ACTIVITY DATE OF PERCENTAGE OF

COMPLETE WORK COMPLETE


2D &3D drawing bum with 15-03-2022 10%
material selection and production
process selection
Finet element analysis 18-03-2022 13%

Design Validation 23-03-2022 16%

Bill of material and cost estimation 27-03-2022 23%

Product casting budget validation 01-04-2022 25%

Approval and purchase order 04-04-2022 31%

sample production 10-04-2022 36%

Fixing the device to real system 19-04-2022 42%

User trail running test 1 24-04-2022 50%

Test 1 result analysis 30-04-2022 57%

Design and fabrication validation 08-05-2022 70%

User trail running test 2 10-05-2022 75%

Test 2 result analysis 12-05-2022 85%

Design and fabrication validation 14-05-2022 90%

User trail running test 3 16-05-2022 95%

Successful acceptance 18-05-2022 100%


S.No DESCIRPTION QUANTITY MATERIAL

1. SHAFT AS PER REQUIRMENT STAINLESS STEEL

2. FRAME AS PER MILD STEEL


REQUIRMENT

3. SHEET METAL COVERS 1 MILD STEEL

4. BEARING 12 STAINLESS STEEL

5. HOSE AND CONNECTOR 2 METRE AND 5 PLASTIC AND STAINLESS STEEL

6. PNEUMATIC CYLINDER 2 ALUMINIUM

7. SOLENOID VALVE 1 PLASTIC

8. ECU MODULE 1 ELECTRICAL

9. CIRCUIT BOARD 1 ELECTRICAL

10. RELAY 1 ELECTRONICS

11. IR SENSOR 2 ELECTRONICS


3

S.No DESCIRPTION RATE

1. SHAFT 1100

2. FRAME 1500

3. SHEET METAL COVERS 1500

4. BEARING 800

5. HOSE AND CONNECTOR 550

6. PNEUMATIC CYLINDER 1450

7. SOLENOID VALVE 2500

8. ECU MODULE 2300

9. CIRCUIT BOARD 2600

10. RELAY 1900

11. IR SENSOR 1200

12. COST
TOTALESTIMATION 18000