Professional Documents
Culture Documents
FlowNONSTDRoutine Poster
FlowNONSTDRoutine Poster
NON-STANDARD
NON-STANDARD
Develop Job Review and Issue Work Order
Methodology Approve or Purchase • Unplanned
2 RISK ASSESSMENT PREPARATION Order based on activities
Job Methodolgy • May not repeat
Lafarge Holcim’s Contractors
OR • Unpredictable
(Job Planning Tool) (JSA, JHA, TA, etc.)
emergency
• LH Job Supervisor or the Contractor
Supervisor to conduct/arrange assessments
• Best undertaken with both supervisors
and workers
• Can start from blank or use either
company’s assessment and update it
• Worker’s to continually apply the PRA process and safe Eyes on hands
behavior Body limits
• Works to follow the job methods and controls Line of fire
6 JOB MONITORING
• LH Management & Safety Team to visit and check For every job more
the job regularly to ensure controls are in place then 3 days
(sign the rear of the LST form)
7 FOLLOW-UP