Professional Documents
Culture Documents
Tep 1474708 C09 0001 - 02
Tep 1474708 C09 0001 - 02
Tep 1474708 C09 0001 - 02
DOCUMENT NUMBER DOCUMENT TITLE REV. CODE ISSUE STATUS DOCUMENT STATUS
870310-S-1474708-CIV-C09-0001 DUCTING AND INSTRUMENTATION AND FLOW DIAGRAM (D&ID) E&I BUILDING B R-Submit for Review B-Accept With Comment
NO COMMENTS ORIGINATOR SUPPLIER RESPONSE REASONS NAME &TITLE SECTION AFFECTED COMMENT STATUS
1 1
2 2
3 3
A B C D E F G H J K
A B C D E F G H J K
1 1
2 2
3 3
4 4
A B C D E F G H J K
A B C D E F G H J K
1 1
2 2
3 3
4 4
A B C D E F G H J K
A B C D E F G H J K
General Notes:
1. All ductwork shall be designed and built in accordance
with ASHRAE and SMACNA standards.
2. This drawing does not indicated the exact location of
supply/return/exhaust grille.
1 3. The following ductwork system to be insulated: 1
A. Internal Supply Air.
B. External Supply Air and Return Air.
C. Intake Plenum and Ductwork.
4. Motorized fire and gas damper powered by HVAC UCP
and Controlled by FACP.
5. Motorized fire dampers to be fitted with proximity type
limit switch for feedback of open/close position to HVAC
UCP.
6. Smoke Detector (SD) shall be provided by CSTS on
Fresh Air intake.
7. All Grilles shall be provided with integrated Volume
2 Control Damper for regulation of airflow and system air 2
balancing.
8. Detail of refrigerant piping size and instrumentation of
refrigerant circuits within skid in accordance to DWG No.
TEP-1474708-C01-0001 - HVAC PIPING AND
INSTRUMENTATION DIAGRAM (P&ID) FOR E&I
BUILDING.
9. Smoke Detector and Gas Detector are provided by other.
10. All instrument is provided with manifold.
3 3
4 4
A B C D E F G H J K