A number of Gan Chart viewing op ons have been set up to display a variety of different data.

To view resource details;


1. Right-click inside the Gan Chart area of the Scheduler and select Gan Chart Op ons.

2. From the presented Chart Views dialog box, select Resources from the le panel then click

12.1.1.3. SCHEDULER REPORTS


A number of report op ons have been setup to display various data including which Resources have been assigned and
the number required to complete that task in the specified meframe.
To view the resources report;
1. Right-click inside the Repor ng grid and select Report Op ons.

2. From the presented Report Op ons dialog box, select Resource Summary from the le panel and click
112 | P a g e
Op onal Prac ce
Repeat the steps covered in the ACTIVITY ASSIGNMENT
above exercises to assign
resources to the remaining task
ac vi es as listed in the table
below; RESOURCE NAME
Blind Hole Borer Fresh/Return Air Rise
Jumbo 02 Remaining produc on tasks
Produc on Hole Rig Produc on Drilling
Stope Boggers Stope
Hydraulic Backfill Backfill