Professional Documents
Culture Documents
9205 BP12B MMJV Ifcd Me P1 000 00040 Rev.000
9205 BP12B MMJV Ifcd Me P1 000 00040 Rev.000
NOTE: ALL TENANT SHALL HAVE BTU METER AND COMMISSIONING SET.
FCU NUMBER CHW FLOWRATE CHW PIPE SIZE
CHWF/R PIPE AT HIGH LEVEL ( LPS ) ( MM )
CHWF/R PIPE AT LOW LEVEL FCU 01 0.040 20 ø
FCU 02 0.050 20 ø
FCU 03 0.072 20 ø
FCU 04 0.082 20 ø
IV FCU 05 0.096 20 ø
IV KEY PLAN
FCU 06 0.122 20 ø IV
IV
FCU 07 0.149 20 ø NOTES:
100Ø CHWF/R FCU 08 0.183 25 ø 32Ø CHWF/R
@ 13.921 LPS FCU 09 25 ø (NORMAL)
0.220
FCU 10 0.260 25 ø
150Ø CHWF/R
(NORMAL) FCU 11 0.305 25 ø
FCU 12 0.324 25 ø
FCU 17 FCU 01 FCU 17 FCU 13 0.539 32 ø FCU 17 FCU 18
Ø80
AHU-2P1-05-01 CHWF/R FCU 14 0.855 40 ø
Ø25 CHWF/R Ø20 CHWF/R Ø20 CHWF/R Ø25 CHWF/R Ø25 CHWF/R
NORMAL FCU 15 0.096 20 ø NORMAL NORMAL
NORMAL NORMAL NORMAL
0.257 LPS 0.040 LPS 5.016 LPS 0.257 LPS FCU 16 0.129 20 ø 0.257 LPS 0.281 LPS
M
Level 05
IV IV IV
IV IV IV
32Ø CHWF/R
IV (CRITCAL)
32Ø CHWF/R
(CRITICAL) IV
IV
IV 40Ø CHWF/R
IV 32Ø CHWF/R (CRITICAL)
IV (CRITICAL) IV
IV Drawing Approval Status
40Ø CHWF/R
(NORMAL) 40Ø CHWF/R A - APPROVED
(NORMAL) (Consultant / Contractor May Proceed)
Ø20 CHWF/R Ø20 CHWF/R Ø25 CHWF/R Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R CHWF/R CHWF/R Ø40 CHWF/R Ø40 CHWF/R Ø25 CHWF/R Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R
CRITICAL CRITICAL C - REVISE AND RESUBMIT
NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL CRITICAL CRITICAL NORMAL NORMAL NORMAL NORMAL (Resubmission required)
DUTY STAND BY
0.149 LPS 0.149 LPS 0.257 LPS 0.040 LPS 0.096 LPS 0.096 LPS 0.097 LPS 0.141 LPS 0.324 LPS 0.324 LPS 0.257 LPS 0.082LPS 0.040 LPS 0.096 LPS
GYM 01 & 02 / D - REJECTED ( Not Required)
MALE TOILET FEMALE TOILET MEP 03 ELEC 02 STORAGE 02 STAIR BH11 GYM 01/GYM LOBBY ICT STAIR BG17 ELEC 01 PANTRY STORAGE 01
GYM LOBBY
E - FOR INFORMATION ONLY
Level 04
Name :
Date :
IV IV IV
IV REFERENCES
IV IV IV IV PHASE DRAWING NUMBER TITLE Rev. DATE
IV 50Ø CHWF/R SD LUS-BP12-F&P-DWG-ME-XX569XX-001 PIPEWORK SCHEMATIC GENERAL DETAILS 02 16 AUG 2019
IV IV IV (CRITICAL)
IV A 50Ø CHWF/R LUS-BP12-F&P-DWG-ME-XX569XX-002 PIPEWORK SCHEMATIC GENERAL DETAILS 02 16 AUG 2019
40Ø CHWF/R (CRITICAL) IV IV IV
(CRITICAL) LUS-BP12B-F&P-DWG-ME-2PX550XX-001 PIPEWORK SCHEMATIC PODIUM 02 16 AUG 2019
Level 03
IV IV IV
IV
IV IV IV
IV
IV IV 150Ø CHWF/R
IV (CRITICAL)
IV A 150Ø CHWF/R IV
40Ø CHWF/R (CRITICAL) IV
IV 40Ø CHWF/R
(CRITICAL) (CRITICAL)
@0.855 LPS IV
50Ø CHWF/R IV
IV (CRITICAL)
IV REVISIONS:
FCU 17 FCU 14 IV 65Ø CHWF/R
A IV
IV (NORMAL)
Ø40 CHWF/R
Ø25 CHWF/R CRITICAL
NORMAL STAND BY
0.257 LPS 0.855 LPS 65Ø CHWF/R
000 05 Feb 2021 ISSUED FOR CONSTRUCTION AF EP WY
(NORMAL)
STAIR BA11 ICT 02 Rev. Date Revision Details Drawn Chkd. Appd.
FCU 07 FCU 07 FCU 15 FCU 01 FCU 16 FCU 15 Ø150 Ø50 FCU 14 FCU 11 FCU 11 Ø32 Ø150 FCU 15 FCU 15 FCU 03
Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R CHWF/R CHWF/R Ø40 CHWF/R Ø40 CHWF/R Ø40 CHWF/R CHWF/R CHWF/R Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R
CRITICAL CRITICAL CRITICAL Stage:
NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL CRITICAL NORMAL CRITICAL NORMAL NORMAL NORMAL NORMAL
DUTY DUTY STAND BY
0.149 LPS 0.149 LPS 0.096 LPS 0.040 LPS 0.129 LPS 0.096 LPS 29.923 LPS 1.517 LPS 0.855 LPS 0.305 LPS 0.305 LPS 0.357 LPS 3.608 LPS 0.096 LPS 0.096 LPS 0.072 LPS ISSUED FOR CONSTRUCTION
TRAINING CENTER 1/ TRAINING CENTER 02/
MALE TOILET FEMALE TOILET MEP 03 ELEC 02 STORAGE 02 STAIR BH11 OFFICE LOBBY 1/ ICT 02 ICT 01 OFFICE LOBBY 02/ STORAGE 01 STAIR BG17 ELEC 01
DATA CENTER IT OFFICE Client:
Level 02 Lusail Real Estate Development Co
Doha, State of Qatar
IV IV IV
IV
PM/CM :
IV IV
IV 32Ø CHWF/R
(CRITICAL)
32Ø CHWF/R 32Ø CHWF/R IV Designer:
(CRITICAL) (CRITICAL)
IV IV
IV IV IV 32Ø CHWF/R
(CRITICAL) Supervision Consultant :
IV IV DAR AL-HANDASAH
SHAIR AND PARTNERS
IV
Main Contractor :
65Ø CHWF/R
(NORMAL)
65Ø CHWF/R
(NORMAL)
MIC Construct
FCU 07 FCU 07 FCU 01 FCU 03 Ø50 Ø20 Ø40 FCU 15 FCU 04 FCU 12 FCU 12 Ø32 FCU 04
Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R Ø20 CHWF/R CHWF/R CHWF/R CHWF/R Ø20 CHWF/R Ø32 CHWF/R Ø32 CHWF/R Ø32 CHWF/R CHWF/R Ø20 CHWF/R
NORMAL CRITICAL NORMAL CRITICAL CRITICAL NORMAL
NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL DUTY STAND BY NORMAL Contractor's Lead Designer:
0.149 LPS 0.149 LPS 0.040 LPS 0.072 LPS 1.423 LPS 0.087 LPS 1.483 LPS 0.096 LPS 0.082 LPS 0.324 LPS 0.324 LPS 0.473 LPS 0.082 LPS
NURSERY DATA CENTER
MALE TOILET FEMALE TOILET ELEC 2 NURSERY CLINIC & RETAIL 02 CORRIDOR SERVICE LOBBY ICT ELEC 1
CORRIDOR LOBBY
IV
Sub-Consultant:
IV
IV
IV
200Ø CHWF/R
(NORMAL)
32Ø CHWF/R FCU 09 FCU 09 FCU 09 FCU 09 FCU 09 FCU 09 150Ø CHWF/R
(CRITICAL) Ø25 Ø50 (NORMAL)
CHWF/R CHWF/R Ø25 CHWF/R Ø25 CHWF/R Ø25 CHWF/R Ø25 CHWF/R Ø25 CHWF/R Ø25 CHWF/R Project Name:
LUSAIL PLAZA TOWERS
CRITICAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL PLOT 2 (BP12B)
0.158 LPS 2.013 LPS 0.220 LPS 0.220 LPS 0.220 LPS 0.220 LPS 0.220 LPS 0.220 LPS
Drawing Title:
Level 01
RETAIL 01 LOBBY 03 LOBBY 02 LOBBY 01
PODIUM 2P1, GRID: BB/11 PODIUM 2P1, GRID: BG/11 32Ø CHWF/R 25Ø CHWF/R
PODIUM 2P1, GRID: BF/16
CHILLED WATER PODIUM BUILDING
(CRITICAL) @ LG H/L (CRITICAL) @ LG H/L
P1 SCHEMATIC DIAGRAM
Drawn: A. FERNANDEZ Size : A0
FOR CONTINUATION REFER TO DRAWING Checked: E. PASTRANA Scale @ A1: NTS
NO.9205-BP12B-MMJV-DWG-ME-NS-000-00030
Approved: W. YAKOB Date: 05 Feb 2021
Drawing Number: Revision:
9205-BP12B-MMJV-IFCD-ME-P1-000-00040 000
Sheet : 01 of 01