70 - 33-001-CHI TIẾT CỌC THỬ D400
70 - 33-001-CHI TIẾT CỌC THỬ D400
030
+2.820
2. ĐỐI VỚI BẤT KỲ GIAI ĐOẠN NÀO, KHI TẢI TRỌNG KHÔNG THAY ĐỔI, THỜI GIAN VÀ CHUYỂN VỊ PHẢI ĐƯỢC GHI LẠI NGAY LÚC ĐẠT ĐẾN TẢI TRỌNG,
CÁCH KHOẢNG TỪ 5 PHÚT CHO 15 PHÚT ĐẦU, CÁCH 15 PHÚT CHO 1 GIỜ, VÀ MỖI 30 PHÚT TỪ 1 GIỜ ĐẾN 4 GIỜ VÀ MỖI 1 GIỜ TỪ 4 GIỜ ĐẾN 24 GIỜ
SAU KHI CHẤT THÊM TẢI.
3. TẢI TRỌNG SẼ ĐƯỢC CHẤT QUA 2 CHU KỲ CHO ĐẾN KHI TẢI TRỌNG THÍ NGHIỆM CỦA CỌC ĐẠT 200% TẢI TRỌNG LÀM VIỆC
4. CUỐI CHU KÌ THỨ 2 CHUYỂN VỊ DƯ SẼ ĐƯỢC ĐO MỖI 60 PHÚT 1 LẦN SAU KHI DỞ HẾT TẢI, CHO ĐẾN KHI TỐC ĐỘ PHỤC HỒI NHỎ HƠN 0.1mm/GIỜ LIÊN DANH TƯ VẤN THIẾT KẾ
HỐ KHOAN THAM KHẢO HK1-10 HỐ KHOAN THAM KHẢO HK1-14 HỐ KHOAN THAM KHẢO HK1-17
DESIGN CONSULTANCY CONSORTIUM
VÀ ĐƯỢC THEO DÕI TRONG THỜI GIAN KHÔNG ÍT HƠN 15 PHÚT.
THIẾT KẾ KIẾN TRÚC THIẾT KẾ KẾT CẤU & CƠ ĐIỆN THIẾT KẾ HẠ TẦNG KỸ THUẬT
ĐẠI DIỆN LIÊN DANH STRUCTURE AND M&E KẾT CẤU & CƠ ĐIỆN
REFERENCE BOREHOLE HK1-10 REFERENCE BOREHOLE HK1-14 REFERENCE BOREHOLE HK1-17 5. NHÀ THẦU PHẢI CHỊU TRÁCH NHIỆM SẮP XẾP, LẮP ĐẶT HỆ THỐNG CHẤT TẢI, DẦM ĐỠ VÀ CỌC NEO ARCHITECTURAL CONSULTANT
REPRESENTATIVE OF CONSORTIUM
CONSULTANT INFRASTRUCTURE, STRUCTURE
AND & M&E CONSULTANT
6. NHÀ THẦU PHẢI XUẤT TRÌNH KẾT QUẢ CƯỜNG ĐỘ CỦA BÊTÔNG CHO KỸ SƯ VÀ ĐÁP ỨNG YÊU CẦU CỦA KỸ SƯ TƯ VẤN TRƯỚC KHI TIẾN HÀNH
GMP INTERNATIONAL GMBH CÔNG TY TNHH ARUP VIỆT NAM - ARUP CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG
THÍ NGHIỆM CỌC. THEO ĐỀ NGHỊ CỦA KỸ SƯ,THÍ NGHIỆM CỌC SẼ ĐƯỢC TIẾN HÀNH RỘNG RÃI. CÔNG NGHIỆP VÀ ĐÔ THỊ VIỆT NAM
7. SỨC CHỊU TẢI CỌC DỰ KIẾN R4=1000KN. SỨC CHỊU TẢI CỦA CỌC SẼ ĐƯỢC XÁC ĐỊNH SAU KHI CÓ KẾT QUẢ THÍ NGHIỆM NÉN TĨNH CỌC
CHU KỲ GIA TẢI LOADING CYCLE SCHEDULE EXISTING GROUND LEVEL CUT-OFF LEVEL MINITES INTERVALS UP TO 15 MINUTES, AT APPROXIMATELY 15 MINUTES UP TO 1 HOUR, AT 30 MINUTES INTERVALS BETWEEN 1 HOURS AND 4 HOURS
ĐẠI DIỆN / REPRESENTATIVE
Giám Đốc Dự án - Project Director
ĐẠI DIỆN / REPRESENTATIVE
Tổng Giám Đốc - General Director
ĐẠI DIỆN / REPRESENTATIVE
Tổng Giám Đốc - General Director
(TBC) AND 1 HOUR INTERVALS BETWEEN 4 HOURS AND 24 HOURS AFTER THE APPLICATION OF THE INCREMENT OF LOAD.
TẢI TRỌNG % TẢI THỬ THỜI GIAN MAX. % OF TEST LOAD
CHU KỲ HOLDING TIME 3. LOAD SHALL BE APPLIED IN 2 CYCLES, UP TO TEST LOAD OF 200% WORKING LOAD.
LỚN NHẤT TẢI TRỌNG LƯU TẢI CYCLE TEST LOAD WORKING
(kN) (kN) LOAD (kN) (mins) TRẦN CÔNG ĐỨC NEIL RONALD HARVEY HOÀNG THỊ NGỌC LOAN
(kN) THIẾT KẾ (PHÚT)
0 0 - 0 0 - 4. AT THE END OF CYCLE 2 THE RESIDUAL MOVEMENT WILL BE THAT MEASURED AT 60 MINUTES INTERVALS AFTER REMOVAL OF ALL LOAD, UNTIL THE
MIDDLE SEGMENTS
RECOVERY RATE CRITERION OF LESS THAN 0.1mm/hr IS OBSERVED IN A PERIOD OF NOT LESS THAN 15 MINUTES.
25 250 60 25 250 60
L1
50 500 60 50 500 60 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGEMENT AND INSTALLATION OF KENTLEGE, SUPPORTING BEAMS AND ANCHOR PILES. Design leader
MAXIMIUM 3 SEGMENT
50 500 30 50 500 30 7. ESTIMATE PILE WORKING LOAD: R4=1000KN. PILE WORKING CAPACITY WILL BE CONFIRMED AFTER TEST PILE
25 250 30 25 250 30
0 0 60 0 0 60 Thể hiện/ NGUYỄN PHẠM TRỌNG NHÂN
Drawn by
L2
0 0 - 0 0 -
CAO ĐỘ NỐI CỌC
50 500 60 50 500 60 CONNECTION LEVEL
100 1000 60 100 1000 60
125 1250 60 125 1250 60
LOWER SEGMENTS
ĐOẠN MŨI
2 2000 200 2000 1440(24 hrs) 2 2000 200 2000 1440(24 hrs)
175 1750 30 175 1750 30
150 1500 30 150 1500 30
125 1250 30 125 1250 30
100 1000 30 100 1000 30 SƠ ĐỒ HẠ CỌC ĐIỂN HÌNH Tên bản vẽ / Drawing name:
Số dự án/ Project Number Khổ giấy/ Tỉ lệ/ Scale Giai đoạn thực hiện/ Project stage
Paper size NTS
287817 A1 THIẾT KẾ BẢN VẼ THI CÔNG
AP 33-001