 23:35 7.5 7.5 Reschedule (Pump)
23-Apr-22 27 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 021871 BCTMP (441) PT TKM Borepile Pipe Bridge BCTMP K300 Hadi R. - - 7.5 -
24-Apr-22 20 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 021871 BCTMP (441) PT TKM Borepile Pipe Bridge BCTMP K300 Hadi R. - - 7.5 - Reschedule
25-Apr-22 25 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 021871 BCTMP (441) PT TKM Borepile Pipe Bridge BCTMP K300 Hadi R. - - 7.5 - Reschedule
26-Apr-22 14 BCTMP (P1R01_ PO. 9100005271 (2) 021871 BCTMP (441) PT TKM Borepile Pipe Bridge BCTMP K300 Hadi R. 19:10 20:00 7.5 7.5 Reschedule
30-May-22 42 POWER (P1G02_ PO. 9100005119 (5) 020413 Coal Handling (28A) PT TKM Borepile Transfer Tower #7 K300 Mayer 17:00 17:25 7.5 7.5
31-May-22 40 POWER (P1G02_ PO. 9100005119 (3) 020419 Coal Handling (28A) PT TKM Widening Road TT#7 K300 NN Mayer 18:00 18:15 7.0 7.5
31-May-22 41 POWER (P1G02_ PO. 9100005119 (5) 020418 Coal Handling (28A) PT TKM Borepile TT#7 Coal Yard K300 Mayer 19:35 20:35 7.5 10.0
1-Jun-22 38 POWER (P1G02_ PO. 9100005119 (5) 020421 Coal Handling (28A) PT TKM Borepile Transfer Tower#7 BP-04 K300 Mayer - - 8.5 -
2-Jun-22 40 POWER (P1G02_ PO. 9100005119 (5) 020423 Coal Handling (28A) PT TKM Borepile Transfer Tower#7 BP-003 K300 Mayer - - 8.5 -
2-Jun-22 41 POWER (P1G02_ PO. 9100005119 (5) 020421 Coal Handling (28A) PT TKM Borepile Transfer Tower#7 BP-04 K300 Mayer 15:25 15:45 8.5 8.5 Reschedule
3-Jun-22 40 POWER (P1G02_ PO. 9100005119 (5) 020423 Coal Handling (28A) PT TKM Borepile Transfer Tower#7 BP-003 K300 Mayer 18:05 18:20 8.5 8.5 Reschedule
4-Jun-22 54 POWER (P1G02_ PO. 9100005119 (5) 020434 Coal Handling (28A) PT TKM Borepile Transfer Tower#5 BP-01 K300 Mayer 18:45 19;35 8.5 8.5
5-Jun-22 36 POWER (P1G02_ 9100005271 (1) 020435 Coal Handling (28A) PT TKM Borepile Transfer Tower#5 BP-02 K300 Mayer - - 8.5 -
6-Jun-22 68 POWER (P1G02_ PO. 9100005119 (5) 020435 Coal Handling (28A) PT TKM Borepile Transfer Tower#5 BP-02 K300 Mayer 13:05 13:30 8.5 8.5 Reschedule
2-Jul-22 35 POWER (P1G02_ PO. 9100005271 (2) 024251 TG10 (29A) PT TKM Borepile TC 10 K300 Kevin 17:05 17:40 10.0 10.0
3-Jul-22 26 POWER (P1G02_ PO. 9100005271 (2) 024252 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 14:20 14:20 10.0 10.0
4-Jul-22 32 POWER (P1G02_ PO. 9100005271 (2) 024253 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 11:10 11:35 11.0 11.0
5-Jul-22 43 POWER (P1G02_ PO. 9100005271 (2) 024254 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 13:55 14:10 11.0 11.0
6-Jul-22 27 POWER (P1G02_ PO. 9100005271 (2) 024255 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin - - 11.0 -
7-Jul-22 29 POWER (P1G02_ PO. 9100005271 (2) 024255 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 15:30 15:45 11.0 11.0 Reschedule
8-Jul-22 38 POWER (P1G02_ PO. 9100005271 (2) 024271 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 18:50 19:40 11.0 11.0
11-Jul-22 19 POWER (P1G02_ PO. 9100005271 (2) 024274 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 16:25 17:15 11.0 11.0
12-Jul-22 32 POWER (P1G02_ PO. 9100005271 (2) 024273 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 16:45 16:45 5.5 5.5
19-Jul-22 39 POWER (P1G02_ PO. 9100005441 024278 Coal Handling (28A) PT TKM Borepile Point#1 Samping PB#5 K300 Ian Felix S. 16:25 17:35 8.5 8.5
20-Jul-22 28 POWER (P1G02_ PO. 9100005441 024279 Coal Handling (28A) PT TKM Borepile Point#1 Samping PB#5 K300 Ian Felix S. 17:20 17:45 8.5 8.5
21-Jul-22 33 POWER (P1G02_ PO. 9100005441 024280 Coal Handling (28A) PT TKM Borepile Point#3 Samping PB#5 K300 Ian Felix S. - - 8.5 -
22-Jul-22 33 POWER (P1G02_ PO. 9100005441 024280 Coal Handling (28A) PT TKM Borepile Point#3 Samping PB#5 K300 Ian Felix S. - - 8.5 - Reschedule
23-Jul-22 26 POWER (P1G02_ PO. 9100005441 024281 Coal Handling (28A) PT TKM Borepile Point#1 K300 Ian Felix S. 17:40 20:05 25.5 25.5
24-Jul-22 24 POWER (P1G02_ PO. 9100005441 024282 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 16:45 18:35 25.5 25.5
25-Jul-22 29 POWER (P1G02_ PO. 9100005441 024283 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. - - 8.5 -
26-Jul-22 3 BCTMP (P1R01_ PO. 9100005474 (7) 024284 H2O2 (651) PT TKM Borepile #7 Pipe Rack H2O2 K300 Brian C. 18:15 18:50 7.5 7.5
26-Jul-22 30 POWER (P1G02_ PO. 9100005441 024283 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 15:45 16:15 8.5 8.5 Reschedule
27-Jul-22 4 BCTMP (P1R01_ PO. 9100005474 (7) 024285 H2O2 (651) PT TKM Borepile #6 Pipe Rack H2O2 K300 Brian C. 15:05 15:40 7.5 7.5
27-Jul-22 29 POWER (P1G02_ PO. 9100005441 024292 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 16:50 17:30 8.5 8.5
28-Jul-22 2 BCTMP (P1R01_ PO. 9100005474 (7) 024286 H2O2 (651) PT TKM Borepile #5 Pipe Rack H2O2 K300 Brian C. 18:40 19:00 7.5 7.5
29-Jul-22 2 BCTMP (P1R01_ PO. 9100005474 (7) 024287 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 -
30-Jul-22 3 BCTMP (P1R01_ PO. 9100005474 (7) 024287 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 - Reschedule
30-Jul-22 38 POWER (P1G02_ PO. 9100005441 024291 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. - - 8.5 -
31-Jul-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 024287 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 14:30 14:45 7.5 7.5 Reschedule
31-Jul-22 27 POWER (P1G02_ PO. 9100005441 024291 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 17:25 18:05 8.5 8.5 Reschedule
1-Aug-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 024288 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 13:05 13:55 7.5 7.5
1-Aug-22 29 POWER (P1G02_ PO. 9100005441 024293 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 21:05 21:05 8.5 8.5
2-Aug-22 6 BCTMP (P1R01_ PO. 9100005474 (7) 024289 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 -
2-Aug-22 32 POWER (P1G02_ PO. 9100005441 024294 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. - - 8.5 -
3-Aug-22 4 BCTMP (P1R01_ PO. 9100005474 (7) 024289 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 11:35 18:40 7.5 7.5 Reschedule
3-Aug-22 23 POWER (P1G02_ PO. 9100005441 024294 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 21:25 21:45 8.5 8.5 Reschedule
4-Aug-22 32 POWER (P1G02_ PO. 9100005441 024295 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. - - 8.5 -
5-Aug-22 38 POWER (P1G02_ PO. 9100005441 024295 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 18:25 20:15 8.5 8.5 Reschedule
8-Aug-22 4 BCTMP (P1R01_ PO. 9100005474 (7) 024290 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 -
9-Aug-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 024290 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 17:00 18:10 7.5 7.5 Reschedule
10-Aug-22 14 BCTMP (P1R01_ PO. 9100005474 (7) 029466 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 18;40 19:00 7.5 7.5
11-Aug-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 029473 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 -
12-Aug-22 13 BCTMP (P1R01_ PO. 9100005474 (7) 029473 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 15:35 16:15 7.5 7.5 Reschedule
13-Aug-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 029475 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 16:15 17:35 7.5 7.5
21-Aug-22 4 BCTMP (P1R01_ PO. 9100005474 (7) 029476 H2O2 (651) PT TKM Bore Pile Pipe Rack K300 Brian C. 15:20 15:45 7.5 7.5
22-Aug-22 14 BCTMP (P1R01_ PO. 9100005474 (7) 029500 H2O2 (651) PT TKM Bore Pile Pipe Rack K300 Brian C. 11:10 11:40 7.5 7.5
23-Aug 5 BCTMP (P1R01_ PO. 9100005474 (7) 029499 H2O2 (651) PT TKM Bore Pile Pipe Rack K300 Brian C. 15:15 16:30 7.5 7.5
14-Oct 18 FL3B-BM Related PO. 9100004019 (2) 031910 PB5 (285) PT TKM Borepile Feedwater Station K300 15:00 18:20 19:00 7.5 7.5
16-Oct 24 FL3B-BM Related PO. 9100004019 (2) 031911 PB5 (285) PT TKM Borepile Feedwater Station K300 15:00 13:15 13:30 7.5 7.5
27-Oct 29 FL3B-BM Related 033594 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 20:30 20:50 8.5 8.5
28-Oct 22 FL3B-BM Related P1G02_ON-CPPU0034 031938 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 17:10 17:40 8.5 8.5
30-Oct 21 FL3B-BM Related P1G02_ON-CPPU0034 034602 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 15:30 15:45 8.5 8.5
31-Oct 24 FL3B-BM Related P1G02_ON-CPPU0034 034604 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 14:05 14:15 9.0 9.0
1-Nov 24 FL3B-BM Related P1G02_ON-CPPU0034 034605 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. - - 9.0 -
2-Nov 25 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 9.0 -
2-Nov 31 FL3B-BM Related P1G02_ON-CPPU0034 034605 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 9:20 9:30 9.0 9.0 Reschedule
3-Nov 30 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 9.0 - Reschedule
4-Nov 24 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 9.0 - Reschedule
10-Nov 20 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Rori G. - - 9.0 -
11-Nov 19 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Rori G. 16:50 17:00 9.0 9.0 Reschedule
12-Nov 22 FL3B-BM Related P1G02_ON-CPPU0034 034685 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 8.5 -
13-Nov 21 FL3B-BM Related PO. 9100005119 (2) 034686 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 8.5 -
13-Nov 25 FL3B-BM Related P1G02_ON-CPPU0034 034685 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. 11:35 11:45 8.5 8.5 Reschedule
14-Nov 18 FL3B-BM Related PO. 9100005119 (2) 034687 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. 2:30 16:50 8.5 8.5
15-Nov 26 FL3B-BM Related PO. 9100005119 (2) 034620 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 8.5 -
16-Nov 28 FL3B-BM Related PO. 9100005119 (2) 034620 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. 18:35 19:50 8.5 8.5 Reschedule
19-Nov 24 FL3B-BM Related P1G02_ON-CPPU0034 034686 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. 17:15 17:40 8.5 8.5
20-Nov 11 FL3B-BM Related P1G02_ON-CPPU0034 034643 Coal Handling (28A) PT TKM Borepile TR19 K300 Fendy T. 12:25 13:00 8.5 8.5
21-Nov 18 FL3B-BM Related P1G02_ON-CPPU0034 034644 Coal Handling (28A) PT TKM Borepile TR19 K300 Fendy T. 18:10 19:35 8.5 8.5
22-Nov 25 FL3B-BM Related P1G02_ON-CPPU0034 034645 Coal Handling (28A) PT TKM Borepile TR19 K300 Fendy T. 19:00 19:55 8.5 8.5
23-Nov 19 FL3B-BM Related P1G02_ON-CPPU0034 034646 Coal Handling (28A) PT TKM Borepile TR17 K300 Fendy T. 17:45 18;10 8.5 8.5
24-Nov 20 FL3B-BM Related P1G02_ON-CPPU0034 034642 Coal Handling (28A) PT TKM Borepile TR17 K300 Fendy T. 12:15 12:20 8.5 8.5
4-Dec 17 FL3B-BM Related P1G02_ON-CPPU0084 034647 Coal Handling (28A) PT TKM Borepile TR17 Belakang Site Office TPE K300 Fendy T. - - 8.5 -
4-Dec 18 FL3B-BM Related P1G02_ON-CPPU0084 034648 Coal Handling (28A) PT TKM Borepile Primary Crusher K300 Fendy T. - - 17.0 -
5-Dec 17 FL3B-BM Related P1G02_ON-CPPU0084 034647 Coal Handling (28A) PT TKM Borepile TR17 Belakang Site Office TPE K300 Fendy T. - - 8.5 - Reschedule
5-Dec 18 FL3B-BM Related P1G02_ON-CPPU0084 034648 Coal Handling (28A) PT TKM Borepile Primary Crusher K300 Fendy T. - - 17.0 - Reschedule
6-Dec 22 FL3B-BM Related P1G02_ON-CPPU0084 034647 Coal Handling (28A) PT TKM Borepile TR17 Belakang Site Office TPE K300 Fendy T. 17:50 18:05 8.5 8.5 Reschedule
6-Dec 23 FL3B-BM Related P1G02_ON-CPPU0084 034648 Coal Handling (28A) PT TKM Borepile Primary Crusher K300 Fendy T. - - 17.0 - Reschedule
7-Dec 13 FL3B-BM Related P1G02_ON-CPPU0034 036104 Coal Handling (28A) PT TKM Borepile TR17 K300 Rori G. - - 8.5 -
8-Dec 20 FL3B-BM Related P1G02_ON-CPPU0034 036106 Coal Handling (28A) PT TKM Borepile K300 Rori G. - - 17.0 -
8-Dec 21 FL3B-BM Related P1G02_ON-CPPU0034 036104 Coal Handling (28A) PT TKM Borepile TR17 K300 Rori G. - - 8.5 - Reschedule
9-Dec 25 FL3B-BM Related P1G02_ON-CPPU0034 036106 Coal Handling (28A) PT TKM Borepile K300 Rori G. 13:30 17:35 17.0 17.0 Reschedule
9-Dec 26 FL3B-BM Related P1G02_ON-CPPU0034 036104 Coal Handling (28A) PT TKM Borepile TR17 K300 Rori G. - - 8.5 - Reschedule
10-Dec 17 FL3B-BM Related P1G02_ON-CPPU0034 036104 Coal Handling (28A) PT TKM Borepile TR17 K300 Rori G. - - 8.5 - Reschedule
10-Dec 18 FL3B-BM Related P1G02_ON-CPPU0034 036108 Coal Handling (28A) PT TKM Borepile K300 Rori G. 16:40 17:15 17.0 17.0
11-Dec 15 FL3B-BM Related P1G02_ON-CPPU0034 036110 Coal Handling (28A) PT TKM Borepile K300 Rori G. 14:20 14:20 8.5 8.5
11-Dec 16 FL3B-BM Related P1G02_ON-CPPU0034 036109 Coal Handling (28A) PT TKM Borepile K300 Rori G. 13;50 19:10 17.0 17.0
12-Dec 16 FL3B-BM Related P1G02_ON-CPPU0034 036111 Coal Handling (28A) PT TKM Borepile K300 Rori G. 17:15 18:20 17.0 17.0
12-Dec 17 FL3B-BM Related P1G02_ON-CPPU0034 036112 Coal Handling (28A) PT TKM Borepile K300 Rori G. 18:15 18:15 8.5 8.5
13-Dec 65 FL3B-BM Related P1G02_ON-CPPU0034 036113 Coal Handling (28A) PT TKM Borepile K300 Rori G. 14:50 15:40 8.5
13-Dec 67 FL3B-BM Related P1G02_ON-CPPU0034 036112 Coal Handling (28A) PT TKM Borepile K300 Rori G. 17:35 18:40 8.5
14-Dec 24 FL3B-BM Related P1G02_ON-CPPU0034 036116 Coal Handling (28A) PT TKM Borepile TR16 K300 Rori G. 15:50 16:20 8.5 8.5
14-Dec 25 FL3B-BM Related P1G02_ON-CPPU0034 036115 Coal Handling (28A) PT TKM Borepile K300 Rori G. 15:15 16:20 8.5 8.5
20-Dec 17 FL3B-BM Related P1G02_ON-CPPU0034 036119 Coal Handling (28A) PT TKM Borepile K300 Yoga N. - - 8.5 -
21-Dec 16 FL3B-BM Related P1G02_ON-CPPU0034 036123 Coal Handling (28A) PT TKM Borepile K300 Iskandar 16:25 17:15 8.5 8.5
22-Dec 17 FL3B-BM Related P1G02_ON-CPPU0034 036124 Coal Handling (28A) PT TKM Borepile K300 Iskandar 17:05 18:15 8.5 8.5
23-Dec 16 FL3B-BM Related P1G02_ON-CPPU0034 036125 Coal Handling (28A) PT TKM Borepile K300 Iskandar - - 8.5 -
24-Dec 13 FL3B-BM Related P1G02_ON-CPPU0034 036125 Coal Handling (28A) PT TKM Borepile K300 Iskandar 18:16 19;20 8.5 8.5 Reschedule
26-Dec 15 FL3B-BM Related P1G02_ON-CPPU0034 036126 Coal Handling (28A) PT TKM Borepile K300 Iskandar 17:10 18:10 8.5 8.5
26-Dec 19 FL3B-BM Related P1G02_ON-CPPU0034 036125 Coal Handling (28A) PT TKM Borepile K300 Iskandar - - 8.5 - Reschedule
11-Jan 12 FL3B-BM Related PO. 9100004019 (2) 036140 PB5 (285) PT TKM Borepile Primary Area Fan K300 Tigor H. 20:15 21:10 7.5 7.5
12-Jan 22 FL3B-BM Related PO. 9100004019 (2) 036138 PB5 (285) PT TKM Borepile Primary Area Fan K300 Tigor H. - - 7.5 -
13-Jan 18 FL3B-BM Related PO. 9100004019 (2) 036138 PB5 (285) PT TKM Borepile Primary Area Fan K300 Tigor H. 18:20 19:10 7.5 7.5 Reschedule
14-Jan 17 FL3B-BM Related PO. 9100004019 (2) 036137 PB5 (285) PT TKM Borepile Primary Air Fan (3) K300 Mayer - - 7.5 -
15-Jan 50 FL3B-BM Related PO. 9100004019 (2) 036137 PB5 (285) PT TKM Borepile Primary Air Fan (3) K300 Mayer 14:20 15:25 7.5
15-Jan 51 FL3B-BM Related PO. 9100004019 (2) 036139 PB5 (285) PT TKM Borepile Primary Air Fan (3) K300 Mayer 16:35 17:15 7.5
18-Jan 12 FL3B-BM Related PO. 9100004019 (2) 036141 PB5 (285) PT TKM Borepile Feed Water (4) K300 Mayer - - 7.5 -
19-Jan 16 FL3B-BM Related PO. 9100004019 (2) 036142 PB5 (285) PT TKM Borepile Feed Water (5) K300 Mayer 16:55 20:30 15.0 15.0
1-Feb 10 FL3B-BM Related PO. 9100005119 (2) 038709 Coal Handling (28A) PT TKM Borepile TR-19 K300 Fendy Tan - - 8.5 -
2-Feb 13 FL3B-BM Related PO. 9100005119 038710 Coal Handling (28A) PT TKM Bore Pile TR/19 K300 Rori 14:45 15:50 8.5 8.5
3-Feb 7 FL3B-BM Related PO. 9100005119 038711 Coal Handling (28A) PT TKM Bore Pile TR/16 K300 Rori 14:20 15:25 8.5 8.5
4-Feb 13 FL3B-BM Related P1G02-ON-CPPU0084 038716 Coal Handling (28A) PT TKM Bore Pile TR/16 K300 Rori - - 8.5 -
5-Feb 7 FL3B-BM Related P1G02-ON-CPPU0084 038716 Coal Handling (28A) PT TKM Bore Pile TR/16 K300 Rori 13:30 15:20 8.5 8.5 Reschedule

Total 1,467.0 955.5


PT KIK, BATCHING PLANT
Actual Concrete Supplied
Prepared By : HRP

Concrete Req Approval Concrete Time Volume (m3)


No Project Cost Center Req No. Location Contractor Work Type Remarks
Grade by Start Finish Req Actual
0

24-Jul-21 28 BM PO. 9100000180 (22) 08329 BM1 Land Development PT TKM Benol LC K100 Ramses 14:35 14:35 4.0 4.0
26-Jul-21 4 BM PO. 9100000137 08330 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses - - 13.0 -
27-Jul-21 26 BM PO. 9100000137 08331 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 16:45 16:45 13.0 6.0
28-Jul-21 2 BM PO. 9100000137 08330 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 15:00 17:00 13.0 12.0
29-Jul-21 31 BM PO. 9100000137 08349 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 13:20 13:20 12.0 6.0
30-Jul-21 25 BM PO. 9100000137 08350 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 10:05 14:15 12.0 12.0
31-Jul-21 37 BM PO. 9100000137 08714 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 9:50 14:05 12.0 12.0
2-Aug-21 34 BM PO. 9100000137 08715 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:30 9:40 12.0 12.0
3-Aug-21 35 BM PO. 9100000137 08717 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:40 14:10 12.0 12.0
4-Aug-21 26 BM PO. 9100000137 08718 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses - - 12.0 -
5-Aug-21 21 BM PO. 9100000137 08718 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 10:05 11:05 12.0 12.0
6-Aug-21 29 BM PO. 9100000137 08722 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 10:00 10:00 12.0 6.0
7-Aug-21 22 BM PO. 9100000137 08719 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:30 14:05 12.0 12.0
9-Aug-21 35 BM PO. 9100000137 08720 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses - - 12.0 -
10-Aug-21 27 BM PO. 9100000137 08720 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:55 10:05 12.0 12.0
10-Aug-21 28 BM PO. 9100000180 (22) 09201 BM1 Land Development PT TKM LC BM#1 K100 Ramses 14:00 14:00 3.0 3.0
12-Aug-21 38 BM PO. 9100000137 09202 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 10:20 13:00 12.0 12.0
13-Aug-21 33 BM PO. 9100001000 09204 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1)
13-Aug-21 34 BM PO. 9100000137 09203 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:10 9:10 18.0 6.0
14-Aug-21 30 BM PO. 9100001000 09204 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses 10:30 10:30 3.0 3.0 PO. 9100001000 (1) Reschedule
14-Aug-21 31 BM PO. 9100000137 09206 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:10 11:05 12.0 12.0
14-Aug-21 32 BM PO. 9100000137 09205 BM1 Land Development PT TKM Cast In Situ BM1 Grid 15-45 K300 Ramses 15:15 15:15 12.0 6.0
16-Aug-21 25 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1)
16-Aug-21 26 BM PO. 9100000137 09207 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:50 13:50 18.0 17.0
18-Aug-21 22 BM PO. 9100000137 09210 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses - - 12.0 -
18-Aug-21 23 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1) Reschedule
19-Aug-21 44 BM PO. 9100000137 09210 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:30 10:20 12.0 12.0 Reschedule
19-Aug-21 45 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1) Reschedule
20-Aug-21 37 BM PO. 9100000137 09211 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:55 16:25 18.0 15.0
20-Aug-21 38 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1) Reschedule
21-Aug-21 30 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses 13:10 13:10 3.0 3.0 PO. 9100001000 (1) Reschedule
21-Aug-21 31 BM PO. 9100000137 09212 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 13:55 15:30 12.0 12.0
23-Aug-21 41 BM PO. 9100001000 09215 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses 17:55 17:55 3.0 3.0 PO. 9100001000 (1)
23-Aug-21 42 BM PO. 9100000137 09214 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:40 14:20 18.0 18.0
23-Aug-21 58 BM PO. 9100000137 09301 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 17:05 17:05 5.0 5.0
24-Aug-21 25 BM PO. 9100000137 09302 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 13:25 15:00 24.0 18.0
25-Aug-21 40 BM PO. 9100001000 09216 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:55 13:55 24.0 12.0
25-Aug-21 41 BM PO. 9100001000 09209 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 4.0 -

26-Aug-21 43 BM PO. 9100001000 09217 PT TKM Pile Cap Cast in Situ BM #1 Grid 15-45 K300 Ramses 14:45 14:45 12.0 6.0
BM1 Land Development
26-Aug-21 44 BM PO. 9100001000 09209 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 4.0 - Reschedule

27-Aug-21 39 BM PO. 9100001000 09218 PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses 14:25 14:25 6.0 6.0
BM1 Land Development
27-Aug-21 40 BM PO. 9100001000 09219 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 -

28-Aug-21 31 BM PO. 9100001000 09220 PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses 13:25 13:25 12.0 6.0
BM1 Land Development
28-Aug-21 32 BM PO. 9100001000 09219 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses 14:15 14:15 3.0 3.0 Reschedule
30-Aug-21 32 BM PO. 9100001000 09221 BM1 Land Development PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses - - 12.0 -
31-Aug-21 40 BM PO. 9100001000 09222 BM1 Land Development PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses 14:30 14:30 12.0 6.0
31-Aug-21 41 BM PO. 9100001000 09221 BM1 Land Development PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses - - 12.0 - Reschedule
1-Sep-21 40 BM PO. 9100001000 09224 BM1 Land Development PT TKM Precast PileCap BM1 Grid 15-45 K300 Ramses 14:00 15:30 12.0 12.0
1-Sep-21 41 BM PO. 9100001000 09223 BM1 Land Development PT TKM LC Cast in Situ PileCap K100 Ramses 16:05 16:05 9.0 6.0
2-Sep-21 34 BM PO. 9100001000 09225 BM1 Land Development PT TKM Precast PileCap BM1 Grid 15-45 K300 Ramses 9:35 14:10 12.0 11.0
3-Sep-21 46 BM PO. 9100001000 09226 BM1 Land Development PT TKM Precast PileCap BM1 Grid 15-45 K300 Agung N. 15:05 15:05 6.0 6.0
3-Sep-21 47 BM PO. 9100001000 09227 BM1 Land Development PT TKM LC PileCap K100 Agung N. 16:30 16:30 3.0 3.0
4-Sep-21 39 BM PO. 9100001000 09229 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 16:30 16:30 6.0 6.0
4-Sep-21 40 BM PO. 9100001000 09228 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram - - 4.0 -
4-Sep-21 62 BM PO. 9100001000 09234 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Agung 18:25 18:25 4.0 4.0
5-Sep-21 33 BM PO. 9100001000 09231 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram - - 10.0 -
5-Sep-21 34 BM PO. 9100001000 09230 BM1 Land Development PT TKM LC PileCap Slopping Protection K100 Bram 11:10 11:10 4.0 4.0
5-Sep-21 35 BM PO. 9100001000 09228 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram - - 4.0 - Reschedule
6-Sep-21 46 BM PO. 9100001000 09232 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram - - 3.0 -
6-Sep-21 47 BM PO. 9100001000 09233 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 18:15 18:15 9.0 6.0
7-Sep-21 43 BM PO. 9100001000 09235 BM1 Land Development PT TKM Capping Beam Sheet Pile BM1 Grid 15-45 K300 Bram 16:40 20:20 17.0 18.0
7-Sep-21 44 BM PO. 9100001000 09232 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram - - 3.0 - Reschedule
7-Sep-21 45 BM PO. 9100001000 09235 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 21:55 23:00 9.0 9.0
7-Sep-21 60 BM PO. 9100001000 010401 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 23:00 23:00 3.0 3.0
8-Sep-21 28 BM PO. 9100001000 09238 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram 15:40 15:40 6.0 3.0
8-Sep-21 29 BM PO. 9100001000 09237 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram - - 18.0 -
9-Sep-21 19 BM PO. 9100001000 010402 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram 13:50 13:50 3.0 3.0

9-Sep-21 20 BM PO. 9100001000 010403 PT TKM Capping Beam Sheet Pile BM1 Grid 15-45 K300 Bram - - 18.0 -
BM1 Land Development
9-Sep-21 21 BM PO. 9100001000 010404 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 18:15 20:15 16.0 11.0
9-Sep-21 22 BM PO. 9100001000 09237 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram - - 18.0 - Reschedule
10-Sep-21 32 BM PO. 9100001000 010403 BM1 Land Development PT TKM Capping Beam Sheet Pile BM1 Grid 15-45 K300 Bram 16:55 20:10 18.0 18.0 Reschedule
10-Sep-21 33 BM PO. 9100001000 09237 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 20:40 20:40 18.0 6.0 Reschedule
11-Sep-21 35 BM PO. 9100001000 09993 BM1 Land Development PT TKM Capping Beam Sheet Pile BM1 Grid 15-45 K300 Bram 13:25 13:25 14.0 6.0
11-Sep-21 36 BM PO. 9100001000 09991 BM1 Land Development PT TKM LC PileCap Slopping Protection K100 Bram - - 3.0 -
13-Sep-21 44 BM PO. 9100000137 010801 BM1 Land Development PT TKM PileCap InSitu K300 Bram 13:25 16:55 12.0 12.0
13-Sep-21 45 BM PO. 9100001000 09991 BM1 Land Development PT TKM LC PileCap Slopping Protection K100 Bram 15:20 15:20 3.0 3.0
13-Sep-21 64 BM PO. 9100001000 010805 BM1 Land Development PT TKM PileCap InSitu K300 Bram 18:55 18:55 6.0
14-Sep-21 38 BM PO. 9100001000 010809 BM1 Land Development PT TKM LC PileCap K100 Agung N. 19:00 19:00 3.0 3.0

14-Sep-21 39 BM PO. 9100001000 010807 PT TKM Pile Cap In Situ Grid 63-65 & 73-78 K300 Agung N. 17:35 20:00 18.0 18.0
BM1 Land Development
14-Sep-21 40 BM PO. 9100001000 010808 BM1 Land Development PT TKM Capping Beam Sheet Pile 23m Grid 46-69 K300 Agung N. 14:50 17:00 18.0 18.0
15-Sep-21 46 BM PO. 9100001000 010810 BM1 Land Development PT TKM PileCap InSitu Grid 80-88 K300 Agung N. 16:40 19:45 18.0 18.0 P1G01-ON-CPPU0023 (2)
15-Sep-21 47 BM PO. 9100001000 010811 BM1 Land Development PT TKM LC Pile Cap K100 Agung N. - - 3.0 - P1G01-ON-CPPU0023 (2)
16-Sep-21 53 BM PO. 9100001000 010813 BM1 Land Development PT TKM Capping Beam Sheet Pile Grid 69-92 K300 Agung N. - - 18.0 -
16-Sep-21 54 BM PO. 9100001000 010814 BM1 Land Development PT TKM PileCap In Situ Grid 100-105 K300 Agung N. 18:45 20:15 12.0 12.0
16-Sep-21 56 BM PO. 9100001000 010811 BM1 Land Development PT TKM LC Pile Cap K100 Agung N. - - 3.0 - Reschedule
17-Sep-21 45 BM PO. 9100001000 010811 BM1 Land Development PT TKM LC Pile Cap K100 Agung N. - - 3.0 - Reschedule
17-Sep-21 48 BM PO. 9100001000 010813 BM1 Land Development PT TKM Capping Beam Sheet Pile Grid 69-92 K300 Agung N. 8:40 16:30 18.0 18.0 Reschedule
18-Sep-21 37 BM PO. 9100001000 010811 BM1 Land Development PT TKM LC Pile Cap K100 Agung N. 16:10 16:10 3.0 4.0 Reschedule
18-Sep-21 48 BM PO. 9100001000 010816 BM1 Land Development PT TKM PileCap Grid 1-3 K300 Agung N. 19:45 19:45 6.0 6.0
19-Sep-21 35 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. - - 3.0 -
19-Sep-21 36 BM PO. 9100001000 010817 BM1 Land Development PT TKM PileCap InSitu Grid 27-32 K300 Agung N. - - 18.0 -
19-Sep-21 37 BM PO. 9100001000 010818 BM1 Land Development PT TKM Capping Beam Grid 92-115 K300 Agung N. - - 18.0 -
20-Sep-21 49 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. - - 3.0 - Reschedule
20-Sep-21 50 BM PO. 9100001000 010820 BM1 Land Development PT TKM PileCap InSitu Grid 7-9 & 21-26 K300 Bram 15:45 18:25 18.0 18.0 Reschedule
20-Sep-21 51 BM PO. 9100001000 010821 BM1 Land Development PT TKM LC Pile Cap K100 Bram 20:05 20:05 3.0 4.0 Reschedule
21-Sep-21 35 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. - - 3.0 - Reschedule
21-Sep-21 36 BM PO. 9100001000 010817 BM1 Land Development PT TKM PileCap InSitu Grid 27-32 K300 Agung N. - - 18.0 - Reschedule
21-Sep-21 37 BM PO. 9100001000 010818 BM1 Land Development PT TKM Capping Beam Grid 92-115 K300 Agung N. 16:55 16:55 18.0 6.0 Reschedule
22-Sep-21 47 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. - - 3.0 - Reschedule
22-Sep-21 48 BM PO. 9100001000 010817 BM1 Land Development PT TKM PileCap InSitu Grid 27-32 K300 Agung N. 18:40 18:40 18.0 6.0 Reschedule
22-Sep-21 57 BM PO. 9100001000 011252 BM1 Land Development PT TKM Capping Beam Grid 100-123 K300 Agung N. 14:00 17:00 18.0 18.0
23-Sep-21 45 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. 17:30 17:30 3.0 4.0 Reschedule
23-Sep-21 46 BM PO. 9100001000 011253 BM1 Land Development PT TKM PileCap Area 2 Grid 16-26 K300 Bram 13:20 17:05 18.0 18.0
23-Sep-21 47 BM PO. 9100001000 011256 BM1 Land Development PT TKM Capping Beam Grid 120-143 K300 Bram - - 18.0 -
23-Sep-21 48 BM PO. 9100001000 011255 BM1 Land Development PT TKM LC Area 2 Grid 38-47 K100 Bram 18:50 18:50 3.0 4.0
24-Sep-21 38 BM PO. 9100001000 011257 BM1 Land Development PT TKM Precast K300 Bram 17:35 19:05 12.0 12.0
24-Sep-21 39 BM PO. 9100001000 011258 BM1 Land Development PT TKM PileCap Area 2 Grid 26-47 K300 Bram - - 28.0 -
24-Sep-21 40 BM PO. 9100001000 011256 BM1 Land Development PT TKM Capping Beam Grid 120-143 K300 Bram 13:15 16:00 18.0 18.0 Reschedule
25-Sep-21 40 BM PO. 9100001000 011261 BM1 Land Development PT TKM Precast K300 Bram 13:50 13:50 6.0 6.0
25-Sep-21 41 BM PO. 9100001000 011259 BM1 Land Development PT TKM Capping Beam Grid 143-173 K300 Bram - - 24.0 -
25-Sep-21 42 BM PO. 9100001000 011258 BM1 Land Development PT TKM PileCap Area 2 Grid 26-47 K300 Bram 10:45 17:00 28.0 29.0 Reschedule
25-Sep-21 43 BM PO. 9100001000 011262 BM1 Land Development PT TKM Pile Cap Grid 47-56 K300 Bram 17:50 17:50 18.0 6.0
27-Sep-21 48 BM PO. 9100001000 011260 BM1 Land Development PT TKM Capping Beam Grid 173-210 K300 Bram - - 28.0 - Reschedule
27-Sep-21 49 BM PO. 9100001000 011259 BM1 Land Development PT TKM Capping Beam Grid 143-173 K300 Bram - - 24.0 - Reschedule
27-Sep-21 50 BM PO. 9100001000 011263 BM1 Land Development PT TKM Precast K300 Bram - - 6.0 - Reschedule
28-Sep-21 37 BM PO. 9100001000 011260 BM1 Land Development PT TKM Capping Beam Grid 173-210 K300 Bram 18:15 20:20 28.0 18.0 Reschedule
28-Sep-21 38 BM PO. 9100001000 011259 BM1 Land Development PT TKM Capping Beam Grid 143-173 K300 Bram 15:05 17:40 24.0 24.0 Reschedule
28-Sep-21 39 BM PO. 9100001000 011263 BM1 Land Development PT TKM Precast K300 Bram 10:30 10:30 6.0 6.0 Reschedule
29-Sep-21 38 BM PO. 9100001000 011267 BM1 Land Development PT TKM Precast Area 2 K300 Bram - - 24.0 -
29-Sep-21 39 BM PO. 9100001000 011268 BM1 Land Development PT TKM LC K100 Bram 15:35 15:35 4.0 4.0
30-Sep-21 42 BM PO. 9100001000 011267 BM1 Land Development PT TKM Precast Area 2 K300 Bram 13:25 15:45 24.0 11.0 Reschedule
30-Sep-21 55 BM PO. 9100001000 011269 BM1 Land Development PT TKM LC K100 Bram 16:45 17:15 8.0 8.0
1-Oct-21 44 BM PO. 9100001000 011271 BM1 Land Development PT TKM Precast Area 2 K300 Ramses - - 24.0 -
2-Oct-21 49 BM PO. 9100001000 011271 BM1 Land Development PT TKM Precast Area 2 K300 Ramses 12:15 13:20 24.0 12.0 Reschedule
3-Oct-21 31 BM PO. 9100001000 011273 BM1 Land Development PT TKM Capping Beam Grid 1-46 K300 Bram - - 36.0 -
3-Oct-21 32 BM PO. 9100001000 011274 BM1 Land Development PT TKM LC K100 Bram - - 4.0 -
3-Oct-21 33 BM PO. 9100001000 011272 BM1 Land Development PT TKM Precast Area 2 K300 Bram - - 18.0 -
4-Oct-21 51 BM PO. 9100001000 011274 BM1 Land Development PT TKM LC K100 Bram - - 4.0 - Reschedule
4-Oct-21 52 BM PO. 9100001000 011275 BM1 Land Development PT TKM Precast Area 2 K300 Bram 14:35 16:30 18.0 12.0
4-Oct-21 53 BM PO. 9100001000 011273 BM1 Land Development PT TKM Capping Beam Grid 1-46 K300 Bram - - 36.0 - Reschedule
4-Oct-21 54 BM PO. 9100001000 011272 BM1 Land Development PT TKM Precast Area 2 K300 Bram - - 18.0 - Reschedule
5-Oct-21 46 BM PO. 9100001000 011273 BM1 Land Development PT TKM Capping Beam Grid 1-46 K300 Bram 8:55 17:00 36.0 30.0 Reschedule
5-Oct-21 47 BM PO. 9100001000 011272 BM1 Land Development PT TKM Precast Area 2 K300 Bram 15:15 16:40 18.0 12.0 Reschedule
6-Oct-21 50 BM PO. 9100001000 011278 BM1 Land Development PT TKM Capping Beam Grid 15-45 K300 Ramses 18:50 20:45 36.0 18.0
6-Oct-21 51 BM PO. 9100001000 011279 BM1 Land Development PT TKM Precast Beam K300 Ramses 13:15 13:15 12.0 6.0
7-Oct-21 53 BM PO. 9100001000 011280 BM1 Land Development PT TKM Precast Beam K300 Ramses 13:50 14:35 18.0 12.0
8-Oct-21 45 BM PO. 9100001000 011285 BM1 Land Development PT TKM Precast Beam K300 Bram - - 18.0 -
8-Oct-21 46 BM PO. 9100001000 011284 BM1 Land Development PT TKM Capping Beam Grid 46-93 K300 Bram 17:55 19:25 18.0 12.0
9-Oct-21 38 BM PO. 9100001000 011288 BM1 Land Development PT TKM Precast Beam K300 Bram - - 12.0 -
9-Oct-21 39 BM PO. 9100001000 011289 BM1 Land Development PT TKM Capping Beam Grid 56-93 K300 Bram - - 36.0 -
9-Oct-21 40 BM PO. 9100001000 011285 BM1 Land Development PT TKM Precast Beam K300 Bram 9:25 11:25 18.0 12.0 Reschedule
10-Oct-21 29 BM PO. 9100001000 011295 BM1 Land Development PT TKM LC K100 Bram - - 4.0 -
10-Oct-21 30 BM PO. 9100001000 011288 BM1 Land Development PT TKM Precast Beam K300 Bram 12:10 13:55 12.0 12.0 Reschedule
10-Oct-21 31 BM PO. 9100001000 011290 BM1 Land Development PT TKM PileCap Precast K300 Bram - - 12.0 -
10-Oct-21 32 BM PO. 9100001000 011291 BM1 Land Development PT TKM Capping Beam Grid 74-93 K300 Bram 14:50 17:30 24.0 24.0
11-Oct-21 39 BM PO. 9100001000 011294 BM1 Land Development PT TKM LC K100 Bram - - 4.0 -
11-Oct-21 40 BM PO. 9100001000 011293 BM1 Land Development PT TKM Capping Beam Grid 80-93 K300 Bram 14:50 16:35 24.0 18.0
11-Oct-21 41 BM PO. 9100001000 011295 BM1 Land Development PT TKM LC K100 Bram 18:25 18:25 4.0 3.0 Reschedule
11-Oct-21 42 BM PO. 9100001000 011292 BM1 Land Development PT TKM Precast PileCap K300 Bram 10:45 13:35 12.0 12.0
12-Oct-21 39 BM PO. 9100001000 011296 BM1 Land Development PT TKM Precast PileCap K300 Ramses 14:35 14:35 18.0 6.0
12-Oct-21 40 BM PO. 9100001000 011294 BM1 Land Development PT TKM LC K100 Bram - - 4.0 - Reschedule
13-Oct-21 43 BM PO. 9100001000 011294 BM1 Land Development PT TKM LC K100 Bram 13:40 13:40 4.0 4.0 Reschedule
13-Oct-21 44 BM PO. 9100001000 012202 BM1 Land Development PT TKM PileCap Grid 1-6 Cast In Situ K300 Ramses - - 12.0 -
13-Oct-21 45 BM PO. 9100001000 012201 BM1 Land Development PT TKM Precast PileCap K300 Ramses 12:50 14:35 18.0 12.0
14-Oct-21 43 BM PO. 9100001000 012204 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram 14:25 15:35 18.0 12.0
14-Oct-21 44 BM PO. 9100001000 012205 BM1 Land Development PT TKM PileCap Grid 4-10 Area 3 K300 Bram - - 18.0 -
14-Oct-21 45 BM PO. 9100001000 012202 BM1 Land Development PT TKM PileCap Grid 1-6 Cast In Situ K300 Ramses - - 12.0 - Reschedule
15-Oct-21 37 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 -
15-Oct-21 38 BM PO. 9100001000 012207 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram - - 12.0 -
15-Oct-21 39 BM PO. 9100001000 012205 BM1 Land Development PT TKM PileCap Grid 4-10 Area 3 K300 Bram 17:35 18:35 18.0 12.0 Reschedule
15-Oct-21 40 BM PO. 9100001000 012202 BM1 Land Development PT TKM PileCap Grid 1-6 Cast In Situ K300 Ramses - - 12.0 - Reschedule
16-Oct-21 44 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 - Reschedule
16-Oct-21 46 BM PO. 9100001000 012208 BM1 Land Development PT TKM PileCap Grid 10-19 K300 Bram - - 18.0 -
16-Oct-21 47 BM PO. 9100001000 012207 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram 14:25 15:50 12.0 12.0 Reschedule
16-Oct-21 48 BM PO. 9100001000 012202 BM1 Land Development PT TKM PileCap Grid 1-6 Cast In Situ K300 Ramses 15:25 16:55 12.0 12.0 Reschedule
17-Oct-21 39 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 - Reschedule
17-Oct-21 40 BM PO. 9100001000 012208 BM1 Land Development PT TKM PileCap Grid 10-19 K300 Bram 13:30 13:30 18.0 6.0 Reschedule
17-Oct-21 41 BM PO. 9100001000 012211 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram - - 18.0 -
17-Oct-21 42 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 -
18-Oct-21 50 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 - Reschedule
18-Oct-21 51 BM PO. 9100001000 012211 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram 13:05 15:05 18.0 18.0 Reschedule
18-Oct-21 52 BM PO. 9100001000 012212 BM1 Land Development PT TKM PileCap Grid 20-26 K300 Bram - - 18.0 -
18-Oct-21 53 BM PO. 9100001000 012213 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram - - 18.0 -
18-Oct-21 54 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
19-Oct-21 44 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 - Reschedule
19-Oct-21 45 BM PO. 9100001000 012212 BM1 Land Development PT TKM PileCap Grid 20-26 K300 Bram 11:05 13:45 18.0 18.0 Reschedule
19-Oct-21 47 BM PO. 9100001000 012213 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram 15:30 15:30 18.0 6.0 Reschedule
19-Oct-21 48 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
21-Oct-21 45 BM PO. 9100001000 012223 BM1 Land Development PT TKM PileCap Grid 26-29 K300 Ramses 13:55 16:55 18.0 18.0
21-Oct-21 46 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 -
21-Oct-21 47 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
22-Oct-21 54 BM PO. 9100001000 012225 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 18.0 -
22-Oct-21 55 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
22-Oct-21 56 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
23-Oct-21 37 BM PO. 9100001000 012225 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 12:45 13:35 18.0 12.0 Reschedule
23-Oct-21 38 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
23-Oct-21 39 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
24-Oct-21 32 BM PO. 9100001000 012227 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 -
24-Oct-21 33 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
24-Oct-21 34 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
25-Oct-21 51 BM PO. 9100001000 012228 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 11:00 16:05 18.0 18.0
25-Oct-21 52 BM PO. 9100001000 012227 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
25-Oct-21 53 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
25-Oct-21 54 BM PO. 9100001000 012229 BM1 Land Development PT TKM Capping Beam Grid: 26-46 Area 3 K300 Ramses 16:30 19:50 24.0 18.0
25-Oct-21 55 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
26-Oct-21 49 BM PO. 9100001000 012227 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
26-Oct-21 50 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
26-Oct-21 51 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
27-Oct-21 52 BM PO. 9100001000 012227 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 12:30 15:25 24.0 24.0 Reschedule
27-Oct-21 53 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 17:25 18:20 24.0 12.0 Reschedule
27-Oct-21 54 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
28-Oct-21 49 BM PO. 9100001000 012230 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 9:50 15:35 18.0 18.0
28-Oct-21 50 BM PO. 9100001000 012231 BM1 Land Development PT TKM Capping Beam Grid 26-36 Area 3 K300 Ramses 16:35 18:15 24.0 18.0
28-Oct-21 51 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
29-Oct-21 40 BM PO. 9100001000 012234 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 14:35 16:15 18.0 17.0
29-Oct-21 41 BM PO. 9100001000 012233 BM1 Land Development PT TKM PileCap Area 3 Grid 23-29 K300 Ramses - - 12.0 -
29-Oct-21 42 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 -
29-Oct-21 43 BM PO. 9100001928 012236 BM1 Land Development PT TKM LC Area 3 K100 Ramses 11:20 11:20 4.0 4.0
29-Oct-21 44 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
30-Oct-21 41 BM PO. 9100001928 012237 BM1 Land Development PT TKM LC Area South 2 K100 Ramses 16:40 16:40 4.0 4.0 PO. 9100001764 (13)
30-Oct-21 42 BM PO. 9100001000 012233 BM1 Land Development PT TKM PileCap Area 3 Grid 23-29 K300 Ramses 14:50 14:50 12.0 6.0 PO. 9100001764 (13)
30-Oct-21 43 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - PO. 9100001764 (13)
30-Oct-21 44 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - PO. 9100001764 (13)
31-Oct-21 26 BM PO. 9100001000 012238 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 11:05 13:35 24.0 24.0
31-Oct-21 27 BM PO. 9100001000 012239 BM1 Land Development PT TKM Capping Beam Grid 66-76 Area 3 K300 Ramses - - 24.0 -
31-Oct-21 28 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
31-Oct-21 29 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram 15:40 15:40 18.0 6.0 Reschedule
1-Nov-21 41 BM PO. 9100001928 012241 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 6.0 -
1-Nov-21 42 BM PO. 9100001000 012243 BM1 Land Development PT TKM Precast PileCap K300 Ramses 14:55 17:20 18.0 18.0
1-Nov-21 43 BM PO. 9100001000 012242 BM1 Land Development PT TKM PileCap Area 2 South Grid 1-6 K300 Ramses - - 12.0 -
1-Nov-21 44 BM PO. 9100001000 012239 BM1 Land Development PT TKM Capping Beam Grid 66-76 Area 3 K300 Ramses - - 24.0 - Reschedule
1-Nov-21 45 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
2-Nov-21 48 BM PO. 9100001928 012241 BM1 Land Development PT TKM LC Area 2 South K100 Ramses 15:20 15:20 6.0 6.0 Reschedule
2-Nov-21 49 BM PO. 9100001000 012245 BM1 Land Development PT TKM Precast PileCap K300 Ramses 15:00 17:50 18.0 15.0
2-Nov-21 50 BM PO. 9100001000 012242 BM1 Land Development PT TKM PileCap Area 2 South Grid 1-6 K300 Ramses - - 12.0 - Reschedule
2-Nov-21 51 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
3-Nov-21 42 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 -
3-Nov-21 43 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
3-Nov-21 44 BM PO. 9100001000 09303 BM1 Land Development PT TKM PileCap Area South Grid 48-59 K300 Ramses 16:05 18:35 24.0 16.0
3-Nov-21 46 BM PO. 9100001000 09305 BM1 Land Development PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 -
3-Nov-21 47 BM PO. 9100001000 012242 BM1 Land Development PT TKM PileCap Area 2 South Grid 1-6 K300 Ramses - - 12.0 - Reschedule
4-Nov-21 39 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 - Reschedule
4-Nov-21 40 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
4-Nov-21 42 BM PO. 9100001000 09307 BM1 Land Development PT TKM PileCap Area 2 South Grid 60-76 K300 Ramses - - 30.0 -
4-Nov-21 43 BM PO. 9100001000 09305 BM1 Land Development PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 - Reschedule
4-Nov-21 44 BM PO. 9100001000 012242 BM1 Land Development PT TKM PileCap Area 2 South Grid 1-6 K300 Ramses 12:20 16:05 12.0 12.0 Reschedule
5-Nov-21 37 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 - Reschedule
5-Nov-21 38 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses 10:00 10:00 6.0 6.0 Reschedule
5-Nov-21 39 BM PO. 9100001000 09309 BM1 Land Development PT TKM Precast Area 2 K300 Ramses 18:55 20:30 18.0 12.0
5-Nov-21 40 BM PO. 9100001000 09308 BM1 Land Development PT TKM PileCap Area 2 South Grid 60-76 K300 Ramses - - 30.0 - Reschedule
5-Nov-21 43 BM PO. 9100001000 09305 BM1 Land Development PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 - Reschedule
6-Nov-21 59 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 - Reschedule
6-Nov-21 60 BM PO. 9100001000 09310 BM1 Land Development PT TKM Precast PileCap K300 Bram - - 18.0 -
6-Nov-21 61 BM PO. 9100001000 09308 BM1 Land Development PT TKM PileCap Area 2 South Grid 60-76 K300 Ramses - - 30.0 - Reschedule

6-Nov-21 64 BM PO. 9100001000 09305 PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 - Reschedule
BM1 Land Development
7-Nov-21 40 BM PO. 9100001928 09313 BM1 Land Development PT TKM LC Area 2 South K100 Bram - - 12.0 -
7-Nov-21 41 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 - Reschedule
7-Nov-21 42 BM PO. 9100001000 09310 BM1 Land Development PT TKM Precast PileCap K300 Bram 11:55 11:55 18.0 6.0 Reschedule
7-Nov-21 44 BM PO. 9100001000 09308 BM1 Land Development PT TKM PileCap Area 2 South Grid 60-76 K300 Ramses - - 30.0 - Reschedule
7-Nov-21 45 BM PO. 9100001000 09311 BM1 Land Development PT TKM PileCap Grid 76-86 K300 Bram 9:55 11:45 24.0 12.0
7-Nov-21 47 BM PO. 9100001000 09305 PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 - Reschedule
BM1 Land Development
7-Nov-21 48 BM PO. 9100001000 09312 BM1 Land Development PT TKM Precast Beam 2 K300 Bram - - 18.0 -
8-Nov-21 48 BM PO. 9100001928 09313 BM1 Land Development PT TKM LC Area 2 South K100 Bram - - 12.0 - Reschedule
8-Nov-21 51 BM PO. 9100001000 09305 BM1 Land Development PT TKM Capping Beam Grid 92-111 2 South K300 Ramses 11:40 17:20 24.0 21.0 Reschedule
9-Nov-21 43 BM PO. 9100001928 012247 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 -
9-Nov-21 44 BM PO. 9100001000 012246 BM1 Land Development PT TKM Precast Area 2 South K300 Ramses 13:40 14:55 24.0 12.0
9-Nov-21 45 BM PO. 9100001000 012248 BM1 Land Development PT TKM PileCap Grid 86-96 Area 2 South K300 Ramses - - 24.0 -
10-Nov-21 48 BM PO. 9100001000 09316 BM1 Land Development PT TKM Capping Beam Area South Grid 92-120 K300 Ramses 17:50 20:10 30.0 18.0
10-Nov-21 49 BM PO. 9100001000 012248 BM1 Land Development PT TKM PileCap Grid 86-96 Area 2 South K300 Ramses - - 24.0 - Reschedule
11-Nov-21 43 BM PO. 9100001000 012249 BM1 Land Development PT TKM Precast Area 2 South K300 Ramses 13:35 14:25 24.0 12.0

11-Nov-21 44 BM PO. 9100001000 012250 PT TKM Capping Beam Area 2 South Grid 121-135 K300 Ramses - - 30.0 -
BM1 Land Development
11-Nov-21 61 BM PO. 9100001000 012248 BM1 Land Development PT TKM PileCap Grid 86-96 Area 2 South K300 Ramses 14:00 18:05 24.0 16.0
12-Nov-21 41 BM PO. 9100001928 09318 BM1 Land Development PT TKM LC Area 2 South K100 Ramses 13:05 13:05 12.0 6.0

12-Nov-21 42 BM PO. 9100001000 09320 PT TKM Capping Beam Area 2 South Grid 112-125 K300 Ramses 11:30 11:30 24.0 6.0
BM1 Land Development
12-Nov-21 43 BM PO. 9100001000 09317 BM1 Land Development PT TKM Precast Area 2 South K300 Ramses 15:25 15:25 12.0 6.0
12-Nov-21 44 BM PO. 9100001000 09319 BM1 Land Development PT TKM PileCap Area 2 South Grid 97-102 K300 Ramses - - 12.0 -
13-Nov-21 48 BM PO. 9100001000 09321 BM1 Land Development PT TKM Precast Area 2 South K300 Ramses - - 12.0 -
13-Nov-21 49 BM PO. 9100001000 09326 BM1 Land Development PT TKM PileCap Area 2 South Grid 75-82 K300 Ramses - - 12.0 -
13-Nov-21 50 BM PO. 9100001000 09322 BM1 Land Development PT TKM Capping Beam Area 2 South Grid 122-135 K300 Ramses - - 24.0 -
13-Nov-21 51 BM PO. 9100001000 09319 BM1 Land Development PT TKM PileCap Area 2 South Grid 97-102 K300 Ramses - - 12.0 - Reschedule
14-Nov-21 21 BM PO. 9100001000 09325 BM1 Land Development PT TKM PileCap Area 2 Grid 83-90 K300 Ramses - - 12.0 -
14-Nov-21 22 BM PO. 9100001000 09324 BM1 Land Development PT TKM Precast Area 2 K300 Ramses 12:40 12:40 12.0 6.0
14-Nov-21 23 BM PO. 9100001928 09323 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 6.0 -
20-Dec 47 BM PO. 9100001794 036118 IRS (888) PT TKM Borepile K300 Ferdinand 15:10 16:25 10.0 10.0
21-Dec 45 BM PO. 9100001794 036120 IRS (888) PT TKM Borepile K300 Ferdinand - - 10.0 -
22-Dec 51 BM PO. 9100001794 036121 IRS (888) PT TKM Borepile K300 Ferdinand 17:05 17:30 22.0 11.0
23-Dec 45 BM PO. 9100001794 036122 IRS (888) PT TKM Borepile K300 Yoga N. 15:45 16:30 22.0 11.0
24-Dec 41 BM PO. 9100001794 036127 IRS (888) PT TKM Borepile K300 Yoga N. 17:30 18:35 22.0 11.0
26-Dec 44 BM PO. 9100001794 036128 IRS (888) PT TKM Borepile IRS K300 Yoga N. 16:50 10:05 22.0 11.0
26-Dec 45 BM PO. 9100001794 036127 IRS (888) PT TKM Borepile K300 Yoga N. - - 22.0 -
27-Dec 46 BM PO. 9100001794 036127 IRS (888) PT TKM Borepile K300 Yoga N. - - 22.0 - Reschedule
10-Jan 35 BM PO. 9100001794 036130 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
11-Jan 41 BM PO. 9100001794 036130 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 - Reschedule
12-Jan 43 BM PO. 9100001794 036130 IRS (888) PT TKM Borepile IRS K300 Yoga N. 18:00 20:00 22.0 22.0 Reschedule
13-Jan 37 BM PO. 9100001794 036131 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
14-Jan 39 BM PO. 9100001794 036131 IRS (888) PT TKM Borepile IRS K300 Yoga N. 17:35 18:35 22.0 11.0 Reschedule
15-Jan 30 BM PO. 9100001794 036132 IRS (888) PT TKM Borepile IRS K300 Yoga N. 15:05 17:45 22.0 22.0
16-Jan 31 BM PO. 9100001794 036133 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
17-Jan 40 BM PO. 9100001794 036133 IRS (888) PT TKM Borepile IRS K300 Yoga N. 19:15 21:15 22.0 22.0 Reschedule
18-Jan 40 BM PO. 9100001794 036135 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
19-Jan 44 BM PO. 9100001794 036135 IRS (888) PT TKM Borepile IRS K300 Yoga N. 15:00 20:25 22.0 22.0 Reschedule
20-Jan 46 BM PO. 9100001794 036136 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
21-Jan 43 BM PO. 9100001794 036136 IRS (888) PT TKM Borepile IRS K300 Yoga N. 16:40 16:45 22.0 22.0 Reschedule
23-Jan 40 BM PO. 9100001794 038702 IRS (888) PT TKM Borepile IRS K300 Yoga N. 16:20 16:25 22.0 11.0
24-Jan 37 BM PO. 9100001794 038703 IRS (888) PT TKM Borepile IRS K300 Yoga N. 17:55 18:50 22.0 11.0
25-Jan 43 BM PO. 9100001794 038705 IRS (888) PT TKM Borepile IRS K300 Yoga N. 18:05 18:35 22.0 11.0
1-Feb 38 BM PO. 9100009001 (3) 038708 BM1 (861) PT TKM Borepile Zona 1 FC'30 David S. 19:00 21:50 11.0 9.0
2-Feb 38 BM PO. 9100009001 (3) 038712 BM1 (861) PT TKM Borepile Zona 1 FC'30 David S. 19:05 19:05 11.0 3.0
3-Feb 43 BM PO. 9100009001 (3) 038714 BM1 (861) PT TKM Borepile Zona 1 FC'30 David S. 13:55 16:25 11.0 6.0
4-Feb 40 BM PO. 9100009001 (3) 038715 BM1 (861) PT TKM Borepile Zona 1 FC'30 David S. 11:30 13:10 11.0 6.0
5-Feb 32 BM PO. 9100001794 038718 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 11:50 11:50 11.0 3.0
5-Feb 33 BM PO. 9100001794 038717 BM1 (861) PT TKM Borepile Zona 1 K300 David S. - - 11.0 -
6-Feb 44 BM PO. 9100001794 038720 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 12:00 14:00 11.0 6.0
7-Feb 39 BM PO. 9100001794 038722 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 10:15 11:55 11.0 6.0
7-Feb 72 BM PO. 9100001794 039726 BM1 (861) PT TKM Borepile CCK Zone 3 K300 Agithya E.P 17:10 17:25 8.0
8-Feb 29 BM PO. 9100001794 038727 BM1 (861) PT TKM Borpile CCK Zone 3 K300 Agithya E.P 18:25 18:35 8.0 8.0
8-Feb 36 BM PO. 9100001794 038723 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 12:10 12:10 10.0 6.0
9-Feb 22 BM PO. 9100001794 038732 BM1 (861) PT TKM Borpile CCK Zone 3 K300 Agithya E.P 20:35 21:30 8.0 8.0
9-Feb 32 BM PO. 9100001794 038730 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 14:20 14:20 11.0 6.0
11-Feb 42 BM PO. 9100001794 038733 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 10:45 10:45 11.0 6.0
12-Feb 24 BM PO. 9100001794 038734 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 11:55 11:55 11.0 6.0
15-Feb 69 BM PO. 9100001794 035522 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 17:30 17:30 3.0
16-Feb 53 BM PO. 9100001794 038735 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 11:00 11:50 12.0 7.0
17-Feb 59 BM PO. 9100001794 038736 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 18:00 20:38 11.0 9.0
17-Mar 44 BM PO. 9100001794 038744 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 10.0 -
18-Mar 46 BM PO. 9100001794 038744 IRS (888) PT TKM Borpile IRS K300 Yoga N. 18:05 19:35 10.0 10.0 Reschedule
19-Mar 29 BM PO. 9100001794 042601 IRS (888) PT TKM Borpile IRS K300 Yoga N. 14:05 14:05 11.0 11.0 Reschedule
20-Mar 52 BM PO. 9100001794 042602 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 -
21-Mar 46 BM PO. 9100001794 042603 IRS (888) PT TKM Borpile IRS K300 Yoga N. 17:45 18:35 11.0 11.0
22-Mar 33 BM PO. 9100001794 042604 IRS (888) PT TKM Borpile IRS K300 Yoga N. 16:45 17:10 11.0 11.0
23-Mar 38 BM PO. 9100001794 042605 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 -
24-Mar 24 BM PO. 9100001794 042605 IRS (888) PT TKM Borpile IRS K300 Yoga N. 16:45 17:30 11.0 11.0 Reschedule
25-Mar 35 BM PO. 9100001794 042606 IRS (888) PT TKM Borpile IRS K300 Yoga N. 12:40 13:35 11.0 11.0
26-Mar 31 BM PO. 9100001794 038742 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 -
27-Mar 38 BM PO. 9100001794 038742 IRS (888) PT TKM Borpile IRS K300 Yoga N. 17:10 17:35 11.0 11.0 Reschedule
28-Mar 37 BM PO. 9100001794 029497 IRS (888) PT TKM Borpile IRS K300 Yoga N. 16:10 16:35 11.0 11.0
29-Mar 36 BM PO. 9100001794 042621 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 -
30-Mar 29 BM PO. 9100001794 042621 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 - Reschedule
1-Apr 29 BM PO. 9100008836 042618 BM1 (861) PT TKM Borepile BM Grid 1 K300 Johannes S. - - 8.0 -
2-Apr 25 BM PO. 9100008836 042618 BM1 (861) PT TKM Borepile BM Grid 1 K300 Johannes S. - - 8.0 - Reschedule
3-Apr 24 BM PO. 9100008836 042618 BM1 (861) PT TKM Borepile BM Grid 1 K300 Johannes S. 9:15 11:30 8.0 8.0 Reschedule
3-Apr 58 BM PO. 9100008836 042639 BM1 (861) PT TKM Borepile Sewer Pit 2 (2) K300 Johannes S. 11:30 11:30 1.0
4-Apr 23 BM PO. 9100008836 042628 BM1 (861) PT TKM Borepile Sewer Pit 2 (2) K300 Johannes S. 10:10 11:20 9.0 9.0
4-Apr 61 BM PO. 9100008836 042639 BM1 (861) PT TKM Borepile Sewer Pit 2 (2) K300 Johannes S. 18:40 20:05 9.0
5-Apr 32 BM PO. 9100008836 042640 BM1 (861) PT TKM Borepile Sewer Pit 2 K300 Johannes S. 15:35 17:10 9.0 9.0
7-Apr 25 BM PO. 9100001794 042620 IRS (888) PT TKM Borepile IRS K300 Yoga N. 15:50 16:05 11.0 11.0
8-Apr 43 BM PO. 9100001794 042622 IRS (888) PT TKM Borepile IRS K300 Yoga N. 17:25 18:30 11.0 11.0
11-Apr 37 BM PO. 9100001794 042624 IRS (888) PT TKM Borepile FSH K300 Yoga N. 17:30 18:45 8.5 8.5
12-Apr 36 BM PO. 9100001794 042625 IRS (888) PT TKM Borepile FSH K300 Yoga N. 18:15 19:10 8.5 8.5
13-Apr 40 BM PO. 9100001794 044553 IRS (888) PT TKM Borepile FSH K300 Yoga N. 20;00 20:35 8.5 8.5
14-Apr 39 BM PO. 9100001794 042643 IRS (888) PT TKM Borepile FSH K300 Yoga N. - - 8.5 -
15-Apr 32 BM PO. 9100001794 043556 IRS (888) PT TKM Borepile FSH K300 Yoga N. 14:20 15:05 8.5 8.5
16-Apr 25 BM PO. 9100001794 043557 IRS (888) PT TKM Borepile FSH K300 Yoga N. - - 8.5 -
17-Apr 33 BM PO. 9100001794 043559 IRS (888) PT TKM Borepile FSH K300 Yoga N. 13:25 13:45 8.5 8.5
18-Apr 34 BM PO. 9100001794 043562 IRS (888) PT TKM Borepile FSH K300 Yoga N. 13:15 14:15 8.5 8.5
10-May 28 BM PO. 9100008836 043593 BM1 (861) PT TKM Borepile Sewer Pit (1) CCK K300 Agithya EP. - - 8.5 -
11-May 28 BM PO. 9100008836 043594 BM1 (861) PT TKM Borepile Sewer Pit (1) CCK K300 Agithya EP. 11:15 12:05 8.5 8.5
12-May 24 BM PO. 9100008836 043595 BM1 (861) PT TKM Borepile Sewer Pit (1) CCK K300 Agithya EP. 14:15 15:15 8.5 8.5
13-May 14 BM PO. 9100008836 043596 BM1 (861) PT TKM Borepile Sewer Pit (1) CCK K300 Agithya EP. 15:10 17:00 8.5 8.5
19-May 33 BM PO. 9100001794 043590 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Pump
20-May 27 BM PO. 9100001794 043590 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 18:40 19:40 8.5 8.5 Reschedule
21-May 16 BM PO. 9100001724 045003 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 16:25 17:25 8.5 8.5
22-May 28 BM PO. 9100001794 045004 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
23-May 31 BM PO. 9100001794 045005 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 11:10 10:25 17.0 8.5
24-May 31 BM PO. 9100001794 045006 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 16:30 16:40 8.5 8.5
25-May 38 BM PO. 9100001794 045019 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
26-May 38 BM PO. 9100001794 045019 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 19:05 19:50 8.5 8.5 Reschedule
27-May 37 BM PO. 9100001794 045022 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 16:40 19:00 8.5 8.5
28-May 25 BM PO. 9100001794 045023 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
29-May 31 BM PO. 9100001794 045023 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
30-May 31 BM PO. 9100001794 045023 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
31-May 24 BM PO. 9100001794 046032 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 10.5 -
31-May 34 BM PO. 9100001794 045030 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
1-Jun 17 BM PO. 9100001794 046032 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 10.5 - Reschedule
1-Jun 26 BM PO. 9100001794 045030 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
2-Jun 23 BM PO. 9100001794 046032 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 20:45 21:00 10.5 10.5 Reschedule
2-Jun 34 BM PO. 9100001794 045030 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 17:45 18:05 8.5 8.5 Reschedule
3-Jun 20 BM PO. 9100001794 045035 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 10.5 -
3-Jun 31 BM PO. 9100001794 045036 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 19:15 19:35 8.5 8.5
4-Jun 9 BM PO. 9100001794 046352 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. - - 21.0 -
4-Jun 17 BM PO. 9100001794 046351 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
5-Jun 19 BM PO. 9100001794 046352 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 16:55 18;50 21.0 21.0 Reschedule
5-Jun 31 BM PO. 9100001794 046351 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
6-Jun 24 BM PO. 9100001794 045037 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. - - 21.0 -
6-Jun 37 BM PO. 9100001794 046351 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
7-Jun 22 BM PO. 9100001794 045037 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 15:25 16:35 21.0 10.5 Reschedule
8-Jun 16 BM PO. 9100001794 045038 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 17:50 20:10 21.0 21.0
9-Jun 16 BM PO. 9100001794 046353 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 17:35 21:50 31.5 21.0
10-Jun 58 BM PO. 9100001794 046354 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 17:40 19:00 10.5
11-Jun 9 BM PO. 9100001794 046356 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 15:45 18:50 31.5 31.5
12-Jun 20 BM PO. 9100001794 046357 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 18:05 20:35 31.5 21.0
13-Jun 18 BM PO. 9100001794 046358 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 20:10 22:40 31.5 21.0
14-Jun 21 BM PO. 9100001794 046359 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 16:45 16:45 31.5 10.5
15-Jun 17 BM PO. 9100001794 046360 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 15:00 17:30 21.0 21.0
16-Jun 16 BM PO. 9100001794 046361 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 17:10 21:40 42.0 31.5
17-Jun 17 BM PO. 9100001794 046377 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 19:25 1:30 52.5 47.5
18-Jun 13 BM PO. 9100001794 046379 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 52.5 -
19-Jun 17 BM PO. 9100001794 046379 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 14:15 19:00 52.5 31.5 Reschedule
20-Jun 25 BM PO. 9100001794 046362 BM1 (861) PT TKM Borepile BM Office & Mechanical WS K300 Agithya EP. 15:20 19:45 52.5 31.5
21-Jun 20 BM PO. 9100001794 045040 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 18:40 23:40 52.5 42.0
22-Jun 21 BM PO. 9100001794 045042 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 18:40 20:00 52.5 10.5
23-Jun 24 BM PO. 9100001794 045043 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 13:20 20:40 52.5 42.5
24-Jun 17 BM PO. 9100001794 046378 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 16:20 19;40 52.5 42.0
25-Jun 9 BM PO. 9100001794 046381 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 17:05 21:10 52.5 32.0
26-Jun 16 BM PO. 9100001794 046382 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 15:25 15:50 52.5 31.5
27-Jun 23 BM PO. 9100001794 046801 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 16:05 16:35 52.0 10.5
28-Jun 19 BM PO. 9100001794 046803 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 52.5 -
30-Jun 16 BM PO. 9100001794 046803 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 52.5 - Reschedule
1-Jul 14 BM PO. 9100001794 046384 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 18:05 19:25 52.5 21.0
2-Jul 6 BM PO. 9100001794 046385 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 17:45 18:35 31.5 21.0
3-Jul 17 BM PO. 9100001794 046386 BM1 (861) PT TKM Borepile BM Office & Mechanical WS K300 Agithya EP. - - 31.5 -
4-Jul 19 BM PO. 9100001794 046386 BM1 (861) PT TKM Borepile BM Office & Mechanical WS K300 Agithya EP. 12:35 19:55 31.5 21.0 Reschedule
5-Jul 21 BM PO. 9100001794 046806 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 18:20 18:50 31.5 10.5
6-Jul 13 BM PO. 9100001794 046810 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 21:30 21:45 31.5 10.5
7-Jul 14 BM PO. 9100001794 046814 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 15:15 21:35 31.5 21.0
8-Jul 16 BM PO. 9100001794 046815 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 31.5 -
8-Jul 34 BM PO. 9100008389 (2) 046816 BM1 (861) PT TKM Borepile Slab on Pile K500 Agung N. 18:25 18:45 10.5 10.5
9-Jul 9 BM PO. 9100001794 046815 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 31.5 - Reschedule
9-Jul 25 BM PO. 9100008389 (2) 046819 BM1 (861) PT TKM Borepile Slab on Pile K500 Agung N. 17:20 18:15 10.5 10.5
10-Jul 16 BM PO. 9100001794 046815 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 15:45 16:10 31.5 10.5 Reschedule
10-Jul 34 BM PO. 9100008389 (2) 046822 BM1 (861) PT TKM Borepile BM K500 Agung N. 18:50 19:25 10.5 10.5
11-Jul 16 BM PO. 9100001794 046826 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 17:10 22:25 31.0 21.5
11-Jul 35 BM PO. 9100008389 (2) 046825 BM1 (861) PT TKM Borepile Slab on Pile K500 Agung N. - - 21.0 -
12-Jul 17 BM PO. 9100001794 046828 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 19:05 21:50 31.0 22.0
12-Jul 39 BM PO. 9100008389 (2) 046825 BM1 (861) PT TKM Borepile Slab on Pile K500 Agung N. 20:05 21:05 21.0 10.5 Reschedule
14-Jul 38 BM PO. 9100001794 046832 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 18:15 19:55 21.0 21.0
14-Jul 66 BM PO. 9100001794 046836 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 22:25 22:25 3.0
15-Jul 44 BM PO. 9100001794 046834 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 16:35 20:20 45.0 25.0
16-Jul 30 BM PO. 9100001794 046839 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 14:00 20:40 45.0 45.0
17-Jul 37 BM PO. 9100001794 046835 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 16:45 21:10 45.0 36.0
18-Jul 35 BM PO. 9100001794 046390 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 16:25 21:55 40.0 33.0
19-Jul 32 BM PO. 9100001794 046392 BM1 (861) PT TKM Borepile K300 Agung N. 14:40 15:25 45.0 11.0
20-Jul 37 BM PO. 9100008389 046393 BM1 (861) PT TKM Borepile K500 Agung N. 15:25 19:55 45.0 33.0
21-Jul 35 BM PO. 9100008389 047253 BM1 (861) PT TKM Borepile K500 Agung N. 14:30 20:10 52.5 44.0
22-Jul 35 BM PO. 9100008389 047255 BM1 (861) PT TKM Borepile K500 Agung N. 16:15 19:00 44.5 33.0
23-Jul 24 BM PO. 9100008389 047256 BM1 (861) PT TKM Borepile K500 Agung N. 16:05 18:35 52.5 33.0
24-Jul 35 BM PO. 9100008389 047260 BM1 (861) PT TKM Borepile K500 Agung N. 17:50 21:05 52.5 22.0
24-Jul 57 BM PO. 9100001794 047262 BM1 (861) PT TKM Borepile Office & Mechanical WS K300 Agithya EP. 17:25 18:35 10.0
25-Jul 16 BM PO. 9100001794 047265 BM1 (861) PT TKM Borepile Office & Mechanical WS K300 Agithya EP. 15:15 16:05 10.0 10.0
25-Jul 36 BM PO. 9100008389 047264 BM1 (861) PT TKM Borepile K500 Agung N. 15:20 18:10 52.5 22.0
26-Jul 42 BM PO. 9100008389 047267 BM1 (861) PT TKM Borepile Slab On Pile K500 Agung N. 18:15 18:55 52.5 22.0
27-Jul 40 BM PO. 9100008389 047269 BM1 (861) PT TKM Borepile K500 Agung N. 15:45 16:25 52.5 11.0
28-Jul 42 BM PO. 9100008387 047270 BM1 (861) PT TKM Borepile K500 Agung N. 15:05 15:55 52.5 11.0
29-Jul 41 BM PO. 9100008387 047273 BM1 (861) PT TKM Borepile K500 Agung N. - - 52.5 -
30-Jul 25 BM PO. 9100008387 047273 BM1 (861) PT TKM Borepile K500 Agung N. - - 52.5 - Reschedule
31-Jul 40 BM PO. 9100008387 047273 BM1 (861) PT TKM Borepile K500 Agung N. 16:55 17:05 52.5 11.0 Reschedule
1-Aug 57 BM PO. 9100008387 (2) 047277 BM1 (861) PT TKM Borepile BM#1 K500 Agung N. 17:55 18:35 11.0
2-Aug 41 BM PO. 9100008387 (2) 047278 BM1 (861) PT TKM Borepile BM#1 K500 Agung N. 17:50 18:45 11.0 11.0
5-Aug 30 BM PO. 9100008387 (2) 047285 BM1 (861) PT TKM Borepile BM#1 K500 Agung N. 17:40 20:15 22.0 22.0

Total 7,483.5 3,330.0

You might also like