SAP CO ECC 6.0 Bootcamp Case Study for Day 5
Each branch produces 2 products, Product Light Blue and Product Pink,
where the processes for each product are:
Product Pink:
• Process 4 – total employee 20
• Process 5 –total employee 15
There is a packaging line that works for both products. The costs will not be
captured in the process cost centres. The costs will be charged to the
Process cost centres for Product Light Blue (in process 1) and Product Pink
(in process 5) based on the percentage of quantities they produce. (Product
Light Blue produces 30 units and Product Pink produces 20 units).
By the end of the month, each department and each process have captured
the following costs:
• Salary DEM $100000 (each)
• Office supplies DEM $5000 (each)
• Water DEM $5000 (each)
• Electricity usage DEM $ 10000 (each)
Z65412/Z65591 Page 2 of 3
Copyright © Accenture 2007 All Rights Reserved SAP CO ECC 6.0 Bootcamp - Case Study for Day 5.doc
SAP CO ECC 6.0 Bootcamp Case Study for Day 5
Each of the branches is going to develop software for their processes (details
have only been captured for Process 1.)
Scope:
• Design
• Programming
• Training
The budget for the whole project is DEM $40000. The only part of the project
to generate an asset is programming. The Design phase has taken 50 hours
to complete the work (activity rate $30/hr) by Training Department. The project
expenses (Design & Training) are going to be charged to Process 1.
Instructions: