24-Feb-21 17 FL3B (P1E01_ON PO. 9100000180 (11) 04702 Woodyard (328) PT TKM Bore Plie Conveyor Leg 11 K300 Heriandi B. - - 7.5 - P1E01-ON-PC1120
25-Feb-21 3 FL3B (P1E01_ON PO. 9100000180 (11) 04702 Woodyard (328) PT TKM Bore Plie Conveyor Leg 11 K300 Heriandi B. 16:50 17:05 7.5 7.5 P1E01-ON-PC1120
26-Feb-21 10 PO. 9100000180 (11) 04703 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 16:05 17:30 15.0 8.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
27-Feb-21 12 FL3B (P1E01_ON PO. 9100000180 (11) 04704 Woodyard (328) PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 15:20 18:20 15.0 15.0 P1E01-ON-PC1120
1-Mar-21 14 PO. 9100000180 (11) 04705 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 13:35 18:10 15.0 16.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
2-Mar-21 15 PO. 9100000180 (11) 04706 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 15:25 16:25 16.0 7.5 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
3-Mar-21 9 FL3B (P1E01_ON PO. 9100000180 (11) 04708 Woodyard (328) PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 14:05 16:00 15.0 15.0 P1E01-ON-PC1120
4-Mar-21 11 PO. 9100000180 (11) 04709 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. - - 16.0 - P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
5-Mar-21 2 FL3B (P1E01_ON PO. 9100000180 (11) 04709 Woodyard (328) PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 11:00 11:30 16.0 7.5 P1E01-ON-PC1120
6-Mar-21 17 PO. 9100000180 (11) 04710 PT TKM Bore Plie Conveyor Leg 10 dan Leg 11 K300 Heriandi B. 17:15 18:15 8.5 7.5 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328)
Bore Plie Conveyor Leg 10, Leg 26 &
8-Mar-21 23 PO. 9100000180 (11) 04711 PT TKM K300 Heriandi B. 20:10 20:25 25.5 8.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328) Leg 27
Bore Plie Conveyor Leg 10, Leg
9-Mar-21 18 PO. 9100000180 (11) 04712 PT TKM K300 Heriandi B. 16:25 19:50 33.0 17.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328) 26 ,Leg 27 & Leg 28
Bore Plie Conveyor Leg 10, Leg
10-Mar-21 21 PO. 9100000180 (11) 04713 PT TKM K300 Heriandi B. 13:50 20:20 33.0 25.0 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328) 26 ,Leg 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 ,Leg
12-Mar-21 14 PO. 9100000180 (11) 04714 PT TKM K300 Heriandi B. 14:30 18:35 33.0 24.5 P1E01-ON-PC1120
FL3B (P1E01_ON Woodyard (328) 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 ,Leg
13-Mar-21 15 PO. 9100000180 (11) 04715 PT TKM K300 Heriandi B. 15:10 18:30 33.0 33.0
FL3B (P1E01_ON Woodyard (328) 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 ,Leg
15-Mar-21 14 PO. 9100000180 (11) 04716 PT TKM K300 Heriandi B. 14:05 18:20 33.0 34.0
FL3B (P1E01_ON Woodyard (328) 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 ,Leg
16-Mar-21 14 PO. 9100000180 (11) 04717 PT TKM K300 Heriandi B. 16:30 20:25 33.0 25.5
FL3B (P1E01_ON Woodyard (328) 27 & Leg 28
Bore Plie Conveyor Leg 9, Leg 26 &
17-Mar-21 20 PO. 9100000180 (11) 04718 PT TKM K300 Vincent C. 17:20 19:30 24.5 24.5
FL3B (P1E01_ON Woodyard (328) Leg 27
22-Mar-21 12 FL3B (P1E01_ON PO. 9100000180 (13) 04722 Woodyard (328) PT TKM BorPile Leg 2, 4, 5 & 26B K300 Vincent C. 12:00 17:20 54.5 37.5
23-Mar-21 18 FL3B (P1E01_ON PO. 9100000180 (13) 04723 Woodyard (328) PT TKM BorPile Leg 26, 29, 4 & 5 K300 Vincent C. 19:10 23:10 55.0 46.5
24-Mar-21 11 FL3B (P1E01_ON PO. 9100000180 (13) 04724 Woodyard (328) PT TKM BorPile Leg 26B, 29, 4 & 5 K300 Vincent C. 14:30 20:10 55.0 29.5
25-Mar-21 13 FL3B (P1E01_ON PO. 9100000180 (13) 04725 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 14:00 19:00 55.0 38.0
26-Mar-21 13 FL3B (P1E01_ON PO. 9100000180 (13) 04726 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 14:50 18:05 55.0 38.0
28-Mar-21 10 FL3B (P1E01_ON PO. 9100000180 (13) 04727 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 13:10 21:20 55.0 55.0
28-Mar-21 14 FL3B (P1E01_ON PO. 9100000180 (19) 04730 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 21:20 21:20 2.0 2.0
29-Mar-21 20 FL3B (P1E01_ON PO. 9100000180 (13) 04728 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 17:45 17:45 5.5 5.5
29-Mar-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 04729 Woodyard (328) PT TKM BorPile Leg 26B, 2, 4 & 5 K300 Vincent C. 17:05 19:25 49.5 21.5
30-Mar-21 15 FL3B (P1E01_ON PO. 9100000180 (19) 04731 Woodyard (328) PT TKM BorPile Leg 26Brace, 2, 4, 4 fixed K300 Vincent C. 18:05 22:30 55.0 46.5
31-Mar-21 11 FL3B (P1E01_ON PO. 9100000180 (19) 04733 Woodyard (328) PT TKM BorPile Leg 26Brace, 2, 4, 4 fixed K300 Vincent C. - - 46.5 -
1-Apr-21 1 FL3B (P1E01_ON PO. 9100000180 (19) 04733 Woodyard (328) PT TKM BorPile Leg 26Brace, 2, 4, 4 fixed K300 Vincent C. 16:30 21:55 46.5 38.0
3-Apr-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 04735 Woodyard (328) PT TKM BorPile Leg 26Brace & 4 fixed K300 Vincent C. 17:45 20:20 19.0 19.0
5-Apr-21 14 FL3B (P1E01_ON PO. 9100000180 (19) 04739 Woodyard (328) PT TKM BorPile Leg 26Brace & 4 fixed K300 Vincent C. 13:25 17:35 53.0 30.5
6-Apr-21 20 FL3B (P1E01_ON PO. 9100000180 (19) 04741 Woodyard (328) PT TKM BorPile Leg 3, 4 Fixed, 19 K300 Vincent C. 19:40 22:50 34.0 34.0
7-Apr-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 04742 Woodyard (328) PT TKM BorPile Leg 3, 4 Fixed, 19, 20,21 K300 Vincent C. 17:10 17:50 42.5 8.5
8-Apr-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 04743 Woodyard (328) PT TKM BorPile Leg 3, 4 Fixed, 19, 20,21 K300 Vincent C. 10:55 19:35 42.5 42.5
9-Apr-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 04744 Woodyard (328) PT TKM BorPile Leg 4 Fixed, 19, 20,21 K300 Vincent C. 15:55 18:55 42.5 25.5
10-Apr-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 04745 Woodyard (328) PT TKM BorPile Leg 4 Fixed, 19, 20,21,3 K300 Vincent C. 11:30 18:55 42.5 25.5
11-Apr-21 15 FL3B (P1E01_ON PO. 9100000180 (19) 04746 Woodyard (328) PT TKM BorPile Leg 4 Fixed, 19, 20,21,3 K300 Vincent C. 13:35 18:25 42.5 25.5
12-Apr-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 04747 Woodyard (328) PT TKM BorPile Leg 4 Fixed, 19, 20,21 K300 Vincent C. 17:45 21:00 42.5 25.5
14-Apr-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 04750 Woodyard (328) PT TKM BorPile Leg 19, 20 & 21 K300 Vincent C. 13:55 15:25 25.5 9.0
15-Apr-21 28 FL3B (P1E01_ON PO. 9100000180 (19) 05904 Woodyard (328) PT TKM BorPile Leg 18, 20 K300 Vincent C. 17:10 21:00 17.0 16.5
16-Apr-21 20 FL3B (P1E01_ON PO. 9100000180 (19) 05905 Woodyard (328) PT TKM BorPile Leg 18, 19, 20, 21 K300 Vincent C. 19:05 20:05 34.0 8.5
17-Apr-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 05906 Woodyard (328) PT TKM BorPile Leg 18, 19, 21 K300 Vincent C. 13:50 15:00 25.5 8.5
18-Apr-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 05908 Woodyard (328) PT TKM BorPile Leg 18, 19, 21 K300 Vincent C. 14:50 18:15 25.5 25.5
19-Apr-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 05909 Woodyard (328) PT TKM BorPile Leg 18, 20, 21 K300 Vincent C. 16:35 17:30 25.5 8.5
20-Apr-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 05911 Woodyard (328) PT TKM BorPile Leg 18, 20, 21 K300 Vincent C. 17:10 20:10 25.5 25.5
21-Apr-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 05913 Woodyard (328) PT TKM BorePile Leg 18, 20 K300 Vincent C. 16:30 19:25 17.0 17.0
22-Apr-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 05914 Woodyard (328) PT TKM BorePile Leg 18, 20 K300 Vincent C. 16:20 16:55 17.0 8.5
23-Apr-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 05915 Woodyard (328) PT TKM BorePile Leg 18, 20, 25 K300 Vincent C. - - 34.0 -
24-Apr-21 3 FL3B (P1E01_ON PO. 9100000180 (19) 05915 Woodyard (328) PT TKM BorePile Leg 18, 20, 25 K300 Vincent C. 12:15 14:30 34.0 25.5
26-Apr-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 05917 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. - - 25.5 -
27-Apr-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 05917 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. 12:45 18:50 25.5 26.5
28-Apr-21 12 FL3B (P1E01_ON PO. 9100000180 (19) 05918 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. 13:25 14:25 25.5 17.0
29-Apr-21 27 FL3B (P1E01_ON PO. 9100000180 (19) 05919 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. 13:35 19:00 25.5 25.5
30-Apr-21 22 FL3B (P1E01_ON PO. 9100000180 (19) 05920 Woodyard (328) PT TKM BorePile Leg 18, 25 K300 Vincent C. 17:10 20:40 25.5 25.5
2-May-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 05921 Woodyard (328) PT TKM BorePile Leg 25 K300 Vincent C. 14:40 15:20 8.5 8.5
3-May-21 16 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05924 Water Intake (273) PT TKM BorePile K400 Eko Subagyo 13:25 15:10 8.0 7.0
3-May-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 05922 Pipe Bridge (186) PT TKM BorePile Pipe Bridge K300 Vincent C. - - 15.0 -
4-May-21 5 FL3B (P1E01_ON PO. 9100000180 (19) 05922 Pipe Bridge (186) PT TKM BorePile Pipe Bridge K300 Vincent C. 16:45 18:30 15.0 7.5
19-May-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05925 Water Intake (273) PT TKM BorePile Point 2 & 3 K400 Kevin K. 14:55 14:55 16.0 5.5
20-May-21 15 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06252 Water Intake (273) PT TKM BorePile Grid A1 K400 Kevin K. 14:10 14:10 8.0 5.0
22-May-21 26 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06253 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 15:30 15:30 8.0 5.5
24-May-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06255 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 17:15 17:15 8.0 5.5
24-May-21 14 FL3B (P1E01_ON PO. 9100000180 (3) 06256 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge K300 Brian C. 17:45 18:40 7.5 8.0
25-May-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06257 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 16:50 16:50 8.0 5.5
25-May-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 06260 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 1-5 Point 60 K300 Vincent C. 16:50 17:35 7.5 7.5
25-May-21 25 FL3B (P1E01_ON PO. 9100000180 (3) 06261 Pipe Bridge (186) PT TKM BorePile SPG 37 K300 Brian C. 20:30 21:00 7.5 7.5
26-May-21 16 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06258 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 15:15 15:15 8.0 5.5
26-May-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 06264 Water Intake (273) PT TKM BorePile Grid l-5 Point 61 K300 Vincent C. - - 7.5 -
27-May-21 5 FL3B (P1E01_ON PO. 9100000180 (19) 06264 Water Intake (273) PT TKM BorePile Grid l-5 Point 61 K300 Vincent C. - - 7.5 -
27-May-21 18 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06259 Water Intake (273) PT TKM BorePile Grid B K400 Kevin K. 17:20 17:20 8.0 5.5
27-May-21 19 FL3B (P1E01_ON PO. 9100000180 (3) 06262 Fiberline (414) PT TKM Bore Pile K300 Brian C. - - 7.5 -
28-May-21 1 FL3B (P1E01_ON PO. 9100000180 (19) 06264 Water Intake (273) PT TKM BorePile Grid l-5 Point 61 K300 Vincent C. 17:45 18:20 7.5 7.5
28-May-21 2 FL3B (P1E01_ON PO. 9100000180 (3) 06262 Fiberline (414) PT TKM Bore Pile K300 Brian C. 18:35 19:50 7.5 7.5
28-May-21 14 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06265 Water Intake (273) PT TKM BorePile Grid C K400 Kevin K. 16:10 16:10 8.0 5.5
29-May-21 27 FL3B (P1E01_ON PO. 9100000180 (19) 06451 Water Intake (273) PT TKM BorePile Grid l-5 Point 57 K300 Vincent C. 15:55 16:55 7.5 7.5
29-May-21 28 FL3B (P1E01_ON PO. 9100000180 (3) 06454 Fiberline (414) PT TKM Bore Pile SPA K300 Brian C. 17:35 18:30 7.5 8.0
29-May-21 29 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06266 Water Intake (273) PT TKM BorePile Grid C K400 Kevin K. 15:40 15:40 8.0 5.5
30-May-21 21 FL3B (P1E01_ON PO. 9100000180 (3) 06455 Fiberline (414) PT TKM Bore Pile BPA 377 K300 Brian C. 16:25 17:20 7.5 7.5
30-May-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06267 Water Intake (273) PT TKM BorePile Grid C K400 Kevin K. - - 8.0 -
Bore Pile Pipe Bridge Grid 1-5 Point
30-May-21 23 PO. 9100000180 (19) 06452 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Pipe Bridge (186) 56
31-May-21 2 FL3B (P1E01_ON PO. 9100000180 (34) 06457 Recausticizing (474) PT TKM Bore Pile BPA-05 K300 Poltak 17:00 20:10 7.5 7.5
31-May-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 06452 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 1-5 Point 56 K300 Vincent C. 14:25 15:30 7.5 8.5
31-May-21 10 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06267 Water Intake (273) PT TKM BorePile Grid C K400 Kevin K. 15:00 15:00 8.0 5.5
31-May-21 29 FL3B (P1E01_ON PO. 9100000180 (3) 06456 Fiberline (414) PT TKM Bore Pile BPA 373 K300 Brian C. - - 7.5 -
1-Jun-21 3 FL3B (P1E01_ON PO. 9100000180 (3) 06456 Fiberline (414) PT TKM Bore Pile BPA 373 K300 Brian C. 18:00 18:25 7.5 7.5
1-Jun-21 14 FL3B (P1E01_ON PO. 9100000180 (34) 06474 Recausticizing (474) PT TKM BorePile BPA-06 K300 Poltak - - 7.5 -
1-Jun-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 06463 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-4 K300 Vincent C. 17:05 17:50 7.5 7.5
1-Jun-21 19 P1D12-ON-PC1618 (3) 06485 Water Intake (273) PT TKM BorePile MCC Room & Pipe Slipper K400 Kevin K. 16:05 16:05 16.0 5.5
FL3B (P1E01_ON
2-Jun-21 5 FL3B (P1E01_ON PO. 9100000180 (34) 06474 Recausticizing (474) PT TKM BorePile BPA-06 K300 Poltak 15:05 16:05 7.5 7.5
2-Jun-21 24 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06268 Water Intake (273) PT TKM BorePile MCC Room & Pipe Slipper K400 Kevin K. 13:45 13:45 16.0 5.5
2-Jun-21 25 FL3B (P1E01_ON PO. 9100000180 (3) 06492 Fiberline (414) PT TKM Bore Pile BPA 374 K300 Brian C. 17:20 17:50 7.5 7.5
2-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 06464 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-4 K300 Vincent C. 15:10 16:40 7.5 7.5
3-Jun-21 20 FL3B (P1E01_ON PO. 9100000180 (34) 06484 Recausticizing (474) PT TKM BorePile BPA-01 & 05 K300 Nico B. 19:00 20:05 15.0 7.5
3-Jun-21 24 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06486 Water Intake (273) PT TKM BorePile MCC Room & Pipe Slipper K400 Kevin K. 12:10 12:10 16.0 5.5
3-Jun-21 25 PO. 9100000180 (19) 06465 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-4 K300 Vincent C. 19:25 20:40 7.5 7.5
FL3B (P1E01_ON
3-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (3) 06468 Fiberline (414) PT TKM BorePile BPA 375 K300 Brian C. - - 7.5 -
4-Jun-21 2 FL3B (P1E01_ON PO. 9100000180 (3) 06468 Fiberline (414) PT TKM BorePile BPA 375 K300 Brian C. 13:40 14:35 7.5 7.5
4-Jun-21 13 FL3B (P1E01_ON PO. 9100000180 (34) 06478 Recausticizing (474) PT TKM BorePile BPA-02 K300 Nico B. - - 7.5 -
4-Jun-21 17 PO. 9100000180 (19) 06453 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-3 K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON
4-Jun-21 18 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06487 Water Intake (273) PT TKM BorePile Pipe Slipper K400 Kevin K. - - 8.0 -
5-Jun-21 8 FL3B (P1E01_ON PO. 9100000180 (34) 06478 Recausticizing (474) PT TKM BorePile BPA-02 K300 Nico B. 13:25 14:20 7.5 7.5
5-Jun-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 06453 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR-2 Grid 1-3 K300 Vincent C. 16:55 17:30 7.5 7.5
5-Jun-21 10 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06487 Water Intake (273) PT TKM BorePile Pipe Slipper K400 Kevin K. 17:05 17:05 8.0 5.5
5-Jun-21 28 FL3B (P1E01_ON PO. 9100000180 (34) 06476 Recausticizing (474) PT TKM BorePile BPA-02 K300 Nico B. 14:00 15:25 7.5 7.5
7-Jun-21 8 FL3B (P1E01_ON PO. 9100000180 (34) 06475 Recausticizing (474) PT TKM BorePile BPA-03 K300 Nico B. 18:25 19:00 7.5 7.5
7-Jun-21 9 FL3B (P1E01_ON PO. 9100000180 (3) 06473 Fiberline (414) PT TKM BorePile K300 Brian C. - - 7.5 -
7-Jun-21 10 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06488 Water Intake (273) PT TKM BorePile Pipe Slipper K400 Kevin K. 15:45 15:45 8.0 5.5
7-Jun-21 29 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06480 Water Intake (273) PT TKM BorePile MCC Room & Pipe Slipper K400 Kevin K. - - 16.0 -
7-Jun-21 30 FL3B (P1E01_ON PO. 9100000180 (3) 06469 Fiberline (414) PT TKM BorePile BPA 1 K300 Brian C. - - 7.5 -
7-Jun-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 06467 Pipe Bridge (186) PT TKM BorePile Pipe Bridge & Conveyor Leg 12 K300 Vincent C. 16:15 17:10 15.0 7.5
8-Jun-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 06490 Pipe Bridge (186) PT TKM BorePile Pipe Bridge & Leg 12 K300 Vincent C. 20:30 22:25 15.0 7.5
8-Jun-21 24 FL3B (P1E01_ON PO. 9100000180 (3) 06470 Fiberline (414) PT TKM BorePile BPP 1 K300 Brian C. - - 7.5 -
8-Jun-21 26 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06483 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 17:55 17:55 5.5 5.5
8-Jun-21 27 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06482 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 8.0 -
9-Jun-21 4 FL3B (P1E01_ON PO. 9100000180 (3) 06470 Fiberline (414) PT TKM BorePile BPP 1 K300 Brian C. 13:30 14:10 7.5 7.5
9-Jun-21 5 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06482 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 15:20 15:20 8.0 5.5
9-Jun-21 22 FL3B (P1E01_ON PO. 9100000180 (19) 06491 Pipe Bridge (186) PT TKM BorePile Pipe Bridge & Leg 12 K300 Vincent C. 18:05 18:40 15.0 7.5
9-Jun-21 23 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06489 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 18:05 18:05 5.5 5.5
10-Jun-21 27 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06497 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 16:45 16:45 8.0 5.5
10-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06498 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 19:10 19:10 5.5 5.5
10-Jun-21 29 FL3B (P1E01_ON PO. 9100000180 (3) 06471 Fiberline (414) PT TKM BorePile BPP 3 K300 Brian C. 17:45 18:30 7.5 7.5
BorePile Pipe Bridge FR-3 Grid 3-19 &
10-Jun-21 30 PO. 9100000180 (19) 06494 Pipe Bridge (186) PT TKM K300 Vincent C. 18:55 20:15 15.0 7.5
FL3B (P1E01_ON FR-2 Grid 1-3
BorePile Leg 12 Conveyor 3060, 3061
10-Jun-21 31 PO. 9100000180 (19) 06495 PT TKM K300 Vincent C. 20:35 21:45 7.5 7.5
FL3B (P1E01_ON Woodyard (328) & 3071
11-Jun-21 15 FL3B (P1E01_ON PO. 9100000180 (34) 07051 Recausticizing (474) PT TKM BorePile BPA K300 Nico B. 14:30 15:15 7.5 7.5
11-Jun-21 16 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06500 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 8.0 -
11-Jun-21 17 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06499 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 5.5 -
11-Jun-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 07054 Woodyard (328) PT TKMBorePile Leg 12 Conveyor 3060, 3061 & 3071 K300 Vincent C. 18:20 19:25 7.5 7.5
BorePile Pipe Bridge Grid 3-18 & 3-19
11-Jun-21 19 PO. 9100000180 (19) 06493 Pipe Bridge (186) PT TKM K300 Vincent C. 16:00 16:45 22.5 7.5
FL3B (P1E01_ON (FR-3)
12-Jun-21 2 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06500 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 17:10 17:10 8.0 5.5
12-Jun-21 3 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06499 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 5.5 -
BorePile Pipe Bridge FR3 Grid 3-20 &
12-Jun-21 24 PO. 9100000180 (19) 07055 Pipe Bridge (186) PT TKM K300 Vincent C. 17:55 21:37 22.5 22.5
FL3B (P1E01_ON 3-21
BorePile Conveyor 3060, 3061 &
12-Jun-21 25 PO. 9100000180 (19) 07056 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Woodyard (328) 3071 Leg 12
12-Jun-21 32 FL3B (P1E01_ON PO. 9100000180 (34) 07052 Recausticizing (474) PT TKM Bore Pile BPB K300 Nico B. 17:25 18:30 7.5 7.5
14-Jun-21 8 FL3B (P1E01_ON PO. 9100000180 (34) 07053 Recausticizing (474) PT TKM Bore Pile BPC K300 Nico B. 13:45 13:45 7.5 6.0
14-Jun-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 07057 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR3 Grid 3-20 & 3-21 K300 Vincent C. 15:20 15:55 22.5 7.5
14-Jun-21 10 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07062 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 12:20 12:20 5.5 5.5
14-Jun-21 11 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07059 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 13:00 13:00 8.0 5.5
14-Jun-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 06499 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 5.5 -
14-Jun-21 13 FL3B (P1E01_ON PO. 9100000180 (19) 07056 Woodyard (328) PT TKMBorePile Conveyor 3060, 3061 & 3071 Leg 12 K300 Vincent C. - - 7.5 -
14-Jun-21 32 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07060 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 8.0 -
15-Jun-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 07056 Woodyard (328) PT TKMBorePile Conveyor 3060, 3061 & 3071 Leg 12 K300 Vincent C. 15:30 16:35 7.5 7.5
15-Jun-21 29 FL3B (P1E01_ON PO. 9100000180 (34) 07063 Recausticizing (474) PT TKM Bore Pile BRP 4 K300 Nico B. 13:55 15:00 7.5 7.5
15-Jun-21 31 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07082 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 12:50 13:45 12.0 11.0
15-Jun-21 32 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07078 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 18:20 19:00 11.0 11.0
BorePile Pipe Bridge FR3 Grid 3-17 &
15-Jun-21 34 PO. 9100000180 (19) 07067 Pipe Bridge (186) PT TKM K300 Vincent C. 14:45 15:20 15.0 7.5
FL3B (P1E01_ON 3-20
16-Jun-21 28 FL3B (P1E01_ON PO. 9100000180 (34) 07064 Recausticizing (474) PT TKM Bore Pile BRP 7 K300 Nico B. 16:05 16:45 7.5 7.5
16-Jun-21 29 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07061 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 17:00 18:45 11.0 11.0
16-Jun-21 30 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07077 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 12.0 -
16-Jun-21 31 FL3B (P1E01_ON PO. 9100000180 (19) 07070 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-17, 3-19 & 3-20K300 Vincent C. 14:20 19:55 22.5 15.0
16-Jun-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 07071 Woodyard (328) PT TKMBorePile Conveyor 3060, 3061 & 3071 Leg 12 K300 Vincent C. - - 7.5 -
BorePile Conveyor 3060, 3061 &
17-Jun-21 10 PO. 9100000180 (19) 07071 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Woodyard (328) 3071 Leg 12
17-Jun-21 24 FL3B (P1E01_ON PO. 9100000180 (34) 07065 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. - - 7.5 -
17-Jun-21 25 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07079 Water Intake (273) PT TKM BorePile MCC Room Grid C & D K400 Kevin K. 16:15 17:50 22.0 11.0
17-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07073 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-17, 3-19, 3-20 & 3-9
K300 Vincent C. 13:45 15:00 30.0 7.5
18-Jun-21 6 FL3B (P1E01_ON PO. 9100000180 (34) 07065 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. - - 7.5 -
BorePile Conveyor 3060, 3061 &
18-Jun-21 7 PO. 9100000180 (19) 07071 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Woodyard (328) 3071 Leg 12
BorePile Pipe Bridge FR3 Grid 3-17, 3-
18-Jun-21 25 PO. 9100000180 (19) 07072 Pipe Bridge (186) PT TKM K300 Vincent C. 16:15 18:45 30.0 15.0
FL3B (P1E01_ON 19, 3-20 & 3-9
18-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (34) 07066 Recausticizing (474) PT TKM Bore Pile BRP 1 K300 Nico B. - - 7.5 -
18-Jun-21 29 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07069 Water Intake (273) PT TKM BorePile MCC Room Grid C & D K400 Kevin K. 17:15 17:15 22.0 7.5
19-Jun-21 3 FL3B (P1E01_ON PO. 9100000180 (34) 07065 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. 12:25 13:40 7.5 7.5
BorePile Conveyor 3060, 3061 &
19-Jun-21 4 PO. 9100000180 (19) 07071 PT TKM K300 Vincent C. 19:00 19:50 7.5 8.0
FL3B (P1E01_ON Woodyard (328) 3071 Leg 12
19-Jun-21 5 FL3B (P1E01_ON PO. 9100000180 (34) 07066 Recausticizing (474) PT TKM Bore Pile BRP 1 K300 Nico B. - - 7.5 -
19-Jun-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07080 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 17:50 18:30 22.0 9.0
BorePile Pipe Bridge FR3 Grid 3-9, 3-
19-Jun-21 23 PO. 9100000180 (19) 07074 Pipe Bridge (186) PT TKM K300 Vincent C. 16:15 18:40 30.0 15.0
FL3B (P1E01_ON 17, 3-19, 3-20
19-Jun-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 07050 Woodyard (328) PT TKMBorePile Conveyor 3060, 3061 & 3071 Leg 12 K300 Vincent C. 21:25 21:25 3.0
20-Jun-21 2 FL3B (P1E01_ON PO. 9100000180 (34) 07066 Recausticizing (474) PT TKM Bore Pile BRP 1 K300 Nico B. - - 7.5 -
20-Jun-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07081 Water Intake (273) PT TKM BorePile MCC Room Grid C & D K400 Kevin K. 15:05 15:05 11.0 5.5
20-Jun-21 13 FL3B (P1E01_ON PO. 9100000180 (19) 07075 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-9, 3-17, 3-19, 3-20
K300 Vincent C. 12:55 13:35 30.0 7.5
21-Jun-21 5 FL3B (P1E01_ON PO. 9100000180 (34) 07066 Recausticizing (474) PT TKM Bore Pile BRP 1 K300 Nico B. 15:35 17:05 7.5 7.5
21-Jun-21 24 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07098 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 13:25 18:50 17.0 16.5
BorePile Pipe Bridge FR3 Grid 3-9, 3-
21-Jun-21 25 PO. 9100000180 (19) 07076 Pipe Bridge (186) PT TKM K300 Vincent C. 13:25 20:25 37.5 22.5
FL3B (P1E01_ON 17, 3-19, 3-21
22-Jun-21 24 FL3B (P1E01_ON PO. 9100000180 (34) 07091 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. - - 7.5 -
22-Jun-21 25 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07097 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 17:50 17:50 11.0 5.5
22-Jun-21 26 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07096 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. 13:45 13:45 11.0 5.5
BorePile Pipe Bridge FR3 Grid 3-9, 3-
22-Jun-21 27 PO. 9100000180 (19) 07083 Pipe Bridge (186) PT TKM K300 Vincent C. - - 30.0 -
FL3B (P1E01_ON 18, 3-19, 3-21
22-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07092 FWT (142) PT TKM BorePile Condensation Collection Tank K400 Darwin 13:45 17:45 11.0 11.0
23-Jun-21 10 FL3B (P1E01_ON PO. 9100000180 (34) 07091 Recausticizing (474) PT TKM Bore Pile BRP K300 Nico B. 17:00 17:55 7.5 7.5
BorePile Pipe Bridge FR3 Grid 3-9, 3-
23-Jun-21 11 PO. 9100000180 (19) 07083 Pipe Bridge (186) PT TKM K300 Vincent C. 16:40 17:30 30.0 7.5
FL3B (P1E01_ON 18, 3-19, 3-21
23-Jun-21 32 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05926 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. - - 5.5 -
23-Jun-21 33 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05927 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
23-Jun-21 34 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07093 FWT (142) PT TKM BorePile Condensation Collection Tank K400 Darwin 13:00 13:00 11.0 5.5
23-Jun-21 36 FL3B (P1E01_ON PO. 9100000180 (19) 05923 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-9, 3-18, 3-19, 3-20
K300 Vincent C. - - 30.0 -
24-Jun-21 5 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05926 Water Intake (273) PT TKM BorePile MCC Room K400 Kevin K. 16:00 16:00 5.5 5.5
24-Jun-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05927 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
24-Jun-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07094 FWT (142) PT TKMBorePile Condensation Collection Tank RB#5 K400 Darwin 13:55 18:25 11.0 11.0
BorePile Pipe Bridge FR3 Grid 3-9, 3-
24-Jun-21 23 PO. 9100000180 (19) 07085 Pipe Bridge (186) PT TKM K300 Vincent C. 16:30 19:10 30.0 15.5
FL3B (P1E01_ON 18, 3-19, 3-20
BorePile Conveyor 3060,3061,3071
24-Jun-21 24 PO. 9100000180 (19) 07086 PT TKM K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON Woodyard (328) Leg 4
25-Jun-21 5 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05927 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
25-Jun-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 07086 Woodyard (328) PT TKM BorePile Conveyor 3060,3061,3071 Leg 4 K300 Vincent C. - - 7.5 -
25-Jun-21 24 FL3B (P1E01_ON PO. 9100000180 (3) 07099 Fiberline (414) PT TKM BorePile BPP37 K300 Brian C. 15:20 16:20 7.5 7.5
25-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07087 Pipe Bridge (186) PT TKM
BorePile Pipe Bridge FR3 Grid 3-9, 3-18, 3-19, 3-20
K300 Vincent C. 16:40 17:25 30.0 7.5
25-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07095 FWT (142) PT TKMBorePile Condensation Collection Tank RB#5 K400 Darwin 14:15 14:15 11.0 5.5
26-Jun-21 3 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05927 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
BorePile Conveyor 3060,3061,3071
26-Jun-21 4 PO. 9100000180 (19) 07086 PT TKM K300 Vincent C. 21:05 22:20 7.5 7.5
FL3B (P1E01_ON Woodyard (328) Leg 4
26-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (3) 07100 Fiberline (414) PT TKM BorePile BPP36 K300 Brian C. 15:10 16:15 7.5 7.5
BorePile Pipe Bridge FR3 Grid 3-9, 3-
26-Jun-21 27 PO. 9100000180 (19) 07088 Pipe Bridge (186) PT TKM K300 Vincent C. 17:00 22:00 30.0 22.5
FL3B (P1E01_ON 18, 3-20
28-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 05928 Water Intake (273) PT TKM BorePile Pipe Support K400 Kevin K. - - 11.0 -
BorePile Pipe Bridge FR3 Grid 3-9, 3-
28-Jun-21 29 PO. 9100000180 (19) 07553 Pipe Bridge (186) PT TKM K300 Vincent C. 11:50 15:50 30.0 15.0
FL3B (P1E01_ON 18, 3-20
28-Jun-21 30 FL3B (P1E01_ON PO. 9100000180 (19) 07554 Woodyard (328) PT TKM BorePile Conveyor 3060,3061,3071 Leg 4 K300 Vincent C. 11:30 12:20 7.5 7.5
29-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07555 Pipe Bridge (186) PT TKMBorePile Pipe Bridge FR3 Grid 3-8, 3-18, 3-20 K300 Vincent C. 14:20 18:15 30.0 15.0
Bore Pile Conveyor 3060, 3061, 3071
29-Jun-21 27 PO. 9100000180 (19) 07556 PT TKM K300 Vincent C. 18:50 19:50 7.5 7.5
FL3B (P1E01_ON Woodyard (328) Leg 4
29-Jun-21 28 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07566 Woodyard (328) PT TKM BorePile Pipe Support K400 Kevin K. - - 22.0 -
30-Jun-21 25 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07567 Woodyard (328) PT TKM BorePile Pipe Support K400 Kevin K. 13:45 14:55 22.0 11.0
30-Jun-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07558 Woodyard (328) PT TKM Bore Pile Conveyor 3060, 3061, 3071 Leg 4 K300 Vincent C. 17:20 17:55 7.5 7.5
BorePile Pipe Bridge FR3 Grid 3-8, 3-
30-Jun-21 27 PO. 9100000180 (19) 07559 Pipe Bridge (186) PT TKM K300 Vincent C. 17:30 20:30 37.5 22.5
FL3B (P1E01_ON 18, 3-20
1-Jul-21 31 FL3B (P1E01_ON PO. 9100000180 (19) 07562 Pipe Bridge (186) BorePile
PT TKMPipe Bridge FR3 Grid 3-8, 3-18, 3-21 & FR3A Grid
K300
3A-2E Vincent C. 14:05 17:30 37.5 16.0
1-Jul-21 32 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07551 Woodyard (328) PT TKM BorePile Pipe Support K400 Kevin K. - - 22.0 -
2-Jul-21 5 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 07551 Woodyard (328) PT TKM BorePile Pipe Support K400 Kevin K. - - 22.0 -
2-Jul-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07563 Pipe Bridge (186) BorePile
PT TKMPipe Bridge FR3 Grid 3-8, 3-18, 3-21 & FR3A Grid
K300
3A-2E Vincent C. 14:05 15:15 37.5 15.0
3-Jul-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 07564 Pipe Bridge (186) BorePile
PT TKMPipe Bridge FR3A Grid 3A-D, 3A-F, 3A-G & FR3 Grid
K3003-8 Vincent C. 16:00 19:00 37.5 16.0
3-Jul-21 27 FL3B (P1E01_ON PO. 9100000766 (6) 07752 Woodyard (328) PT TKM Bore Pile Pipe Support K400 Kevin K. 15:55 16:35 22.0 11.0 P1G01-ON-CPPU0011 (6)
4-Jul-21 18 FL3B (P1E01_ON PO. 9100000766 (6) 07568 Woodyard (328) PT TKM Bore Pile Pipe Support K400 Kevin K. 16:00 19:00 22.0 17.5 P1G01-ON-CPPU0011 (6)
9-Jul-21 28 PO. 9100000766 (6) 07580 PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 15:20 15:20 16.5 5.5
FL3B (P1E01_ON Woodyard (328)
9-Jul-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 07574 Woodyard (328) PT TKM
BorePile Pipe Bridge FR3 Grid 3-8 & FR3A Grid 3A-D
K300 Vincent C. - - 15.0 -
10-Jul-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 07574 Woodyard (328) PT TKM
BorePile Pipe Bridge FR3 Grid 3-8 & FR3A Grid 3A-D
K300 Vincent C. 15:05 15:45 15.0 7.5
10-Jul-21 27 PO. 9100000766 (6) 07581 PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 13:50 13:50 16.5 5.5
FL3B (P1E01_ON Woodyard (328)
10-Jul-21 28 FL3B (P1E01_ON PO. 9100000180 (19) 07583 Pipe Bridge (186) PT TKM BorePile FR12 K300 Delvin S. - - 22.5 -
11-Jul-21 1 FL3B (P1E01_ON PO. 9100000180 (19) 07583 Pipe Bridge (186) PT TKM BorePile FR12 K300 Delvin S. - - 22.5 -
BorePile Pipe Bridge FR3A Grid 3A-E,
11-Jul-21 7 PO. 9100000180 (19) 07576 PT TKM K300 Vincent C. 15:35 17:50 15.0 7.5
FL3B (P1E01_ON Woodyard (328) 3A-M
11-Jul-21 8 FL3B (P1E01_ON PO. 9100000766 (6) 07587 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 14:45 14:45 11.0 5.5
12-Jul-21 5 FL3B (P1E01_ON PO. 9100000180 (19) 07583 Pipe Bridge (186) PT TKM BorePile FR12 K300 Delvin S. - - 22.5 -
BorePile Pipe Bridge FR3A Grid 3A-E,
12-Jul-21 27 PO. 9100000180 (19) 07577 PT TKM K300 Vincent C. 13:05 14:30 15.0 7.5
FL3B (P1E01_ON Woodyard (328) 3A-M
12-Jul-21 28 FL3B (P1E01_ON PO. 9100000766 (6) 07582 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. - - 16.5 -
12-Jul-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 07584 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12 K300 Delvin S. - - 22.5 -
13-Jul-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 07585 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12 K300 Delvin S. 16:20 18:00 30.0 15.0
13-Jul-21 30 FL3B (P1E01_ON PO. 9100000180 (19) 07578 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR3A Grid 3A-M K300 Vincent C. 17:20 18:20 7.5 7.5
13-Jul-21 33 FL3B (P1E01_ON PO. 9100000766 (6) 07588 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 16:35 16:35 16.5 5.5
BorePile Pipe Bridge FR12 Grid 12A-
14-Jul-21 31 PO. 9100000180 (19) 07586 Pipe Bridge (186) PT TKM K300 Delvin S. 15:05 19:45 30.0 22.5
FL3B (P1E01_ON 3, 12A-5, 12A-7, 12A-9
14-Jul-21 32 FL3B (P1E01_ON PO. 9100000766 (6) 07589 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. - - 16.5 -
15-Jul-21 2 FL3B (P1E01_ON PO. 9100000766 (6) 07589 Woodyard (328) PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. - - 16.5 -
BorePile Pipe Bridge FR12 Grid 3A-3,
15-Jul-21 23 PO. 9100000180 (19) 07595 Pipe Bridge (186) PT TKM K300 Delvin S. 16:50 19:05 30.0 30.0
FL3B (P1E01_ON 3A-5, 3A-7 & 3A-9
BorePile Pipe Bridge Grid 12A-3, 12A-
16-Jul-21 14 PO. 9100000180 (19) 07597 Pipe Bridge (186) PT TKM K300 Delvin S. 15:25 19:45 30.0 15.0
FL3B (P1E01_ON 5, 12A-8, 12A-9
17-Jul-21 14 PO. 9100000766 (6) 07589 PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 15:05 15:05 16.5 5.5
FL3B (P1E01_ON Woodyard (328)
BorePile Pipe Bridge Grid 12A-3, 12A-
17-Jul-21 41 PO. 9100000180 (19) 07598 Pipe Bridge (186) PT TKM K300 Delvin S. 13:55 20:10 30.0 30.0
FL3B (P1E01_ON 5, 12A-8, 12A-9
17-Jul-21 42 FL3B (P1E01_ON PO. 9100000180 (19) 08301 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 16:25 19:00 15.0 16.0
17-Jul-21 49 FL3B (P1E01_ON PO. 9100000180 (19) 08303 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 21:15 21:15 3.0 3.0
18-Jul-21 26 PO. 9100000766 (6) 07592 PT TKM BorePile Pipe Support Grid 18 & 19 K400 Kevin K. 15:00 15:00 11.0 5.5
FL3B (P1E01_ON Woodyard (328)
18-Jul-21 28 FL3B (P1E01_ON PO. 9100000180 (19) 08302 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3A Grid 3A-C K300 Vincent C. 15:35 16:25 15.0 7.5
BorePile Pipe Bridge Grid 12A-3, 12A-
18-Jul-21 29 PO. 9100000180 (19) 07599 Pipe Bridge (186) PT TKM K300 Delvin S. 12:55 17:10 30.0 30.0
FL3B (P1E01_ON 5, 12A-8, 12A-9
BorePile Pipe Bridge Grid 12A-3, 12A-
19-Jul-21 29 PO. 9100000180 (19) 07600 Pipe Bridge (186) PT TKM K300 Delvin S. 15:40 18:55 30.0 15.0
FL3B (P1E01_ON 4, 12A-7, 12A-9
19-Jul-21 30 PO. 9100000766 (6) 07594 PT TKM Borepile Pipe Support Grid 18 & 19 K400 Kevin K. - - 11.0 -
FL3B (P1E01_ON Woodyard (328)
19-Jul-21 33 FL3B (P1E01_ON PO. 9100000180 (19) 08304 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 16:10 17:35 15.0 7.5
21-Jul-21 6 FL3B (P1E01_ON PO. 9100000766 (6) 07594 Woodyard (328) PT TKM Borepile Pipe Support Grid 18 & 19 K400 Kevin K. 17:10 17:10 11.0 5.5
21-Jul-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 08314 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 15:30 19:05 15.0 15.0
21-Jul-21 40 FL3B (P1E01_ON PO. 9100000180 (19) 08311 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-3 K300 Delvin S. 15:50 16:20 7.5 7.5
22-Jul-21 36 PO. 9100000766 (6) 08317 PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. - - 11.0 -
FL3B (P1E01_ON Woodyard (328)
BorePile Pipe Bridge Grid 12A-4, 12A-
22-Jul-21 37 PO. 9100000180 (19) 08310 Pipe Bridge (186) PT TKM K300 Delvin S. 15:00 16:10 15.0 7.5
FL3B (P1E01_ON 7
22-Jul-21 38 FL3B (P1E01_ON PO. 9100000180 (19) 08315 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C K300 Vincent C. 17:45 18:25 7.5 7.5
23-Jul-21 6 FL3B (P1E01_ON PO. 9100000766 (6) 08317 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. - - 11.0 -
23-Jul-21 25 FL3B (P1E01_ON PO. 9100000180 (19) 08312 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-7 & 12A-4 K300 Delvin S. 15:50 16:35 15.0 7.5
23-Jul-21 26 PO. 9100000180 (19) 08316 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR3A Grid 3A-C K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON
24-Jul-21 5 PO. 9100000766 (6) 08317 PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. 13:10 13:10 11.0 6.0
FL3B (P1E01_ON Woodyard (328)
24-Jul-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 08316 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR3A Grid 3A-C K300 Vincent C. - - 7.5 -
BorePile Pipe Bridge Grid 12A-4 &
24-Jul-21 29 PO. 9100000180 (19) 08313 Pipe Bridge (186) PT TKM K300 Delvin S. 15:15 16:10 15.0 7.5
FL3B (P1E01_ON 12A-6
24-Jul-21 31 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08324 ETP (135) PT TKM BorePile BP1 & BP9 Area Primary Clarifier K400 Andri - - 17.0 -
26-Jul-21 8 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08324 ETP (135) PT TKM BorePile BP1 & BP9 Area Primary Clarifier K400 Andri - - 17.0 -
26-Jul-21 31 FL3B (P1E01_ON PO. 9100000766 (6) 08319 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. - - 11.0 -
26-Jul-21 32 FL3B (P1E01_ON PO. 9100000766 (6) 08320 Water Intake (273) PT TKM Bore Pile Pipe Support Grid 227 K400 Kevin K. 21:00 21:00 11.0 5.5
BorePile Pipe Bridge Grid 12A-4 &
26-Jul-21 33 PO. 9100000180 (19) 08333 Pipe Bridge (186) PT TKM K300 Delvin S. 15:10 16:10 15.0 7.5
FL3B (P1E01_ON 12A-6
26-Jul-21 38 FL3B (P1E01_ON PO. 9100000180 (19) 08336 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 3A-C, Point F K300 Benny 14:55 16:00 7.5 7.5
BorePile BP1 & BP9 Area Primary
27-Jul-21 7 P1D12-ON-PC1618 (3) 08324 ETP (135) PT TKM K400 Andri - - 17.0 -
FL3B (P1E01_ON Clarifier
27-Jul-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 08334 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-4 & 12A-6 K300 Delvin S. 17:05 17:50 15.0 7.5
27-Jul-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08326 ETP (135) PT TKM Bore Pile BP3 & BP7 Area Primary Clarifier K400 Andri 16:50 17:55 17.0 8.5
27-Jul-21 23 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08327 ETP (135) PT TKM Bore Pile Screening BPA2 K400 Andri - - 8.5 -
27-Jul-21 24 FL3B (P1E01_ON PO. 9100000766 (6) 08338 Water Intake (273) PT TKM Borepile Pipe Support Grid 226 K400 Kevin K. - - 11.0 -
27-Jul-21 25 FL3B (P1E01_ON PO. 9100000766 (6) 08337 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 K400 Kevin K. - - 11.0 -
28-Jul-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08327 ETP (135) PT TKM Bore Pile Screening BPA2 K400 Andri - - 8.5 -
28-Jul-21 23 FL3B (P1E01_ON PO. 9100000766 (6) 08338 Water Intake (273) PT TKM Borepile Pipe Support Grid 226 K400 Kevin K. - - 11.0 -
28-Jul-21 24 FL3B (P1E01_ON PO. 9100000766 (6) 08337 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 K400 Kevin K. 15:10 15:10 11.0 5.5
28-Jul-21 40 FL3B (P1E01_ON PO. 9100000180 (19) 08335 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-4 K300 Delvin S. - - 15.0 -
28-Jul-21 41 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08328 ETP (135) PT TKM Bore Pile BP3 & BP7 K400 Andri 18:15 19:35 17.0 8.5
29-Jul-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08327 ETP (135) PT TKM Bore Pile Screening BPA2 K400 Andri 20:25 21:05 8.5 8.5
29-Jul-21 7 FL3B (P1E01_ON PO. 9100000766 (6) 08338 Water Intake (273) PT TKM Borepile Pipe Support Grid 226 K400 Kevin K. - - 11.0 -
29-Jul-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 08335 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-4 K300 Delvin S. - - 15.0 -
29-Jul-21 21 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08341 ETP (135) PT TKM Bore Pile BP3 & BP7 K400 Andri - - 17.0 -
29-Jul-21 22 FL3B (P1E01_ON PO. 9100000766 (6) 08340 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 K400 Kevin K. 17:45 17:45 11.0 6.0
29-Jul-21 23 FL3B (P1E01_ON PO. 9100000766 (6) 08339 Water Intake (273) PT TKM Borepile Pipe Support Grid 226 K400 Kevin K. 18:00 18:00 11.0 6.0
30-Jul-21 17 FL3B (P1E01_ON PO. 9100000180 (19) 08702 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid FR15 K300 Delvin S. - - 7.5 -
30-Jul-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 08701 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid FR12C K300 Delvin S. 16:25 17:10 7.5 7.5
30-Jul-21 21 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08342 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge BP4&BP6 K400 Andri 18:05 21:05 17.0 17.0
30-Jul-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08343 ETP (135) PT TKM Bore Pile Screening BPA3 K400 Andri - - 8.5 -
30-Jul-21 37 FL3B (P1E01_ON PO. 9100000766 (6) 08709 Woodyard (328) PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. 15:40 15:40 5.5 5.5
31-Jul-21 4 FL3B (P1E01_ON PO. 9100000180 (19) 08702 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid FR15 K300 Delvin S. 15:40 15:40 7.5 5.5
31-Jul-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 08703 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C-3 &12A-4 K300 Delvin S. - - 15.0 -
31-Jul-21 17 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08344 ETP (135) PT TKM Bore Pile Clarifier BP5&BP6 K400 Andri - - 17.0 -
31-Jul-21 18 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08345 ETP (135) PT TKM Bore Pile Screening BPA K400 Andri 18:15 19:30 8.5 8.5
31-Jul-21 23 FL3B (P1E01_ON PO. 9100000766 (6) 08708 Water Intake (273) PT TKM Borepile Pipe Support Grid 228 K400 Kevin K. 20:20 20:20 11.0 6.0
2-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 08703 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C-3 &12A-4 K300 Delvin S. - - 15.0 -
2-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 08705 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15A-E K300 Delvin S. 11:30 18:20 11.0 11.0
2-Aug-21 11 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08344 ETP (135) PT TKM BorePile Clarifier BP5&BP6 K400 Andri - - 17.0 -
2-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08347 ETP (135) PT TKM BorePile Screening BPA K400 Andri - - 8.5 -
2-Aug-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08346 ETP (135) PT TKM BorePile Clarifier BP5 & BP7 K400 Andri - - 17.0 -
2-Aug-21 25 FL3B (P1E01_ON PO. 9100000766 (6) 08712 Water Intake (273) PT TKM Borepile Pipe Support Grid 227 K400 Kevin K. 20:45 20:45 11.0 5.5
2-Aug-21 26 PO. 9100000766 (6) 08711 PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. - - 11.0 -
FL3B (P1E01_ON Woodyard (328)
2-Aug-21 30 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08348 ETP (135) PT TKM Bore Pile Screening BPA K400 Andri - - 8.5 -
3-Aug-21 11 PO. 9100000766 (6) 08711 PT TKM Borepile Pipe Support Grid 16 & 17 K400 Kevin K. 15:40 15:40 11.0 5.5
FL3B (P1E01_ON Woodyard (328)
3-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08346 ETP (135) PT TKM BorePile Clarifier BP5 & BP7 K400 Andri 15:15 16:10 17.0 8.5
3-Aug-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08348 ETP (135) PT TKM Bore Pile Screening BPA K400 Andri 20:10 20:55 8.5 8.5
BorePile Pipe Bridge Grid 15A-4 &
3-Aug-21 29 PO. 9100000180 (19) 08723 Pipe Bridge (186) PT TKM K300 Delvin S. - - 15.0 -
FL3B (P1E01_ON 15C-4
3-Aug-21 30 FL3B (P1E01_ON PO. 9100000180 (19) 08707 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-E K300 Delvin S. - - 11.0 -
BorePile Pipe Bridge Grid 15A-4 &
4-Aug-21 5 PO. 9100000180 (19) 08723 Pipe Bridge (186) PT TKM K300 Delvin S. 16:35 17:45 15.0 7.5
FL3B (P1E01_ON 15C-4
4-Aug-21 6 FL3B (P1E01_ON PO. 9100000180 (19) 08707 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-E K300 Delvin S. 13:10 13:10 11.0 5.5
4-Aug-21 13 FL3B (P1E01_ON PO. 9100000766 (6) 08713 Woodyard (328) PT TKM Borepile Pipe Support Grid 11 K400 Kevin K. 18:25 18:25 11.0 5.5
4-Aug-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08734 ETP (135) PT TKM BorePile Clarifier BPA5 & BPA6 K400 Andri - - 17.0 -
4-Aug-21 23 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08735 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri - - 8.5 -
5-Aug-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08734 ETP (135) PT TKM BorePile Clarifier BPA5 & BPA6 K400 Andri - - 17.0 -
5-Aug-21 7 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08735 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri - - 8.5 -
5-Aug-21 15 FL3B (P1E01_ON PO. 9100000180 (19) 08725 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C-4 K300 Delvin S. - - 15.0 -
5-Aug-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 08724 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-E K300 Delvin S. 13:15 13:15 11.0 5.5
5-Aug-21 17 FL3B (P1E01_ON PO. 9100000766 (6) 08730 Woodyard (328) PT TKM Borepile Pipe Support Grid 11 K400 Kevin K. 17:25 17:25 11.0 5.5
6-Aug-21 4 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08734 ETP (135) PT TKM BorePile Clarifier BPA5 & BPA6 K400 Andri - - 17.0 -
6-Aug-21 5 FL3B (P1E01_ON PO. 9100000180 (19) 08725 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C-4 K300 Delvin S. 15:35 16:10 15.0 7.5
6-Aug-21 18 FL3B (P1E01_ON PO. 9100000766 (6) 08731 Woodyard (328) PT TKM Borepile Pipe Support Grid 11 K400 Kevin K. 15:15 15:15 11.0 5.5
6-Aug-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 08726 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-C K300 Delvin S. 16:05 16:05 11.0 5.5
6-Aug-21 24 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08736 ETP (135) PT TKM BorePile Screening BPB1 K400 Andri - - 7.5 -
7-Aug-21 3 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08734 ETP (135) PT TKM BorePile Clarifier BPA5 & BPA6 K400 Andri - - 17.0 -
7-Aug-21 4 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08736 ETP (135) PT TKM BorePile Screening BPB1 K400 Andri - - 7.5 -
7-Aug-21 11 FL3B (P1E01_ON PO. 9100000180 (19) 08728 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12C K300 Delvin S. 15:20 16:20 15.0 7.5
7-Aug-21 12 FL3B (P1E01_ON PO. 9100000180 (19) 08727 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-D K300 Delvin S. 13:05 13:05 11.0 5.5
7-Aug-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08737 ETP (135) PT TKM BorePile Screening BPA8 & BPA7 K400 Andri 14:05 16:35 17.0 17.0
7-Aug-21 14 FL3B (P1E01_ON PO. 9100000766 (6) 08733 Woodyard (328) PT TKM Borepile Pipe Support Grid 12 31 K400 Kevin K. 14:45 15:00 11.0 11.0
9-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 08726 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-D K300 Delvin S. 13:40 13:40 11.0 5.5
9-Aug-21 11 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08738 ETP (135) PT TKM BorePile Screening BPB2 K400 Andri 15:05 15:55 7.5 7.5
9-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 08743 ETP (135) PT TKM BorePile Screening BPA7 & 6 K400 Andri - - 17.0 -
9-Aug-21 13 FL3B (P1E01_ON PO. 9100000766 (6) 08732 Woodyard (328) PT TKMBorepile Pipe Support Grid 12 Point 29 & 27 K400 Kevin K. 12:25 16:05 11.0 11.0
9-Aug-21 34 FL3B (P1E01_ON PO. 9100000180 (19) 08744 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12 K300 Delvin S. 18:15 19:00 15.0 7.5
10-Aug-21 19 FL3B (P1E01_ON PO. 9100000180 (19) 08746 ETP (135) PT TKM BorePile FR-15 Grid C K300 Delvin S. - - 11.0 -
10-Aug-21 20 FL3B (P1E01_ON PO. 9100000180 (19) 08747 Pipe Bridge (186) PT TKM BorePile FR-12 Grid A & C K300 Delvin S. 15:30 20:25 15.0 15.0
10-Aug-21 21 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09251 ETP (135) PT TKM BorePile Clarifier BPA07 K400 Andri 13:30 14:10 8.5 8.5
10-Aug-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09252 ETP (135) PT TKM BorePile Screening BPB2 K400 Andri - - 7.5 -
12-Aug-21 7 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09252 ETP (135) PT TKM BorePile Screening BPB2 K400 Andri - - 7.5 -
12-Aug-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09253 ETP (135) PT TKM BorePile Point BP7 Clarifier K400 Andri 17:30 19:20 8.5 10.0
12-Aug-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 08750 Pipe Bridge (186) PT TKM BorePile FR-12 K300 Delvin S. 13:15 16:40 22.5 15.0
12-Aug-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 08745 Pipe Bridge (186) PT TKM BorePile FR-15 Grid C K300 Delvin S. - - 11.0 -
13-Aug-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 09259 Pipe Bridge (186) PT TKM BorePile FR-12 K300 Delvin S. 15:55 17:40 30.0 15.0
13-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 08745 Pipe Bridge (186) PT TKM BorePile FR-15 Grid C K300 Delvin S. - - 11.0 - Reschedule
BorePile BP6 Clarifier & BPA5
13-Aug-21 10 P1D12-ON-PC1618 (3) 09254 ETP (135) PT TKM K400 Andri 15:40 16:20 16.0 8.5
FL3B (P1E01_ON Screening
14-Aug-21 6 FL3B (P1E01_ON PO. 9100000180 (21) 09268 Recausticizing (474) PT TKM Bore Pile Make Up Building BP11 K300 Poltak - - 7.5 -
14-Aug-21 8 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09255 ETP (135) PT TKM BorePile BP7 Clarifier & BPB4 Screening K400 Andri - - 16.0 -
14-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 09261 Pipe Bridge (186) PT TKM BorePile FR-15C K300 Delvin S. - - 11.0 -
14-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 09260 Pipe Bridge (186) PT TKM BorePile FR-12 C-6, A-1 K300 Delvin S. 15:25 17:10 30.0 15.0
15-Aug-21 4 FL3B (P1E01_ON PO. 9100000180 (21) 09268 Recausticizing (474) PT TKM Bore Pile Make Up Building BP11 K300 Poltak 13:25 14:25 7.5 7.5 Reschedule
BorePile BP7 Clarifier & BPB4
15-Aug-21 5 P1D12-ON-PC1618 (3) 09255 ETP (135) PT TKM K400 Andri 18:00 18:30 16.0 7.5 Reschedule
FL3B (P1E01_ON Screening
15-Aug-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09256 ETP (135) PT TKM BorePile BP6 Clarifier & BPB5 Screening K400 Andri - - 16.0 -
15-Aug-21 7 FL3B (P1E01_ON PO. 9100000180 (15) 09263 Pipe Bridge (186) PT TKM BorePile FR-15C K300 Delvin S. 16:25 16:25 11.0 5.5
15-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 09262 Pipe Bridge (186) PT TKM BorePile FR-12 C-6, A-1 K300 Delvin S. 11:35 20:05 30.0 30.0
16-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 09266 Pipe Bridge (186) PT TKM BorePile FR-12 K300 Delvin S. 17:15 18:25 30.0 7.5 Late Request
16-Aug-21 11 FL3B (P1E01_ON PO. 9100000180 (19) 09267 Pipe Bridge (186) PT TKM BorePile FR-15 K300 Delvin S. 17:40 17:40 11.0 5.5 Late Request
16-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09256 ETP (135) PT TKM BorePile BP6 Clarifier & BPB5 Screening K400 Andri 16:45 17:35 16.0 8.5 Reschedule
16-Aug-21 13 FL3B (P1E01_ON PO. 9100000180 (21) 09265 Recausticizing (474) PT TKM Borepile BRP 12, BRP 17 K300 Poltak 16:30 17:40 15.0 7.5 Late Request
18-Aug-21 4 FL3B (P1E01_ON PO. 9100000180 (21) 09274 Recausticizing (474) PT TKM Borepile BRP 13, BRP 14 K300 Nico B. 19:55 21:15 15.0 7.5
18-Aug-21 8 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri - - 16.0 -
18-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 09264 Pipe Bridge (186) PT TKM BorePile FR-15 K300 Delvin S. 20:00 20:00 11.0 5.5
18-Aug-21 10 FL3B (P1E01_ON PO. 9100000180 (19) 09269 Pipe Bridge (186) PT TKM BorePile FR-12 K300 Delvin S. 18:20 19:45 30.0 7.5
19-Aug-21 4 FL3B (P1E01_ON PO. 9100000180 (21) 09275 Recausticizing (474) PT TKM Borepile Makeup Building BRP 9 K300 Nico B. - - 7.5 -
19-Aug-21 17 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri - - 16.0 - Reschedule
19-Aug-21 18 FL3B (P1E01_ON PO. 9100000180 (19) 09271 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-C K300 Delvin S. 15:40 15:40 11.0 5.5
BorePile Pipe Bridge Grid 12A-1, 12A-
19-Aug-21 20 PO. 9100000180 (19) 09270 Pipe Bridge (186) PT TKM K300 Delvin S. 15:05 20:10 22.5 15.0
FL3B (P1E01_ON B, 12A-C
20-Aug-21 7 FL3B (P1E01_ON PO. 9100000180 (21) 09275 Recausticizing (474) PT TKM Borepile Makeup Building BRP 9 K300 Nico B. - - 7.5 - Reschedule
BorePile Pipe Bridge Grid 12A-6, 12A-
20-Aug-21 15 PO. 9100000180 (19) 09272 Pipe Bridge (186) PT TKM K300 Delvin S. 16:05 18:55 30.0 15.0
FL3B (P1E01_ON B, 12A-C, 12A-D
20-Aug-21 16 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09281 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri 14:10 15:25 7.5 7.5
20-Aug-21 17 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 -
FL3B (P1E01_ON
20-Aug-21 18 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri - - 16.0 - Reschedule
20-Aug-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 09280 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR7A K300 Dapot M. - - 5.5 -
21-Aug-21 2 FL3B (P1E01_ON PO. 9100000180 (19) 09277 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12C-6, 12A-B, 12A-D K300 Delvin S. 12:40 19:45 22.5 15.0
21-Aug-21 5 FL3B (P1E01_ON PO. 9100000180 (21) 09275 Recausticizing (474) PT TKM Borepile Makeup Building BRP 9 K300 Nico B. 10:55 11:55 7.5 7.5 Reschedule
21-Aug-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
21-Aug-21 17 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri - - 16.0 - Reschedule
21-Aug-21 26 FL3B (P1E01_ON PO. 9100000766 (6) 09290 Woodyard (328) PT TKM BorePile Pipe Support Grid 15 K400 Kevin K. - - 11.0 -
21-Aug-21 29 FL3B (P1E01_ON PO. 9100000180 (19) 09280 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR7A K300 Dapot M. 18:55 18:55 5.5 5.5 Reschedule
23-Aug-21 9 FL3B (P1E01_ON PO. 9100000180 (19) 09279 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12C-6, 12A-A, 12A-D K300 Delvin S. - - 22.5 -
23-Aug-21 12 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09258 ETP (135) PT TKM BorePile BPB5 Screening K400 Andri 9:20 11:10 16.0 7.5 Reschedule
23-Aug-21 13 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09284 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri - - 7.5 -
23-Aug-21 14 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
23-Aug-21 33 FL3B (P1E01_ON PO. 9100000766 (6) 09290 Woodyard (328) PT TKM BorePile Pipe Support Grid 15 K400 Kevin K. - - 11.0 - Reschedule
23-Aug-21 36 FL3B (P1E01_ON PO. 9100000180 (19) 09292 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 7A K300 Dapot M. - - 5.5 -
24-Aug-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 09279 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12C-6, 12A-A, 12A-D K300 Delvin S. - - 22.5 - Reschedule
24-Aug-21 9 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09284 ETP (135) PT TKM BorePile Screening BPB6 K400 Andri 13:50 14:45 7.5 7.5 Reschedule
24-Aug-21 10 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
24-Aug-21 22 FL3B (P1E01_ON PO. 9100000766 (6) 09290 Woodyard (328) PT TKM BorePile Pipe Support Grid 15 K400 Kevin K. 14:55 14:55 11.0 5.5 Reschedule
24-Aug-21 23 FL3B (P1E01_ON PO. 9100000180 (19) 09292 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 7A K300 Dapot M. - - 5.5 - Reschedule
25-Aug-21 20 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09285 ETP (135) PT TKM BorePile Screening BPB8 K400 Andri - - 7.5 -
25-Aug-21 21 FL3B (P1E01_ON PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
BorePile Pipe Bridge Grid 12C-6, 12A-
25-Aug-21 24 PO. 9100000180 (19) 09279 Pipe Bridge (186) PT TKM K300 Delvin S. 12:10 19:25 22.5 22.5 Reschedule
FL3B (P1E01_ON A, 12A-D
25-Aug-21 35 FL3B (P1E01_ON PO. 9100000766 (6) 09295 Woodyard (328) PT TKM BorePile Pipe Support Grid 14 K400 Kevin K. 16:15 16:15 11.0 5.5
25-Aug-21 38 FL3B (P1E01_ON PO. 9100000180 (19) 09292 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 7A K300 Dapot M. 11:55 11:55 5.5 6.0 Reschedule
26-Aug-21 22 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09285 ETP (135) PT TKM BorePile Screening BPB8 K400 Andri 17:40 18:40 7.5 7.5 Reschedule
26-Aug-21 23 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
BorePile Pipe Bridge Grid 12A-4, 12C-
26-Aug-21 26 PO. 9100000180 (19) 09297 Pipe Bridge (186) PT TKM K300 Delvin S. 16:20 19:10 15.0 15.0
FL3B (P1E01_ON 6
26-Aug-21 34 FL3B (P1E01_ON PO. 9100000180 (19) 09296 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR7A K300 Dapot M. 12:00 12:00 5.5 5.5
26-Aug-21 37 FL3B (P1E01_ON PO. 9100000766 (2) 09951 Woodyard (328) PT TKM BorePile Pipe Support Grid 14 K300 Kevin K. 17:15 17:15 11.0 5.5 PO. 9100000766 (6)
27-Aug-21 6 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09286 ETP (135) PT TKM BorePile Screening BPB4 K400 Andri - - 7.5 -
27-Aug-21 7 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
27-Aug-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 09298 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-4, 12C-5 K300 Delvin S. 15:55 16:50 15.0 7.5
27-Aug-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 09299 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge Grid 7A K300 Dapot M. 15:15 15:15 5.5 5.5
27-Aug-21 32 FL3B (P1E01_ON PO. 9100000766 (6) 09952 Woodyard (328) PT TKM BorePile Pipe Support Grid 14 K400 Kevin K. 11:30 11:30 11.0 5.5
28-Aug-21 2 FL3B (P1E01_ON PO. 9100000180 (19) 09953 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12A-5, 12A-A K300 Delvin S. 17:00 20:25 15.0 15.0
28-Aug-21 3 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09286 ETP (135) PT TKM BorePile Screening BPB4 K400 Andri 17:30 18:10 7.5 7.5 Reschedule
28-Aug-21 4 PO. 9100000180 (19) 09276 Pipe Bridge (186) PT TKM BorePile FR 15C Pipe Bridge Grid 15-C K300 Delvin S. - - 11.0 - Reschedule
FL3B (P1E01_ON
29-Aug-21 4 FL3B (P1E01_ON P1D12-ON-PC1618 (3) 09287 ETP (135) PT TKM BorePile Screening BPA5 K400 Andri - - 8.5 -
29-Aug-21 8 FL3B (P1E01_ON PO. 9100000180 (19) 09954 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12C-5, 12C-2, 12A-1 K300 Delvin S. 15:35 16:15 22.5 7.5
30-Aug-21 46 FL3B (P1E01_ON PO. 9100000180 (19) 09955 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12A-1, 12C-1, 12C-5 K300 Delvin S. 14:45 15:40 22.5 7.5
BorePile Pipe Bridge Grid 12A-1, 12C-
31-Aug-21 19 PO. 9100000180 (19) 09956 Pipe Bridge (186) PT TKM K300 Delvin S. - - 22.5 -
FL3B (P1E01_ON 2, 12C-4
1-Sep-21 4 FL3B (P1E01_ON PO. 9100000766 (6) 09962 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. - - 15.0 -
1-Sep-21 16 FL3B (P1E01_ON PO. 9100000180 (19) 09956 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12A-1, 12C-2, 12C-4 K300 Delvin S. 14:15 17:10 22.5 15.0 Reschedule
2-Sep-21 11 FL3B (P1E01_ON PO. 9100000766 (6) 09962 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. - - 15.0 - Reschedule
BorePile Pipe Bridge Grid 12C-2, 12C-
2-Sep-21 28 PO. 9100000180 (19) 09957 Pipe Bridge (186) PT TKM K300 Delvin S. 16:05 21:10 15.0 15.0
FL3B (P1E01_ON 4
3-Sep-21 13 FL3B (P1E01_ON PO. 9100000766 (6) 09963 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 16:55 18;50 22.5 7.5
3-Sep-21 31 FL3B (P1E01_ON PO. 9100000180 (19) 09958 Pipe Bridge (186) PT TKMBorePile Pipe Bridge Grid 12A-4,12C-2, 12C-4 K300 Delvin S. 19:55 19:55 22.5 5.5
4-Sep-21 5 FL3B (P1E01_ON PO. 9100000766 (6) 09964 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 17:55 18:45 22.5 12.0
4-Sep-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 09959 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 122C-2 K300 Delvin S. 17:00 17:35 7.5 7.5
5-Sep-21 2 FL3B (P1E01_ON PO. 9100000766 (6) 09965 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. - - 22.5 -
6-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09966 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. - - 22.5 -
6-Sep-21 4 FL3B (P1E01_ON PO. 9100000766 (6) 09965 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 9:50 14:10 22.5 17.0 Reschedule
6-Sep-21 43 FL3B (P1E01_ON PO. 9100000180 (19) 09960 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 -
7-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09966 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 14:30 16:55 22.5 11.5 Reschedule
7-Sep-21 36 FL3B (P1E01_ON PO. 9100000180 (19) 09960 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 - Reschedule
8-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09970 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 14:15 17:45 22.5 16.5
8-Sep-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 09960 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 - Reschedule
8-Sep-21 25 FL3B (P1E01_ON PO. 9100000180 (19) 09967 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 15-2 K300 Delvin S. 11:40 17:20 11.0 11.0
9-Sep-21 32 FL3B (P1E01_ON PO. 9100000180 (19) 09960 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. 13:00 13:00 11.0 5.5
10-Sep-21 7 FL3B (P1E01_ON PO. 9100000766 (6) 09971 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 15:30 18:05 30.0 24.5 Reschedule
10-Sep-21 22 FL3B (P1E01_ON PO. 9100000180 (19) 09968 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15-4 K300 Delvin S. - - 11.0 -
11-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09973 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. - - 37.5 -
11-Sep-21 24 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 -
11-Sep-21 26 FL3B (P1E01_ON PO. 9100000180 (19) 09968 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15-4 K300 Delvin S. 13:25 13:25 11.0 5.5 Reschedule
13-Sep-21 11 FL3B (P1E01_ON PO. 9100000766 (6) 09980 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 11:25 10:35 37.5 20.5
13-Sep-21 38 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
14-Sep-21 6 FL3B (P1E01_ON PO. 9100000766 (6) 09981 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 15:00 19:30 37.5 24.0
14-Sep-21 35 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
15-Sep-21 5 FL3B (P1E01_ON PO. 9100000766 (6) 09982 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 20:55 22:05 37.5 12.0
15-Sep-21 39 FL3B (P1E01_ON PO. 9100000180 (19) 09976 Pipe Bridge (186) PT TKM BorePile FR15D K300 Delvin S. 19:25 20:10 15.0 7.5 P1G01-ON-CPPU0023 (2)
15-Sep-21 43 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - P1G01-ON-CPPU0023 (2)
16-Sep-21 17 FL3B (P1E01_ON PO. 9100000766 (6) 09983 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 18:00 21:35 37.5 13.0 P1G01-ON-CPPU0023 (2)
16-Sep-21 39 FL3B (P1E01_ON PO. 9100001764 (24) 09987 Pipe Bridge (186) PT TKM Borepile FR9 K300 Dapot M. - - 7.5 - P1E01-ON-CPPU0124 (24)
16-Sep-21 46 FL3B (P1E01_ON PO. 9100000180 (19) 09977 Pipe Bridge (186) PT TKM BorePile Pipe Bridge Grid 12D-8 K300 Delvin S. 18:20 20:15 7.5 7.5 PO. 9100000180 (17)
16-Sep-21 47 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
17-Sep-21 4 FL3B (P1E01_ON PO. 9100000766 (6) 09984 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 15:25 15:25 30.0 5.5
17-Sep-21 35 FL3B (P1E01_ON PO. 9100001764 (24) 09987 Pipe Bridge (186) PT TKM Borepile FR9 K300 Dapot M. - - 7.5 - P1E01-ON-CPPU0124 (24) Reschedule
17-Sep-21 36 FL3B (P1E01_ON PO. 9100000180 (17) 09978 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 -
17-Sep-21 37 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
18-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (6) 09985 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 14:35 22:45 30.0 20.5
18-Sep-21 30 FL3B (P1E01_ON PO. 9100000180 (17) 09978 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. 15:35 18:15 7.5 7.5 Reschedule
18-Sep-21 31 FL3B (P1E01_ON PO. 9100000180 (19) 09974 Pipe Bridge (186) PT TKM BorePile FR15 Grid 15-4 K300 Delvin S. - - 11.0 - Reschedule
18-Sep-21 47 FL3B (P1E01_ON PO. 9100001764 (24) 09990 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 K300 Delvin S. 15:20 16:25 7.5 7.5 P1E01-ON-CPPU0124 (24)
19-Sep-21 5 FL3B (P1E01_ON PO. 9100000766 (3) 09986 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. - - 30.0 - PO. 9100000766 (6)
19-Sep-21 29 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 -
19-Sep-21 33 FL3B (P1E01_ON PO. 9100001764 (24) 09989 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 K300 Mustainul - - 7.5 - P1E01-ON-CPPU0124 (24)
20-Sep-21 8 FL3B (P1E01_ON PO. 9100000766 (3) 09986 PD5 (855) PT TKM Borepile GL 15-17/B K400 Calvin W. 14:40 21:20 30.0 23.5 PO. 9100000766 (6) Reschedule
20-Sep-21 39 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
20-Sep-21 40 FL3B (P1E01_ON PO. 9100000180 (17) 09994 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 -
20-Sep-21 42 FL3B (P1E01_ON PO. 9100001764 (24) 09988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 9M-2 K300 Mustainul - - 7.5 - P1E01-ON-CPPU0124 (24)
20-Sep-21 43 FL3B (P1E01_ON PO. 9100001764 (24) 09989 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 K300 Mustainul 16:05 17:30 7.5 7.5 P1E01-ON-CPPU0124 (24) Reschedule
21-Sep-21 11 FL3B (P1E01_ON PO. 9100000766 (3) 011102 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 10:25 5:45 47.0 33.0 PO. 9100000766 (6)
21-Sep-21 27 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
21-Sep-21 28 FL3B (P1E01_ON PO. 9100000180 (17) 09994 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
21-Sep-21 30 FL3B (P1E01_ON PO. 9100001764 (24) 09988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 9M-2 K300 Mustainul - - 7.5 - P1E01-ON-CPPU0124 (24) Reschedule
22-Sep-21 3 FL3B (P1E01_ON PO. 9100000766 (3) 011101 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 21:50 21:50 47.0 5.5 PO. 9100000766 (6)
22-Sep-21 35 FL3B (P1E01_ON PO. 9100001764 (24) 09988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 9M-2 K300 Mustainul - - 7.5 - P1E01-ON-CPPU0124 (24) Reschedule
22-Sep-21 40 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
22-Sep-21 41 FL3B (P1E01_ON PO. 9100000180 (17) 09994 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
23-Sep-21 5 FL3B (P1E01_ON PO. 9100000766 (6) 011104 PD5 (855) PT TKM Borepile GL 15-17/B K400 Gonggom P. 9:30 11:05 30.0 6.0
23-Sep-21 38 FL3B (P1E01_ON PO. 9100000180 (15) 011106 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 -
23-Sep-21 39 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
23-Sep-21 41 FL3B (P1E01_ON PO. 9100001764 (24) 011206 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul - - 15.0 - P1E01-ON-CPPU0124 (24)
24-Sep-21 33 FL3B (P1E01_ON PO. 9100000180 (15) 011106 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
24-Sep-21 34 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
24-Sep-21 35 FL3B (P1E01_ON PO. 9100001764 (24) 011206 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul 13:45 14:50 15.0 7.5 P1E01-ON-CPPU0124 (24) Reschedule
25-Sep-21 36 FL3B (P1E01_ON PO. 9100000180 (15) 011106 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
25-Sep-21 37 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
25-Sep-21 38 FL3B (P1E01_ON PO. 9100001764 (24) 09995 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul - - 15.0 - P1E01-ON-CPPU0124 (24)
25-Sep-21 52 FL3B (P1E01_ON PO. 9100000180 (15) 09997 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. 13:55 18:25 11.0 11.0
27-Sep-21 41 FL3B (P1E01_ON PO. 9100000180 (15) 09998 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 - Reschedule
27-Sep-21 42 FL3B (P1E01_ON PO. 9100000180 (15) 011106 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 7.5 - Reschedule
27-Sep-21 43 FL3B (P1E01_ON PO. 9100000180 (17) 09979 Pipe Bridge (186) PT TKM BorePile Pipe Bridge BP5 FR12D K300 Delvin S. - - 7.5 - Reschedule
27-Sep-21 44 FL3B (P1E01_ON PO. 9100001764 (24) 09995 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul 12:15 12;15 15.0 7.5 P1E01-ON-CPPU0124 (24) Reschedule
27-Sep-21 45 FL3B (P1E01_ON PO. 9100001764 (24) 09996 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul - - 15.0 - P1E01-ON-CPPU0124 (24) Reschedule
28-Sep-21 28 FL3B (P1E01_ON PO. 9100000180 (15) 010000 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR12D K300 Delvin S. - - 15.0 -
28-Sep-21 29 FL3B (P1E01_ON PO. 9100000180 (15) 011113 Pipe Bridge (186) PT TKM BorePile Pipe Bridge FR15 K300 Delvin S. - - 11.0 -
28-Sep-21 35 FL3B (P1E01_ON PO. 9100001764 (24) 09996 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 K300 Mustainul - - 15.0 - P1E01-ON-CPPU0124 (24) Reschedule
29-Sep-21 29 FL3B (P1E01_ON PO. 9100001764 (24) 011116 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 Grid FR9M K300 Mustainul 14:10 17:30 15.0 7.5 P1E01-ON-CPPU0124 (24)
29-Sep-21 51 FL3B (P1E01_ON PO. 9100000180 (15) 011115 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12D K300 Delvin S. 13:10 14:15 15.0 7.5
29-Sep-21 52 PO. 9100000180 (15) 011114 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Delvin S. 13:55 17:05 11.0 11.0
FL3B (P1E01_ON
29-Sep-21 55 FL3B (P1E01_ON PO. 9100001764 (24) 010408 Pipe Bridge (186) PT TKM Borepile Pipe Bridge K300 18:10 19:50 7.5 7.5 P1E01-ON-CPPU0124 (24)
30-Sep-21 36 FL3B (P1E01_ON PO. 9100001764 (24) 011112 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 20:45 23:10 15.0 12.5 P1E01-ON-CPPU0124 (24)
30-Sep-21 37 PO. 9100001764 (24) 011117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - P1E01-ON-CPPU0124 (24)
FL3B (P1E01_ON
Borepile Pipe Bridge FR-9 Grid 9Q &
30-Sep-21 40 PO. 9100001764 (24) 011119 Pipe Bridge (186) PT TKM K300 Mustainul 17:25 22:20 15.0 15.0 P1E01-ON-CPPU0124 (24)
FL3B (P1E01_ON 9M
1-Oct-21 34 FL3B (P1E01_ON PO. 9100001764 (13) 011120 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 18:30 19:25 22.5 7.5 P1E01-ON-CPPU0124 (24)
1-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (13) 011125 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR-9 Grid 9Q & 9M K300 Darwin H. - - 15.0 - P1E01-ON-CPPU0124 (24)
1-Oct-21 36 PO. 9100001764 (13) 011117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - P1E01-ON-CPPU0124 (24) Reschedule
FL3B (P1E01_ON
Borepile Pipe Bridge FR22 Grid 22-2,
2-Oct-21 40 PO. 9100000731 (4) 011121 Pipe Bridge (186) PT TKM K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON 22-4, 22-5
Borepile Pipe Bridge FR-9 Grid 9Q &
2-Oct-21 41 PO. 9100001764 (13) 011125 Pipe Bridge (186) PT TKM K300 Darwin H. 16:35 19:40 15.0 15.0 P1E01-ON-CPPU0124 (24) Reschedule
FL3B (P1E01_ON 9M
2-Oct-21 42 FL3B (P1E01_ON PO. 9100001764 (13) 011117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - P1E01-ON-CPPU0124 (24) Reschedule
3-Oct-21 26 FL3B (P1E01_ON PO. 9100001764 (13) 011122 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 16:30 17:00 22.5 7.5 PO. 9100000731 (4)
3-Oct-21 27 FL3B (P1E01_ON PO. 9100000731 (4) 011128 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 9Q & 9N, 9B K300 Darwin H. 13:20 14:30 22.5 7.5
4-Oct-21 45 FL3B (P1E01_ON PO. 9100000731 (4) 011129 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q, 9N & 9B K300 Darwin H. 21:40 23:10 22.5 11.5
4-Oct-21 46 FL3B (P1E01_ON PO. 9100001764 (13) 011124 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 22:50 22:50 22.5 4.0 PO. 9100000731 (4)
4-Oct-21 47 PO. 9100001764 (13) 011117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - P1E01-ON-CPPU0124 (24) Reschedule
FL3B (P1E01_ON
5-Oct-21 39 FL3B (P1E01_ON PO. 9100000180 (31) 011123 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR22 Grid 22-3, 22-4, 22-5K300 Darwin H. 11:35 17:45 22.5 20.5
5-Oct-21 40 FL3B (P1E01_ON PO. 9100000180 (31) 011130 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR K300 Darwin H. 18:15 19:00 30.0 7.5
6-Oct-21 42 FL3B (P1E01_ON PO. 9100001764 (24) 011132 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 19:30 22:05 22.5 15.0 PO. 9100000731 (4)
6-Oct-21 43 FL3B (P1E01_ON PO. 9100000731 (4) 011131 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 K300 Darwin H. - - 11.0 -
Borepile Pipe Bridge FR9 Grid 9A, 9B
6-Oct-21 47 PO. 9100000180 (31) 011136 Pipe Bridge (186) PT TKM K300 Mustainul 13:05 19:05 22.5 22.5
FL3B (P1E01_ON & 9Q
7-Oct-21 33 FL3B (P1E01_ON PO. 9100000731 (4) 011134 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 K300 Darwin H. 12:00 12:00 11.0 5.5
Borepile Pipe Bridge FR22 Grid 22-4,
7-Oct-21 34 PO. 9100000731 (4) 011135 Pipe Bridge (186) PT TKM K300 Darwin H. 12:35 18:10 22.5 15.0
FL3B (P1E01_ON 22-3
Borepile Pipe Bridge FR9 Grid 9A, 9B
7-Oct-21 37 PO. 9100000731 (4) 011137 Pipe Bridge (186) PT TKM K300 Mustainul 14:55 18:40 22.5 15.0
FL3B (P1E01_ON & 9P
8-Oct-21 35 FL3B (P1E01_ON PO. 9100000731 (4) 011141 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9A & 9P K300 Mustainul - - 15.0 -
8-Oct-21 36 FL3B (P1E01_ON PO. 9100000731 (4) 011140 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 K300 Darwin H. - - 11.0 -
Borepile Pipe Bridge FR22 Grid 22-4,
8-Oct-21 37 PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON 22-3
9-Oct-21 26 PO. 9100000731 (4) 011143 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-2 & 22-4 K300 Darwin H. 14:15 19:10 22.5 22.5
FL3B (P1E01_ON
Borepile Pipe Bridge FR22 Grid 22-4,
9-Oct-21 28 PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM K300 Darwin H. - - 22.5 - Reschedule
FL3B (P1E01_ON 22-3
Borepile Pipe Bridge FR9 Grid 9A &
9-Oct-21 34 PO. 9100000731 (4) 011141 Pipe Bridge (186) PT TKM K300 Mustainul 19:40 20:35 15.0 7.5 Reschedule
FL3B (P1E01_ON 9P
10-Oct-21 25 FL3B (P1E01_ON PO. 9100000731 (4) 011144 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-4, 22-3 K300 Darwin H. 17:40 18:20 22.5 7.5
10-Oct-21 28 PO. 9100000731 (4) 011147 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 -
FL3B (P1E01_ON
11-Oct-21 27 FL3B (P1E01_ON PO. 9100000731 (4) 011148 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-2, 22-3, 22-4 K300 Darwin H. 17:45 18:45 22.5 7.5
11-Oct-21 30 FL3B (P1E01_ON PO. 9100000731 (4) 012101 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9A & 9P K300 Darwin H. 18:40 19:55 15.0 7.5
11-Oct-21 31 FL3B (P1E01_ON PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-4, 22-3 K300 Darwin H. - - 22.5 - Reschedule
11-Oct-21 34 PO. 9100000731 (4) 011147 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
FL3B (P1E01_ON
12-Oct-21 32 FL3B (P1E01_ON PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-4, 22-3 K300 Darwin H. - - 22.5 - Reschedule
12-Oct-21 34 PO. 9100000731 (4) 011147 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
FL3B (P1E01_ON
13-Oct-21 35 FL3B (P1E01_ON PO. 9100000731 (4) 011139 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-4, 22-3 K300 Darwin H. 16:45 19:35 22.5 15.0 Reschedule
13-Oct-21 37 PO. 9100000731 (4) 011147 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
FL3B (P1E01_ON
Borepile Pipe Bridge FR22 Grid 22-3,
14-Oct-21 36 PO. 9100000731 (4) 012104 Pipe Bridge (186) PT TKM K300 Darwin H. 18:50 21:05 22.5 11.5
FL3B (P1E01_ON 22-7 & 22-8
14-Oct-21 37 FL3B (P1E01_ON PO. 9100000731 (4) 012105 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
14-Oct-21 39 FL3B (P1E01_ON PO. 9100001764 (4) 012113 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul - - 7.5 -
15-Oct-21 27 FL3B (P1E01_ON PO. 9100001764 (27) 012110 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 -
15-Oct-21 28 PO. 9100001764 (27) 012108 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON
15-Oct-21 31 FL3B (P1E01_ON PO. 9100000731 (4) 012105 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 14:30 20:35 7.5 7.5 Reschedule
15-Oct-21 32 FL3B (P1E01_ON PO. 9100001764 (27) 012115 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul 18:40 20:20 7.5 9.0
15-Oct-21 33 FL3B (P1E01_ON PO. 9100001764 (27) 012116 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3A K300 Mustainul 19:25 20:20 7.5 7.5
16-Oct-21 33 FL3B (P1E01_ON PO. 9100001764 (27) 012111 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
16-Oct-21 34 PO. 9100001764 (27) 012124 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 -
FL3B (P1E01_ON
16-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012110 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
16-Oct-21 36 PO. 9100001764 (27) 012108 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. 16:50 18:10 22.5 7.5 Reschedule
FL3B (P1E01_ON
16-Oct-21 40 FL3B (P1E01_ON PO. 9100001764 (27) 012118 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul 17:25 18:35 7.5 7.5
16-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012117 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul 19:20 20:15 7.5 7.5
17-Oct-21 26 FL3B (P1E01_ON PO. 9100001764 (27) 012122 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
17-Oct-21 27 FL3B (P1E01_ON PO. 9100001764 (27) 012121 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-3, 22-8 K300 Darwin H. - - 15.0 -
17-Oct-21 28 PO. 9100001764 (27) 012124 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 - Reschedule
FL3B (P1E01_ON
17-Oct-21 30 FL3B (P1E01_ON PO. 9100001764 (27) 012125 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 K300 Darwin H. - - 11.0 -
17-Oct-21 34 FL3B (P1E01_ON PO. 9100001764 (27) 012120 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul - - 7.5 -
17-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012119 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul - - 7.5 -
18-Oct-21 32 FL3B (P1E01_ON PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 -
18-Oct-21 33 PO. 9100001764 (27) 012121 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-3, 22-8 K300 Darwin H. 15:20 16:10 15.0 7.5 Reschedule
FL3B (P1E01_ON
18-Oct-21 34 PO. 9100001764 (27) 012128 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-M K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON
18-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012122 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 18:25 19:05 7.5 7.5 Reschedule
18-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012120 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul - - 7.5 - Reschedule
18-Oct-21 42 FL3B (P1E01_ON PO. 9100001764 (27) 012119 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR9 Grid 9Q K300 Mustainul 15:55 17:05 7.5 7.5 Reschedule
19-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 - Reschedule
19-Oct-21 36 PO. 9100001764 (27) 012128 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-M K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON
21-Oct-21 34 PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON
21-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012128 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-M K300 Darwin H. 17:20 22:35 15.0 15.0 Reschedule
21-Oct-21 36 PO. 9100001764 (27) 012134 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 14-L & 14-N K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON
22-Oct-21 43 FL3B (P1E01_ON PO. 9100001764 (27) 0121242 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Darwin H. 21:50 22:20 7.5 7.5
Borepile Pipe Bridge FR22 grid 22-7 &
22-Oct-21 44 PO. 9100001764 (27) 0121240 Pipe Bridge (186) PT TKM K300 Darwin H. 18:55 19:40 15.0 7.5
FL3B (P1E01_ON 22-8
22-Oct-21 46 FL3B (P1E01_ON PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 - Reschedule
22-Oct-21 47 PO. 9100001764 (27) 012134 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 14-L & 14-N K300 Darwin H. 20:25 21:15 15.0 7.5 Reschedule
FL3B (P1E01_ON
23-Oct-21 6 FL3B (P1E01_ON PO. 9100001764 (2) 012141 Fiberline (414) PT TKM Borepile Fiberline BP3 K300 Hadi R. - - 7.5 -
23-Oct-21 25 FL3B (P1E01_ON PO. 9100001764 (27) 012143 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-L & 14-M K300 Darwin H. 16:35 17:15 15.0 7.5
23-Oct-21 30 FL3B (P1E01_ON PO. 9100001764 (27) 012127 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 22-7, 22-8 K300 Darwin H. - - 15.0 - Reschedule
24-Oct-21 10 FL3B (P1E01_ON PO. 9100001764 (2) 012141 Fiberline (414) PT TKM Borepile Fiberline BP3 K300 Hadi R. - - 7.5 - Reschedule
24-Oct-21 23 PO. 9100001764 (27) 012144 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-6 K300 Darwin H. - - 7.5 -
FL3B (P1E01_ON
Borepile Pipe Bridge FR14 Grid 14-M
24-Oct-21 24 PO. 9100001764 (27) 012145 Pipe Bridge (186) PT TKM K300 Darwin H. 14:20 15:50 15.0 7.5
FL3B (P1E01_ON & 14-K
25-Oct-21 4 FL3B (P1E01_ON PO. 9100000731 (2) 012951 Fiberline (414) PT TKM Borepile Fiberline BP2 K300 Hadi R. 19:25 22:25 7.5 7.5 PO. 9100001764 (2)
25-Oct-21 39 FL3B (P1E01_ON PO. 9100001764 (27) 012144 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 Grid 22-6 K300 Darwin H. 19:35 21:15 7.5 7.5 Reschedule
25-Oct-21 40 FL3B (P1E01_ON PO. 9100001764 (27) 012150 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR2 K300 Darwin H. 16:30 17:35 7.5 7.5
25-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012149 Pipe Bridge (186) PT TKMBorepile Pipe Bridge FR14 Grid 14-K & 14-M K300 Darwin H. 0:25 1:25 15.0 7.5
25-Oct-21 42 FL3B (P1E01_ON PO. 9100001764 (27) 012148 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. - - 7.5 -
26-Oct-21 9 FL3B (P1E01_ON PO. 9100000731 (3) 012959 Fiberline (414) PT TKM Borepile Fiberline BP2 K500 Hadi R. - - 7.5 -
26-Oct-21 37 FL3B (P1E01_ON PO. 9100001764 (27) 012957 Pipe Bridge (186) PT TKM Borepile FR2A Pipe Bridge K300 Darwin H. - - 7.5 -
26-Oct-21 38 FL3B (P1E01_ON PO. 9100001764 (27) 012956 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-K & 15-L K300 Darwin H. 17:45 18:45 15.0 7.5
26-Oct-21 39 FL3B (P1E01_ON PO. 9100001764 (27) 012955 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-L K300 Darwin H. - - 11.0 -
26-Oct-21 40 PO. 9100001764 (27) 012954 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON
27-Oct-21 13 FL3B (P1E01_ON PO. 9100000731 (3) 012959 Fiberline (414) PT TKM Borepile Fiberline BP2 K500 Hadi R. 0:15 1:55 7.5 7.5 Reschedule
27-Oct-21 40 FL3B (P1E01_ON PO. 9100001764 (27) 012957 Pipe Bridge (186) PT TKM Borepile FR2A Pipe Bridge K300 Darwin H. - - 7.5 - Reschedule
27-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012955 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-L K300 Darwin H. - - 11.0 - Reschedule
27-Oct-21 42 PO. 9100001764 (27) 012954 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. 14:15 19:10 15.0 15.0 Reschedule
FL3B (P1E01_ON
27-Oct-21 43 FL3B (P1E01_ON PO. 9100001764 (27) 012960 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-K & 14-L K300 Darwin H. - - 15.0 -
27-Oct-21 44 PO. 9100001764 (27) 012961 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. 19:50 20:35 15.0 7.5
FL3B (P1E01_ON
28-Oct-21 14 PO. 9100000731 (3) 012962 PT TKM Borepile Pipe Bridge North Point BP1 K500 Hadi R. - - 7.5 -
FL3B (P1E01_ON Fiberline (414)
28-Oct-21 38 FL3B (P1E01_ON PO. 9100001764 (27) 012964 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-K & 14-L K300 Darwin H. 17:05 17:40 15.0 7.5
28-Oct-21 40 PO. 9100001764 (27) 012965 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. 15:05 20:25 15.0 15.0
FL3B (P1E01_ON
28-Oct-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012963 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-2 K300 Darwin H. - - 11.0 -
29-Oct-21 11 PO. 9100000731 (3) 012962 PT TKM Borepile Pipe Bridge North Point BP1 K500 Hadi R. - - 7.5 - Reschedule
FL3B (P1E01_ON Fiberline (414)
29-Oct-21 30 FL3B (P1E01_ON PO. 9100001764 (27) 012969 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-2 K300 Darwin H. - - 11.0 -
29-Oct-21 31 FL3B (P1E01_ON PO. 9100001764 (27) 012968 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-K & 14-L K300 Darwin H. 14:05 15:15 15.0 15.0
29-Oct-21 32 FL3B (P1E01_ON PO. 9100001764 (27) 012967 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. - - 22.5 -
30-Oct-21 11 PO. 9100000731 (3) 012979 PT TKM Borepile Pipe Bridge North Point BP1 K500 Hadi R. 22:25 23:45 7.5 7.5 Reschedule
FL3B (P1E01_ON Fiberline (414)
Borepile Pipe Bridge FR14 Grid 14-K
30-Oct-21 33 PO. 9100001764 (27) 012971 Pipe Bridge (186) PT TKM K300 Darwin H. - - 15.0 - PO. 9100001764 (13)
FL3B (P1E01_ON & 14-L
30-Oct-21 34 PO. 9100001764 (27) 012969 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-2 K300 Darwin H. - - 11.0 - PO. 9100001764 (13)
FL3B (P1E01_ON
30-Oct-21 35 FL3B (P1E01_ON PO. 9100001764 (27) 012967 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 & FR12C K300 Darwin H. 12:25 20:20 22.5 20.5 PO. 9100001764 (13)
Borepile Pipe Bridge FR14 Grid 14-K
31-Oct-21 24 PO. 9100001764 (27) 012972 Pipe Bridge (186) PT TKM K300 Darwin H. 14:00 16:25 15.0 15.0
FL3B (P1E01_ON & 14-L
Borepile Pipe Bridge FR12C Grid 12C-
31-Oct-21 40 PO. 9100001764 (27) 012978 Pipe Bridge (186) PT TKM K300 Darwin H. 18:15 19:15 7.5 7.5
FL3B (P1E01_ON 7
1-Nov-21 34 PO. 9100001764 (27) 012976 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR 12C & FR22 K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON
1-Nov-21 35 FL3B (P1E01_ON PO. 9100002335 (26) 012975 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid 14-K & 14-L K300 Darwin H. 17:25 21:15 15.0 15.0 PO. 9100001764 (27)
Borepile Pipe Bridge FR14 Grid 14-K
1-Nov-21 37 PO. 9100001764 (27) 012971 Pipe Bridge (186) PT TKM K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON & 14-L
2-Nov-21 39 FL3B (P1E01_ON PO. 9100001764 (27) 012985 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR15 Grid 15-1 & 15-2 K300 Darwin H. - - 11.0 -
Borepile Pipe Bridge FR14 Grid 14-M
2-Nov-21 40 PO. 9100002335 (26) 012984 Pipe Bridge (186) PT TKM K300 Darwin H. 14:10 16:50 22.5 15.0 PO. 9100001764 (27)
FL3B (P1E01_ON & 14-K
3-Nov-21 33 PO. 9100001764 (27) 012990 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON
3-Nov-21 36 PO. 9100002335 (26) 012988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. 16:25 18:50 15.0 15.0 PO. 9100001764 (27)
FL3B (P1E01_ON
4-Nov-21 59 FL3B (P1E01_ON PO. 9100001764 (27) 012902 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. 15:10 17:50 22.5 15.0
5-Nov-21 28 FL3B (P1E01_ON PO. 9100001764 (27) 012992 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul - - 7.5 -
5-Nov-21 29 FL3B (P1E01_ON PO. 9100001764 (27) 012991 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 & FR4 K300 Mustainul 16:25 17:25 15.0 7.5
5-Nov-21 31 FL3B (P1E01_ON PO. 9100001764 (27) 012994 Pipe Bridge (186) PT TKM Bore Pipe Bridge FR12A-1 K300 Darwin H. - - 7.5 -
5-Nov-21 32 FL3B (P1E01_ON PO. 9100001764 (27) 012993 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. - - 15.0 -
6-Nov-21 38 FL3B (P1E01_ON PO. 9100001764 (27) 012999 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 -
6-Nov-21 47 FL3B (P1E01_ON PO. 9100001764 (27) 027601 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 K300 Dapot M. 20:10 21:40 15.0 7.5
6-Nov-21 50 FL3B (P1E01_ON PO. 9100001764 (27) 012995 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. 11:45 16:10 15.0 15.0
6-Nov-21 51 FL3B (P1E01_ON PO. 9100001764 (27) 012994 Pipe Bridge (186) PT TKM Bore Pipe Bridge FR12A-1 K300 Darwin H. - - 7.5 - Reschedule
6-Nov-21 52 FL3B (P1E01_ON PO. 9100001764 (27) 012993 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. - - 15.0 - Reschedule
7-Nov-21 31 FL3B (P1E01_ON PO. 9100001764 (27) 013000 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 -
7-Nov-21 34 FL3B (P1E01_ON PO. 9100001764 (27) 027602 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 K300 Dapot M. 15:10 18:30 15.0 15.0
7-Nov-21 38 FL3B (P1E01_ON PO. 9100001764 (27) 012996 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - PO. 9100001764 (27)
8-Nov-21 33 FL3B (P1E01_ON PO. 9100002335 (26) 013000 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 13:50 14:40 7.5 7.5 PO. 9100001764 (27) Reschedule
Borepile Pipe Bridge FR7 Grid 7-C &
8-Nov-21 37 PO. 9100002335 (26) 027604 Pipe Bridge (186) PT TKM K300 Vincent C. 17:25 18:50 15.0 15.0 PO. 9100001764 (27)
FL3B (P1E01_ON 7-B
8-Nov-21 38 FL3B (P1E01_ON PO. 9100002335 (26) 027603 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Vincent C. 17:45 18:30 7.5 7.5 PO. 9100001764 (27)
8-Nov-21 41 FL3B (P1E01_ON PO. 9100001764 (27) 012994 Pipe Bridge (186) PT TKM Bore Pipe Bridge FR12A-1 K300 Darwin H. - - 7.5 - Reschedule
8-Nov-21 42 PO. 9100001764 (27) 027607 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 -
FL3B (P1E01_ON Pipe Bridge (186)
8-Nov-21 43 FL3B (P1E01_ON PO. 9100001764 (27) 012993 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. - - 15.0 - Reschedule
8-Nov-21 44 PO. 9100001764 (27) 012996 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON Pipe Bridge (186)
8-Nov-21 70 FL3B (P1E01_ON PO. 9100002335 (26) 027613 Pipe Bridge (186) PT TKM Borepile Grid 3-19 K300 Mustainul 19:25 19:25 7.5 7.5 PO. 9100001764 (13)
9-Nov-21 27 FL3B (P1E01_ON PO. 9100001764 (4) 027611 Woodyard (328) PT TKM
Borepile Woodyard Warehouse 11A, 12A Grid 7AK300 Nur Jaya - - 11.0 -
9-Nov-21 30 FL3B (P1E01_ON PO. 9100003018 (3) 027610 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 - P1E01_ON CPPU0147 (3)
9-Nov-21 31 FL3B (P1E01_ON PO. 9100002335 (26) 027605 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-17 & 3-19 K300 Vincent C. 18:40 19:20 15.0 15.0
9-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (26) 027606 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. - - 15.0 -
9-Nov-21 36 PO. 9100002335 (26) 012993 PT TKM Borepile Pipe Bridge FR14 & FR13A K300 Darwin H. 15:50 16:30 15.0 7.5 Reschedule
FL3B (P1E01_ON Pipe Bridge (186)
9-Nov-21 37 PO. 9100002335 (26) 012996 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON Pipe Bridge (186)
10-Nov-21 27 FL3B (P1E01_ON PO. 9100001764 (4) 027611 Woodyard (328) PT TKM
Borepile Woodyard Warehouse 11A, 12A Grid 7AK300 Nur Jaya 13:35 13;35 11.0 5.5 Reschedule
10-Nov-21 38 FL3B (P1E01_ON PO. 9100003018 (3) 027610 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 19:10 19:40 7.5 7.5 P1E01_ON CPPU0147 (3) Reschedule
10-Nov-21 41 FL3B (P1E01_ON PO. 9100002335 (26) 012996 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. 14:15 15:15 15.0 8.0 Reschedule
10-Nov-21 42 PO. 9100002335 (26) 027606 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. 17:30 18;50 15.0 7.5 Reschedule
FL3B (P1E01_ON
Borepile Woodyard Warehouse 11A,
11-Nov-21 23 PO. 9100001764 (4) 027620 PT TKM K300 Nur Jaya 16:30 16:30 5.5 5.5
FL3B (P1E01_ON Woodyard (328) 12A
11-Nov-21 31 FL3B (P1E01_ON PO. 9100003018 (3) 027621 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 - P1E01_ON CPPU0147 (3)
11-Nov-21 33 PO. 9100002335 (26) 027616 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. 17:25 19:30 15.0 15.0
FL3B (P1E01_ON
11-Nov-21 35 FL3B (P1E01_ON PO. 9100002335 (26) 027617 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 3-18 & 3-19 K300 Mustainul 17:25 20:25 15.0 15.0
11-Nov-21 38 FL3B (P1E01_ON PO. 9100002335 (26) 027619 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. 13:30 15:00 15.0 15.0
12-Nov-21 30 FL3B (P1E01_ON PO. 9100003018 (3) 027621 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 16:10 17:35 7.5 7.5 P1E01_ON CPPU0147 (3) Reschedule
12-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (26) 027624 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-18 & 3-19 K300 Vincent C. 16:55 17:45 15.0 7.5
12-Nov-21 34 PO. 9100002335 (26) 027618 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Mustainul 19:55 21:35 15.0 15.0
FL3B (P1E01_ON
12-Nov-21 36 PO. 9100002335 (26) 027623 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. 13:50 14:35 15.0 7.5
FL3B (P1E01_ON Pipe Bridge (186)
12-Nov-21 61 FL3B (P1E01_ON PO. 9100003018 (3) 027631 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 Grid 4-G K300 Kevin 17:35 18:20 7.5 7.5 P1E01_ON CPPU0147 (3)
Borepile Pipe Bridge FR4 Grid 4-G &
13-Nov-21 33 PO. 9100003018 (3) 027632 Pipe Bridge (186) PT TKM K300 Kevin 19:50 20:45 15.0 15.0 P1E01_ON CPPU0147 (3)
FL3B (P1E01_ON 4-H
13-Nov-21 38 FL3B (P1E01_ON PO. 9100002335 (26) 027634 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 -
13-Nov-21 41 FL3B (P1E01_ON PO. 9100002335 (26) 027625 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. - - 15.0 -
13-Nov-21 44 PO. 9100002335 (26) 027626 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-18 K300 Mustainul - - 7.5 -
FL3B (P1E01_ON
14-Nov-21 15 PO. 9100002335 (17) 027635 PT TKM Borepile Pipe Bridge FR14 Grid 14-I K300 Darwin H. 14:25 15:10 7.5 7.5
FL3B (P1E01_ON Pipe Bridge (186)
14-Nov-21 16 FL3B (P1E01_ON PO. 9100002335 (17) 027627 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-18 & 3-20 K300 Vincent C. 15:35 17:05 15.0 7.5
14-Nov-21 17 PO. 9100002335 (26) 027629 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. - - 7.5 -
FL3B (P1E01_ON
14-Nov-21 36 FL3B (P1E01_ON PO. 9100003018 (3) 027647 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 16:05 17:20 7.5 7.5 P1E01_ON CPPU0147 (3)
14-Nov-21 37 FL3B (P1E01_ON PO. 9100002335 (26) 013302 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 Grid I K300 Darwin H. 15:10 16:15 7.5 7.5
15-Nov-21 25 FL3B (P1E01_ON PO. 9100003018 (3) 027640 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 Grid SP8 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3)
15-Nov-21 27 FL3B (P1E01_ON PO. 9100002335 (26) 027634 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
15-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (26) 027626 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 Grid 3-18 K300 Mustainul - - 7.5 - Reschedule
15-Nov-21 36 PO. 9100002335 (17) 027625 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. 17:45 18:00 15.0 7.5 Reschedule
FL3B (P1E01_ON
15-Nov-21 37 PO. 9100002335 (26) 027629 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Vincent C. - - 7.5 - Reschedule
FL3B (P1E01_ON
16-Nov-21 17 FL3B (P1E01_ON PO. 9100003018 (3) 027648 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3)
16-Nov-21 24 FL3B (P1E01_ON PO. 9100002335 (17) 027641 Pipe Bridge (186) PT TKM Borepile FR3A K300 Vincent C. 14:25 14:35 7.5 7.5
16-Nov-21 26 FL3B (P1E01_ON PO. 9100002335 (17) 027639 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 17:25 17:50 7.5 7.5
16-Nov-21 27 FL3B (P1E01_ON PO. 9100002335 (26) 027634 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
16-Nov-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 027628 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Mustainul 14:35 15:20 15.0 7.5
16-Nov-21 30 FL3B (P1E01_ON PO. 9100002335 (17) 027630 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-B K300 Mustainul 16:05 17:55 15.0 15.0
17-Nov-21 25 FL3B (P1E01_ON PO. 9100003018 (3) 027648 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3) Reschedule
17-Nov-21 27 FL3B (P1E01_ON PO. 9100002335 (26) 027643 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3A, FR7 K300 Vincent C. - - 30.0 -
17-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (26) 027634 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
18-Nov-21 29 FL3B (P1E01_ON PO. 9100003018 (3) 027648 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3) Reschedule
18-Nov-21 36 PO. 9100002335 (26) 027634 PT TKM Borepile Pipe Bridge FR13A & FR14 K300 Darwin H. - - 15.0 - Reschedule
FL3B (P1E01_ON Pipe Bridge (186)
18-Nov-21 37 PO. 9100002335 (17) 027643 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3A, FR7 K300 Vincent C. 15:05 19;15 30.0 22.5 Reschedule
FL3B (P1E01_ON
19-Nov-21 25 FL3B (P1E01_ON PO. 9100003018 (3) 013407 Pipe Bridge (186) PT TKM Borepile FR4 Grid 4-I K300 Kevin 20:45 21:05 7.5 7.5 P1E01_ON CPPU0147 (3)
19-Nov-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 027645 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7-3, FR3A K300 Vincent C. 19:20 21:50 30.0 22.5
19-Nov-21 31 FL3B (P1E01_ON PO. 9100002335 (17) 013410 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. 17:35 18:40 7.5 9.5
20-Nov-21 30 FL3B (P1E01_ON PO. 9100003018 (3) 013418 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 18:45 19:45 7.5 7.5 P1E01_ON CPPU0147 (3)
20-Nov-21 32 FL3B (P1E01_ON PO. 9100002335 (17) 013413 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. 19:00 19:00 7.5 8.5
20-Nov-21 33 FL3B (P1E01_ON PO. 9100002335 (17) 013415 Pipe Bridge (186) PT TKM Borepile FR13 K300 Darwin H. 17:50 19:00 9.5 9.5
20-Nov-21 34 FL3B (P1E01_ON PO. 9100002335 (17) 027646 Pipe Bridge (186) PT TKM Borepile FR7, FR3 & FR3A K300 Vincent C. - - 30.0 -
20-Nov-21 57 FL3B (P1E01_ON PO. 9100002335 (17) 013425 Pipe Bridge (186) PT TKM Borepile FR14 K300 Darwin H. 20:05 20:05 7.5 6.0
22-Nov-21 31 FL3B (P1E01_ON PO. 9100003018 (3) 013419 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 17:25 18:20 7.5 7.5 P1E01_ON CPPU0147 (3)
22-Nov-21 34 FL3B (P1E01_ON PO. 9100002335 (17) 013414 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. - - 7.5 -
22-Nov-21 35 FL3B (P1E01_ON PO. 9100002335 (17) 013416 Pipe Bridge (186) PT TKM Borepile FR13 K300 Darwin H. 16:45 17:35 9.5 9.5
22-Nov-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 013424 Pipe Bridge (186) PT TKM Borepile FR13 & FR14 K300 Darwin H. - - 17.0 -
22-Nov-21 40 FL3B (P1E01_ON PO. 9100002335 (17) 013420 Pipe Bridge (186) PT TKM Borepile FR7, FR3 & FR3A K300 Vincent C. 18:10 19:40 30.0 15.0
22-Nov-21 69 FL3B (P1E01_ON PO. 9100003018 (3) 013428 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 18:20 19:10 7.5 7.5 P1E01_ON CPPU0147 (3)
23-Nov-21 37 FL3B (P1E01_ON PO. 9100003018 (3) 013429 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 19:05 21:25 15.0 15.0 P1E01_ON CPPU0147 (3)
23-Nov-21 38 FL3B (P1E01_ON PO. 9100002335 (17) 013430 Pipe Bridge (186) PT TKM Borepile FR13 & FR14 K300 Darwin H. 18:10 19:05 17.0 9.5
23-Nov-21 39 FL3B (P1E01_ON PO. 9100002335 (17) 013431 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. - - 7.5 -
23-Nov-21 41 FL3B (P1E01_ON PO. 9100002335 (17) 013414 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. - - 7.5 - Reschedule
23-Nov-21 42 FL3B (P1E01_ON PO. 9100002335 (17) 013421 Pipe Bridge (186) PT TKM Borepile FR7 & FR3A K300 Vincent C. - - 22.5 -
24-Nov-21 34 FL3B (P1E01_ON PO. 9100003018 (3) 013433 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 15.0 - P1E01_ON CPPU0147 (3)
24-Nov-21 41 FL3B (P1E01_ON PO. 9100002335 (17) 013431 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. - - 7.5 - Reschedule
24-Nov-21 42 FL3B (P1E01_ON PO. 9100002335 (17) 013421 Pipe Bridge (186) PT TKM Borepile FR7 & FR3A K300 Vincent C. - - 22.5 - Reschedule
25-Nov-21 40 FL3B (P1E01_ON PO. 9100003018 (3) 013433 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 17:55 18:25 15.0 7.5 P1E01_ON CPPU0147 (3) Reschedule
25-Nov-21 44 FL3B (P1E01_ON PO. 9100002335 (17) 013437 Pipe Bridge (186) PT TKM Borepile FR14 K300 Darwin H. - - 7.5 -
25-Nov-21 49 FL3B (P1E01_ON PO. 9100002335 (17) 013431 Pipe Bridge (186) PT TKM Borepile FR12A K300 Darwin H. 18:25 18:30 7.5 7.5 Reschedule
25-Nov-21 50 FL3B (P1E01_ON PO. 9100002335 (17) 013422 Pipe Bridge (186) PT TKM Borepile FR7 & FR3A K300 Vincent C. 13;10 19:05 30.0 15.0
26-Nov-21 40 FL3B (P1E01_ON PO. 9100003018 (3) 013444 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 20:15 21:00 15.0 7.5 P1E01_ON CPPU0147 (3)
Borepile FR7 Grid 7-3 & 7-6 & FR3 &
26-Nov-21 42 PO. 9100002335 (17) 013441 Pipe Bridge (186) PT TKM K300 Vincent C. - - 30.0 -
FL3B (P1E01_ON FR3A
26-Nov-21 47 FL3B (P1E01_ON PO. 9100002335 (17) 013446 Pipe Bridge (186) PT TKM Borepile Flash Tank Grid 13 K300 Darwin H. 19:00 19:00 9.5 9.5
26-Nov-21 49 FL3B (P1E01_ON PO. 9100002335 (17) 013448 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12A K300 Darwin H. - - 7.5 -
26-Nov-21 50 FL3B (P1E01_ON PO. 9100002335 (17) 013437 Pipe Bridge (186) PT TKM Borepile FR14 K300 Darwin H. 19:00 19:40 7.5 7.5 Reschedule
27-Nov-21 36 FL3B (P1E01_ON PO. 9100003018 (3) 013449 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin - - 7.5 - P1E01_ON CPPU0147 (3)
27-Nov-21 43 FL3B (P1E01_ON PO. 9100002335 (17) 013441 Pipe Bridge (186) PT TKM Borepile FR7 Grid 7-3 & 7-6 & FR3 & FR3A K300 Vincent C. 18::25 19:45 30.0 7.5 Reschedule
27-Nov-21 46 FL3B (P1E01_ON PO. 9100002335 (17) 013448 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12A K300 Darwin H. - - 7.5 - Reschedule
28-Nov-21 28 FL3B (P1E01_ON PO. 9100003018 (3) 013449 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 13:05 14:25 7.5 7.5 P1E01_ON CPPU0147 (3) Reschedule
28-Nov-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 013448 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12A K300 Darwin H. - - 7.5 - Reschedule
28-Nov-21 37 FL3B (P1E01_ON PO. 9100002335 (17) 013442 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR7 Grid 7-5 K300 Vincent C. 11:55 12:45 7.5 7.5
28-Nov-21 51 FL3B (P1E01_ON PO. 9100002335 (17) 014407 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3A K300 Vincent C. 17:25 17:55 7.5 7.5
29-Nov-21 35 FL3B (P1E01_ON PO. 9100003018 (3) 013450 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 17:55 18:10 7.5 7.5 P1E01_ON CPPU0147 (3)
29-Nov-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 014406 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3A & FR7 K300 Vincent C. 16:15 17:40 30.0 7.5
29-Nov-21 39 FL3B (P1E01_ON PO. 9100002335 (17) 013448 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR12A K300 Darwin H. 17:00 17:45 7.5 7.5 Reschedule
29-Nov-21 61 FL3B (P1E01_ON PO. 9100003018 (3) 014418 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 Grid 4-D & 4-E K300 Kevin 18:10 19:20 13.5 13.5 P1E01_ON CPPU0147 (3)
30-Nov-21 26 FL3B (P1E01_ON PO. 9100003018 (3) 014412 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR4 K300 Kevin 18:10 20:55 21.0 21.0 P1E01_ON CPPU0147 (3)
30-Nov-21 33 PO. 9100002335 (17) 014408 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR5 K300 Vincent C. 16:15 21:15 30.0 22.5
FL3B (P1E01_ON
Borepile Pipe Bridge FR4 Grid 4-D &
1-Dec-21 33 PO. 9100003018 (3) 014421 Pipe Bridge (186) PT TKM K300 Kevin 17:10 22:20 21.0 21.0 P1E01_ON CPPU0147 (3)
FL3B (P1E01_ON 4-E
1-Dec-21 40 PO. 9100002335 (17) 013443 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR5 K300 Vincent C. 14:35 18:25 30.0 15.0
FL3B (P1E01_ON
Borepile Pipe Bridge FR4 Grid 4-D &
2-Dec-21 20 PO. 9100003018 (3) 014422 Pipe Bridge (186) PT TKM K300 Kevin 20:20 22:50 21.0 21.0 P1E01_ON CPPU0147 (3)
FL3B (P1E01_ON 4-E
2-Dec-21 31 FL3B (P1E01_ON PO. 9100002335 (17) 014413 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR3A K300 Vincent C. 15:10 16:05 30.0 12.0
3-Dec-21 29 FL3B (P1E01_ON PO. 9100003018 (3) 014424 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 4-D 4-E K300 Kevin - - 21.0 - P1E01_ON CPPU0147 (3)
3-Dec-21 35 FL3B (P1E01_ON PO. 9100002335 (17) 014415 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR3A K300 Vincent C. 14:35 17:40 30.0 23.0
4-Dec-21 27 FL3B (P1E01_ON PO. 9100003018 (3) 014424 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 4-D 4-E K300 Kevin 19;00 20:35 21.0 21.0 P1E01_ON CPPU0147 (3) Reschedule
4-Dec-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 014416 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 & FR3A K300 Vincent C. 12:45 19;15 30.0 28.0
5-Dec-21 13 FL3B (P1E01_ON PO. 9100003018 (3) 014429 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin - - 21.0 - P1E01_ON CPPU0147 (3)
5-Dec-21 16 FL3B (P1E01_ON PO. 9100002335 (17) 014425 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR7 K300 Mustainul 13:10 13:10 15.0 5.5
6-Dec-21 29 FL3B (P1E01_ON PO. 9100003018 (3) 014429 Pipe Bridge (186) PT TKM Borepile FR4 K300 Kevin 15:55 19:25 21.0 18.0 P1E01_ON CPPU0147 (3) Reschedule
6-Dec-21 34 FL3B (P1E01_ON PO. 9100002335 (17) 014426 Pipe Bridge (186) PT TKM Borepile FR3, FR7, FR2A K300 Vincent C. 16:15 17:40 30.0 20.5
7-Dec-21 26 FL3B (P1E01_ON PO. 9100001764 (4) 014434 Woodyard (328) PT TKM Bore Pile Lighting Foundation 2 K300 Fendy Tan - - 7.5 -
7-Dec-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 014435 Pipe Bridge (186) PT TKM Borepile FR7, FR2A, FR3 K300 Vincent C. 14:15 18:35 28.0 21.0
8-Dec-21 25 FL3B (P1E01_ON PO. 9100001764 (4) 014434 Woodyard (328) PT TKM Bore Pile Lighting Foundation 2 K300 Fendy Tan - - 7.5 - Reschedule
8-Dec-21 33 FL3B (P1E01_ON PO. 9100002335 (17) 014436 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3 & FR2 K300 Vincent C. - - 20.5 -
9-Dec-21 4 PO. 9100003017 (4) 014441 PT TKM BorePile PD5/ Pipe Rack Grid 14/B K400 Gonggom P. - - 7.5 -
FL3B (P1E01_ON PD5 (855)
9-Dec-21 26 FL3B (P1E01_ON PO. 9100001764 (4) 014434 Woodyard (328) PT TKM Bore Pile Lighting Foundation 2 K300 Fendy Tan 17:10 17:10 7.5 6.0 Reschedule
9-Dec-21 31 PO. 9100002335 (17) 014436 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3 & FR2 K300 Vincent C. - - 20.5 - Reschedule
FL3B (P1E01_ON
10-Dec-21 8 FL3B (P1E01_ON PO. 9100003017 (4) 014441 PD5 (855) PT TKM BorePile PD5/ Pipe Rack Grid 14/B K400 Gonggom P. 20:45 21:30 7.5 7.5 Reschedule
10-Dec-21 29 FL3B (P1E01_ON PO. 9100001764 (4) 014444 Woodyard (328) PT TKM BorePile Lighting Tower K300 Fendy T. 18:05 18:05 6.0 6.0
10-Dec-21 35 PO. 9100002335 (17) 014436 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3, FR3 & FR2 K300 Vincent C. 17:50 19:30 20.5 7.5 Reschedule
FL3B (P1E01_ON
Borepile Area Woodyard Lighting
11-Dec-21 26 PO. 9100001764 (4) 014443 PT TKM K300 Fendy T. - - 6.0 -
FL3B (P1E01_ON Woodyard (328) Tower 2
11-Dec-21 32 FL3B (P1E01_ON PO. 9100002335 (17) 014447 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR22 K300 Darwin H. 16:20 16:45 7.5 7.5
11-Dec-21 53 FL3B (P1E01_ON PO. 9100002335 (17) 014449 NaOH (613) PT TKM Borepile Tower Crane K300 Darwin H. 16:45 17:40 7.5 7.5
13-Dec-21 26 PO. 9100001764 (4) 015252 PT TKM Borepile Woodyard Lighting Tower2 K300 Fendy T. - - 6.0 -
FL3B (P1E01_ON Woodyard (328)
Borepile Pipe Bridge FR22 & Tower
13-Dec-21 35 PO. 9100002335 (17) 015251 Pipe Bridge (186) PT TKM K300 Darwin H. 14:50 18;40 37.5 30.0
FL3B (P1E01_ON Crane
Borepile Pipe Bridge FR22, Tower
13-Dec-21 37 PO. 9100002335 (17) 014448 Pipe Bridge (186) PT TKM K300 Darwin H. - - 22.5 -
FL3B (P1E01_ON Crane & FR10
13-Dec-21 38 FL3B (P1E01_ON PO. 9100002335 (17) 014437 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-F K300 Vincent C. 16:55 17:50 7.5 7.5
13-Dec-21 61 PO. 9100001764 (4) 014443 PT TKM Borepile Woodyard Lighting Tower2 K300 Fendy T. 12:35 12:35 6.0 6.0
FL3B (P1E01_ON Woodyard (328)
14-Dec-21 28 PO. 9100001764 (4) 015252 PT TKM Borepile Woodyard Lighting Tower2 K300 Fendy T. 18:40 18:40 6.0 6.0 Reschedule
FL3B (P1E01_ON Woodyard (328)
14-Dec-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 015253 Pipe Bridge (186) PTBorepile
TKM Pipe Bridge FR10, FR10, FR12C & Crane Tower
K300 Darwin H. 14:15 20:50 52.5 26.5
14-Dec-21 32 FL3B (P1E01_ON PO. 9100002335 (17) 015255 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-F K300 Vincent C. 14:50 15:45 7.5 7.5
Borepile Pipe Bridge FR10, FR22,
15-Dec-21 34 PO. 9100002335 (17) 015256 Pipe Bridge (186) PT TKM K300 Darwin H. 13:05 22:10 52.5 34.0
FL3B (P1E01_ON FR11B & Tower Crane
16-Dec-21 29 FL3B (P1E01_ON PO. 9100002335 (17) 015260 Pipe Bridge (186) Borepile
PT TKMPipe Bridge FR10, FR11B, FR22, FR12C & CraneK300
Tower Darwin H. 12:45 16:00 52.5 30.0
16-Dec-21 31 FL3B (P1E01_ON PO. 9100002335 (17) 015261 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Vincent C. - - 7.5 -
17-Dec-21 26 FL3B (P1E01_ON PO. 9100002335 (17) 015262 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Vincent C. 17:55 18:40 7.5 7.5
Borepile Pipe Bridge FR10, FR11B,
17-Dec-21 28 PO. 9100002335 (17) 015264 Pipe Bridge (186) PT TKM K300 Darwin H. 13:35 18:50 45.0 15.0
FL3B (P1E01_ON FR12C & Tower Crane
18-Dec-21 30 FL3B (P1E01_ON PO. 9100002335 (17) 015263 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Vincent C. - - 7.5 -
Borepile Pipe Bridge FR10, FR11B,
18-Dec-21 31 PO. 9100002335 (17) 015267 Pipe Bridge (186) PT TKM K300 Darwin H. 13:10 17:50 37.5 30.0
FL3B (P1E01_ON FR11A
19-Dec-21 18 FL3B (P1E01_ON PO. 9100002335 (17) 015268 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 14:55 18:25 30.0 30.0
20-Dec-21 25 FL3B (P1E01_ON PO. 9100002335 (17) 015274 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 15.0 -
Borepile Pipe Bridge FR10, FR1A &
20-Dec-21 26 PO. 9100002335 (17) 015273 Pipe Bridge (186) PT TKM K300 Darwin H. 15:10 20:40 37.5 22.5
FL3B (P1E01_ON FR1B
20-Dec-21 33 FL3B (P1E01_ON PO. 9100002335 (17) 015263 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Vincent C. 14:50 15:50 7.5 7.5 Reschedule
21-Dec-21 43 FL3B (P1E01_ON PO. 9100002335 (17) 015278 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 7-E K300 Mustainul 17:50 19:00 7.5 7.5
21-Dec-21 48 FL3B (P1E01_ON PO. 9100002335 (17) 015275 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR1B K300 Darwin H. 10:35 19:15 37.5 30.0
21-Dec-21 49 FL3B (P1E01_ON PO. 9100002335 (17) 015276 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 18:30 19:35 15.0 7.5
22-Dec-21 32 FL3B (P1E01_ON PO. 9100002335 (17) 015282 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
22-Dec-21 33 FL3B (P1E01_ON PO. 9100002335 (17) 015281 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 14:20 18:15 45.0 22.5
Borepile Pipe Bridge FR10, FR11A,
23-Dec-21 26 PO. 9100002335 (17) 015286 Pipe Bridge (186) PT TKM K300 Darwin H. 13:25 16:55 45.0 37.5
FL3B (P1E01_ON FR11B & FR22
23-Dec-21 27 FL3B (P1E01_ON PO. 9100002335 (17) 015282 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 14-1 K300 Darwin H. - - 7.5 -
24-Dec-21 38 FL3B (P1E01_ON PO. 9100002335 (17) 015291 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
24-Dec-21 39 FL3B (P1E01_ON PO. 9100002335 (17) 015290 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 13:05 18:20 52.5 28.0
26-Dec-21 21 FL3B (P1E01_ON PO. 9100002335 (17) 015292 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. - - 37.5 -
26-Dec-21 23 FL3B (P1E01_ON PO. 9100002335 (17) 015291 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 - Reschedule
27-Dec-21 37 FL3B (P1E01_ON PO. 9100002335 (17) 015292 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 17:20 19:20 37.5 22.5 Reschedule
27-Dec-21 39 FL3B (P1E01_ON PO. 9100002335 (17) 015291 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 - Reschedule
28-Dec-21 30 FL3B (P1E01_ON PO. 9100002335 (17) 016001 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A & FR11B K300 Darwin H. 12:45 18:35 45.0 37.5
29-Dec-21 27 FL3B (P1E01_ON PO. 9100002335 (17) 016002 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11A, FR11B & FR22K300 Darwin H. 12:05 18:45 45.0 30.0
30-Dec-21 36 FL3B (P1E01_ON PO. 9100002335 (17) 016006 Pipe Bridge (186) PTBorepile
TKM Pipe Bridge FR10, FR11A, FR11B, FR12C & FR22K300 Darwin H. 19:45 20:45 45.0 22.5
Borepile Pipe Bridge FR10, FR11A,
31-Dec-21 39 PO. 9100002335 (17) 016009 Pipe Bridge (186) PT TKM K300 Darwin H. - - 45.0 -
FL3B (P1E01_ON FR11B, FR22 & FR12C
3-Jan-22 37 FL3B (P1E01_ON PO. 9100003017 (3) 016015 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10, FR11A, FR11B K300 Darwin H. 16:50 20:40 37.5 37.5
3-Jan-22 59 FL3B (P1E01_ON PO. 9100003017 (3) 016019 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR10 K300 Delvin S. 21:45 21:45 7.5 7.5
Borepile Pipe Bridge FR12C, FR11A,
4-Jan-22 32 PO. 9100003017 (3) 016018 Pipe Bridge (186) PT TKM K300 Darwin H. 16:05 17:50 45.0 22.5
FL3B (P1E01_ON FR11B & FR10
Borepile Pipe Bridge FR10, FR11,
5-Jan-22 41 PO. 9100003017 (3) 016020 Pipe Bridge (186) PT TKM K300 Darwin H. 14:25 18:30 45.0 30.0
FL3B (P1E01_ON FR11A & FR12C
Borepile Pipe Bridge FR10, FR11,
6-Jan-22 32 PO. 9100003017 (3) 016026 Pipe Bridge (186) PT TKM K300 Darwin H. 15:20 21:00 45.0 45.0
FL3B (P1E01_ON FR11A & FR12C
6-Jan-22 37 FL3B (P1E01_ON PO. 9100002335 (17) 016025 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
Borepile Pipe Bridge FR10, FR11,
7-Jan-22 35 PO. 9100003017 (3) 016027 Pipe Bridge (186) PT TKM K300 Darwin H. 16:10 19:20 52.5 37.5
FL3B (P1E01_ON FR11A & FR12C
7-Jan-22 36 FL3B (P1E01_ON PO. 9100002335 (17) 016028 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
7-Jan-22 37 FL3B (P1E01_ON PO. 9100002335 (17) 016025 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 - Reschedule
Borepile Pipe Bridge FR10, FR11,
8-Jan-22 44 PO. 9100003017 (3) 016032 Pipe Bridge (186) PT TKM K300 William 15:20 21:15 52.5 30.0
FL3B (P1E01_ON FR11A & FR12C
9-Jan-22 29 FL3B (P1E01_ON PO. 9100003017 (3) 016037 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR12CK300 Darwin H. 15:50 19:30 37.5 37.5
9-Jan-22 40 FL3B (P1E01_ON PO. 9100003017 (3) 016044 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11 K300 Darwin H. 19:30 19:50 15.0 7.5
10-Jan-22 34 FL3B (P1E01_ON PO. 9100003017 (3) 016041 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR12CK300 William 18:30 21:05 45.0 22.5
Borepile Pipe Bridge FR10, FR11,
11-Jan-22 28 PO. 9100003017 (3) 016045 Pipe Bridge (186) PT TKM K300 William 12:00 18:45 52.5 45.0
FL3B (P1E01_ON FR11A
11-Jan-22 29 FL3B (P1E01_ON PO. 9100002335 (17) 016046 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 William - - 15.0 -
12-Jan-22 21 FL3B (P1E01_ON PO. 9100003017 (3) 016702 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 13:45 18:10 52.5 22.5
12-Jan-22 23 FL3B (P1E01_ON PO. 9100003017 (3) 016703 Pipe Bridge (186) PT TKM Borepile Pedestal 12D-8 K300 Darwin H. 19:10 19:10 4.0 6.0
12-Jan-22 28 FL3B (P1E01_ON PO. 9100003017 (3) 016046 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 William 19:30 20:25 15.0 7.5 Reschedule
Borepile Pipe Bridge FR10, FR11,
13-Jan-22 44 PO. 9100003017 (3) 016704 Pipe Bridge (186) PT TKM K300 William 14:15 0:15 45.0 30.0
FL3B (P1E01_ON FR11A & FR11B
13-Jan-22 45 FL3B (P1E01_ON PO. 9100003017 (3) 016705 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 William 17:50 18:55 20.5 18.5
Borepile Pipe Bridge FR10, FR11,
14-Jan-22 32 PO. 9100003017 (3) 016712 Pipe Bridge (186) PT TKM K300 Darwin H. 17:00 21:45 52.5 30.0
FL3B (P1E01_ON FR11A & FR1B
14-Jan-22 33 FL3B (P1E01_ON PO. 9100003017 (3) 016711 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 Darwin H. 18:10 19:00 20.5 7.5
15-Jan-22 29 FL3B (P1E01_ON PO. 9100003017 (3) 016715 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 13:00 20:55 52.5 30.0
16-Jan-22 22 FL3B (P1E01_ON PO. 9100003017 (3) 016721 Pipe Bridge (186) PT TKMBorepile Pipe Bridge FR14 & FR15 Pipe Bridge K300 Darwin H. 14:50 15:30 20.5 22.5
Borepile Pipe Bridge FR10, FR11,
16-Jan-22 23 PO. 9100003017 (3) 016720 Pipe Bridge (186) PT TKM K300 Darwin H. 15:30 18:40 45.0 30.0
FL3B (P1E01_ON FR11A & FR11B
17-Jan-22 43 FL3B (P1E01_ON PO. 9100002335 (17) 016727 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 Darwin H. - - 20.5 -
17-Jan-22 44 FL3B (P1E01_ON PO. 9100003017 (3) 016726 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 19:05 19;35 52.5 7.5
18-Jan-22 40 FL3B (P1E01_ON PO. 9100003017 (3) 016731 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 18:05 18:25 15.0 10.5
18-Jan-22 41 FL3B (P1E01_ON PO. 9100003017 (3) 016730 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 12:35 21:40 52.5 45.0
Borepile Pipe Bridge FR10, FR11,
19-Jan-22 38 PO. 9100003017 (3) 016733 Pipe Bridge (186) PT TKM K300 William 15:25 20:20 52.5 48.0
FL3B (P1E01_ON FR11A & FR11B
19-Jan-22 39 FL3B (P1E01_ON PO. 9100002335 (17) 016732 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 William - - 15.0 -
Borepile Pipe Bridge FR10, FR11,
20-Jan-22 46 PO. 9100003017 (3) 016739 Pipe Bridge (186) PT TKM K300 Darwin H. 17:50 21:55 52.5 22.0 Salah Buat Vol di buat 22.5 M3
FL3B (P1E01_ON FR11A & FR11B
20-Jan-22 47 FL3B (P1E01_ON PO. 9100003017 (3) 016738 Pipe Bridge (186) PT TKM Borepile Pipe Bridge Grid 14-N & 14-S K300 Darwin H. 16:00 17:20 15.0 7.5
21-Jan-22 36 FL3B (P1E01_ON PO. 9100003288 (3) 016743 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 William 14:05 21:10 52.5 37.5
21-Jan-22 37 FL3B (P1E01_ON PO. 9100003288 (3) 016744 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 William 16:10 17:00 7.5 7.5
22-Jan-22 25 FL3B (P1E01_ON PO. 9100003288 (3) 016747 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14-5 K300 Delvin S. 20;25 21:05 7.5 7.5
Borepile Pipe Bridge FR10, FR11,
22-Jan-22 26 PO. 9100003288 (3) 016746 Pipe Bridge (186) PT TKM K300 Darwin H. 17:50 21:05 45.0 31.0
FL3B (P1E01_ON FR11A & FR11B
23-Jan-22 21 FL3B (P1E01_ON PO. 9100000766 (2) 016748 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Delvin S. 12:50 19:00 45.0 37.5 PO. 9100003288 (3)
Borepile Pipe Bridge Grid 14-N & 14-
24-Jan-22 31 PO. 9100000766 (2) 017202 Pipe Bridge (186) PT TKM K300 Darwin H. 13:10 13:50 15.0 7.5 PO. 9100003288 (3)
FL3B (P1E01_ON S
Borepile Pipe Bridge FR10, FR11,
24-Jan-22 32 PO. 9100000766 (2) 017201 Pipe Bridge (186) PT TKM K300 Darwin H. 15:45 19;20 52.5 45.0 PO. 9100003288 (3)
FL3B (P1E01_ON FR11A & FR11B
25-Jan-22 33 FL3B (P1E01_ON PO. 9100002158 017204 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 Darwin H. 17:10 19:35 52.5 30.0
25-Jan-22 34 FL3B (P1E01_ON PO. 9100002158 017203 Pipe Bridge (186) PT TKM Borepile Pipe Bridege FR14 K300 Darwin H. 17:25 17:25 7.5 3.0
Borepile Pipe Bridge FR10, FR11,
26-Jan-22 31 PO. 9100002158 017208 Pipe Bridge (186) PT TKM K300 William 13:35 20:45 52.5 52.5
FL3B (P1E01_ON FR11A & FR11B
26-Jan-22 32 FL3B (P1E01_ON PO. 9100002158 017207 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 7.5 -
27-Jan-22 25 FL3B (P1E01_ON PO. 9100002158 017209 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 William 14:15 20:40 52.5 30.0
27-Jan-22 30 FL3B (P1E01_ON PO. 9100002158 017210 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. - - 15.0 -
28-Jan-22 29 FL3B (P1E01_ON PO. 9100002158 017211 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 William 15:05 19:00 52.5 37.5
28-Jan-22 38 FL3B (P1E01_ON PO. 9100002158 017210 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 K300 Darwin H. 14:20 15:20 15.0 7.5 Reschedule
29-Jan-22 30 FL3B (P1E01_ON PO. 9100002158 017216 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A & FR11BK300 William 17:15 22:25 52.5 37.5
29-Jan-22 32 PO. 9100002158 017217 PT TKM Bore Pile Pipe Bridge FR14 & FR15 K300 William 16:55 18:50 20.5 6.0
FL3B (P1E01_ON Pipe Bridge (186)
Borepile Pipe Bridge FR10, FR11,
30-Jan-22 32 PO. 9100002158 017218 Pipe Bridge (186) PT TKM K300 William - - 45.0 -
FL3B (P1E01_ON FR11A, FR11B
30-Jan-22 33 FL3B (P1E01_ON PO. 9100000766 (2) 017219 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 William 15:15 18:45 20.5 18.0 PO. 9100002158
31-Jan-22 29 FL3B (P1E01_ON PO. 9100000766 (2) 017221 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 William 19:00 19:35 20.5 7.5 PO. 9100002158
31-Jan-22 30 FL3B (P1E01_ON PO. 9100000766 (2) 017220 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11, FR11A, FR11BK300 William 13:35 19:45 52.5 52.5 PO. 9100002158
Borepile Pipe Bridge FR10, FR11,
31-Jan-22 45 PO. 9100002158 017218 Pipe Bridge (186) PT TKM K300 William - - 45.0 - Reschedule
FL3B (P1E01_ON FR11A, FR11B
2-Feb-22 63 FL3B (P1E01_ON PO. 9100000766 (2) 017225 Pipe Bridge (186) PT TKMBore Pile Bridge FR10, FR11, FR 11A & FR 11B K300 William 19:05 22:40 52.5 22.5 PO. 9100002158
2-Feb-22 64 FL3B (P1E01_ON PO. 9100000766 (2) 017224 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 14 & FR 15 K300 William 21:05 21:45 20.5 10.5 PO. 9100002158
Bore Pile Bridge FR 10, FR 11, FR 11A
3-Feb-22 30 PO. 9100000766 (2) 017231 Pipe Bridge (186) PT TKM K300 Darwin 17:00 19:35 52.5 22.5 P1E01_ON-CPPU0162 (2)
FL3B (P1E01_ON & FR 11B
3-Feb-22 32 FL3B (P1E01_ON PO. 9100000766 (2) 017232 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 William 17:45 19:25 20.5 12.5 P1E01_ON-CPPU0162 (2)
Bore Pile Bridge FR 10, FR 11A, FR 11
4-Feb-22 33 PO. 9100000766 (2) 017236 Pipe Bridge (186) PT TKM K300 Delvin 14:35 20:25 52.5 37.5 P1E01_ON-CPPU0162 (2)
FL3B (P1E01_ON & FR 11B
4-Feb-22 34 FL3B (P1E01_ON PO. 9100000766 (2) 017237 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 Delvin 17:10 18:55 13.0 10.5 P1E01_ON-CPPU0162 (2)
Bore Pile Bridge FR 10, FR 11A & FR
5-Feb-22 26 PO. 9100001252 017242 Pipe Bridge (186) PT TKM K300 Delvin 13:30 20:50 52.5 37.5
FL3B (P1E01_ON 11B
5-Feb-22 27 P1E01_ON-CPPU0162 (2) 017243 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR14 & FR15 K300 Delvin - - 13.0 -
FL3B (P1E01_ON
6-Feb-22 25 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 017244 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR11, FR11A & FR 11B K300 Delvin - - 52.5 - Pump
Bore Pile Pipe Bridge FR11, FR11A &
7-Feb-22 33 PO. 9100001252 017244 Pipe Bridge (186) PT TKM K300 Delvin 17:05 22:15 52.5 37.5 Reschedule
FL3B (P1E01_ON FR 11B
8-Feb-22 69 FL3B (P1E01_ON PO. 9100001252 026604 Pipe Bridge (186) PT TKM Bore Pile Bridge FR 11, FR 11A, & FR 11B K300 Delvin 16:55 20:25 52.5 30.0
9-Feb-22 41 FL3B (P1E01_ON PO. 9100001252 026607 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge T K300 Darwin 17:00 20:30 52.5 37.5
9-Feb-22 42 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 026608 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A, FR K300 Darwin - - 7.5 -
10-Feb-22 28 FL3B (P1E01_ON PO. 9100001252 026611 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A, FR11B K300 Darwin 15:35 20:15 52.5 45.0
11-Feb-22 21 FL3B (P1E01_ON PO. 9100002922 026615 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A, FR11B K300 Darwin 15:50 19:10 52.5 52.5
11-Feb-22 61 FL3B (P1E01_ON PO. 9100002922 026623 Pipe Bridge (186) PT TKM Borepile K300 Darwin 19:00 19:25 7.5 7.5
Bore Pile Pipe Bridge FR 11, FR11A,
12-Feb-22 30 PO. 9100002922 026622 Pipe Bridge (186) PT TKM K300 Darwin 17:30 23:00 52.5 45.0
FL3B (P1E01_ON FR11B
12-Feb-22 36 FL3B (P1E01_ON PO. 9100005271 (4) 026624 Pipe Bridge (186) PT TKM Bore Pile Pipe Slipper FS 1 K300 Delvin 18:15 19:30 22.5 15.0
13-Feb-22 19 FL3B (P1E01_ON PO. 9100002922 026628 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Darwin 17:10 17:45 22.5 15.0
Bore Pile Pipe Bridge FR 11, FR11A,
13-Feb-22 20 PO. 9100002922 026627 Pipe Bridge (186) PT TKM K300 Darwin 15:40 21:15 52.5 52.5
FL3B (P1E01_ON FR11B
14-Feb-22 30 FL3B (P1E01_ON PO. 9100002922 026630 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Darwin 18:25 18:40 22.5 15.0
Bore Pile Pipe Bridge FR 11, FR11A,
14-Feb-22 31 PO. 9100002922 026629 Pipe Bridge (186) PT TKM K300 Darwin 11:30 18:00 52.5 30.0
FL3B (P1E01_ON FR11B
15-Feb-22 44 FL3B (P1E01_ON PO. 9100005271 (2) 026635 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 18:35 18:50 15.0 15.0
Bore Pile Pipe Bridge FR10, FR 11,
15-Feb-22 45 PO. 9100005271 (2) 026634 Pipe Bridge (186) PT TKM K300 Delvin S. 16:00 20:55 52.5 37.5
FL3B (P1E01_ON FR11A & FR11B
16-Feb-22 36 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 026637 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. - - 15.0 -
Bore Pile Pipe Bridge FR10, FR 11,
16-Feb-22 37 PO. 9100005271 (2) 026636 Pipe Bridge (186) PT TKM K300 Delvin S. 16:05 17:40 52.5 22.5 P1E01_ON-CPPU0162 (2)
FL3B (P1E01_ON FR11A & FR11B
17-Feb-22 44 FL3B (P1E01_ON PO. 9100005271 (2) 026645 Pipe Bridge (186) PT TKM
Bore Pile Pipe Bridge FR10, FR 11, FR11A & FR11B
K300 Delvin S. 11:05 18:20 52.5 52.5
17-Feb-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 026637 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 0:30 0:45 15.0 7.5 Reschedule
17-Feb-22 91 PO. 9100005271 (2) 026649 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11 & FR11B K300 Delvin S. 18:35 18:45 15.0 7.5
FL3B (P1E01_ON
17-Feb-22 94 FL3B (P1E01_ON PO. 9100005271 (2) 026646 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR3 K300 Delvin S. 21:40 22:16 8.0 8.0
Bore Pile Pipe Bridge FR 11, FR11A &
18-Feb-22 45 PO. 9100005271 (2) 026648 Pipe Bridge (186) PT TKM K300 Darwin 19:15 21:45 52.5 37.5
FL3B (P1E01_ON FR11B
18-Feb-22 76 FL3B (P1E01_ON PO. 9100005271 (2) 017243 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS1 K300 Delvin S. 21:15 21:25 15.0 7.5
Bore Pile Pipe Bridge FR 11, FR11A &
19-Feb-22 40 PO. 9100005271 (2) 028051 Pipe Bridge (186) PT TKM K300 Darwin 17:25 18:40 60.0 22.5
FL3B (P1E01_ON FR11B
19-Feb-22 41 FL3B (P1E01_ON PO. 9100005271 (2) 028053 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 18:45 19:05 15.0 15.0
19-Feb-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 028052 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR333 K300 Delvin S. 18:00 18:25 7.5 7.5
20-Feb-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 028059 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 15:55 16:50 15.0 7.5
20-Feb-22 32 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 028058 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR333 K300 Delvin S. - - 7.5 -
Bore Pile Pipe Bridge FR 11, FR11A &
20-Feb-22 33 PO. 9100005271 (2) 028057 Pipe Bridge (186) PT TKM K300 Delvin S. 12:55 20:25 45.0 37.5
FL3B (P1E01_ON FR11B
21-Feb-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 028061 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Delvin S. 13:00 13:35 15.0 7.5
21-Feb-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 028060 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A & FR11B K300 Delvin S. 18:05 21:35 45.0 37.5
21-Feb-22 71 FL3B (P1E01_ON PO. 9100005271 (2) 028058 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR333 K300 Delvin S. 21:00 21:25 7.5 7.5
22-Feb-22 34 FL3B (P1E01_ON PO. 9100005271 (2) 028069 Pipe Bridge (186) PT TKM Borepile Pipe Slipper FS-1 K300 Darwin 18:10 19:05 7.5 7.5
22-Feb-22 35 FL3B (P1E01_ON PO. 9100005271 (2) 028068 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:50 17:15 15.0 7.5
Bore Pile Pipe Bridge FR 11, FR11A &
22-Feb-22 36 PO. 9100005271 (2) 028067 Pipe Bridge (186) PT TKM K300 Darwin 16:20 20:25 52.5 37.5
FL3B (P1E01_ON FR11B
23-Feb-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 028074 Pipe Bridge (186) PT TKM Bore Pile Pipe Bridge FR 11, FR11A & FR11B K300 Delvin S. 14:45 19:20 52.5 22.5
23-Feb-22 43 FL3B (P1E01_ON PO. 9100005271 (2) 028073 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Delvin S. 17:20 17:50 15.0 15.0 Reschedule
Borepile Pipe Bridge FR11, FR11A &
24-Feb-22 31 PO. 9100005271 (2) 028076 Pipe Bridge (186) PT TKM K300 Darwin 12:05 18;40 37.5 22.5
FL3B (P1E01_ON FR11B
24-Feb-22 32 FL3B (P1E01_ON) PO. 9100005271 (2) 028075 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:25 18:00 30.0 30.0
25-Feb-22 35 FL3B (P1E01_ON) PO. 9100005271 (2) 028080 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 13:45 15:45 37.5 22.5
25-Feb-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 028079 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11A & FR11B K300 Darwin 14:00 17:00 22.5 22.5
26-Feb-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 028083 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11A & FR11B K300 Darwin 13:05 18:45 37.5 22.5
26-Feb-22 40 FL3B (P1E01_ON) PO. 9100005271 (2) 028084 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:35 17:20 37.5 22.5
27-Feb-22 32 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 028088 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11A & FR11B K300 Darwin - - 22.5 -
27-Feb-22 33 FL3B (P1E01_ON) PO. 9100005271 (2) 028087 Pipe Bridge (186) PT TKM Borepile Pipe bridge FR23 K300 Darwin 13:50 16:35 37.5 30.0
28-Feb-22 27 FL3B (P1E01_ON) PO. 9100005271 (2) 028094 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 12:50 16:25 37.5 30.0
28-Feb-22 28 FL3B (P1E01_ON PO. 9100005271 (2) 028093 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR10, FR11B & Evaporator#6K300 Darwin 16:45 18:00 22.5 22.5
28-Feb-22 32 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 028088 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11A & FR11B K300 Darwin - - 22.5 - Reschedule
28-Feb-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 028099 Pipe Bridge (186) PT TKM Borepile Area FR11B & Evaporator#6 K300 Darwin 18:05 18:05 4.0
1-Mar-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 028096 Pipe Bridge (186) PT TKM
Borepile Pipe Bridge FR11A, FR11B & Evaporator#6K300 Darwin 20:35 21:15 26.5 9.5
1-Mar-22 33 FL3B (P1E01_ON) PO. 9100005271 (6) 028097 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 13:45 16:10 37.5 30.0
Borepile Pipe Bridge FR10, FR11B &
2-Mar-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 027401 Pipe Bridge (186) PT TKM K300 Darwin 17:05 19:10 26.5 19.0
Evaporator#6
2-Mar-22 37 FL3B (P1E01_ON) PO. 9100005271 (2) 027402 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:45 19:30 37.5 22.5
Borepile Evaporator#6 & Borepile
3-Mar-22 24 PO. 9100005271 (2) 027411 Pipe Bridge (186) PT TKM K300 Darwin 16:30 17:40 19.0 17.0
FL3B (P1E01_ON FR11B
3-Mar-22 25 FL3B (P1E01_ON) PO. 9100005271 (2) 027409 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 14:45 15:30 37.5 7.5
4-Mar-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 027414 Pipe Bridge (186) PT TKM Borepile Evaporator#6 K300 Darwin 17:15 17:45 19.0 9.5
4-Mar-22 33 FL3B (P1E01_ON) PO. 9100005271 (2) 027413 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:50 17:35 30.0 22.5
5-Mar-22 44 FL3B (P1E01_ON) PO. 9100005271 (2) 027415 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:55 18;05 37.5 15.0
5-Mar-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 027416 Pipe Bridge (186) PT TKM Borepile Evaporator#6, FR11, FR11A K300 Darwin 16:25 18:40 34.0 15.0
6-Mar-22 29 FL3B (P1E01_ON) PO. 9100005271 (2) 027419 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:20 17:55 37.5 15.0
6-Mar-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 027420 Pipe Bridge (186) PT TKM Borepile Evaporator#6, FR11, FR11A K300 Darwin 18:20 19:25 34.0 15.0
7-Mar-22 47 FL3B (P1E01_ON) PO. 9100005271 (2) 027423 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 13:25 18:50 30.0 30.0
Borepile FR11, FR11A &
7-Mar-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 027425 Pipe Bridge (186) PT TKM K300 Darwin 16:45 18:50 22.5 22.5
Evaporator#6
7-Mar-22 72 FL3B (P1E01_ON PO. 9100005271 (2) 027426 Pipe Bridge (186) PT TKM Borepile FR11, FR26 K300 Darwin 17:10 17:10 17.0 7.5
8-Mar-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 027427 Pipe Bridge (186) PT TKM Borepile FR11, FR11A & FR11B K300 Darwin 14:50 18:35 22.5 17.0
8-Mar-22 49 FL3B (P1E01_ON) PO. 9100005271 (2) 027428 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 16:35 17:40 30.0 15.0
8-Mar-22 50 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027429 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin - - 7.5 -
9-Mar-22 33 FL3B (P1E01_ON PO. 9100005271 (2) 027433 Pipe Bridge (186) PT TKM Borepile FR11 & FR11B K300 Darwin 17:10 17:45 15.0 7.5
9-Mar-22 34 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027434 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin - - 7.5 -
9-Mar-22 35 FL3B (P1E01_ON) PO. 9100005271 (2) 027435 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 15:10 20:40 30.0 22.5
9-Mar-22 38 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027429 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin - - 7.5 - Reschedule
10-Mar-22 44 FL3B (P1E01_ON) PO. 9100005271 (2) 027437 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 16:20 18:30 30.0 15.0
10-Mar-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 027438 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 14:00 14:00 15.0 7.5
10-Mar-22 46 PO. 9100005271 (2) 027439 Pipe Bridge (186) PT TKM Borepile FR11 & FR11B K300 Darwin 16:15 18:05 22.5 22.5
FL3B (P1E01_ON
11-Mar-22 46 FL3B (P1E01_ON) PO. 9100005271 (2) 027444 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 12:35 18:20 22.5 22.5
11-Mar-22 47 FL3B (P1E01_ON PO. 9100005271 (2) 027440 Pipe Bridge (186) PT TKM Borepile FR11B K300 Darwin 17:05 17:40 15.0 15.0
11-Mar-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 027443 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 11:15 11:15 15.0 7.5
12-Mar-22 37 FL3B (P1E01_ON) PO. 9100005271 (2) 027445 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 15:10 16:20 22.5 22.5
12-Mar-22 38 FL3B (P1E01_ON PO. 9100005271 (2) 027446 Pipe Bridge (186) PT TKM Borepile FR11B K300 Darwin 17:15 18:10 7.5 7.5
12-Mar-22 39 FL3B (P1E01_ON PO. 9100005271 (2) 027447 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 18:55 19:05 15.0 7.5
13-Mar-22 25 FL3B (P1E01_ON PO. 9100005271 (2) 027449 Pipe Bridge (186) PT TKM Borepile FR11B K300 Darwin 17:20 17:35 7.5 7.5
13-Mar-22 26 FL3B (P1E01_ON PO. 9100005271 (2) 027450 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 15:05 15:15 15.0 7.5
13-Mar-22 30 FL3B (P1E01_ON) PO. 9100005271 (2) 027448 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 13:20 14:30 15.0 15.0
14-Mar-22 50 FL3B (P1E01_ON PO. 9100005271 (2) 017684 Pipe Bridge (186) PT TKM Borepile FR11B K300 Darwin 16:10 16:50 7.5 7.5
14-Mar-22 51 FL3B (P1E01_ON) PO. 9100005271 (2) 017685 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 13:10 13:15 15.0 15.0
14-Mar-22 52 FL3B (P1E01_ON PO. 9100005271 (2) 017686 Pipe Bridge (186) PT TKM Borepile FR26 K300 Darwin 11:25 18:45 15.0 15.0
14-Mar-22 84 FL3B (P1E01_ON PO. 9100005271 (2) 027957 Pipe Bridge (186) PT TKM Borepile Pipe Birdge FR26 K300 Darwin 18:05 18;10 7.5 7.5
15-Mar-22 48 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027953 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 15.0 -
15-Mar-22 49 FL3B (P1E01_ON PO. 9100005271 (2) 027952 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin 15:00 15:50 7.5 7.5
15-Mar-22 50 FL3B (P1E01_ON) PO. 9100005271 (2) 027951 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:35 16:45 15.0 15.0
16-Mar-22 33 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027959 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 15.0 -
16-Mar-22 34 FL3B (P1E01_ON) PO. 9100005271 (2) 027958 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:45 17:00 15.0 15.0
16-Mar-22 35 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027961 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin - - 7.5 -
16-Mar-22 39 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027953 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 15.0 - Reschedule
17-Mar-22 45 FL3B (P1E01_ON) PO. 9100005271 (2) 027966 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:45 16:55 7.5 7.5
17-Mar-22 46 P1E01_ON-CPPU0162 (2) 027965 PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 -
FL3B (P1E01_ON DNCG (492)
17-Mar-22 48 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027963 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 15.0 -
18-Mar-22 54 FL3B (P1E01_ON) PO. 9100005271 (2) 027971 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:40 16:35 7.5 7.5
18-Mar-22 55 FL3B (P1E01_ON PO. 9100005271 (2) 027970 Pipe Bridge (186) PT TKM Borepile Pipe Evaporator#6 & FR26 K300 Darwin 17:15 18:05 22.5 22.5
18-Mar-22 58 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027965 DNCG (492) PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 - Reschedule
19-Mar-22 38 FL3B (P1E01_ON) PO. 9100005271 (2) 027978 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:05 17:40 15.0 7.5
19-Mar-22 39 FL3B (P1E01_ON PO. 9100005271 (2) 027977 Pipe Bridge (186) PT TKM
Borepile Pipe Evaporator#6 & Pipe Bridge FR26K300 Darwin 17:05 19:40 22.5 15.0
Borepile Pipe Bridge Fr26 &
20-Mar-22 26 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027982 Pipe Bridge (186) PT TKM K300 Darwin - - 22.5 -
Evaporator#6
20-Mar-22 27 FL3B (P1E01_ON) PO. 9100005271 (2) 027981 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:55 16:35 15.0 7.5
20-Mar-22 28 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027980 DNCG (492) PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 -
21-Mar-22 49 FL3B (P1E01_ON PO. 9100005271 (2) 027986 Pipe Bridge (186) PT TKM
Borepile Pipe Evaporator#6 & Pipe Bridge FR26K300 Darwin 12:55 16:35 22.5 22.5
21-Mar-22 50 FL3B (P1E01_ON) PO. 9100005271 (2) 027985 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 14:20 18:15 15.0 15.0
21-Mar-22 53 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027980 DNCG (492) PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 - Reschedule
21-Mar-22 75 FL3B (P1E01_ON PO. 9100005271 (2) 027991 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin 18:40 19:15 7.5 7.5
22-Mar-22 41 FL3B (P1E01_ON) PO. 9100005271 (2) 027990 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:20 19:00 15.0 15.0
22-Mar-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 027989 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin 19:20 19:40 7.5 7.5
22-Mar-22 43 FL3B (P1E01_ON PO. 9100005271 (2) 027988 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin 14:40 18:10 22.5 20.5
22-Mar-22 46 P1E01_ON-CPPU0162 (2) 027980 PT TKM Borepile DNCG FL#2 K300 Darwin - - 7.5 - Reschedule
FL3B (P1E01_ON DNCG (492)
23-Mar-22 44 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 027993 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B & FR26 K300 Darwin - - 22.5 -
23-Mar-22 45 FL3B (P1E01_ON) PO. 9100005271 (2) 027992 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 18:48 19:15 15.0 7.5
Borepile Pipe Bridge FR26 &
24-Mar-22 46 PO. 9100005271 (2) 028000 Pipe Bridge (186) PT TKM K300 Darwin 17:00 17:30 22.5 7.5
FL3B (P1E01_ON Evaporator#6
24-Mar-22 49 FL3B (P1E01_ON) PO. 9100005271 (2) 027997 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:40 16:35 15.0 7.5
25-Mar-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 018154 Pipe Bridge (186) PT TKM Borepile Evaporator#6 & Pipe Bridge K300 Darwin 17:35 20;35 22.5 22.5
25-Mar-22 44 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 018152 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 7.5 -
26-Mar-22 41 FL3B (P1E01_ON PO. 9100005271 (2) 018168 Pipe Bridge (186) PT TKM Borepile Evaporator#6 K300 Darwin 18:50 18:55 7.5 7.5
26-Mar-22 42 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 018167 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 7.5 -
27-Mar-22 30 FL3B (P1E01_ON) PO. 9100005271 (2) 018169 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:15 18:00 7.5 7.5
28-Mar-22 51 FL3B (P1E01_ON PO. 9000575508 (1) 018179 Pipe Bridge (186) PT TKM Borepile Evaporator#6 K300 Darwin - - 7.5 -
28-Mar-22 55 FL3B (P1E01_ON) PO. 9100005271 (2) 018167 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:05 17:30 7.5 7.5 Reschedule
29-Mar-22 50 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 018190 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin - - 7.5 -
29-Mar-22 52 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 018188 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 7.5 -
29-Mar-22 56 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 018179 Pipe Bridge (186) PT TKM Borepile Evaporator#6 K300 Darwin - - 7.5 - Reschedule
30-Mar-22 53 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 018196 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 7.5 -
30-Mar-22 54 FL3B (P1E01_ON PO. 9100005271 (2) 018195 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin 18:25 19:20 7.5 7.5
31-Mar-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 019055 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR11B K300 Darwin 15:45 15:45 7.5 7.5
31-Mar-22 47 FL3B (P1E01_ON) PO. 9100005271 (2) 019056 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 13:50 14:00 7.5 7.5
31-Mar-22 50 FL3B (P1E01_ON PO. 9100005271 (2) 019062 Pipe Bridge (186) PT TKM Borepile Fiberline K300 Delvin S. 15:05 16:05 7.5 7.5
Borepile Pipe Bridge
1-Apr-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 019066 Pipe Bridge (186) PT TKM K300 Delvin S. 18:35 19:15 7.5 7.5
West/FiberLine#3
1-Apr-22 51 FL3B (P1E01_ON) PO. 9100005271 (2) 019065 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 14:15 15z:10 15.0 7.5
2-Apr-22 35 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 019071 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 7.5 -
2-Apr-22 36 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 019070 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin - - 15.0 -
2-Apr-22 40 FL3B (P1E01_ON PO. 9100005271 (2) 019073 DNCG (492) PT TKM Borepile Fiberline #2 DNCG K300 Darwin 17:45 17:45 7.5 7.5
2-Apr-22 41 FL3B (P1E01_ON PO. 9100005271 (2) 019072 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FiberLine#3 K300 Delvin S. 16:25 16:30 7.5 7.5
4-Apr-22 39 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 019071 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin - - 7.5 - Reschedule
4-Apr-22 42 FL3B (P1E01_ON) P1E01_ON-CPPU0162 (2) 019078 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 Grid F & H K300 Darwin - - 8.0 -
4-Apr-22 44 FL3B (P1E01_ON) PO. 9100005271 (2) 019075 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 19:25 20:00 7.5 7.5
4-Apr-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 019074 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FiberLine#3 & DNCG K300 Delvin S. 14:30 19:35 15.0 15.0
5-Apr-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 019081 DNCG (492) PT TKM Borepile DNCG & Pipe Bridge West K300 Darwin 17:50 18:10 15.0 15.0
5-Apr-22 47 FL3B (P1E01_ON PO. 9100005271 (2) 019082 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR26 K300 Darwin 18:05 18:20 7.5 7.5
6-Apr-22 36 FL3B (P1E01_ON) PO. 9100005271 (2) 019087 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:05 17:25 7.5 7.5
6-Apr-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 019086 DNCG (492) PT TKM Borepile Pipe Bridge & DNCG K300 Darwin 15:45 16:30 15.0 7.5
7-Apr-22 46 FL3B (P1E01_ON) PO. 9100005271 (2) 019089 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:15 17:55 7.5 7.5
7-Apr-22 47 FL3B (P1E01_ON PO. 9100005271 (2) 019088 DNCG (492) PT TKM Borepile Pipe Bridge & DNCG K300 Darwin 14:25 17:00 15.0 15.0
8-Apr-22 46 FL3B (P1E01_ON PO. 9100005271 (2) 019095 Pipe Bridge (186) PT TKM Borepile Pipe Bridge /FiberLine #3 K300 Darwin 19:50 20:35 7.5 7.5
8-Apr-22 47 FL3B (P1E01_ON) PO. 9100005271 (2) 019094 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:55 17:35 7.5 7.5
9-Apr-22 45 FL3B (P1E01_ON) PO. 9100005271 (2) 018904 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:10 17:00 7.5 7.5
10-Apr-22 31 FL3B (P1E01_ON) PO. 9100005271 (2) 018905 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:35 18:10 7.5 7.5
10-Apr-22 53 FL3B (P1E01_ON PO. 9100005271 (2) 018917 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR8A K300 Darwin 18:35 19:30 7.5
11-Apr-22 48 FL3B (P1E01_ON) PO. 9100005271 (2) 018916 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:10 16:20 7.5 7.5
13-Apr-22 37 FL3B (P1E01_ON) PO. 9100005271 (2) 018925 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:05 16:25 7.5 7.5
14-Apr-22 37 FL3B (P1E01_ON) PO. 9100005271 (2) 018926 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:30 15:55 7.5 7.5
15-Apr-22 33 FL3B (P1E01_ON) PO. 9100005271 (2) 018933 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:05 16:40 7.5 7.5
16-Apr-22 40 FL3B (P1E01_ON) PO. 9100005271 (2) 018936 Pipe Bridge (186) PT TKM Borepile FR23 K300 Darwin 15:05 16:15 7.5 7.5
17-Apr-22 40 FL3B (P1E01_ON) PO. 9100005271 (2) 018939 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 14:40 15:00 7.5 7.5
18-Apr-22 50 FL3B (P1E01_ON) PO. 9100005271 (2) 018943 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 17:20 18:00 7.5 7.5 P1E01_ON-CPPU0162 (2)
19-Apr-22 41 FL3B (P1E01_ON) PO. 9100005271 (2) 018947 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 16:15 16:35 7.5 7.5 P1E01_ON-CPPU0162 (2)
20-Apr-22 44 FL3B (P1E01_ON) PO. 9100005271 (2) 018949 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 15:50 15:50 7.5 7.5
21-Apr-22 31 FL3B (P1E01_ON) PO. 9100005271 (2) 021856 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR23 K300 Darwin 18:55 19:40 7.5 7.5
21-Apr-22 70 FL3B (P1E01_ON PO. 9100005271 (2) 021864 General (100) PT TKM Borepile Cable Tray K300 Darwin 20:25 20:35 7.5
22-Apr-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 021863 General (100) PT TKM Borepile Cable Tray K300 Kevin 17:15 18;05 7.5 7.5
22-Apr-22 43 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 021862 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 7.5 -
23-Apr-22 42 FL3B (P1E01_ON PO. 9100005271 (2) 021866 General (100) PT TKM Borepile Cable Tray TG K300 Kevin 16:10 16:30 7.5 7.5
23-Apr-22 48 FL3B (P1E01_ON PO. 9100005271 (2) 021862 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 14:55 14:55 7.5 7.5 Reschedule
23-Apr-22 81 FL3B (P1E01_ON PO. 9100005271 (2) 021872 General (100) PT TKM Borepile Cable Tray TG K300 Kevin 16:40 17:25 7.5
23-Apr-22 84 FL3B (P1E01_ON PO. 9100005271 (2) 021873 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 19:05 19:25 7.5
24-Apr-22 35 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 021870 General (100) PT TKM Borepile Cable Tray TG K300 Kevin - - 7.5 -
24-Apr-22 39 FL3B (P1E01_ON PO. 9100005271 (2) 021869 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 17:20 17:20 7.5 7.5
24-Apr-22 66 FL3B (P1E01_ON PO. 9100005271 (2) 021877 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 21:50 22:25 7.5
25-Apr-22 52 FL3B (P1E01_ON P1E01_ON-CPPU0162 (2) 021870 General (100) PT TKM Borepile Cable Tray TG K300 Kevin - - 7.5 - Reschedule
25-Apr-22 55 P1E01_ON-CPPU0162 (2) 021875 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 30.0 -
FL3B (P1E01_ON
14-May-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 021911 Pipe Bridge (186) PT TKM Borepile FR23 & 16 K300 Darwin - - 22.5 -
15-May-22 22 FL3B (P1E01_ON PO. 9100005271 (2) 021909 Pipe Bridge (186) PT TKM Borepile FR23 & 16 K300 Darwin 13:10 15:30 15.0 15.0
16-May-22 21 FL3B (P1E01_ON PO. 9100005271 (2) 021882 General (100) PT TKM Borepile Cable Tray K300 Kevin 18:05 19:05 7.5 7.5
16-May-22 29 FL3B (P1E01_ON PO. 9100005271 (2) 021911 Pipe Bridge (186) PT TKM Borepile FR23 & 16 K300 Darwin 15:55 17:10 22.5 15.0 Reschedule
17-May-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 021887 General (100) PT TKM Borepile Cable Tray K300 Kevin 16:45 17:35 7.5 7.5
17-May-22 35 FL3B (P1E01_ON PO. 9100005271 (2) 021885 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 16:30 16:50 7.5 7.5
18-May-22 23 FL3B (P1E01_ON PO. 9100005271 (2) 021890 General (100) PT TKM Borepile Cable Tray 150Kv K300 Kevin 16:45 17:30 6.0 7.5
18-May-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 021889 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 15:25 16;05 7.5 7.5
19-May-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 021893 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 19:05 19:30 7.5 7.5
20-May-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 021895 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 16:30 16:45 7.5 7.5
20-May-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 021894 Woodyard (328) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 16:05 16:35 7.5 7.5
21-May-22 20 FL3B (P1E01_ON PO. 9100005271 (2) 027727 ETP (135) PT TKM Borepile ETP K300 Poltak 17:10 17:10 5.5 5.5
21-May-22 43 FL3B (P1E01_ON PO. 9100005271 (2) 027731 Woodyard (328) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 16:05 16:30 7.5 7.5
21-May-22 44 FL3B (P1E01_ON PO. 9100005271 (2) 027730 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 15:50 16:30 7.5 7.5
22-May-22 4 FL3B (P1E01_ON PO. 9100005271 (2) 027736 ETP (135) PT TKM Borepile ETP K300 Poltak 16:35 16:35 5.5 4.5
22-May-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 027735 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 7.5 -
22-May-22 35 FL3B (P1E01_ON PO. 9100005271 (2) 027734 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 12:50 13:00 7.5 7.5
23-May-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 -
23-May-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 027740 TG9 (296) PT TKM Borepile Cable Tray TG#9 K300 Kevin - - 7.5 -
23-May-22 43 FL3B (P1E01_ON PO. 9100005271 (2) 027739 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 -
24-May-22 12 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
24-May-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 021900 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
24-May-22 38 FL3B (P1E01_ON PO. 9100005271 (2) 027740 TG9 (296) PT TKM Borepile Cable Tray TG#9 K300 Kevin 18:30 19:05 7.5 7.5 Reschedule
24-May-22 44 FL3B (P1E01_ON PO. 9100005271 (2) 027742 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 17:00 17:35 7.5 7.5
25-May-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
25-May-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 021900 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
25-May-22 41 FL3B (P1E01_ON PO. 9100005271 (2) 027747 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin 18:25 18:50 7.5 7.5
25-May-22 47 FL3B (P1E01_ON PO. 9100005271 (2) 027746 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 14:05 14:40 7.5 7.5
26-May-22 8 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
26-May-22 9 FL3B (P1E01_ON PO. 9100005271 (2) 021900 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 15:10 15:10 4.5 4.5 Reschedule
26-May-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 027749 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin - - 7.5 -
26-May-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 020401 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 16:10 16:30 7.5 7.5
27-May-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
27-May-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 027749 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin 16:35 17:15 7.5 7.5 Reschedule
27-May-22 37 FL3B (P1E01_ON PO. 9100005271 (2) 020403 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 -
28-May-22 7 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
28-May-22 35 FL3B (P1E01_ON PO. 9100005271 (2) 020410 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin 13:40 16:00 12.0 7.5
28-May-22 36 FL3B (P1E01_ON PO. 9100005271 (2) 020408 TG9 (296) PT TKM Borepile Cable Tray 150 kV K300 Kevin 16:15 16:55 7.5 7.5
28-May-22 45 FL3B (P1E01_ON PO. 9100005271 (2) 020403 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 - Reschedule
29-May-22 8 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
30-May-22 6 FL3B (P1E01_ON PO. 9100005271 (2) 021899 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.0 - Reschedule
31-May-22 6 FL3B (P1E01_ON PO. 9100005271 (2) 020417 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 17:15 17:15 4.5 4.5
1-Jun-22 6 FL3B (P1E01_ON PO. 9100005271 (2) 020428 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
2-Jun-22 9 FL3B (P1E01_ON PO. 9100005271 (2) 020428 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 15:35 15:35 4.5 4.5 Reschedule
3-Jun-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 020441 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 19:00 19:00 4.5 4.5
4-Jun-22 15 FL3B (P1E01_ON 9100005271 (1) 020449 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
4-Jun-22 45 FL3B (P1E01_ON 9100005271 (1) 020443 General (100) PT TKM Borepile Tray 150 kV K300 Kevin - - 7.5 -
5-Jun-22 20 FL3B (P1E01_ON 9100005271 (1) 020449 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
5-Jun-22 21 FL3B (P1E01_ON 9100005271 (1) 020450 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
5-Jun-22 47 FL3B (P1E01_ON 9100005271 (1) 020444 General (100) PT TKM Borepile Tray 150 kV K300 Kevin - - 7.5 -
6-Jun-22 19 FL3B (P1E01_ON PO. 9100005271 (2) 020449 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
6-Jun-22 20 FL3B (P1E01_ON PO. 9100005271 (2) 020450 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
6-Jun-22 60 FL3B (P1E01_ON PO. 9100005271 (2) 022551 General (100) PT TKM Borepile Tray 150 kV K300 Kevin - - 6.0 -
7-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 -
7-Jun-22 34 FL3B (P1E01_ON PO. 9100005271 (2) 022551 General (100) PT TKM Borepile Tray 150 kV K300 Kevin - - 6.0 - Reschedule
8-Jun-22 7 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
8-Jun-22 52 FL3B (P1E01_ON PO. 9100005271 (2) 022551 General (100) PT TKM Borepile Tray 150 kV K300 Kevin 18:15 18:15 6.0 4.5 Reschedule
9-Jun-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
9-Jun-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 022570 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 19:00 19:50 7.5 7.5
9-Jun-22 33 FL3B (P1E01_ON PO. 9100005271 (2) 022569 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 7.5 -
10-Jun-22 6 FL3B (P1E01_ON PO. 9100003018 (11) 022566 Pipe Bridge (186) PT TKM Borepile Poin 1 K300 Johannes S. 17:30 17:30 5.0 5.0 PO. 9100005271 (4)
10-Jun-22 14 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak - - 4.5 - Reschedule
10-Jun-22 26 FL3B (P1E01_ON PO. 9100005271 (2) 022585 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 18:40 18:40 7.5 7.5
11-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 022554 ETP (135) - Cooling Tower PT TKM Borepile Pump Fondation K300 Poltak 17:55 17:55 4.5 4.5 Reschedule
11-Jun-22 15 FL3B (P1E01_ON PO. 9100005271 (2) 022575 Pipe Bridge (186) PT TKM Borepile Poin 2 K300 Johannes S. 16:30 16:30 5.0 5.0
11-Jun-22 26 FL3B (P1E01_ON PO. 9100005271 (2) 022705 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 15:10 15:30 7.5 7.5
11-Jun-22 77 FL3B (P1E01_ON PO. 9100005271 (2) 022587 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 & FR30 K300 Darwin 19:25 20:05 15.0
12-Jun-22 4 FL3B (P1E01_ON PO. 9100005271 (4) 022576 Pipe Bridge (186) PT TKM Borepile Poin 3 K300 Johannes S. - - 5.0 -
12-Jun-22 29 FL3B (P1E01_ON PO. 9100005271 (2) 022706 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 -
13-Jun-22 7 FL3B (P1E01_ON PO. 9100005271 (2) 022576 Pipe Bridge (186) PT TKM Borepile Poin 3 K300 Johannes S. 17:55 17:55 5.0 5.0 Reschedule
13-Jun-22 20 FL3B (P1E01_ON PO. 9100005271 (2) 022589 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 -
13-Jun-22 21 FL3B (P1E01_ON PO. 9100005271 (2) 022590 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin - - 7.5 -
14-Jun-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 022582 ETP (135) - Cooling Tower PT TKM Borepile Pump House Fondation K300 Poltak 9:15 9:40 10.0 10.0
14-Jun-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 022589 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin - - 7.5 - Reschedule
14-Jun-22 32 FL3B (P1E01_ON PO. 9100005271 (2) 022590 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 18:25 18:25 7.5 4.5 Reschedule
15-Jun-22 1 FL3B (P1E01_ON PO. 9100005271 (2) 022577 Pipe Bridge (186) PT TKM Borepile Point 5 K300 Johannes S. 16:20 16:20 5.0 5.0
15-Jun-22 15 FL3B (P1E01_ON PO. 9100005271 (2) 022595 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower ETP K300 Poltak - - 5.5 -
15-Jun-22 29 FL3B (P1E01_ON PO. 9100005271 (2) 022589 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Darwin 19:05 19:40 7.5 7.5 Reschedule
16-Jun-22 2 FL3B (P1E01_ON PO. 9100005271 (2) 022578 Pipe Bridge (186) PT TKM Borepile Point 7 K300 Johannes S. 18:01 18:10 5.0 5.0
16-Jun-22 13 FL3B (P1E01_ON PO. 9100005271 (2) 022595 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower ETP K300 Poltak 19:55 19:55 5.5 5.0 Reschedule
16-Jun-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 022707 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Darwin 18:00 18:55 7.5 7.5
17-Jun-22 7 FL3B (P1E01_ON PO. 9100005271 (2) 022710 Pipe Bridge (186) PT TKM Borepile Point 8 K300 Johannes S. 14:00 14:00 5.0 5.0
17-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 022708 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower ETP K300 Poltak 17:40 17:40 5.5 4.0
18-Jun-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 022713 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower ETP K300 Poltak 17:30 17:30 5.5 5.5
18-Jun-22 22 FL3B (P1E01_ON PO. 9100005271 (2) 022711 Pipe Bridge (186) PT TKM Borepile Piep Bridge FR30 K300 Delvin S. - - 7.5 -
19-Jun-22 19 FL3B (P1E01_ON PO. 9100005271 (2) 022711 Pipe Bridge (186) PT TKM Borepile Piep Bridge FR30 K300 Delvin S. 18:30 18:30 7.5 5.5 Reschedule
20-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 022560 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 18:50 18:50 5.5 5.0
20-Jun-22 27 FL3B (P1E01_ON PO. 9100005271 (2) 022562 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 17:00 17:25 7.5 7.5
21-Jun-22 12 FL3B (P1E01_ON PO. 9100005271 (2) 023415 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak - - 5.5 5.0
21-Jun-22 33 FL3B (P1E01_ON PO. 9100005271 (2) 023401 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 16:00 16:30 7.5 7.5
21-Jun-22 90 FL3B (P1E01_ON PO. 9100005271 (2) 023424 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR16 K300 Delvin S. 16:30 18:15 7.5 7.5
22-Jun-22 11 FL3B (P1E01_ON PO. 9100005271 (2) 023416 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak - - 5.5 -
22-Jun-22 27 FL3B (P1E01_ON PO. 9100005271 (2) 023425 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 17:50 18:20 7.5 7.5
22-Jun-22 28 FL3B (P1E01_ON PO. 9100005271 (2) 023426 Pipe Bridge (186) PT TKM Borepile FR16 K300 Delvin S. 18:20 18:25 7.5 7.5
23-Jun-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 023416 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak - - 5.5 - Reschedule
23-Jun-22 26 FL3B (P1E01_ON PO. 9100005271 (2) 023427 Pipe Bridge (186) PT TKM Borepile FR16 K300 Delvin S. 18:50 19:40 7.5 7.5
23-Jun-22 27 FL3B (P1E01_ON PO. 9100005271 (2) 023428 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 19:40 20:35 7.5 7.5
24-Jun-22 14 FL3B (P1E01_ON PO. 9100005271 (2) 023416 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 19:45 19:45 5.5 5.0 Reschedule
24-Jun-22 27 FL3B (P1E01_ON PO. 9100005271 (2) 023430 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 17:40 17:55 7.5 7.5
24-Jun-22 28 FL3B (P1E01_ON PO. 9100005271 (2) 023431 Pipe Bridge (186) PT TKM Borepile FR16 K300 Delvin S. 17:55 19:05 7.5 7.5
25-Jun-22 6 FL3B (P1E01_ON PO. 9100005271 (2) 023417 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 18:40 18:40 5.5 5.0
25-Jun-22 28 FL3B (P1E01_ON PO. 9100005271 (2) 023433 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 18:25 18:50 7.5 7.5
26-Jun-22 12 FL3B (P1E01_ON PO. 9100005271 (2) 023419 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak - - 5.5 -
26-Jun-22 23 FL3B (P1E01_ON PO. 9100005271 (2) 023434 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. - - 7.5 -
27-Jun-22 19 FL3B (P1E01_ON PO. 9100005271 (2) 023419 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 15:25 15:25 5.5 5.5 Reschedule
27-Jun-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 023434 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 15:15 15:40 7.5 7.5 Reschedule
27-Jun-22 94 FL3B (P1E01_ON PO. 9100005271 (2) 023422 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 18:15 18:15 6.0
28-Jun-22 10 FL3B (P1E01_ON PO. 9100005271 (2) 023421 ETP (135) - Cooling Tower PT TKM Borepile Cooling Tower K300 Poltak 19:20 19:20 5.5 5.0
28-Jun-22 31 FL3B (P1E01_ON PO. 9100005271 (2) 023435 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 16:05 16:10 7.5 7.5
29-Jun-22 30 FL3B (P1E01_ON PO. 9100005271 (2) 023436 Pipe Bridge (186) PT TKM Borepile Pipe Bridge FR30 K300 Delvin S. 17:00 18:00 7.5 7.5
30-Sep 5 FL3B PO. 9100005271 (2) 031988 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 Darwin - - 7.5 -
1-Oct 5 FL3B PO. 9100005271 (2) 031988 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 Darwin 15:25 16:05 7.5 7.5 Reschedule
2-Oct 3 FL3B PO. 9100005271 (2) 031113 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 Darwin 16:45 16:55 7.5 7.5
3-Oct 4 FL3B PO. 9100005271 (2) 031116 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 Darwin - - 7.5 -
4-Sep 6 FL3B PO. 9100005271 (2) 031116 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 15:00 15:35 16:30 7.5 7.5 Reschedule
5-Sep 7 FL3B PO. 9100005271 (2) 031990 FL3B-Fiber Line 1 PT TKM Bore Pile DNCG K300 15:00 17:10 17:50 7.5 7.5
6-Sep 4 FL3B PO. 9100005271 (2) 031120 FL3B-Fiber Line 1 PT TKM Borepile DNCG K300 15:00 18:20 19:35 7.5 7.5
17-Oct 19 FL3B PO. 9100005271 (2) 031991 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 15:00 19:30 20:15 7.5 7.5
18-Oct 19 FL3B PO. 9100005271 (2) 031912 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 17:10 18:35 7.5 7.5
19-Oct 24 FL3B PO. 9100005271 (2) 031913 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 17:25 18:25 7.5 7.5
20-Sep 22 FL3B PO. 9100005271 (2) 031136 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 Darwin - - 7.5 -
21-Oct 14 FL3B PO. 9100005271 (2) 031915 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 15:55 17:00 7.5 7.5
22-Oct 15 FL3B PO. 9100005271 (2) 031916 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 15:45 16:45 7.5 7.5
23-Oct 9 FL3B PO. 9100005271 (2) 031917 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengsui Wall K300 15:00 16:05 16:25 7.5 7.5
2-Nov 18 FL3B PO. 9100005271 (2) 031918 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin - - 7.5 -
3-Nov 16 FL3B PO. 9100005271 (2) 031939 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin 17:25 18:45 15.0 7.5
4-Nov 17 FL3B PO. 9100005271 (2) 031940 FL3B-PD#5 Fengshui Wall PT TKM Borepile K300 Darwin 17:10 17:10 7.5 7.5
5-Nov 10 FL3B PO. 9100005271 (2) 031946 FL3B-PD#5 Fengshui Wall PT TKM Borepile K300 Darwin 16:20 17:10 7.5 7.5
6-Nov 10 FL3B PO. 9100005271 (2) 031947 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin 12:10 13:40 7.5 7.5
7-Nov 12 FL3B PO. 9100005271 (2) 034618 FL3B-PD#5 Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin 11:45 12:05 7.5 7.5
8-Nov 13 FL3B PO. 9100005271 (2) 034608 FL3B-Fengshui Wall PT TKM Borepile Fengshui Wall K300 Darwin 12:15 12:50 7.5 7.5
Total 18,516.0 9,610.5
No PO Area Qty PO (m) Qty Final (m) Qty Actual Claim(m) Concrete Qty PO (m3) Concrete Qty Actual (m3) Concrete Qty Claim (m3)
15-Mar-22 47 POWER (P1G02_ PO. 9100005271 (2) 027954 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 19:10 19:10 7.5 5.5
16-Mar-22 70 POWER (P1G02_ PO. 9100005271 (2) 027962 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 17:15 17:15 11.0 5.5
17-Mar-22 47 POWER (P1G02_ PO. 9100005271 (2) 027964 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 16:45 18:25 11.0 13.0
18-Mar-22 53 POWER (P1G02_ PO. 9100005271 (2) 027972 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 15:50 15:50 11.0 5.5
19-Mar-22 37 POWER (P1G02_ P1E01_ON-CPPU0162 (2) 027979 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin - - 11.0 -
20-Mar-22 24 P1E01_ON-CPPU0162 (2) 027979 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin - - 11.0 - Reschedule
POWER (P1G02_
23-Mar-22 43 POWER (P1G02_ PO. 9100005271 (2) 027994 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 18:45 18:45 11.0 5.5
24-Mar-22 47 POWER (P1G02_ PO. 9100005271 (2) 027998 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 17:20 17:20 11.0 5.5
24-Mar-22 48 POWER (P1G02_ P1E01_ON-CPPU0162 (2) 027999 CT TG10 (29C) PT TKM Borepile RB5 K300 Darwin - - 7.5 -
25-Mar-22 43 POWER (P1G02_ P1E01_ON-CPPU0162 (2) 018153 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin - - 11.0 -
25-Mar-22 69 BCTMP (P1R01_ PO. 9100005271 (2) 018171 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 15:30 15:35 7.5 7.5
26-Mar-22 7 BCTMP (P1R01_ PO. 9100005271 (2) 018160 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 21:00 21:20 7.5 7.5
26-Mar-22 8 BCTMP (P1R01_ PO. 9100005271 (2) 018158 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 15:05 16:05 7.5 7.5
26-Mar-22 43 POWER (P1G02_ PO. 9100005271 (2) 018166 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 16:45 16:45 11.0 5.5
27-Mar-22 5 BCTMP (P1R01_ PO. 9100005271 (2) 018161 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 19:15 19;35 7.5 7.5
27-Mar-22 6 BCTMP (P1R01_ PO. 9100005271 (2) 018159 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 20:00 20:05 7.5 7.5
27-Mar-22 29 POWER (P1G02_ PO. 9100005271 (2) 018170 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 16:00 16:55 11.0 13.0
28-Mar-22 27 BCTMP (P1R01_ PO. 9100005271 (2) 018181 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 18:10 19:40 7.5 7.5
28-Mar-22 28 BCTMP (P1R01_ PO. 9000575508 (1) 018182 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 -
28-Mar-22 50 POWER (P1G02_ PO. 9100005271 (2) 018180 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 15:30 15:30 11.0 5.5
29-Mar-22 26 BCTMP (P1R01_ PO. 9100005271 (2) 018184 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 19:45 20:15 7.5 7.5
29-Mar-22 27 BCTMP (P1R01_ PO. 9100005271 (2) 018183 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 19:10 19:25 7.5 7.5
29-Mar-22 28 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018182 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 - Reschedule
29-Mar-22 51 POWER (P1G02_ PO. 9100005271 (2) 018189 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 21:15 21:15 11.0 5.5
30-Mar-22 25 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018198 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 -
30-Mar-22 26 BCTMP (P1R01_ PO. 9100005271 (2) 018182 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 18:10 19:10 7.5 7.5 Reschedule
30-Mar-22 55 POWER (P1G02_ PO. 9100005271 (2) 018194 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 15:10 15:10 5.5 5.5
31-Mar-22 18 BCTMP (P1R01_ PO. 9100005271 (2) 018199 BCTMP (441) PT TKM Borepile PC1D K300 Hadi R. 14:45 15:25 7.5 7.5
31-Mar-22 19 P1E01_ON-CPPU0162 (2) 018198 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 - Reschedule
BCTMP (P1R01_
31-Mar-22 42 POWER (P1G02_ PO. 9100005271 (2) 019054 CT TG10 (29C) PT TKM Borepile Cooling Tower K300 Darwin 19:25 19:25 5.5 5.5
1-Apr-22 26 BCTMP (P1R01_ PO. 9100005271 (2) 018198 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 14:55 15:45 7.5 7.5 Reschedule
4-Apr-22 22 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 019076 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. - - 7.5 -
9-Apr-22 27 BCTMP (P1R01_ PO. 9100005271 (2) 018908 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 14:55 15:15 7.5 7.5
10-Apr-22 19 PO. 9100005271 (2) 018911 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 16:25 17:15 7.5 7.5
BCTMP (P1R01_
11-Apr-22 24 BCTMP (P1R01_ PO. 9100005271 (2) 018912 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 17:50 19:00 7.5 7.5
12-Apr-22 20 BCTMP (P1R01_ PO. 9100005271 (2) 018921 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 14:35 14:45 7.5 7.5
13-Apr-22 16 BCTMP (P1R01_ PO. 9100005271 (2) 018922 BCTMP (441) PT TKM Borepile Oxidize WL K300 Hadi R. 16:20 16:45 7.5 7.5
19-Apr-22 20 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018946 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. - - 7.5 - Pump
20-Apr-22 19 PO. 9100005271 (2) 018948 BCTMP (441) PT TKM Borepile Pipe bridge North K300 Hadi R. 21:35 21:35 7.5 7.5
BCTMP (P1R01_
20-Apr-22 20 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018946 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. - - 7.5 - Reschedule (Pump)
21-Apr-22 15 BCTMP (P1R01_ PO. 9100005474 (9) 018283 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. - - 7.5 - PO. 9100003017 (3) Reschedule (Pump)
21-Apr-22 16 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 018946 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. - - 7.5 - Reschedule (Pump)
22-Apr-22 21 BCTMP (P1R01_ PO. 9100005271 (2) 018946 BCTMP (441) PT TKM Borepile BCTMP K300 Hadi R. 22:45 23:35 7.5 7.5 Reschedule (Pump)
23-Apr-22 27 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 021871 BCTMP (441) PT TKM Borepile Pipe Bridge BCTMP K300 Hadi R. - - 7.5 -
24-Apr-22 20 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 021871 BCTMP (441) PT TKM Borepile Pipe Bridge BCTMP K300 Hadi R. - - 7.5 - Reschedule
25-Apr-22 25 BCTMP (P1R01_ P1E01_ON-CPPU0162 (2) 021871 BCTMP (441) PT TKM Borepile Pipe Bridge BCTMP K300 Hadi R. - - 7.5 - Reschedule
26-Apr-22 14 BCTMP (P1R01_ PO. 9100005271 (2) 021871 BCTMP (441) PT TKM Borepile Pipe Bridge BCTMP K300 Hadi R. 19:10 20:00 7.5 7.5 Reschedule
30-May-22 42 POWER (P1G02_ PO. 9100005119 (5) 020413 Coal Handling (28A) PT TKM Borepile Transfer Tower #7 K300 Mayer 17:00 17:25 7.5 7.5
31-May-22 40 POWER (P1G02_ PO. 9100005119 (3) 020419 Coal Handling (28A) PT TKM Widening Road TT#7 K300 NN Mayer 18:00 18:15 7.0 7.5
31-May-22 41 POWER (P1G02_ PO. 9100005119 (5) 020418 Coal Handling (28A) PT TKM Borepile TT#7 Coal Yard K300 Mayer 19:35 20:35 7.5 10.0
1-Jun-22 38 POWER (P1G02_ PO. 9100005119 (5) 020421 Coal Handling (28A) PT TKM Borepile Transfer Tower#7 BP-04 K300 Mayer - - 8.5 -
2-Jun-22 40 POWER (P1G02_ PO. 9100005119 (5) 020423 Coal Handling (28A) PT TKM Borepile Transfer Tower#7 BP-003 K300 Mayer - - 8.5 -
2-Jun-22 41 POWER (P1G02_ PO. 9100005119 (5) 020421 Coal Handling (28A) PT TKM Borepile Transfer Tower#7 BP-04 K300 Mayer 15:25 15:45 8.5 8.5 Reschedule
3-Jun-22 40 POWER (P1G02_ PO. 9100005119 (5) 020423 Coal Handling (28A) PT TKM Borepile Transfer Tower#7 BP-003 K300 Mayer 18:05 18:20 8.5 8.5 Reschedule
4-Jun-22 54 POWER (P1G02_ PO. 9100005119 (5) 020434 Coal Handling (28A) PT TKM Borepile Transfer Tower#5 BP-01 K300 Mayer 18:45 19;35 8.5 8.5
5-Jun-22 36 POWER (P1G02_ 9100005271 (1) 020435 Coal Handling (28A) PT TKM Borepile Transfer Tower#5 BP-02 K300 Mayer - - 8.5 -
6-Jun-22 68 POWER (P1G02_ PO. 9100005119 (5) 020435 Coal Handling (28A) PT TKM Borepile Transfer Tower#5 BP-02 K300 Mayer 13:05 13:30 8.5 8.5 Reschedule
2-Jul-22 35 POWER (P1G02_ PO. 9100005271 (2) 024251 TG10 (29A) PT TKM Borepile TC 10 K300 Kevin 17:05 17:40 10.0 10.0
3-Jul-22 26 POWER (P1G02_ PO. 9100005271 (2) 024252 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 14:20 14:20 10.0 10.0
4-Jul-22 32 POWER (P1G02_ PO. 9100005271 (2) 024253 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 11:10 11:35 11.0 11.0
5-Jul-22 43 POWER (P1G02_ PO. 9100005271 (2) 024254 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 13:55 14:10 11.0 11.0
6-Jul-22 27 POWER (P1G02_ PO. 9100005271 (2) 024255 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin - - 11.0 -
7-Jul-22 29 POWER (P1G02_ PO. 9100005271 (2) 024255 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 15:30 15:45 11.0 11.0 Reschedule
8-Jul-22 38 POWER (P1G02_ PO. 9100005271 (2) 024271 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 18:50 19:40 11.0 11.0
11-Jul-22 19 POWER (P1G02_ PO. 9100005271 (2) 024274 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 16:25 17:15 11.0 11.0
12-Jul-22 32 POWER (P1G02_ PO. 9100005271 (2) 024273 TG10 (29A) PT TKM Borepile TG 10 K300 Kevin 16:45 16:45 5.5 5.5
19-Jul-22 39 POWER (P1G02_ PO. 9100005441 024278 Coal Handling (28A) PT TKM Borepile Point#1 Samping PB#5 K300 Ian Felix S. 16:25 17:35 8.5 8.5
20-Jul-22 28 POWER (P1G02_ PO. 9100005441 024279 Coal Handling (28A) PT TKM Borepile Point#1 Samping PB#5 K300 Ian Felix S. 17:20 17:45 8.5 8.5
21-Jul-22 33 POWER (P1G02_ PO. 9100005441 024280 Coal Handling (28A) PT TKM Borepile Point#3 Samping PB#5 K300 Ian Felix S. - - 8.5 -
22-Jul-22 33 POWER (P1G02_ PO. 9100005441 024280 Coal Handling (28A) PT TKM Borepile Point#3 Samping PB#5 K300 Ian Felix S. - - 8.5 - Reschedule
23-Jul-22 26 POWER (P1G02_ PO. 9100005441 024281 Coal Handling (28A) PT TKM Borepile Point#1 K300 Ian Felix S. 17:40 20:05 25.5 25.5
24-Jul-22 24 POWER (P1G02_ PO. 9100005441 024282 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 16:45 18:35 25.5 25.5
25-Jul-22 29 POWER (P1G02_ PO. 9100005441 024283 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. - - 8.5 -
26-Jul-22 3 BCTMP (P1R01_ PO. 9100005474 (7) 024284 H2O2 (651) PT TKM Borepile #7 Pipe Rack H2O2 K300 Brian C. 18:15 18:50 7.5 7.5
26-Jul-22 30 POWER (P1G02_ PO. 9100005441 024283 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 15:45 16:15 8.5 8.5 Reschedule
27-Jul-22 4 BCTMP (P1R01_ PO. 9100005474 (7) 024285 H2O2 (651) PT TKM Borepile #6 Pipe Rack H2O2 K300 Brian C. 15:05 15:40 7.5 7.5
27-Jul-22 29 POWER (P1G02_ PO. 9100005441 024292 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 16:50 17:30 8.5 8.5
28-Jul-22 2 BCTMP (P1R01_ PO. 9100005474 (7) 024286 H2O2 (651) PT TKM Borepile #5 Pipe Rack H2O2 K300 Brian C. 18:40 19:00 7.5 7.5
29-Jul-22 2 BCTMP (P1R01_ PO. 9100005474 (7) 024287 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 -
30-Jul-22 3 BCTMP (P1R01_ PO. 9100005474 (7) 024287 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 - Reschedule
30-Jul-22 38 POWER (P1G02_ PO. 9100005441 024291 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. - - 8.5 -
31-Jul-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 024287 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 14:30 14:45 7.5 7.5 Reschedule
31-Jul-22 27 POWER (P1G02_ PO. 9100005441 024291 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 17:25 18:05 8.5 8.5 Reschedule
1-Aug-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 024288 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 13:05 13:55 7.5 7.5
1-Aug-22 29 POWER (P1G02_ PO. 9100005441 024293 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 21:05 21:05 8.5 8.5
2-Aug-22 6 BCTMP (P1R01_ PO. 9100005474 (7) 024289 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 -
2-Aug-22 32 POWER (P1G02_ PO. 9100005441 024294 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. - - 8.5 -
3-Aug-22 4 BCTMP (P1R01_ PO. 9100005474 (7) 024289 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 11:35 18:40 7.5 7.5 Reschedule
3-Aug-22 23 POWER (P1G02_ PO. 9100005441 024294 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 21:25 21:45 8.5 8.5 Reschedule
4-Aug-22 32 POWER (P1G02_ PO. 9100005441 024295 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. - - 8.5 -
5-Aug-22 38 POWER (P1G02_ PO. 9100005441 024295 Coal Handling (28A) PT TKM Borepile K300 Ian Felix S. 18:25 20:15 8.5 8.5 Reschedule
8-Aug-22 4 BCTMP (P1R01_ PO. 9100005474 (7) 024290 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 -
9-Aug-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 024290 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 17:00 18:10 7.5 7.5 Reschedule
10-Aug-22 14 BCTMP (P1R01_ PO. 9100005474 (7) 029466 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 18;40 19:00 7.5 7.5
11-Aug-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 029473 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. - - 7.5 -
12-Aug-22 13 BCTMP (P1R01_ PO. 9100005474 (7) 029473 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 15:35 16:15 7.5 7.5 Reschedule
13-Aug-22 5 BCTMP (P1R01_ PO. 9100005474 (7) 029475 H2O2 (651) PT TKM Borepile Pipe Rack H2O2 K300 Brian C. 16:15 17:35 7.5 7.5
21-Aug-22 4 BCTMP (P1R01_ PO. 9100005474 (7) 029476 H2O2 (651) PT TKM Bore Pile Pipe Rack K300 Brian C. 15:20 15:45 7.5 7.5
22-Aug-22 14 BCTMP (P1R01_ PO. 9100005474 (7) 029500 H2O2 (651) PT TKM Bore Pile Pipe Rack K300 Brian C. 11:10 11:40 7.5 7.5
23-Aug 5 BCTMP (P1R01_ PO. 9100005474 (7) 029499 H2O2 (651) PT TKM Bore Pile Pipe Rack K300 Brian C. 15:15 16:30 7.5 7.5
14-Oct 18 FL3B-BM Related PO. 9100004019 (2) 031910 PB5 (285) PT TKM Borepile Feedwater Station K300 15:00 18:20 19:00 7.5 7.5
16-Oct 24 FL3B-BM Related PO. 9100004019 (2) 031911 PB5 (285) PT TKM Borepile Feedwater Station K300 15:00 13:15 13:30 7.5 7.5
27-Oct 29 FL3B-BM Related 033594 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 20:30 20:50 8.5 8.5
28-Oct 22 FL3B-BM Related P1G02_ON-CPPU0034 031938 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 17:10 17:40 8.5 8.5
30-Oct 21 FL3B-BM Related P1G02_ON-CPPU0034 034602 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 15:30 15:45 8.5 8.5
31-Oct 24 FL3B-BM Related P1G02_ON-CPPU0034 034604 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 14:05 14:15 9.0 9.0
1-Nov 24 FL3B-BM Related P1G02_ON-CPPU0034 034605 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. - - 9.0 -
2-Nov 25 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 9.0 -
2-Nov 31 FL3B-BM Related P1G02_ON-CPPU0034 034605 Coal Handling (28A) PT TKM Borepile TR20 K300 Ian FS. 9:20 9:30 9.0 9.0 Reschedule
3-Nov 30 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 9.0 - Reschedule
4-Nov 24 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 9.0 - Reschedule
10-Nov 20 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Rori G. - - 9.0 -
11-Nov 19 FL3B-BM Related P1G02_ON-CPPU0034 034606 Coal Handling (28A) PT TKM Borepile TR19 K300 Rori G. 16:50 17:00 9.0 9.0 Reschedule
12-Nov 22 FL3B-BM Related P1G02_ON-CPPU0034 034685 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 8.5 -
13-Nov 21 FL3B-BM Related PO. 9100005119 (2) 034686 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 8.5 -
13-Nov 25 FL3B-BM Related P1G02_ON-CPPU0034 034685 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. 11:35 11:45 8.5 8.5 Reschedule
14-Nov 18 FL3B-BM Related PO. 9100005119 (2) 034687 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. 2:30 16:50 8.5 8.5
15-Nov 26 FL3B-BM Related PO. 9100005119 (2) 034620 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. - - 8.5 -
16-Nov 28 FL3B-BM Related PO. 9100005119 (2) 034620 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. 18:35 19:50 8.5 8.5 Reschedule
19-Nov 24 FL3B-BM Related P1G02_ON-CPPU0034 034686 Coal Handling (28A) PT TKM Borepile TR19 K300 Ian FS. 17:15 17:40 8.5 8.5
20-Nov 11 FL3B-BM Related P1G02_ON-CPPU0034 034643 Coal Handling (28A) PT TKM Borepile TR19 K300 Fendy T. 12:25 13:00 8.5 8.5
21-Nov 18 FL3B-BM Related P1G02_ON-CPPU0034 034644 Coal Handling (28A) PT TKM Borepile TR19 K300 Fendy T. 18:10 19:35 8.5 8.5
22-Nov 25 FL3B-BM Related P1G02_ON-CPPU0034 034645 Coal Handling (28A) PT TKM Borepile TR19 K300 Fendy T. 19:00 19:55 8.5 8.5
23-Nov 19 FL3B-BM Related P1G02_ON-CPPU0034 034646 Coal Handling (28A) PT TKM Borepile TR17 K300 Fendy T. 17:45 18;10 8.5 8.5
24-Nov 20 FL3B-BM Related P1G02_ON-CPPU0034 034642 Coal Handling (28A) PT TKM Borepile TR17 K300 Fendy T. 12:15 12:20 8.5 8.5
4-Dec 17 FL3B-BM Related P1G02_ON-CPPU0084 034647 Coal Handling (28A) PT TKM Borepile TR17 Belakang Site Office TPE K300 Fendy T. - - 8.5 -
4-Dec 18 FL3B-BM Related P1G02_ON-CPPU0084 034648 Coal Handling (28A) PT TKM Borepile Primary Crusher K300 Fendy T. - - 17.0 -
5-Dec 17 FL3B-BM Related P1G02_ON-CPPU0084 034647 Coal Handling (28A) PT TKM Borepile TR17 Belakang Site Office TPE K300 Fendy T. - - 8.5 - Reschedule
5-Dec 18 FL3B-BM Related P1G02_ON-CPPU0084 034648 Coal Handling (28A) PT TKM Borepile Primary Crusher K300 Fendy T. - - 17.0 - Reschedule
6-Dec 22 FL3B-BM Related P1G02_ON-CPPU0084 034647 Coal Handling (28A) PT TKM Borepile TR17 Belakang Site Office TPE K300 Fendy T. 17:50 18:05 8.5 8.5 Reschedule
6-Dec 23 FL3B-BM Related P1G02_ON-CPPU0084 034648 Coal Handling (28A) PT TKM Borepile Primary Crusher K300 Fendy T. - - 17.0 - Reschedule
7-Dec 13 FL3B-BM Related P1G02_ON-CPPU0034 036104 Coal Handling (28A) PT TKM Borepile TR17 K300 Rori G. - - 8.5 -
8-Dec 20 FL3B-BM Related P1G02_ON-CPPU0034 036106 Coal Handling (28A) PT TKM Borepile K300 Rori G. - - 17.0 -
8-Dec 21 FL3B-BM Related P1G02_ON-CPPU0034 036104 Coal Handling (28A) PT TKM Borepile TR17 K300 Rori G. - - 8.5 - Reschedule
9-Dec 25 FL3B-BM Related P1G02_ON-CPPU0034 036106 Coal Handling (28A) PT TKM Borepile K300 Rori G. 13:30 17:35 17.0 17.0 Reschedule
9-Dec 26 FL3B-BM Related P1G02_ON-CPPU0034 036104 Coal Handling (28A) PT TKM Borepile TR17 K300 Rori G. - - 8.5 - Reschedule
10-Dec 17 FL3B-BM Related P1G02_ON-CPPU0034 036104 Coal Handling (28A) PT TKM Borepile TR17 K300 Rori G. - - 8.5 - Reschedule
10-Dec 18 FL3B-BM Related P1G02_ON-CPPU0034 036108 Coal Handling (28A) PT TKM Borepile K300 Rori G. 16:40 17:15 17.0 17.0
11-Dec 15 FL3B-BM Related P1G02_ON-CPPU0034 036110 Coal Handling (28A) PT TKM Borepile K300 Rori G. 14:20 14:20 8.5 8.5
11-Dec 16 FL3B-BM Related P1G02_ON-CPPU0034 036109 Coal Handling (28A) PT TKM Borepile K300 Rori G. 13;50 19:10 17.0 17.0
12-Dec 16 FL3B-BM Related P1G02_ON-CPPU0034 036111 Coal Handling (28A) PT TKM Borepile K300 Rori G. 17:15 18:20 17.0 17.0
12-Dec 17 FL3B-BM Related P1G02_ON-CPPU0034 036112 Coal Handling (28A) PT TKM Borepile K300 Rori G. 18:15 18:15 8.5 8.5
13-Dec 65 FL3B-BM Related P1G02_ON-CPPU0034 036113 Coal Handling (28A) PT TKM Borepile K300 Rori G. 14:50 15:40 8.5
13-Dec 67 FL3B-BM Related P1G02_ON-CPPU0034 036112 Coal Handling (28A) PT TKM Borepile K300 Rori G. 17:35 18:40 8.5
14-Dec 24 FL3B-BM Related P1G02_ON-CPPU0034 036116 Coal Handling (28A) PT TKM Borepile TR16 K300 Rori G. 15:50 16:20 8.5 8.5
14-Dec 25 FL3B-BM Related P1G02_ON-CPPU0034 036115 Coal Handling (28A) PT TKM Borepile K300 Rori G. 15:15 16:20 8.5 8.5
20-Dec 17 FL3B-BM Related P1G02_ON-CPPU0034 036119 Coal Handling (28A) PT TKM Borepile K300 Yoga N. - - 8.5 -
21-Dec 16 FL3B-BM Related P1G02_ON-CPPU0034 036123 Coal Handling (28A) PT TKM Borepile K300 Iskandar 16:25 17:15 8.5 8.5
22-Dec 17 FL3B-BM Related P1G02_ON-CPPU0034 036124 Coal Handling (28A) PT TKM Borepile K300 Iskandar 17:05 18:15 8.5 8.5
23-Dec 16 FL3B-BM Related P1G02_ON-CPPU0034 036125 Coal Handling (28A) PT TKM Borepile K300 Iskandar - - 8.5 -
24-Dec 13 FL3B-BM Related P1G02_ON-CPPU0034 036125 Coal Handling (28A) PT TKM Borepile K300 Iskandar 18:16 19;20 8.5 8.5 Reschedule
26-Dec 15 FL3B-BM Related P1G02_ON-CPPU0034 036126 Coal Handling (28A) PT TKM Borepile K300 Iskandar 17:10 18:10 8.5 8.5
26-Dec 19 FL3B-BM Related P1G02_ON-CPPU0034 036125 Coal Handling (28A) PT TKM Borepile K300 Iskandar - - 8.5 - Reschedule
11-Jan 12 FL3B-BM Related PO. 9100004019 (2) 036140 PB5 (285) PT TKM Borepile Primary Area Fan K300 Tigor H. 20:15 21:10 7.5 7.5
12-Jan 22 FL3B-BM Related PO. 9100004019 (2) 036138 PB5 (285) PT TKM Borepile Primary Area Fan K300 Tigor H. - - 7.5 -
13-Jan 18 FL3B-BM Related PO. 9100004019 (2) 036138 PB5 (285) PT TKM Borepile Primary Area Fan K300 Tigor H. 18:20 19:10 7.5 7.5 Reschedule
14-Jan 17 FL3B-BM Related PO. 9100004019 (2) 036137 PB5 (285) PT TKM Borepile Primary Air Fan (3) K300 Mayer - - 7.5 -
15-Jan 50 FL3B-BM Related PO. 9100004019 (2) 036137 PB5 (285) PT TKM Borepile Primary Air Fan (3) K300 Mayer 14:20 15:25 7.5
15-Jan 51 FL3B-BM Related PO. 9100004019 (2) 036139 PB5 (285) PT TKM Borepile Primary Air Fan (3) K300 Mayer 16:35 17:15 7.5
18-Jan 12 FL3B-BM Related PO. 9100004019 (2) 036141 PB5 (285) PT TKM Borepile Feed Water (4) K300 Mayer - - 7.5 -
19-Jan 16 FL3B-BM Related PO. 9100004019 (2) 036142 PB5 (285) PT TKM Borepile Feed Water (5) K300 Mayer 16:55 20:30 15.0 15.0
1-Feb 10 FL3B-BM Related PO. 9100005119 (2) 038709 Coal Handling (28A) PT TKM Borepile TR-19 K300 Fendy Tan - - 8.5 -
2-Feb 13 FL3B-BM Related PO. 9100005119 038710 Coal Handling (28A) PT TKM Bore Pile TR/19 K300 Rori 14:45 15:50 8.5 8.5
3-Feb 7 FL3B-BM Related PO. 9100005119 038711 Coal Handling (28A) PT TKM Bore Pile TR/16 K300 Rori 14:20 15:25 8.5 8.5
4-Feb 13 FL3B-BM Related P1G02-ON-CPPU0084 038716 Coal Handling (28A) PT TKM Bore Pile TR/16 K300 Rori - - 8.5 -
5-Feb 7 FL3B-BM Related P1G02-ON-CPPU0084 038716 Coal Handling (28A) PT TKM Bore Pile TR/16 K300 Rori 13:30 15:20 8.5 8.5 Reschedule
24-Jul-21 28 BM PO. 9100000180 (22) 08329 BM1 Land Development PT TKM Benol LC K100 Ramses 14:35 14:35 4.0 4.0
26-Jul-21 4 BM PO. 9100000137 08330 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses - - 13.0 -
27-Jul-21 26 BM PO. 9100000137 08331 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 16:45 16:45 13.0 6.0
28-Jul-21 2 BM PO. 9100000137 08330 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 15:00 17:00 13.0 12.0
29-Jul-21 31 BM PO. 9100000137 08349 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 13:20 13:20 12.0 6.0
30-Jul-21 25 BM PO. 9100000137 08350 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 10:05 14:15 12.0 12.0
31-Jul-21 37 BM PO. 9100000137 08714 BM1 Land Development PT TKM Pile Cap Grid 15-45 K300 Ramses 9:50 14:05 12.0 12.0
2-Aug-21 34 BM PO. 9100000137 08715 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:30 9:40 12.0 12.0
3-Aug-21 35 BM PO. 9100000137 08717 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:40 14:10 12.0 12.0
4-Aug-21 26 BM PO. 9100000137 08718 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses - - 12.0 -
5-Aug-21 21 BM PO. 9100000137 08718 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 10:05 11:05 12.0 12.0
6-Aug-21 29 BM PO. 9100000137 08722 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 10:00 10:00 12.0 6.0
7-Aug-21 22 BM PO. 9100000137 08719 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:30 14:05 12.0 12.0
9-Aug-21 35 BM PO. 9100000137 08720 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses - - 12.0 -
10-Aug-21 27 BM PO. 9100000137 08720 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:55 10:05 12.0 12.0
10-Aug-21 28 BM PO. 9100000180 (22) 09201 BM1 Land Development PT TKM LC BM#1 K100 Ramses 14:00 14:00 3.0 3.0
12-Aug-21 38 BM PO. 9100000137 09202 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 10:20 13:00 12.0 12.0
13-Aug-21 33 BM PO. 9100001000 09204 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1)
13-Aug-21 34 BM PO. 9100000137 09203 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:10 9:10 18.0 6.0
14-Aug-21 30 BM PO. 9100001000 09204 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses 10:30 10:30 3.0 3.0 PO. 9100001000 (1) Reschedule
14-Aug-21 31 BM PO. 9100000137 09206 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:10 11:05 12.0 12.0
14-Aug-21 32 BM PO. 9100000137 09205 BM1 Land Development PT TKM Cast In Situ BM1 Grid 15-45 K300 Ramses 15:15 15:15 12.0 6.0
16-Aug-21 25 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1)
16-Aug-21 26 BM PO. 9100000137 09207 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:50 13:50 18.0 17.0
18-Aug-21 22 BM PO. 9100000137 09210 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses - - 12.0 -
18-Aug-21 23 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1) Reschedule
19-Aug-21 44 BM PO. 9100000137 09210 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:30 10:20 12.0 12.0 Reschedule
19-Aug-21 45 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1) Reschedule
20-Aug-21 37 BM PO. 9100000137 09211 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:55 16:25 18.0 15.0
20-Aug-21 38 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 - PO. 9100001000 (1) Reschedule
21-Aug-21 30 BM PO. 9100001000 09208 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses 13:10 13:10 3.0 3.0 PO. 9100001000 (1) Reschedule
21-Aug-21 31 BM PO. 9100000137 09212 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 13:55 15:30 12.0 12.0
23-Aug-21 41 BM PO. 9100001000 09215 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses 17:55 17:55 3.0 3.0 PO. 9100001000 (1)
23-Aug-21 42 BM PO. 9100000137 09214 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 8:40 14:20 18.0 18.0
23-Aug-21 58 BM PO. 9100000137 09301 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 17:05 17:05 5.0 5.0
24-Aug-21 25 BM PO. 9100000137 09302 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 13:25 15:00 24.0 18.0
25-Aug-21 40 BM PO. 9100001000 09216 BM1 Land Development PT TKM Pile Cap Precast Grid 15-45 K300 Ramses 9:55 13:55 24.0 12.0
25-Aug-21 41 BM PO. 9100001000 09209 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 4.0 -
26-Aug-21 43 BM PO. 9100001000 09217 PT TKM Pile Cap Cast in Situ BM #1 Grid 15-45 K300 Ramses 14:45 14:45 12.0 6.0
BM1 Land Development
26-Aug-21 44 BM PO. 9100001000 09209 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 4.0 - Reschedule
27-Aug-21 39 BM PO. 9100001000 09218 PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses 14:25 14:25 6.0 6.0
BM1 Land Development
27-Aug-21 40 BM PO. 9100001000 09219 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses - - 3.0 -
28-Aug-21 31 BM PO. 9100001000 09220 PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses 13:25 13:25 12.0 6.0
BM1 Land Development
28-Aug-21 32 BM PO. 9100001000 09219 BM1 Land Development PT TKM LC Cast in Situ Pile Cap BM1 K100 Ramses 14:15 14:15 3.0 3.0 Reschedule
30-Aug-21 32 BM PO. 9100001000 09221 BM1 Land Development PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses - - 12.0 -
31-Aug-21 40 BM PO. 9100001000 09222 BM1 Land Development PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses 14:30 14:30 12.0 6.0
31-Aug-21 41 BM PO. 9100001000 09221 BM1 Land Development PT TKM Cast in Situ Pile Cap BM1 Grid 15-45 K300 Ramses - - 12.0 - Reschedule
1-Sep-21 40 BM PO. 9100001000 09224 BM1 Land Development PT TKM Precast PileCap BM1 Grid 15-45 K300 Ramses 14:00 15:30 12.0 12.0
1-Sep-21 41 BM PO. 9100001000 09223 BM1 Land Development PT TKM LC Cast in Situ PileCap K100 Ramses 16:05 16:05 9.0 6.0
2-Sep-21 34 BM PO. 9100001000 09225 BM1 Land Development PT TKM Precast PileCap BM1 Grid 15-45 K300 Ramses 9:35 14:10 12.0 11.0
3-Sep-21 46 BM PO. 9100001000 09226 BM1 Land Development PT TKM Precast PileCap BM1 Grid 15-45 K300 Agung N. 15:05 15:05 6.0 6.0
3-Sep-21 47 BM PO. 9100001000 09227 BM1 Land Development PT TKM LC PileCap K100 Agung N. 16:30 16:30 3.0 3.0
4-Sep-21 39 BM PO. 9100001000 09229 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 16:30 16:30 6.0 6.0
4-Sep-21 40 BM PO. 9100001000 09228 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram - - 4.0 -
4-Sep-21 62 BM PO. 9100001000 09234 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Agung 18:25 18:25 4.0 4.0
5-Sep-21 33 BM PO. 9100001000 09231 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram - - 10.0 -
5-Sep-21 34 BM PO. 9100001000 09230 BM1 Land Development PT TKM LC PileCap Slopping Protection K100 Bram 11:10 11:10 4.0 4.0
5-Sep-21 35 BM PO. 9100001000 09228 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram - - 4.0 - Reschedule
6-Sep-21 46 BM PO. 9100001000 09232 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram - - 3.0 -
6-Sep-21 47 BM PO. 9100001000 09233 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 18:15 18:15 9.0 6.0
7-Sep-21 43 BM PO. 9100001000 09235 BM1 Land Development PT TKM Capping Beam Sheet Pile BM1 Grid 15-45 K300 Bram 16:40 20:20 17.0 18.0
7-Sep-21 44 BM PO. 9100001000 09232 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram - - 3.0 - Reschedule
7-Sep-21 45 BM PO. 9100001000 09235 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 21:55 23:00 9.0 9.0
7-Sep-21 60 BM PO. 9100001000 010401 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 23:00 23:00 3.0 3.0
8-Sep-21 28 BM PO. 9100001000 09238 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram 15:40 15:40 6.0 3.0
8-Sep-21 29 BM PO. 9100001000 09237 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram - - 18.0 -
9-Sep-21 19 BM PO. 9100001000 010402 BM1 Land Development PT TKM LC PileCAp Slopping Protection K100 Bram 13:50 13:50 3.0 3.0
9-Sep-21 20 BM PO. 9100001000 010403 PT TKM Capping Beam Sheet Pile BM1 Grid 15-45 K300 Bram - - 18.0 -
BM1 Land Development
9-Sep-21 21 BM PO. 9100001000 010404 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 18:15 20:15 16.0 11.0
9-Sep-21 22 BM PO. 9100001000 09237 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram - - 18.0 - Reschedule
10-Sep-21 32 BM PO. 9100001000 010403 BM1 Land Development PT TKM Capping Beam Sheet Pile BM1 Grid 15-45 K300 Bram 16:55 20:10 18.0 18.0 Reschedule
10-Sep-21 33 BM PO. 9100001000 09237 BM1 Land Development PT TKM Pile Cap BM1 Grid 15-45 K300 Bram 20:40 20:40 18.0 6.0 Reschedule
11-Sep-21 35 BM PO. 9100001000 09993 BM1 Land Development PT TKM Capping Beam Sheet Pile BM1 Grid 15-45 K300 Bram 13:25 13:25 14.0 6.0
11-Sep-21 36 BM PO. 9100001000 09991 BM1 Land Development PT TKM LC PileCap Slopping Protection K100 Bram - - 3.0 -
13-Sep-21 44 BM PO. 9100000137 010801 BM1 Land Development PT TKM PileCap InSitu K300 Bram 13:25 16:55 12.0 12.0
13-Sep-21 45 BM PO. 9100001000 09991 BM1 Land Development PT TKM LC PileCap Slopping Protection K100 Bram 15:20 15:20 3.0 3.0
13-Sep-21 64 BM PO. 9100001000 010805 BM1 Land Development PT TKM PileCap InSitu K300 Bram 18:55 18:55 6.0
14-Sep-21 38 BM PO. 9100001000 010809 BM1 Land Development PT TKM LC PileCap K100 Agung N. 19:00 19:00 3.0 3.0
14-Sep-21 39 BM PO. 9100001000 010807 PT TKM Pile Cap In Situ Grid 63-65 & 73-78 K300 Agung N. 17:35 20:00 18.0 18.0
BM1 Land Development
14-Sep-21 40 BM PO. 9100001000 010808 BM1 Land Development PT TKM Capping Beam Sheet Pile 23m Grid 46-69 K300 Agung N. 14:50 17:00 18.0 18.0
15-Sep-21 46 BM PO. 9100001000 010810 BM1 Land Development PT TKM PileCap InSitu Grid 80-88 K300 Agung N. 16:40 19:45 18.0 18.0 P1G01-ON-CPPU0023 (2)
15-Sep-21 47 BM PO. 9100001000 010811 BM1 Land Development PT TKM LC Pile Cap K100 Agung N. - - 3.0 - P1G01-ON-CPPU0023 (2)
16-Sep-21 53 BM PO. 9100001000 010813 BM1 Land Development PT TKM Capping Beam Sheet Pile Grid 69-92 K300 Agung N. - - 18.0 -
16-Sep-21 54 BM PO. 9100001000 010814 BM1 Land Development PT TKM PileCap In Situ Grid 100-105 K300 Agung N. 18:45 20:15 12.0 12.0
16-Sep-21 56 BM PO. 9100001000 010811 BM1 Land Development PT TKM LC Pile Cap K100 Agung N. - - 3.0 - Reschedule
17-Sep-21 45 BM PO. 9100001000 010811 BM1 Land Development PT TKM LC Pile Cap K100 Agung N. - - 3.0 - Reschedule
17-Sep-21 48 BM PO. 9100001000 010813 BM1 Land Development PT TKM Capping Beam Sheet Pile Grid 69-92 K300 Agung N. 8:40 16:30 18.0 18.0 Reschedule
18-Sep-21 37 BM PO. 9100001000 010811 BM1 Land Development PT TKM LC Pile Cap K100 Agung N. 16:10 16:10 3.0 4.0 Reschedule
18-Sep-21 48 BM PO. 9100001000 010816 BM1 Land Development PT TKM PileCap Grid 1-3 K300 Agung N. 19:45 19:45 6.0 6.0
19-Sep-21 35 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. - - 3.0 -
19-Sep-21 36 BM PO. 9100001000 010817 BM1 Land Development PT TKM PileCap InSitu Grid 27-32 K300 Agung N. - - 18.0 -
19-Sep-21 37 BM PO. 9100001000 010818 BM1 Land Development PT TKM Capping Beam Grid 92-115 K300 Agung N. - - 18.0 -
20-Sep-21 49 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. - - 3.0 - Reschedule
20-Sep-21 50 BM PO. 9100001000 010820 BM1 Land Development PT TKM PileCap InSitu Grid 7-9 & 21-26 K300 Bram 15:45 18:25 18.0 18.0 Reschedule
20-Sep-21 51 BM PO. 9100001000 010821 BM1 Land Development PT TKM LC Pile Cap K100 Bram 20:05 20:05 3.0 4.0 Reschedule
21-Sep-21 35 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. - - 3.0 - Reschedule
21-Sep-21 36 BM PO. 9100001000 010817 BM1 Land Development PT TKM PileCap InSitu Grid 27-32 K300 Agung N. - - 18.0 - Reschedule
21-Sep-21 37 BM PO. 9100001000 010818 BM1 Land Development PT TKM Capping Beam Grid 92-115 K300 Agung N. 16:55 16:55 18.0 6.0 Reschedule
22-Sep-21 47 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. - - 3.0 - Reschedule
22-Sep-21 48 BM PO. 9100001000 010817 BM1 Land Development PT TKM PileCap InSitu Grid 27-32 K300 Agung N. 18:40 18:40 18.0 6.0 Reschedule
22-Sep-21 57 BM PO. 9100001000 011252 BM1 Land Development PT TKM Capping Beam Grid 100-123 K300 Agung N. 14:00 17:00 18.0 18.0
23-Sep-21 45 BM PO. 9100001000 010819 BM1 Land Development PT TKM LC PileCap K100 Agung N. 17:30 17:30 3.0 4.0 Reschedule
23-Sep-21 46 BM PO. 9100001000 011253 BM1 Land Development PT TKM PileCap Area 2 Grid 16-26 K300 Bram 13:20 17:05 18.0 18.0
23-Sep-21 47 BM PO. 9100001000 011256 BM1 Land Development PT TKM Capping Beam Grid 120-143 K300 Bram - - 18.0 -
23-Sep-21 48 BM PO. 9100001000 011255 BM1 Land Development PT TKM LC Area 2 Grid 38-47 K100 Bram 18:50 18:50 3.0 4.0
24-Sep-21 38 BM PO. 9100001000 011257 BM1 Land Development PT TKM Precast K300 Bram 17:35 19:05 12.0 12.0
24-Sep-21 39 BM PO. 9100001000 011258 BM1 Land Development PT TKM PileCap Area 2 Grid 26-47 K300 Bram - - 28.0 -
24-Sep-21 40 BM PO. 9100001000 011256 BM1 Land Development PT TKM Capping Beam Grid 120-143 K300 Bram 13:15 16:00 18.0 18.0 Reschedule
25-Sep-21 40 BM PO. 9100001000 011261 BM1 Land Development PT TKM Precast K300 Bram 13:50 13:50 6.0 6.0
25-Sep-21 41 BM PO. 9100001000 011259 BM1 Land Development PT TKM Capping Beam Grid 143-173 K300 Bram - - 24.0 -
25-Sep-21 42 BM PO. 9100001000 011258 BM1 Land Development PT TKM PileCap Area 2 Grid 26-47 K300 Bram 10:45 17:00 28.0 29.0 Reschedule
25-Sep-21 43 BM PO. 9100001000 011262 BM1 Land Development PT TKM Pile Cap Grid 47-56 K300 Bram 17:50 17:50 18.0 6.0
27-Sep-21 48 BM PO. 9100001000 011260 BM1 Land Development PT TKM Capping Beam Grid 173-210 K300 Bram - - 28.0 - Reschedule
27-Sep-21 49 BM PO. 9100001000 011259 BM1 Land Development PT TKM Capping Beam Grid 143-173 K300 Bram - - 24.0 - Reschedule
27-Sep-21 50 BM PO. 9100001000 011263 BM1 Land Development PT TKM Precast K300 Bram - - 6.0 - Reschedule
28-Sep-21 37 BM PO. 9100001000 011260 BM1 Land Development PT TKM Capping Beam Grid 173-210 K300 Bram 18:15 20:20 28.0 18.0 Reschedule
28-Sep-21 38 BM PO. 9100001000 011259 BM1 Land Development PT TKM Capping Beam Grid 143-173 K300 Bram 15:05 17:40 24.0 24.0 Reschedule
28-Sep-21 39 BM PO. 9100001000 011263 BM1 Land Development PT TKM Precast K300 Bram 10:30 10:30 6.0 6.0 Reschedule
29-Sep-21 38 BM PO. 9100001000 011267 BM1 Land Development PT TKM Precast Area 2 K300 Bram - - 24.0 -
29-Sep-21 39 BM PO. 9100001000 011268 BM1 Land Development PT TKM LC K100 Bram 15:35 15:35 4.0 4.0
30-Sep-21 42 BM PO. 9100001000 011267 BM1 Land Development PT TKM Precast Area 2 K300 Bram 13:25 15:45 24.0 11.0 Reschedule
30-Sep-21 55 BM PO. 9100001000 011269 BM1 Land Development PT TKM LC K100 Bram 16:45 17:15 8.0 8.0
1-Oct-21 44 BM PO. 9100001000 011271 BM1 Land Development PT TKM Precast Area 2 K300 Ramses - - 24.0 -
2-Oct-21 49 BM PO. 9100001000 011271 BM1 Land Development PT TKM Precast Area 2 K300 Ramses 12:15 13:20 24.0 12.0 Reschedule
3-Oct-21 31 BM PO. 9100001000 011273 BM1 Land Development PT TKM Capping Beam Grid 1-46 K300 Bram - - 36.0 -
3-Oct-21 32 BM PO. 9100001000 011274 BM1 Land Development PT TKM LC K100 Bram - - 4.0 -
3-Oct-21 33 BM PO. 9100001000 011272 BM1 Land Development PT TKM Precast Area 2 K300 Bram - - 18.0 -
4-Oct-21 51 BM PO. 9100001000 011274 BM1 Land Development PT TKM LC K100 Bram - - 4.0 - Reschedule
4-Oct-21 52 BM PO. 9100001000 011275 BM1 Land Development PT TKM Precast Area 2 K300 Bram 14:35 16:30 18.0 12.0
4-Oct-21 53 BM PO. 9100001000 011273 BM1 Land Development PT TKM Capping Beam Grid 1-46 K300 Bram - - 36.0 - Reschedule
4-Oct-21 54 BM PO. 9100001000 011272 BM1 Land Development PT TKM Precast Area 2 K300 Bram - - 18.0 - Reschedule
5-Oct-21 46 BM PO. 9100001000 011273 BM1 Land Development PT TKM Capping Beam Grid 1-46 K300 Bram 8:55 17:00 36.0 30.0 Reschedule
5-Oct-21 47 BM PO. 9100001000 011272 BM1 Land Development PT TKM Precast Area 2 K300 Bram 15:15 16:40 18.0 12.0 Reschedule
6-Oct-21 50 BM PO. 9100001000 011278 BM1 Land Development PT TKM Capping Beam Grid 15-45 K300 Ramses 18:50 20:45 36.0 18.0
6-Oct-21 51 BM PO. 9100001000 011279 BM1 Land Development PT TKM Precast Beam K300 Ramses 13:15 13:15 12.0 6.0
7-Oct-21 53 BM PO. 9100001000 011280 BM1 Land Development PT TKM Precast Beam K300 Ramses 13:50 14:35 18.0 12.0
8-Oct-21 45 BM PO. 9100001000 011285 BM1 Land Development PT TKM Precast Beam K300 Bram - - 18.0 -
8-Oct-21 46 BM PO. 9100001000 011284 BM1 Land Development PT TKM Capping Beam Grid 46-93 K300 Bram 17:55 19:25 18.0 12.0
9-Oct-21 38 BM PO. 9100001000 011288 BM1 Land Development PT TKM Precast Beam K300 Bram - - 12.0 -
9-Oct-21 39 BM PO. 9100001000 011289 BM1 Land Development PT TKM Capping Beam Grid 56-93 K300 Bram - - 36.0 -
9-Oct-21 40 BM PO. 9100001000 011285 BM1 Land Development PT TKM Precast Beam K300 Bram 9:25 11:25 18.0 12.0 Reschedule
10-Oct-21 29 BM PO. 9100001000 011295 BM1 Land Development PT TKM LC K100 Bram - - 4.0 -
10-Oct-21 30 BM PO. 9100001000 011288 BM1 Land Development PT TKM Precast Beam K300 Bram 12:10 13:55 12.0 12.0 Reschedule
10-Oct-21 31 BM PO. 9100001000 011290 BM1 Land Development PT TKM PileCap Precast K300 Bram - - 12.0 -
10-Oct-21 32 BM PO. 9100001000 011291 BM1 Land Development PT TKM Capping Beam Grid 74-93 K300 Bram 14:50 17:30 24.0 24.0
11-Oct-21 39 BM PO. 9100001000 011294 BM1 Land Development PT TKM LC K100 Bram - - 4.0 -
11-Oct-21 40 BM PO. 9100001000 011293 BM1 Land Development PT TKM Capping Beam Grid 80-93 K300 Bram 14:50 16:35 24.0 18.0
11-Oct-21 41 BM PO. 9100001000 011295 BM1 Land Development PT TKM LC K100 Bram 18:25 18:25 4.0 3.0 Reschedule
11-Oct-21 42 BM PO. 9100001000 011292 BM1 Land Development PT TKM Precast PileCap K300 Bram 10:45 13:35 12.0 12.0
12-Oct-21 39 BM PO. 9100001000 011296 BM1 Land Development PT TKM Precast PileCap K300 Ramses 14:35 14:35 18.0 6.0
12-Oct-21 40 BM PO. 9100001000 011294 BM1 Land Development PT TKM LC K100 Bram - - 4.0 - Reschedule
13-Oct-21 43 BM PO. 9100001000 011294 BM1 Land Development PT TKM LC K100 Bram 13:40 13:40 4.0 4.0 Reschedule
13-Oct-21 44 BM PO. 9100001000 012202 BM1 Land Development PT TKM PileCap Grid 1-6 Cast In Situ K300 Ramses - - 12.0 -
13-Oct-21 45 BM PO. 9100001000 012201 BM1 Land Development PT TKM Precast PileCap K300 Ramses 12:50 14:35 18.0 12.0
14-Oct-21 43 BM PO. 9100001000 012204 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram 14:25 15:35 18.0 12.0
14-Oct-21 44 BM PO. 9100001000 012205 BM1 Land Development PT TKM PileCap Grid 4-10 Area 3 K300 Bram - - 18.0 -
14-Oct-21 45 BM PO. 9100001000 012202 BM1 Land Development PT TKM PileCap Grid 1-6 Cast In Situ K300 Ramses - - 12.0 - Reschedule
15-Oct-21 37 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 -
15-Oct-21 38 BM PO. 9100001000 012207 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram - - 12.0 -
15-Oct-21 39 BM PO. 9100001000 012205 BM1 Land Development PT TKM PileCap Grid 4-10 Area 3 K300 Bram 17:35 18:35 18.0 12.0 Reschedule
15-Oct-21 40 BM PO. 9100001000 012202 BM1 Land Development PT TKM PileCap Grid 1-6 Cast In Situ K300 Ramses - - 12.0 - Reschedule
16-Oct-21 44 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 - Reschedule
16-Oct-21 46 BM PO. 9100001000 012208 BM1 Land Development PT TKM PileCap Grid 10-19 K300 Bram - - 18.0 -
16-Oct-21 47 BM PO. 9100001000 012207 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram 14:25 15:50 12.0 12.0 Reschedule
16-Oct-21 48 BM PO. 9100001000 012202 BM1 Land Development PT TKM PileCap Grid 1-6 Cast In Situ K300 Ramses 15:25 16:55 12.0 12.0 Reschedule
17-Oct-21 39 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 - Reschedule
17-Oct-21 40 BM PO. 9100001000 012208 BM1 Land Development PT TKM PileCap Grid 10-19 K300 Bram 13:30 13:30 18.0 6.0 Reschedule
17-Oct-21 41 BM PO. 9100001000 012211 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram - - 18.0 -
17-Oct-21 42 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 -
18-Oct-21 50 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 - Reschedule
18-Oct-21 51 BM PO. 9100001000 012211 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram 13:05 15:05 18.0 18.0 Reschedule
18-Oct-21 52 BM PO. 9100001000 012212 BM1 Land Development PT TKM PileCap Grid 20-26 K300 Bram - - 18.0 -
18-Oct-21 53 BM PO. 9100001000 012213 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram - - 18.0 -
18-Oct-21 54 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
19-Oct-21 44 BM PO. 9100001000 012206 BM1 Land Development PT TKM LC Area 3 K100 Bram - - 4.0 - Reschedule
19-Oct-21 45 BM PO. 9100001000 012212 BM1 Land Development PT TKM PileCap Grid 20-26 K300 Bram 11:05 13:45 18.0 18.0 Reschedule
19-Oct-21 47 BM PO. 9100001000 012213 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Bram 15:30 15:30 18.0 6.0 Reschedule
19-Oct-21 48 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
21-Oct-21 45 BM PO. 9100001000 012223 BM1 Land Development PT TKM PileCap Grid 26-29 K300 Ramses 13:55 16:55 18.0 18.0
21-Oct-21 46 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 -
21-Oct-21 47 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
22-Oct-21 54 BM PO. 9100001000 012225 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 18.0 -
22-Oct-21 55 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
22-Oct-21 56 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
23-Oct-21 37 BM PO. 9100001000 012225 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 12:45 13:35 18.0 12.0 Reschedule
23-Oct-21 38 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
23-Oct-21 39 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
24-Oct-21 32 BM PO. 9100001000 012227 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 -
24-Oct-21 33 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
24-Oct-21 34 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
25-Oct-21 51 BM PO. 9100001000 012228 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 11:00 16:05 18.0 18.0
25-Oct-21 52 BM PO. 9100001000 012227 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
25-Oct-21 53 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
25-Oct-21 54 BM PO. 9100001000 012229 BM1 Land Development PT TKM Capping Beam Grid: 26-46 Area 3 K300 Ramses 16:30 19:50 24.0 18.0
25-Oct-21 55 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
26-Oct-21 49 BM PO. 9100001000 012227 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
26-Oct-21 50 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses - - 24.0 - Reschedule
26-Oct-21 51 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
27-Oct-21 52 BM PO. 9100001000 012227 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 12:30 15:25 24.0 24.0 Reschedule
27-Oct-21 53 BM PO. 9100001000 012224 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 17:25 18:20 24.0 12.0 Reschedule
27-Oct-21 54 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
28-Oct-21 49 BM PO. 9100001000 012230 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 9:50 15:35 18.0 18.0
28-Oct-21 50 BM PO. 9100001000 012231 BM1 Land Development PT TKM Capping Beam Grid 26-36 Area 3 K300 Ramses 16:35 18:15 24.0 18.0
28-Oct-21 51 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
29-Oct-21 40 BM PO. 9100001000 012234 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 14:35 16:15 18.0 17.0
29-Oct-21 41 BM PO. 9100001000 012233 BM1 Land Development PT TKM PileCap Area 3 Grid 23-29 K300 Ramses - - 12.0 -
29-Oct-21 42 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 -
29-Oct-21 43 BM PO. 9100001928 012236 BM1 Land Development PT TKM LC Area 3 K100 Ramses 11:20 11:20 4.0 4.0
29-Oct-21 44 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - Reschedule
30-Oct-21 41 BM PO. 9100001928 012237 BM1 Land Development PT TKM LC Area South 2 K100 Ramses 16:40 16:40 4.0 4.0 PO. 9100001764 (13)
30-Oct-21 42 BM PO. 9100001000 012233 BM1 Land Development PT TKM PileCap Area 3 Grid 23-29 K300 Ramses 14:50 14:50 12.0 6.0 PO. 9100001764 (13)
30-Oct-21 43 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - PO. 9100001764 (13)
30-Oct-21 44 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram - - 18.0 - PO. 9100001764 (13)
31-Oct-21 26 BM PO. 9100001000 012238 BM1 Land Development PT TKM Precast PileCap Area 2 K300 Ramses 11:05 13:35 24.0 24.0
31-Oct-21 27 BM PO. 9100001000 012239 BM1 Land Development PT TKM Capping Beam Grid 66-76 Area 3 K300 Ramses - - 24.0 -
31-Oct-21 28 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
31-Oct-21 29 BM PO. 9100001000 012210 BM1 Land Development PT TKM PileCap Grid 19-25 K300 Bram 15:40 15:40 18.0 6.0 Reschedule
1-Nov-21 41 BM PO. 9100001928 012241 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 6.0 -
1-Nov-21 42 BM PO. 9100001000 012243 BM1 Land Development PT TKM Precast PileCap K300 Ramses 14:55 17:20 18.0 18.0
1-Nov-21 43 BM PO. 9100001000 012242 BM1 Land Development PT TKM PileCap Area 2 South Grid 1-6 K300 Ramses - - 12.0 -
1-Nov-21 44 BM PO. 9100001000 012239 BM1 Land Development PT TKM Capping Beam Grid 66-76 Area 3 K300 Ramses - - 24.0 - Reschedule
1-Nov-21 45 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
2-Nov-21 48 BM PO. 9100001928 012241 BM1 Land Development PT TKM LC Area 2 South K100 Ramses 15:20 15:20 6.0 6.0 Reschedule
2-Nov-21 49 BM PO. 9100001000 012245 BM1 Land Development PT TKM Precast PileCap K300 Ramses 15:00 17:50 18.0 15.0
2-Nov-21 50 BM PO. 9100001000 012242 BM1 Land Development PT TKM PileCap Area 2 South Grid 1-6 K300 Ramses - - 12.0 - Reschedule
2-Nov-21 51 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
3-Nov-21 42 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 -
3-Nov-21 43 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
3-Nov-21 44 BM PO. 9100001000 09303 BM1 Land Development PT TKM PileCap Area South Grid 48-59 K300 Ramses 16:05 18:35 24.0 16.0
3-Nov-21 46 BM PO. 9100001000 09305 BM1 Land Development PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 -
3-Nov-21 47 BM PO. 9100001000 012242 BM1 Land Development PT TKM PileCap Area 2 South Grid 1-6 K300 Ramses - - 12.0 - Reschedule
4-Nov-21 39 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 - Reschedule
4-Nov-21 40 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses - - 6.0 - Reschedule
4-Nov-21 42 BM PO. 9100001000 09307 BM1 Land Development PT TKM PileCap Area 2 South Grid 60-76 K300 Ramses - - 30.0 -
4-Nov-21 43 BM PO. 9100001000 09305 BM1 Land Development PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 - Reschedule
4-Nov-21 44 BM PO. 9100001000 012242 BM1 Land Development PT TKM PileCap Area 2 South Grid 1-6 K300 Ramses 12:20 16:05 12.0 12.0 Reschedule
5-Nov-21 37 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 - Reschedule
5-Nov-21 38 BM PO. 9100001000 012235 BM1 Land Development PT TKM LC Area South 2 K100 Ramses 10:00 10:00 6.0 6.0 Reschedule
5-Nov-21 39 BM PO. 9100001000 09309 BM1 Land Development PT TKM Precast Area 2 K300 Ramses 18:55 20:30 18.0 12.0
5-Nov-21 40 BM PO. 9100001000 09308 BM1 Land Development PT TKM PileCap Area 2 South Grid 60-76 K300 Ramses - - 30.0 - Reschedule
5-Nov-21 43 BM PO. 9100001000 09305 BM1 Land Development PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 - Reschedule
6-Nov-21 59 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 - Reschedule
6-Nov-21 60 BM PO. 9100001000 09310 BM1 Land Development PT TKM Precast PileCap K300 Bram - - 18.0 -
6-Nov-21 61 BM PO. 9100001000 09308 BM1 Land Development PT TKM PileCap Area 2 South Grid 60-76 K300 Ramses - - 30.0 - Reschedule
6-Nov-21 64 BM PO. 9100001000 09305 PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 - Reschedule
BM1 Land Development
7-Nov-21 40 BM PO. 9100001928 09313 BM1 Land Development PT TKM LC Area 2 South K100 Bram - - 12.0 -
7-Nov-21 41 BM PO. 9100001928 09306 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 - Reschedule
7-Nov-21 42 BM PO. 9100001000 09310 BM1 Land Development PT TKM Precast PileCap K300 Bram 11:55 11:55 18.0 6.0 Reschedule
7-Nov-21 44 BM PO. 9100001000 09308 BM1 Land Development PT TKM PileCap Area 2 South Grid 60-76 K300 Ramses - - 30.0 - Reschedule
7-Nov-21 45 BM PO. 9100001000 09311 BM1 Land Development PT TKM PileCap Grid 76-86 K300 Bram 9:55 11:45 24.0 12.0
7-Nov-21 47 BM PO. 9100001000 09305 PT TKM Capping Beam Grid 92-111 2 South K300 Ramses - - 24.0 - Reschedule
BM1 Land Development
7-Nov-21 48 BM PO. 9100001000 09312 BM1 Land Development PT TKM Precast Beam 2 K300 Bram - - 18.0 -
8-Nov-21 48 BM PO. 9100001928 09313 BM1 Land Development PT TKM LC Area 2 South K100 Bram - - 12.0 - Reschedule
8-Nov-21 51 BM PO. 9100001000 09305 BM1 Land Development PT TKM Capping Beam Grid 92-111 2 South K300 Ramses 11:40 17:20 24.0 21.0 Reschedule
9-Nov-21 43 BM PO. 9100001928 012247 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 12.0 -
9-Nov-21 44 BM PO. 9100001000 012246 BM1 Land Development PT TKM Precast Area 2 South K300 Ramses 13:40 14:55 24.0 12.0
9-Nov-21 45 BM PO. 9100001000 012248 BM1 Land Development PT TKM PileCap Grid 86-96 Area 2 South K300 Ramses - - 24.0 -
10-Nov-21 48 BM PO. 9100001000 09316 BM1 Land Development PT TKM Capping Beam Area South Grid 92-120 K300 Ramses 17:50 20:10 30.0 18.0
10-Nov-21 49 BM PO. 9100001000 012248 BM1 Land Development PT TKM PileCap Grid 86-96 Area 2 South K300 Ramses - - 24.0 - Reschedule
11-Nov-21 43 BM PO. 9100001000 012249 BM1 Land Development PT TKM Precast Area 2 South K300 Ramses 13:35 14:25 24.0 12.0
11-Nov-21 44 BM PO. 9100001000 012250 PT TKM Capping Beam Area 2 South Grid 121-135 K300 Ramses - - 30.0 -
BM1 Land Development
11-Nov-21 61 BM PO. 9100001000 012248 BM1 Land Development PT TKM PileCap Grid 86-96 Area 2 South K300 Ramses 14:00 18:05 24.0 16.0
12-Nov-21 41 BM PO. 9100001928 09318 BM1 Land Development PT TKM LC Area 2 South K100 Ramses 13:05 13:05 12.0 6.0
12-Nov-21 42 BM PO. 9100001000 09320 PT TKM Capping Beam Area 2 South Grid 112-125 K300 Ramses 11:30 11:30 24.0 6.0
BM1 Land Development
12-Nov-21 43 BM PO. 9100001000 09317 BM1 Land Development PT TKM Precast Area 2 South K300 Ramses 15:25 15:25 12.0 6.0
12-Nov-21 44 BM PO. 9100001000 09319 BM1 Land Development PT TKM PileCap Area 2 South Grid 97-102 K300 Ramses - - 12.0 -
13-Nov-21 48 BM PO. 9100001000 09321 BM1 Land Development PT TKM Precast Area 2 South K300 Ramses - - 12.0 -
13-Nov-21 49 BM PO. 9100001000 09326 BM1 Land Development PT TKM PileCap Area 2 South Grid 75-82 K300 Ramses - - 12.0 -
13-Nov-21 50 BM PO. 9100001000 09322 BM1 Land Development PT TKM Capping Beam Area 2 South Grid 122-135 K300 Ramses - - 24.0 -
13-Nov-21 51 BM PO. 9100001000 09319 BM1 Land Development PT TKM PileCap Area 2 South Grid 97-102 K300 Ramses - - 12.0 - Reschedule
14-Nov-21 21 BM PO. 9100001000 09325 BM1 Land Development PT TKM PileCap Area 2 Grid 83-90 K300 Ramses - - 12.0 -
14-Nov-21 22 BM PO. 9100001000 09324 BM1 Land Development PT TKM Precast Area 2 K300 Ramses 12:40 12:40 12.0 6.0
14-Nov-21 23 BM PO. 9100001928 09323 BM1 Land Development PT TKM LC Area 2 South K100 Ramses - - 6.0 -
20-Dec 47 BM PO. 9100001794 036118 IRS (888) PT TKM Borepile K300 Ferdinand 15:10 16:25 10.0 10.0
21-Dec 45 BM PO. 9100001794 036120 IRS (888) PT TKM Borepile K300 Ferdinand - - 10.0 -
22-Dec 51 BM PO. 9100001794 036121 IRS (888) PT TKM Borepile K300 Ferdinand 17:05 17:30 22.0 11.0
23-Dec 45 BM PO. 9100001794 036122 IRS (888) PT TKM Borepile K300 Yoga N. 15:45 16:30 22.0 11.0
24-Dec 41 BM PO. 9100001794 036127 IRS (888) PT TKM Borepile K300 Yoga N. 17:30 18:35 22.0 11.0
26-Dec 44 BM PO. 9100001794 036128 IRS (888) PT TKM Borepile IRS K300 Yoga N. 16:50 10:05 22.0 11.0
26-Dec 45 BM PO. 9100001794 036127 IRS (888) PT TKM Borepile K300 Yoga N. - - 22.0 -
27-Dec 46 BM PO. 9100001794 036127 IRS (888) PT TKM Borepile K300 Yoga N. - - 22.0 - Reschedule
10-Jan 35 BM PO. 9100001794 036130 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
11-Jan 41 BM PO. 9100001794 036130 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 - Reschedule
12-Jan 43 BM PO. 9100001794 036130 IRS (888) PT TKM Borepile IRS K300 Yoga N. 18:00 20:00 22.0 22.0 Reschedule
13-Jan 37 BM PO. 9100001794 036131 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
14-Jan 39 BM PO. 9100001794 036131 IRS (888) PT TKM Borepile IRS K300 Yoga N. 17:35 18:35 22.0 11.0 Reschedule
15-Jan 30 BM PO. 9100001794 036132 IRS (888) PT TKM Borepile IRS K300 Yoga N. 15:05 17:45 22.0 22.0
16-Jan 31 BM PO. 9100001794 036133 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
17-Jan 40 BM PO. 9100001794 036133 IRS (888) PT TKM Borepile IRS K300 Yoga N. 19:15 21:15 22.0 22.0 Reschedule
18-Jan 40 BM PO. 9100001794 036135 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
19-Jan 44 BM PO. 9100001794 036135 IRS (888) PT TKM Borepile IRS K300 Yoga N. 15:00 20:25 22.0 22.0 Reschedule
20-Jan 46 BM PO. 9100001794 036136 IRS (888) PT TKM Borepile IRS K300 Yoga N. - - 22.0 -
21-Jan 43 BM PO. 9100001794 036136 IRS (888) PT TKM Borepile IRS K300 Yoga N. 16:40 16:45 22.0 22.0 Reschedule
23-Jan 40 BM PO. 9100001794 038702 IRS (888) PT TKM Borepile IRS K300 Yoga N. 16:20 16:25 22.0 11.0
24-Jan 37 BM PO. 9100001794 038703 IRS (888) PT TKM Borepile IRS K300 Yoga N. 17:55 18:50 22.0 11.0
25-Jan 43 BM PO. 9100001794 038705 IRS (888) PT TKM Borepile IRS K300 Yoga N. 18:05 18:35 22.0 11.0
1-Feb 38 BM PO. 9100009001 (3) 038708 BM1 (861) PT TKM Borepile Zona 1 FC'30 David S. 19:00 21:50 11.0 9.0
2-Feb 38 BM PO. 9100009001 (3) 038712 BM1 (861) PT TKM Borepile Zona 1 FC'30 David S. 19:05 19:05 11.0 3.0
3-Feb 43 BM PO. 9100009001 (3) 038714 BM1 (861) PT TKM Borepile Zona 1 FC'30 David S. 13:55 16:25 11.0 6.0
4-Feb 40 BM PO. 9100009001 (3) 038715 BM1 (861) PT TKM Borepile Zona 1 FC'30 David S. 11:30 13:10 11.0 6.0
5-Feb 32 BM PO. 9100001794 038718 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 11:50 11:50 11.0 3.0
5-Feb 33 BM PO. 9100001794 038717 BM1 (861) PT TKM Borepile Zona 1 K300 David S. - - 11.0 -
6-Feb 44 BM PO. 9100001794 038720 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 12:00 14:00 11.0 6.0
7-Feb 39 BM PO. 9100001794 038722 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 10:15 11:55 11.0 6.0
7-Feb 72 BM PO. 9100001794 039726 BM1 (861) PT TKM Borepile CCK Zone 3 K300 Agithya E.P 17:10 17:25 8.0
8-Feb 29 BM PO. 9100001794 038727 BM1 (861) PT TKM Borpile CCK Zone 3 K300 Agithya E.P 18:25 18:35 8.0 8.0
8-Feb 36 BM PO. 9100001794 038723 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 12:10 12:10 10.0 6.0
9-Feb 22 BM PO. 9100001794 038732 BM1 (861) PT TKM Borpile CCK Zone 3 K300 Agithya E.P 20:35 21:30 8.0 8.0
9-Feb 32 BM PO. 9100001794 038730 BM1 (861) PT TKM Borepile Zona 1 K300 David S. 14:20 14:20 11.0 6.0
11-Feb 42 BM PO. 9100001794 038733 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 10:45 10:45 11.0 6.0
12-Feb 24 BM PO. 9100001794 038734 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 11:55 11:55 11.0 6.0
15-Feb 69 BM PO. 9100001794 035522 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 17:30 17:30 3.0
16-Feb 53 BM PO. 9100001794 038735 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 11:00 11:50 12.0 7.0
17-Feb 59 BM PO. 9100001794 038736 BM1 (861) PT TKM Borepile Zone 1 K300 David S. 18:00 20:38 11.0 9.0
17-Mar 44 BM PO. 9100001794 038744 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 10.0 -
18-Mar 46 BM PO. 9100001794 038744 IRS (888) PT TKM Borpile IRS K300 Yoga N. 18:05 19:35 10.0 10.0 Reschedule
19-Mar 29 BM PO. 9100001794 042601 IRS (888) PT TKM Borpile IRS K300 Yoga N. 14:05 14:05 11.0 11.0 Reschedule
20-Mar 52 BM PO. 9100001794 042602 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 -
21-Mar 46 BM PO. 9100001794 042603 IRS (888) PT TKM Borpile IRS K300 Yoga N. 17:45 18:35 11.0 11.0
22-Mar 33 BM PO. 9100001794 042604 IRS (888) PT TKM Borpile IRS K300 Yoga N. 16:45 17:10 11.0 11.0
23-Mar 38 BM PO. 9100001794 042605 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 -
24-Mar 24 BM PO. 9100001794 042605 IRS (888) PT TKM Borpile IRS K300 Yoga N. 16:45 17:30 11.0 11.0 Reschedule
25-Mar 35 BM PO. 9100001794 042606 IRS (888) PT TKM Borpile IRS K300 Yoga N. 12:40 13:35 11.0 11.0
26-Mar 31 BM PO. 9100001794 038742 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 -
27-Mar 38 BM PO. 9100001794 038742 IRS (888) PT TKM Borpile IRS K300 Yoga N. 17:10 17:35 11.0 11.0 Reschedule
28-Mar 37 BM PO. 9100001794 029497 IRS (888) PT TKM Borpile IRS K300 Yoga N. 16:10 16:35 11.0 11.0
29-Mar 36 BM PO. 9100001794 042621 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 -
30-Mar 29 BM PO. 9100001794 042621 IRS (888) PT TKM Borpile IRS K300 Yoga N. - - 11.0 - Reschedule
1-Apr 29 BM PO. 9100008836 042618 BM1 (861) PT TKM Borepile BM Grid 1 K300 Johannes S. - - 8.0 -
2-Apr 25 BM PO. 9100008836 042618 BM1 (861) PT TKM Borepile BM Grid 1 K300 Johannes S. - - 8.0 - Reschedule
3-Apr 24 BM PO. 9100008836 042618 BM1 (861) PT TKM Borepile BM Grid 1 K300 Johannes S. 9:15 11:30 8.0 8.0 Reschedule
3-Apr 58 BM PO. 9100008836 042639 BM1 (861) PT TKM Borepile Sewer Pit 2 (2) K300 Johannes S. 11:30 11:30 1.0
4-Apr 23 BM PO. 9100008836 042628 BM1 (861) PT TKM Borepile Sewer Pit 2 (2) K300 Johannes S. 10:10 11:20 9.0 9.0
4-Apr 61 BM PO. 9100008836 042639 BM1 (861) PT TKM Borepile Sewer Pit 2 (2) K300 Johannes S. 18:40 20:05 9.0
5-Apr 32 BM PO. 9100008836 042640 BM1 (861) PT TKM Borepile Sewer Pit 2 K300 Johannes S. 15:35 17:10 9.0 9.0
7-Apr 25 BM PO. 9100001794 042620 IRS (888) PT TKM Borepile IRS K300 Yoga N. 15:50 16:05 11.0 11.0
8-Apr 43 BM PO. 9100001794 042622 IRS (888) PT TKM Borepile IRS K300 Yoga N. 17:25 18:30 11.0 11.0
11-Apr 37 BM PO. 9100001794 042624 IRS (888) PT TKM Borepile FSH K300 Yoga N. 17:30 18:45 8.5 8.5
12-Apr 36 BM PO. 9100001794 042625 IRS (888) PT TKM Borepile FSH K300 Yoga N. 18:15 19:10 8.5 8.5
13-Apr 40 BM PO. 9100001794 044553 IRS (888) PT TKM Borepile FSH K300 Yoga N. 20;00 20:35 8.5 8.5
14-Apr 39 BM PO. 9100001794 042643 IRS (888) PT TKM Borepile FSH K300 Yoga N. - - 8.5 -
15-Apr 32 BM PO. 9100001794 043556 IRS (888) PT TKM Borepile FSH K300 Yoga N. 14:20 15:05 8.5 8.5
16-Apr 25 BM PO. 9100001794 043557 IRS (888) PT TKM Borepile FSH K300 Yoga N. - - 8.5 -
17-Apr 33 BM PO. 9100001794 043559 IRS (888) PT TKM Borepile FSH K300 Yoga N. 13:25 13:45 8.5 8.5
18-Apr 34 BM PO. 9100001794 043562 IRS (888) PT TKM Borepile FSH K300 Yoga N. 13:15 14:15 8.5 8.5
10-May 28 BM PO. 9100008836 043593 BM1 (861) PT TKM Borepile Sewer Pit (1) CCK K300 Agithya EP. - - 8.5 -
11-May 28 BM PO. 9100008836 043594 BM1 (861) PT TKM Borepile Sewer Pit (1) CCK K300 Agithya EP. 11:15 12:05 8.5 8.5
12-May 24 BM PO. 9100008836 043595 BM1 (861) PT TKM Borepile Sewer Pit (1) CCK K300 Agithya EP. 14:15 15:15 8.5 8.5
13-May 14 BM PO. 9100008836 043596 BM1 (861) PT TKM Borepile Sewer Pit (1) CCK K300 Agithya EP. 15:10 17:00 8.5 8.5
19-May 33 BM PO. 9100001794 043590 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Pump
20-May 27 BM PO. 9100001794 043590 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 18:40 19:40 8.5 8.5 Reschedule
21-May 16 BM PO. 9100001724 045003 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 16:25 17:25 8.5 8.5
22-May 28 BM PO. 9100001794 045004 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
23-May 31 BM PO. 9100001794 045005 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 11:10 10:25 17.0 8.5
24-May 31 BM PO. 9100001794 045006 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 16:30 16:40 8.5 8.5
25-May 38 BM PO. 9100001794 045019 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
26-May 38 BM PO. 9100001794 045019 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 19:05 19:50 8.5 8.5 Reschedule
27-May 37 BM PO. 9100001794 045022 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 16:40 19:00 8.5 8.5
28-May 25 BM PO. 9100001794 045023 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
29-May 31 BM PO. 9100001794 045023 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
30-May 31 BM PO. 9100001794 045023 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
31-May 24 BM PO. 9100001794 046032 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 10.5 -
31-May 34 BM PO. 9100001794 045030 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
1-Jun 17 BM PO. 9100001794 046032 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 10.5 - Reschedule
1-Jun 26 BM PO. 9100001794 045030 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
2-Jun 23 BM PO. 9100001794 046032 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 20:45 21:00 10.5 10.5 Reschedule
2-Jun 34 BM PO. 9100001794 045030 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 17:45 18:05 8.5 8.5 Reschedule
3-Jun 20 BM PO. 9100001794 045035 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 10.5 -
3-Jun 31 BM PO. 9100001794 045036 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. 19:15 19:35 8.5 8.5
4-Jun 9 BM PO. 9100001794 046352 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. - - 21.0 -
4-Jun 17 BM PO. 9100001794 046351 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 -
5-Jun 19 BM PO. 9100001794 046352 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 16:55 18;50 21.0 21.0 Reschedule
5-Jun 31 BM PO. 9100001794 046351 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
6-Jun 24 BM PO. 9100001794 045037 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. - - 21.0 -
6-Jun 37 BM PO. 9100001794 046351 IRS (888) PT TKM Borepile Folio Sheeter K300 Yoga N. - - 8.5 - Reschedule
7-Jun 22 BM PO. 9100001794 045037 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 15:25 16:35 21.0 10.5 Reschedule
8-Jun 16 BM PO. 9100001794 045038 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 17:50 20:10 21.0 21.0
9-Jun 16 BM PO. 9100001794 046353 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 17:35 21:50 31.5 21.0
10-Jun 58 BM PO. 9100001794 046354 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 17:40 19:00 10.5
11-Jun 9 BM PO. 9100001794 046356 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 15:45 18:50 31.5 31.5
12-Jun 20 BM PO. 9100001794 046357 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 18:05 20:35 31.5 21.0
13-Jun 18 BM PO. 9100001794 046358 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 20:10 22:40 31.5 21.0
14-Jun 21 BM PO. 9100001794 046359 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 16:45 16:45 31.5 10.5
15-Jun 17 BM PO. 9100001794 046360 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 15:00 17:30 21.0 21.0
16-Jun 16 BM PO. 9100001794 046361 BM1 (861) PT TKM Borepile BM Office & Mechanical Workshop K300 Agithya EP. 17:10 21:40 42.0 31.5
17-Jun 17 BM PO. 9100001794 046377 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 19:25 1:30 52.5 47.5
18-Jun 13 BM PO. 9100001794 046379 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 52.5 -
19-Jun 17 BM PO. 9100001794 046379 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 14:15 19:00 52.5 31.5 Reschedule
20-Jun 25 BM PO. 9100001794 046362 BM1 (861) PT TKM Borepile BM Office & Mechanical WS K300 Agithya EP. 15:20 19:45 52.5 31.5
21-Jun 20 BM PO. 9100001794 045040 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 18:40 23:40 52.5 42.0
22-Jun 21 BM PO. 9100001794 045042 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 18:40 20:00 52.5 10.5
23-Jun 24 BM PO. 9100001794 045043 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 13:20 20:40 52.5 42.5
24-Jun 17 BM PO. 9100001794 046378 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 16:20 19;40 52.5 42.0
25-Jun 9 BM PO. 9100001794 046381 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 17:05 21:10 52.5 32.0
26-Jun 16 BM PO. 9100001794 046382 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 15:25 15:50 52.5 31.5
27-Jun 23 BM PO. 9100001794 046801 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 16:05 16:35 52.0 10.5
28-Jun 19 BM PO. 9100001794 046803 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 52.5 -
30-Jun 16 BM PO. 9100001794 046803 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 52.5 - Reschedule
1-Jul 14 BM PO. 9100001794 046384 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 18:05 19:25 52.5 21.0
2-Jul 6 BM PO. 9100001794 046385 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 17:45 18:35 31.5 21.0
3-Jul 17 BM PO. 9100001794 046386 BM1 (861) PT TKM Borepile BM Office & Mechanical WS K300 Agithya EP. - - 31.5 -
4-Jul 19 BM PO. 9100001794 046386 BM1 (861) PT TKM Borepile BM Office & Mechanical WS K300 Agithya EP. 12:35 19:55 31.5 21.0 Reschedule
5-Jul 21 BM PO. 9100001794 046806 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 18:20 18:50 31.5 10.5
6-Jul 13 BM PO. 9100001794 046810 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 21:30 21:45 31.5 10.5
7-Jul 14 BM PO. 9100001794 046814 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 15:15 21:35 31.5 21.0
8-Jul 16 BM PO. 9100001794 046815 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 31.5 -
8-Jul 34 BM PO. 9100008389 (2) 046816 BM1 (861) PT TKM Borepile Slab on Pile K500 Agung N. 18:25 18:45 10.5 10.5
9-Jul 9 BM PO. 9100001794 046815 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. - - 31.5 - Reschedule
9-Jul 25 BM PO. 9100008389 (2) 046819 BM1 (861) PT TKM Borepile Slab on Pile K500 Agung N. 17:20 18:15 10.5 10.5
10-Jul 16 BM PO. 9100001794 046815 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 15:45 16:10 31.5 10.5 Reschedule
10-Jul 34 BM PO. 9100008389 (2) 046822 BM1 (861) PT TKM Borepile BM K500 Agung N. 18:50 19:25 10.5 10.5
11-Jul 16 BM PO. 9100001794 046826 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 17:10 22:25 31.0 21.5
11-Jul 35 BM PO. 9100008389 (2) 046825 BM1 (861) PT TKM Borepile Slab on Pile K500 Agung N. - - 21.0 -
12-Jul 17 BM PO. 9100001794 046828 BM1 (861) PT TKM Borepile BM Office K300 Agithya EP. 19:05 21:50 31.0 22.0
12-Jul 39 BM PO. 9100008389 (2) 046825 BM1 (861) PT TKM Borepile Slab on Pile K500 Agung N. 20:05 21:05 21.0 10.5 Reschedule
14-Jul 38 BM PO. 9100001794 046832 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 18:15 19:55 21.0 21.0
14-Jul 66 BM PO. 9100001794 046836 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 22:25 22:25 3.0
15-Jul 44 BM PO. 9100001794 046834 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 16:35 20:20 45.0 25.0
16-Jul 30 BM PO. 9100001794 046839 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 14:00 20:40 45.0 45.0
17-Jul 37 BM PO. 9100001794 046835 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 16:45 21:10 45.0 36.0
18-Jul 35 BM PO. 9100001794 046390 BM1 (861) PT TKM Borepile Slab on Pile K300 Agung N. 16:25 21:55 40.0 33.0
19-Jul 32 BM PO. 9100001794 046392 BM1 (861) PT TKM Borepile K300 Agung N. 14:40 15:25 45.0 11.0
20-Jul 37 BM PO. 9100008389 046393 BM1 (861) PT TKM Borepile K500 Agung N. 15:25 19:55 45.0 33.0
21-Jul 35 BM PO. 9100008389 047253 BM1 (861) PT TKM Borepile K500 Agung N. 14:30 20:10 52.5 44.0
22-Jul 35 BM PO. 9100008389 047255 BM1 (861) PT TKM Borepile K500 Agung N. 16:15 19:00 44.5 33.0
23-Jul 24 BM PO. 9100008389 047256 BM1 (861) PT TKM Borepile K500 Agung N. 16:05 18:35 52.5 33.0
24-Jul 35 BM PO. 9100008389 047260 BM1 (861) PT TKM Borepile K500 Agung N. 17:50 21:05 52.5 22.0
24-Jul 57 BM PO. 9100001794 047262 BM1 (861) PT TKM Borepile Office & Mechanical WS K300 Agithya EP. 17:25 18:35 10.0
25-Jul 16 BM PO. 9100001794 047265 BM1 (861) PT TKM Borepile Office & Mechanical WS K300 Agithya EP. 15:15 16:05 10.0 10.0
25-Jul 36 BM PO. 9100008389 047264 BM1 (861) PT TKM Borepile K500 Agung N. 15:20 18:10 52.5 22.0
26-Jul 42 BM PO. 9100008389 047267 BM1 (861) PT TKM Borepile Slab On Pile K500 Agung N. 18:15 18:55 52.5 22.0
27-Jul 40 BM PO. 9100008389 047269 BM1 (861) PT TKM Borepile K500 Agung N. 15:45 16:25 52.5 11.0
28-Jul 42 BM PO. 9100008387 047270 BM1 (861) PT TKM Borepile K500 Agung N. 15:05 15:55 52.5 11.0
29-Jul 41 BM PO. 9100008387 047273 BM1 (861) PT TKM Borepile K500 Agung N. - - 52.5 -
30-Jul 25 BM PO. 9100008387 047273 BM1 (861) PT TKM Borepile K500 Agung N. - - 52.5 - Reschedule
31-Jul 40 BM PO. 9100008387 047273 BM1 (861) PT TKM Borepile K500 Agung N. 16:55 17:05 52.5 11.0 Reschedule
1-Aug 57 BM PO. 9100008387 (2) 047277 BM1 (861) PT TKM Borepile BM#1 K500 Agung N. 17:55 18:35 11.0
2-Aug 41 BM PO. 9100008387 (2) 047278 BM1 (861) PT TKM Borepile BM#1 K500 Agung N. 17:50 18:45 11.0 11.0
5-Aug 30 BM PO. 9100008387 (2) 047285 BM1 (861) PT TKM Borepile BM#1 K500 Agung N. 17:40 20:15 22.0 22.0