1.
Width of river =
190 m2.
No. of Tower to
be Provided= 23.
Centre span = 95
m4.
Live load = 5
kN/m
2
7.
Material
available: M30
grade Concrete&
HTS wire or bar
of diameter =
15.2 mm8.
Allowable stress
in HTS wire or
bar of diameter
15.2 mm = 1000
N/mm
2
9.
22
Height of tower
from deck h = 32
mDip of main
cable of center
(mid span) =16
mLoad
calculation: -
Assume thickness
of slab =
300mmSelf wt.
of slab =
×25
=7.5
/
2
Total Load on
Deck = w =7.5 +
5.0 = 12.5
kN
/m
2
UDL on one side
=
12.5 ×
.
=22.5
kN/m
≈ 25
kN/mDiameter of
High Tensile
steel hanger
Cable = 50
mmWeight of
one Hang Cable
=
×()
×()
× 32 × 78.5
= 4.93 KN ≈ 5
kN/mEquivalent
UDL of hang
cable =
.
=2
kN/m
∴
Total Load on
each side w
= 22.5 + 2 = 24.5
≈ 25
kN/mH
A
= Horizontal
component of
tension in the
cable =
×
×
=
×
×
H
A
= 1762.7
kNVertical
reaction on the
TowerV
A
=
=
×
= 1187.5 kNRes
ultant Reaction
R
A
= T = Tension
into the CableT =
T
max
=
+
=
√ 1762.7
+1187.5
= 2125.38 ≈
2125.4
kNAxial
compressive
force from cable
P
1
= Tsin
Θ
1
From mid span
on Tower
= 2125.4 ×
sin33.97°=
kN= 1187.5 kN
Θ
2
= Inclination of
cable at support
(Towards end
span)= Tan
-1
(
) = Tan
-1
(
×
)
Θ
2
= 9.56°
ADGet Scribd without ads.
23
Compressive
force on the cable
from end span
side, P
2
=Ts
inΘ
2
=2125.4 ×
sin9.56°=353
kNFor the worst
case, Total
Compressive
ForceP = P
1
+P
2
(P
1
=P
2
= 1187.5)=
1187.5 + 1187.5=
2375
kNHorizontal
pull on the Tower
(pier)= H = T
max
(cosΘ
1
cosΘ
2
)=2125.4(-
cos33.97° +
cos30.52°)= 68.3
kN
≈
70 kN
DESIGN: -
1.
Design of Main
Cables: -Length
of main cable in
midspan
∴
L
1
=l+
×
= 95 +
×
= 95 + 7.19
= 102.21 m
≈
105 mLength of
main cable in end
span
∴
L
2=
×(2+
×
)
ADGet Scribd without ads.
24
∴
L
2=
×(2×47.
5×
×
×
.
)
= 48 m ≈ 50 m
∴
Total Length of
main cableL = L
1
+2×L
2
= 105 + 2 × 50=
205 mTotal
Tension in the
Cable = 2125.4
kN = TDiameter
of HTS wire/bar
available = 15.22
mm
∴
Allowable stress
in HTS = 1200
N/mm
2
Force in each
HTS wire =
× (15.2)
2
×
= 181.46 × 1.0T
1
= 181.46 kN No.
of 15.2 HTS wire
required =
=
.
.
= 11.71 ≈ 12
∴
Strands
comprises 12 no.
of 15.2 mm wires
can be used in the
main cable.
ADGet Scribd without ads.
25
2 Design of
Hanger Cable
: -Self wt. of
Hang Cable =
5kNLoad due to
DL + LL = 25
×2.5 = 62.5 kN
∴
Total Load
(Tension) = 5 +
62.5 = 67.5
kNStrength of
15.2 mm dia
HTS with 1000
N/mm
2
stress=
×(.)
×
×
=1887.7 kN >
67.5 kNHence
SAFEProvide
15.2 mm
diameter strand at
2.5m c/c
throughout length
of Suspension
bridge.
3 Design of
Tower
Height of power
= 32 mAssumed
o/s dimensions =
2.4 m × 1.2 m =
2304
kNCompressive
force on
pylondue to cable
= 2375 kNTotal
Compressive load
= 4679 kN
≈ 4680
kNHorizontal
force at tip of
pylon = 70 kN
ADGet Scribd without ads.
26
BM at bottom =
70 × 32 = 2240
KNm
∴
pylon will
Designed to resist
axial load and
biaxial BM,P =
4680 kNM
x
= 2240 kNM
u
=
× 4680 = 93.6
kNm
ADGet Scribd without ads.
27
P
a
= 1.5 P = 1.5
× 4680 = 7020
kNM
xu
= 1.5 M
x
=1.5 × 2240 =
3360 kNmM
yu
= 1.5 M
y
= 1.5 × 93.5 =
140.4 kNm
∴
P
a
= 7020 kN
∴
M
xu
=3360 kNm
∴
M
yu
=140.4 kNmC/S
Area of column
= 2400 × 1200 =
2.88 ×10
6
= 2.88 m
2
Assume Steel =
0.8%=
.
× 1200 ×
2400=23040 mm
2
=0.830=
0.0027
××
=
×
×
×
= 0.08125Using
chart (43) of SP-
16
= 0.08
ADGet Scribd without ads.
28
′
=
= 0.042 ≈ 0.05
∴
= 0.08
∴
= 0.08 ×
=
.
× ×
×
= 16588.8
KNmMoment
Capacity along
shortest
dimension:
′
=
= 0.067 ≈ 0.05
Using the chart
(43) sp-16
= 0.08M
u
y
1
= 0.08 ×
=
.
× ×
×
= 8249.4KNmA
c
=A
g
–
A
sc
= 1200 × 2400 -
23040= 2856960
mm
2
P
uz
= 0.45 f
ck
A
c
+ 0.75 f
y
A
sc
=(0.45 × 30 ×
2856960 + 0.75
× 415 ×
23040)=45740.16
KN
=
.
= 0.1535
∴
Since
= 0.1353 < 0.2
α is taken as 1 i.e.
α
= 1.
ADGet Scribd without ads.
29
∴
+
≤ 1;
∴(
.
) +(
.
.
)
≤ 1;
∴
0.2026 +0.017 ≤
1;
∴
0.2 ≤ 1 ;
Hence SAFE
∴
No. of 32 mm of
bars Required=
×()
=
.
= 28.65
≈
32 No.Fig.
Cross
of Tower showi
ng
reinforcement d
etails
ADGet Scribd without ads.
30
CONCLUSI
ONS:
Suspension
bridge has been
designed for a
river of width
190 m. Two
Towers are
providedwith
central main span
of 95m and end
spans each of
47.5 m. Tower
Design has been
carriedout using
limit state
method as per the
specifications
given in the Code
IS: 456-2000 and
SP-16. Main
cable and steel
suspenders are
designed
considering
allowable stresses
which
areapplicable to
High Tensile
steel used in pre-
stressed concrete.
Design details are
incorporatedin
the Project report.
ADGet Scribd without ads.
31
REFERENC
ES:
1.
IS: 456-
2000, “Indian
Standard Plain
and Reinforced
Concrete Code of
Practice”,
Bureau of Indian
Standards, New
Delhi2.
SP:16(6)-
1980, “Design
Aids for
Reinforced
Concrete to IS:
456-
1978”, Bureau of
Indian Standards,
New Delhi3.
P.C. Vergese
, “Limit State
Design of
Reinforced
Concrete”, PHI
Publications,
New
Delhi4.
N Krishna Raju,
Design of
Reinforced Concr
ete
Structures, CBS
Publishers New
Delhi5.
C.S. Reddy
, “Basic
Structural
Analysis”, Tata
M
ec Graw Hill
Publications,
New Delhi
Reward Your Curiosity
Everything you want to read.
Anytime. Anywhere. Any device.
Read free for 30 days
No Commitment. Cancel anytime.
Share this document
Share or Embed Document
Sharing Options
Share on Facebook, opens a new window
Share on Twitter, opens a new window
Share on LinkedIn, opens a new window
Share with Email, opens mail client
Copy Link
Document147 pages
Document38 pages
Document160 pages
Document81 pages
Document29 pages
M Tech
Pavan Kumar
No ratings yet
Transmission Shaft Design For Hydrokinetic Turbine With Reliabili
Document88 pages
Document226 pages
Document77 pages
Document58 pages
2023-Halda River
ABIR IMTIAZ 1701013
No ratings yet
Friction Force
Document43 pages
Friction Force
senith lasen
No ratings yet
Offshore Monopile Wind Turbine Supporting Structure Design
Document97 pages
Document193 pages
Full Thesis
chikna
No ratings yet
Internship Report on Civil Construction Works at the Tanahun Hydropower Project
Document76 pages
FYP Thesis
Asfand Khalid
No ratings yet
VERTICAL NEIGHBORHOOD-Report PDF
Document92 pages
Document8 pages
Document68 pages
Document23 pages
Document69 pages
Document65 pages
Document54 pages
ALL
Akshay Baswa
No ratings yet
Submitted in Partial Fulfillment of The Requirement For Award of The Degree of
Document40 pages
Submitted in Partial Fulfillment of The Requirement For Award of The
Degree of
Manish Jain
No ratings yet
Study On The Utilization of Coconut Shell As Coarse Aggregate in Concrete
Document50 pages
Document163 pages
View PDF
DeepakSingh
No ratings yet
Major Project 1 REPORT 16mclc15
Document62 pages
Document28 pages
Document92 pages
Document50 pages
Document80 pages
Document66 pages
A Deep Learning Approach for Classifying Toxic Online Comments
Prashant Gautam
100% (1)
Group 11 - Plant Design I - Interim Report
Document199 pages
Document92 pages
Document36 pages
Document61 pages
CU Report
kunal ranjan
No ratings yet
Reduction of Cod From Secondary Effluent of Cetp by Chlorination
Document63 pages
Document169 pages
Document51 pages
Design&Fabrication of Vertical Turbine For Rural Micro
Hydroelectric Gen.
Alfisyahrin
No ratings yet
Final Thesis Draft 1401067-126
Document72 pages
Document8 pages
Document25 pages
MINOR_REPORT
Rohit Jasoliya
No ratings yet
Design and Implementation of Applications Over Delay Tolerant Net
Document76 pages
Document58 pages
110ce0575 5
pdhurvey
No ratings yet
General Seminar: ON Three Gorges Dam
Document21 pages
Document47 pages
Dissertation
shinthant
No ratings yet
Final Internship Report
Document65 pages
Document125 pages
Document185 pages
Document104 pages
Document217 pages
Document54 pages
Document76 pages
From Everand
Practical Grounding, Bonding, Shielding and Surge Protection
G Vijayaraghavan
Rating: 4 out of 5 stars
4/5 (15)
Practical Centrifugal Pumps
From Everand
Practical Centrifugal Pumps
Paresh Girdhar
Rating: 4.5 out of 5 stars
4.5/5 (6)
Soal Campuran in English
Document3 pages
Document85 pages
Document16 pages
Document7 pages
Day - 7, Class - 11, Transportation MGT - 19 Feb 2021, Arif Khan Sir
S M Iftekhar
No ratings yet
Quotation No - Mirado
Document1 page
Quotation No - Mirado
Ploykanok Pasuktrakul
No ratings yet
6 Baker The Flow Around High Speed Trains PDF
Document22 pages
6 Baker The Flow Around High Speed Trains PDF
Doiciel
No ratings yet
Thai - 5gci6w - Muhammad Nuryadin - Bkk-Jed - 24apr23 - 18.45-22.40 - 7 Pax
Document1 page
Document2 pages
Document17 pages
Laporan BBM-KM
iduy emails
No ratings yet
ZF 4HP22 Repair Manual
Document108 pages
Document13 pages
Document652 pages
Document55 pages
Document4 pages
Document23 pages
Bill of Lading1111111
Manoj Singh Saun
No ratings yet
Conveyor RRL
Document2 pages
Conveyor RRL
Veronica Mangundayao
No ratings yet
Riga Technical University: Wind Turbine Cooling System Master Thesis
Document69 pages
Document12 pages
Document1 page
A330-340 FCTM
emdileven
No ratings yet
Imdg Code Volume 1 1
Document61 pages
Document1 page
Document5 pages
Document30 pages
Lecture Notes in CDI4
Ahron Ibasan
No ratings yet
Curves: Engineering Survey 2 SUG200/213
Document89 pages
Document2 pages
Aeropuerto Maiquetia
osomatsu
No ratings yet
A Methodology For Multi-Disciplinary Analysis of The Boxwing Concept
Document11 pages
Document133 pages
Tendernotice 2
Pratik Gupta
No ratings yet
ADGet Scribd without ads.
ADGet Scribd without ads.
ADGet Scribd without ads.
ADGet Scribd without ads.
Related titles
Click to expand Related Titles
Related titles
Skip carousel
Carousel Next
Document
0 ratings
Document
Cable Stay Bridge Design PDF
Added by Anonymous DEzGgC0kn
0 ratings
Document
0 ratings
Document
0 ratings
0% found this document useful
Document
100%
M Tech
Document
M Tech
Added by Pavan Kumar
0 ratings
0 ratings
Document
0 ratings
Document
0 ratings
Document
2023-Halda River
Added by ABIR IMTIAZ 1701013
0 ratings
Friction Force
Document
Friction Force
Added by senith lasen
0 ratings
Document
0 ratings
Full Thesis
Document
Full Thesis
Added by chikna
0 ratings
Document
0 ratings
FYP Thesis
Document
FYP Thesis
Added by Asfand Khalid
0 ratings
Document
0 ratings
0 ratings
Document
0 ratings
Document
50%
Document
0 ratings
Document
0 ratings
Document
0 ratings
Document
0 ratings
ALL
Document
ALL
Added by Akshay Baswa
0 ratings
Document
0 ratings
Document
0 ratings
View PDF
Document
View PDF
Added by DeepakSingh
0 ratings
0 ratings
Document
0 ratings
Document
0 ratings
Document
100%
100% found this document useful
Document
0 ratings
Document
100%
Document
0 ratings
Document
Perception OF AN Urban Public Place: A Case Study OF Martyrs' Square,
Trivandrum
Added by Anjana Mary Jacob
0 ratings
Document
0 ratings
Document
0 ratings
CU Report
Document
CU Report
Added by kunal ranjan
0 ratings
0 ratings
Document
0 ratings
Document
0 ratings
Document
0 ratings
0% found this document useful
Analysis of Nano Fluids Using Parabollic Solar Collector: in Fulfilment For The
Award of The Degree of
Document
Analysis of Nano Fluids Using Parabollic Solar Collector: in Fulfilment For The
Award of The Degree of
Added by Hitesh Parwani
0 ratings
Document
0 ratings
MINOR_REPORT
Document
MINOR_REPORT
Added by Rohit Jasoliya
0 ratings
0 ratings
110ce0575 5
Document
110ce0575 5
Added by pdhurvey
0 ratings
Document
0 ratings
Dissertation
Document
Dissertation
Added by shinthant
0 ratings
Document
0 ratings
Document
0 ratings
Document
0 ratings
Document
Developing A Framework For Determining The Contribution of Transportation
Project To Sustainable Development
Added by iraqi-eng
0 ratings
Document
0 ratings
Document
0 ratings
Document
0 ratings
Document
0 ratings
Document
0 ratings
From Everand
byG Vijayaraghavan
4/5
From Everand
Practical Centrifugal Pumps
byParesh Girdhar
4.5/5
Document
0 ratings
Document
0 ratings
Document
0 ratings
0 ratings
Day - 7, Class - 11, Transportation MGT - 19 Feb 2021, Arif Khan Sir
Document
Day - 7, Class - 11, Transportation MGT - 19 Feb 2021, Arif Khan Sir
Added by S M Iftekhar
0 ratings
Quotation No - Mirado
Document
Quotation No - Mirado
Added by Ploykanok Pasuktrakul
0 ratings
Document
0 ratings
0% found this document useful
Document
0 ratings
Document
0 ratings
Document
0 ratings
Laporan BBM-KM
Document
Laporan BBM-KM
Added by iduy emails
0 ratings
Document
92%
Document
0 ratings
Document
0 ratings
0 ratings
Document
0 ratings
Bill of Lading1111111
Document
Bill of Lading1111111
Added by Manoj Singh Saun
0 ratings
Conveyor RRL
Document
Conveyor RRL
Added by Veronica Mangundayao
0 ratings
0% found this document useful
Document
0 ratings
Document
0 ratings
Document
0 ratings
A330-340 FCTM
Document
A330-340 FCTM
Added by emdileven
0 ratings
Document
0 ratings
Document
0 ratings
Document
0 ratings
0 ratings
Document
0 ratings
Aeropuerto Maiquetia
Document
Aeropuerto Maiquetia
Added by osomatsu
0 ratings
Document
0 ratings
0% found this document useful
Tendernotice 2
Document
Tendernotice 2
Added by Pratik Gupta
0 ratings
Footer menu
Back to top
About
About Scribd
Everand: Ebooks & Audiobooks
Press
Join our team!
Contact us
Invite friends
Scribd for enterprise
Support
Help / FAQ
Accessibility
Purchase help
AdChoices
Legal
Terms
Privacy
Copyright
Cookie Preferences
Do not sell or share my personal information
Social
InstagramInstagram
TwitterTwitter
FacebookFacebook
PinterestPinterest
Get our free apps