Annexure 6

Northern Railway
Headquarter Office,
Baroda House,
New Delhi
No. 393-W/168/Pt.XIV Dated: 29.05.2024

Sr.DEN/C
Northern Railway
DRM Office,
DLI, FZR, UMB, MB & LKO.

Sub: Quality of AT welding

Welding data as available on TMS for the period from 15.1.2024 to 24.5.2024 on date
24.5.2024 has been analyzed as under:

Departmental welds
Div Total Tested Removed Initial testing not Defective Defective Total
welds welds before initial done (existing) welds welds(%) defective
testing welds within 30 %age
days
(1) (2) (3) (4) (5) (6) (7)=(6/3)*100 (8)=((6+4)/3)
*100
DLI 5775 5251 154 370 5 0.10 3.03
FZR 2561 2210 42 309 22 1.00 2.90
LKO 2881 2528 56 297 12 0.47 2.69
MB 4196 3685 49 462 16 0.43 1.76
UMB 2156 1774 170 212 3 0.17 9.75
Total 17569 15448 471 1650 58 0.38 3.42

Agency welds
Div Total Tested Removed Initial testing not Defective Defective Total
welds welds before done welds welds(%) defective
initial testing (existing) welds %age
within 30days
(1) (2) (3) (4) (5) (6) (7)=(6/3)*100 (8)=((6+4)/3)
*100
DLI 297 269 20 8 1 0.37 7.81
FZR 619 412 28 179 3 0.73 7.52
LKO 1507 925 70 512 3 0.32 7.89
MB 1106 681 8 417 11 1.62 2.79
UMB 156 144 10 2 0 0.00 6.94
Total 3685 2431 136 1118 18 0.74 6.33

From the above, it is observed that:


1) Large no. of AT welds (471 no. welds i.e. 2.68% of total welds) done by departmental
welders were removed before initial testing.
2) Large no. of AT welds (136 no. welds i.e 3.69% of total welds) done by agency welders
were removed before initial testing.
3) Defective welds %age is high in departmental welding (including AT welds removed
before initial testing) of UMB division (9.75%), DLI division (3.03%) & FZR division
(2.90%).
4) Defective weld %age is high in agency welding (excluding AT welds removed before
initial testing) of MB division (1.62%).
5) Defective welds %age is high in agency welding (including AT welds removed before
initial testing) of DLI division (7.81%), LKO division (7.89%), FZR division (7.52%)
and UMB division (6.94%).
6) For departmental executed 177 no. welds, initial testing of new AT welds not done
within stipulated 30 days (data from 1.1.2024 to 24.4.2024).
7) For agency executed 133 no. welds, initial testing of new AT welds not done within
stipulated 30 days (data from 1.1.2024 to 24.4.2024).
8) Welder wise defective %age of AT welding is high for some of the welders division wise
as under:

MB division
Sr.No. Welder's Name Father's Name Total Welds Tested Defective Defective
Welds Welds Welds
(%)
1 Vijay Pal Singh Om Prakash 33 30 4 13.33
2 Shamshad Ahmad Suraj Ahmad 29 26 1 3.85
3 Vijayveer Singh Dori Lal 94 78 3 3.85
4 Kripal Singh Chandan Lal 34 32 1 3.13
5 Khemraj Meena Badri Prasad 94 77 2 2.60
Meena
6 Amit Kumar Jaipal Singh 73 64 1 1.56
7 Rishi Mishra Vishnu Kant Mishra 115 97 1 1.03

UMB Division
Sr.No. Welder's Name Father's Name Total Welds Tested Defective Defective
Welds Welds Welds (%)
1 Bijender Kumar Raj Kumar 5 5 1 20.00
2 Rajender Kumar Ram Kumar 106 60 1 1.67

DLI division
Sr.No. Welder's Name Father's Name Total Tested Defective Defective
Welds Welds Welds Welds (%)
1 Mukut Bihari Changga 49 43 1 2.33
2 Amit Kumar Om Prakash 61 59 1 1.69
Singh
3 Yasin Ali Sher Mohammad 96 90 1 1.11
LKO Division
Sr.No. Welder's Name Father's Name Total Tested Defective Defective
Welds Welds Welds Welds
(%)
1 Ravi Prakash Dayaram 8 6 1 16.67
2 Vijay Kumar Sharma Tulsi Ram 45 41 3 7.32
3 Anuj Kumar Yadav Shri Roopnarain 21 15 1 6.67
4 Sujit Kumar Rajbhar Ram Murat 34 28 1 3.57
5 Azad Ahmad Latif 32 29 1 3.45
6 Ajit Kumar Ram Phal Paswan 33 31 1 3.23
7 Murarilal Yadav Ram Phar Yadava 67 53 1 1.89
8 Pawan Kumar Meva Lal 65 53 1 1.89

FZR Division
Sr.No. Welder's Name Father's Name Total Tested Defective Defective
Welds Welds Welds Welds
(%)
1 Ganeh Saini Raj Kumar 101 84 9 10.71
2 Ravinder Kumar Raj Kumar 27 20 1 5.00
3 Ram Dutt Ram Bharosey 44 44 2 4.55
4 Pavan Kumar Ram Achal 27 27 1 3.70
5 Darshan Kumar Madan Lal 85 66 2 3.03
6 Amarjeet Lal Krishan Lal 52 39 1 2.56
7 Ashwani Kumar Hans Raj 60 58 1 1.72
8 Rohit Kumar Ramesh Kumar 60 58 1 1.72
9 Sawan Kumar Sh Balmukund Sah 147 139 2 1.44
10 Kuldeep Raj Dharam Pal 78 78 1 1.28
11 Rajesh Kumar Yadav Ramswroop Yadav 81 79 1 1.27

Divisions are advised to take necessary action as follows:


1) Timely USFD testing of new AT welds must be done.
2) Welds removed before initial testing may be avoided. A report of such welds with
reasons should be submitted to this office every month.
3) Welders having defective percentage >2% may be sent for refresher course at
TPP/LKO.
4) Continuous monitoring of all welders for their performance as well as proper training
should be done to improve quality of welding.
5) Full complement of standard equipments for AT welding should be ensured with each
welding unit of the division.

Action taken by divisions in this regard may be advised to this office at the earliest.

PRADEEP Digitally signed by


PRADEEP NAGAR

NAGAR Date: 2024.05.29


16:59:30 +05'30'
(Pradeep Nagar)
Chief Engineer/TM