LOCATION:
SUBJECT: CE 111 - QUANTITY SURVEYING
I GENERAL REQUIREMENTS -
II EARTHWORKS -
IV ARCHITECTURAL WORKS -
V PLUMBING WORKS -
VI ELECTRICAL WORKS -
NAME / SIGNATURE
QS Student - BSCE 3A
Submitted to:
ENGR. MELANIE ROSE P. PASCUA
CE Department Instructor
PROJECT:
LOCATION:
SUBJECT: CE 111 - QUANTITY SURVEYING
MARK-UPS IN
MATERIALS ESTIMATED TOTAL
ITEM PERCENT TOTAL MARK-UPS
DESCRIPTION LABOR DIRECT VAT INDIRECT TOTAL COST UNIT COST
NO. UNIT
QTY UNIT COST AMOUNT COST OCM PROFIT % VALUE COST
MEASURE
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
(3 + 4) (6 + 7) (5 x 8) 5%(5 + 9) (9 + 10) (5 + 11) (12 / 1)
I GENERAL REQUIREMENTS
I.1 Mobilization/Demobilization 1.00 lot
I.2 Temporary Facilities 1.00 lot
I.3 Safety and Health 1.00 lot
Safety Helmet man-days
Safety Shoes man-days
Safety Vest man-days
Safety Gloves man-days
Rain Coat man-days
Rubber Boots man-days
Safety Signages 1.00 lot
Safety and Health Personnel 1.00 lot
I.4 Site Preparation/Demolition (if any) 1.00 lot
I.5 Testing and Inspections 1.00 lot
I.6 Bonds, Permits and Insurances 1.00 lot
Others (if any)
SUBTOTAL OF ITEM I 0.00 0.00 0.00
II EARTHWORKS
Name/Signature
QS Student - BSCE 3A
PROJECT:
LOCATION:
SUBJECT: CE 111 - QUANTITY SURVEYING
A MATERIAL COST
ITEM NO. DESCRIPTION UNIT UNIT COST
B LABOR RATES
ITEM NO. DESCRIPTION RATE PER HOUR RATE PER DAY
C EQUIPMENT RATES
ITEM NO. DESCRIPTION RATE PER HOUR RATE PER DAY
PREPARED BY:
TABOR, CLAIRE
QS Student - BSCE 3A
CONFORME:
CANVASS SHEET
Column1 Column2 Column3 Column4 Column5 Column6 Column7
ITEM OF WORK: GENERAL REQUIREMENTS AS OF: MARCH 01, 2024
INCLUSION: INCLUSION:
SURVEY TEAM SURVEY TEAM
INSTRUMENT MAN INSTRUMENT MAN
TWO SURVEY AIDS TWO SURVEY AIDS
MOBILIZATION / DEMOBILIZATION MOBILIZATION / DEMOBILIZATION
TABOR, CLAIRE
QS Student - BSCE 3A
GENERAL REQUIREMENTS
I. MOBILIZATION / DEMOBILIZATION
SPECIFICATION QTY DAYS REQUIRED RATE (PER DAY) AMOUNT
MINI DUMP TRUCK 1 2 ₱6,000.00 ₱12,000.00
BOOM TRUCK 1 2 ₱10,000.00 ₱20,000.00
TOTAL = ₱32,000.00
TOTAL = ₱65,220.00
III. SAFETY AND HEALTH
SPECIFICATION QTY UNIT COST AMOUNT
SAFETY SHOES - ₱1,299.00 -
SAFETY VEST - ₱234.00 -
SAFETY GLOVES - ₱38.00 -
ELECTRIC RES. GLOVES - ₱369.00 -
SAFETY BOOTS - ₱500.00 -
SAFETY GLASSES - ₱139.00 -
SAFETY GOGGLES - ₱247.00 -
SAFETY HELMET - ₱562.00 -
RAIN COAT - ₱899.00 -
RESPIRATOR - ₱99.00 -
SAFETY SIGNAGE SET 1 ₱1,034.00 ₱1,034.00
FIRST AID KIT BOX 1 ₱1,049.00 ₱1,049.00
MEDICINE & OTHER KITS 1 ₱500.00 ₱500.00
TOTAL =
V. TEMPORARY WORKS
SPECIFICATION QTY UNIT COST AMOUNT
G.I. ROUND PIPE (1-1/2"⌀, 6m) 16 ₱550.00 ₱8,800.00
G.I. PIPE CLAMP 18 ₱46.00 ₱828.00
TARPAULIN 36 ₱115.00 ₱4,140.00
G.I. TIE WIRE #16 6 ₱85.00 ₱510.00
TOTAL = ₱14,278.00
EARTHWORKS
I. EXCAVATION WORKS
FLOOR PLAN
TOTAL HORIZONTAL DIMENSION 8.95
TOTAL VERTICAL DIMENSION 15.45
TOTAL FLOOR AREA 138.2775
LINE LENGTH
A 5.625
A' 4.825
B 7.3
C 5.375
D 13.85
1 4.45
2 8.15
4 4.25
5 3.5
6 3.45
TOTAL LENGTH OF FOOTING TIE BEAM:
TOTAL LENGTH (m) WIDTH (m) DEPTH (m)
60.775 0.25 0.5
TOTAL VOLUME FOR FOOTING TIE BEAM:
IV. BACKFILLING
NOTES: 1. SUBTRACT THE GRAVEL BEDDING OF SOG TO THE RAW TOTAL OF GRAV
2. CONSIDER 10% WASTAGE AND 30% COMPACTION
TOTAL VOLUME OC
TOTAL VOLUME OF BACKFIL
TOTAL VOLUME OF BACKFILL (CONSIDERING WASTAGE AND COMPA
V. FILLING
VOLUME OF SOIL RE
VOLUME TO FILL
LENGTH WIDTH
15.45 8.95
TOTAL VOLUME FOR FILLING:
PREPARED BY:
TABOR, CLAIRE
QS Student - BSCE 3A
CONFORME:
THWORKS
TING COLUMN
OR PLAN
COLUMN FTB
LENGTH 0.25 0.25
WIDTH 0.4 0.35
60.775
TOTAL VOLUME (m³)
7.597
7.597
LL FOOTING
EPTIC TANK
109.657
TING COLUMN
60.775
AREA (m^2)
69.891
69.891
LL FOOTING
AREA(m^2)
2.66
2.657
AB ON GRADE
AREA (SURFACE)
141.37
141.37
381.319
TING COLUMN
VOLUME
27.349
30.084
LL FOOTING
VOLUME
36.57
40.222
AB ON GRADE
15.55
DEPTH VOLUME
0.1 141.37
TAL VOLUME FOR FILLING: 155.50
I. EXCAVATION WORKS
BACKHOE EXCAVATOR (RENT)
INCLUSIONS: BACKHOE, LABOR, GASOLINE PER DAY HEAVY EQUIPMENT RENTALS 15000 PER DAY
INCLUSIONS: TRACKED EXCAVATOR PER DAY MHV BUILDERS ₱2,000.00 PER DAY
IV. BACKFILL/FILLING
SOIL (LOOSE)
INCLUSION:
4 cu.m PER LOAD TOMAS CONSTRUCTION TRADING ₱2,000.00 2.5 cu.m PER LOAD
SOIL (LOOSE)
DRIVER/OPERATOR
SKILLED WORKER PER DAY EPO CONSTRUCTION ₱1,500.00 PER DAY
UNSKILLED WORKER PER DAY EPO CONSTRUCTION ₱650.00 PER DAY
PREPARED BY: CONFORME:
TABOR, CLAIRE
QS Student - BSCE 3A
I. EXCAVATIO
24
SPECIFICATION NO. OF UNIT
BACKHOE EXCAVATOR (RENT) 1
TRACKED EXCAVATOR (RENT) 2
Supplier 2 Cost SPADE 5
SHOVEL 10
WHEEL BARROW 5
PICK AXE 4
LABOR C
JMS HEAVY EQUIPMENT RENTALS₱1,700.00 SPECIFICATION NO. OF UNIT
UNSKILLED WORKERS (10 DAYS) 10
SKILLED WORKERS (5 DAYS) 2
PRAGMATIC ₱570.00 DRIVER (3 DAYS) 1
WILCON ₱420.00
WILCON ₱450.00
WILCON ₱790.00 BACKFILLING
WILCON ₱7,708.00 SPECIFICATION NO. OF UNIT
SOIL 53
PRAGMATIC ₱570.00
PRAGMATIC ₱1,200.00
PRAGMATIC ₱570.00
CONFORME:
1 ₱15,000.00 ₱15,000.00
2 ₱2,000.00 ₱4,000.00
5 ₱420.00 ₱2,100.00
10 ₱450.00 ₱4,500.00
5 ₱7,708.00 ₱38,540.00
4 ₱790.00 ₱3,160.00
LABOR COST
NO. OF UNIT COST PER UNIT AMOUNT
10 ₱650.00 ₱65,000.00
2 ₱1,500.00 ₱30,000.00
1 ₱1,500.00 ₱45,000.00
BACKFILLING/FILLING
NO. OF UNIT COST PER UNIT AMOUNT
53 ₱2,000.00 ₱106,000.00
I. CONCRETE WORKS
A. FOOTING (CLASS C)
B. COLUMN (CLASS C)
D. BEAMS (CLASS C)
LENGTH (m) VOLUME (m3) BAGS OF CEMENT
SYMBOL SAND (m3) GRAVEL (m3)
(40 kg)
FTB 60.775 5.318 99 8.19 16.38
2B1 19.63 1.963
2B2 31.25 3.125
2B3 20.625 2.063
RB 44.7 3.91
TOTAL VOLUME OF BEAMS (m3) 16.38
E. SLABS (CLASS C)
1. SLAB ON GRADE
BAGS OF CEMENT
AREA (m2) VOLUME (m3) (40 kg) SAND (m3) GRAVEL (m3)
141.37 17.67 107 8.84 17.67
2.. SECOND FLOOR SLAB
BAGS OF CEMENT
AREA (m2) VOLUME (m3) (40 kg) SAND (m3) GRAVEL (m3)
62.293 7.79 47 3.9 7.79
F. STAIRS (CLASS C)
1. WAIST SLAB
HORIZONTAL
TOTAL HEIGHT OF LENGTH OF ONE
LENGTH OF STEPS THICKNESS (m) WIDTH (m) VOLUME OF WAIST SLAB (m3)
STEPS (m) WAIST SLAB (m)
(m)
4.365 0.125 4.37 1.78 1.8 1.75
2. RISER/THREAD
AREA (m2) WIDTH (m) VOLUME OF RISER/THREAD (m 3)
1.93 0.2 1.92
3. LANDING
LENGTH (m) WIDTH (m) THICKNESS (m) VOLUME OF LANDING (m3)
2.5 0.6 0.15 1.5
BAGS OF CEMENT
(40 kg) SAND (m ) 3
GRAVEL (m3)
TOTAL VOLUME OF STAIRS (m3) 5.17
32 2.59 5.17
A. FOOTING
LENGTH OF CUTBARS IN ONE
CUTBARS PER FOOTING QUANTITY TOTAL PIECES
CUTBARS SIDE OF FOOTING
1.7 8 16 15 240
CALCULATING WASTAGE
NO. OF CUTBARS / STEEL BAR THAT REQ'D NO. OF TOTAL WASTAGE
SIZES (m) NO. OF STEEL BAR
CAN BE OBTAINED STEEL BAR (m)
6 3.53 80 80 72
7.5 4.42 60 60 42
9 5.3 48 48 24
10.5 6.18 40 40 12
12 7.06 34.29 35 11.95
13.5 7.95 34.29 35 64.45
STEELS TO BE ORDERED
TOTAL WASTAGE
LEAST WASTAGE NO. OF 16mm Ø STEEL BARS TO BE
SIZES (m) SIZE OF STEEL BAR TO BE USED (m)
(m) ORDERED (pcs)
(m)
6 72
7.5 42
9 24
11.95 12 35
10.5 12
12 11.95
13.5 64.45
TIE WIRE
TOTAL LENGTH OF
NO. OF TIES LENGTH OF TIE (m) LENGTH OF 1kg NO. 16 G.I. WIRE (m) TOTAL MASS OF NO. 16 G.I. WIRE (kg)
TIE (m)
960 0.3 1 53 0.02
SUMMARY ON FOOTING
QUANTITY (pcs) RSB LENGTH (m)
0 6
0 7.5
TOTAL NO. OF 16mm Ø STEEL BARS TO BE ORDERED (pcs)
0 9
0 10.5
0 12
0 13.5
TOTAL MASS OF NO. 16 G.I. WIRE (kg) 0.02
C. COLUMNS
I. MAIN REINFORCEMENT (DIRECT COUNTING METHOD)
SYMBOL LENGTH (m) RSB LENGTH (m) NO. OF BARS (pcs) NO. OF COLUMNS TOTAL NO. OF BARS (pcs)
C1 8.5 9 8 15 120
QUANTITY (pcs) RSB LENGTH (m)
NO. OF 16mm Ø STEEL BARS TO BE ORDERED (pcs)
120 9
TOTAL WASTAGE
LEAST WASTAGE NO. OF 10mm Ø STEEL BARS TO BE
SIZES (m) SIZE OF STEEL BAR TO BE USED (m)
(m) ORDERED (pcs)
(m)
6 171.40
7.5 168.40
9 174.40
168.40 7.5 334
168.40 7.5 334
10.5 172.90
12 171.40
13.5 171.40
III. TIE WIRE
NO. OF MAIN BARS TOTAL NO. OF LENGTH OF TIE TOTAL LENGTH OF
NO. OF TIES (pcs) MASS OF NO. 16 G.I. WIRE (kg)
(pcs) STIRRUPS (pcs) (m) TIE (m)
8 1669 13352 0.3 4006 75.59
SUMMARY ON COLUMNS
0 6
TOTAL NO. OF 10mm Ø STEEL BARS TO BE ORDERED (pcs) 334 7.5
0 9
0 10.5
0 12
0 13.5
D. BEAMS
I. MAIN REINFORCEMENT (DIRECT COUNTING METHOD)
1. FTB
COLUMN GRID LENGTH (m) RSB LENGTH (m) NO. OF BARS (pcs)
A 5.625 6 7
A' 4.825 6 6
B 7.3 7.5 9
5.375 6 7
C
13.85 9 15
D
1 4.45 6 6
2 8.15 9 10
4 4.25 7.5 6
5 3.5 7.5 6
6 3.45 7.5 6
QUANTITY (pcs) RSB LENGTH (m)
NO. OF 16mm Ø STEEL BARS TO BE ORDERED (pcs) 26 6
27 7.5
25 9
2. 2ND FLOOR BEAMS
COLUMN GRID LENGTH (m) RSB LENGTH (m) NO. OF BARS (pcs)
B-1 1.963 6 2
B-2 3.125 6 4
B-3 2.0625 6 3
QUANTITY (pcs) RSB LENGTH (m)
NO. OF 16mm Ø STEEL BARS TO BE ORDERED (pcs)
9 6
3. RB
COLUMN GRID LENGTH (m) RSB LENGTH (m) NO. OF BARS (pcs)
A 3.65 6 4
B 4.65 6 5
C 3.65 6 4
D 8.5 9 8
2 8.15 9 8
3 8.15 9 8
4 0.8 6 1
5 7.15 7.5 1
QUANTITY (pcs) RSB LENGTH (m)
NO. OF 16mm Ø STEEL BARS TO BE ORDERED (pcs) 14 6
1 7.5
24 9
II. STIRRUPS (DIRECT COUNTING METHOD)
1. FTB
LENGTH OF ONE QUANTITY OF FTB TOTAL NO. OF
SPAN (m) NO. OF STIRRUPS IN ONE BEAM (pcs) TOTAL (pcs)
STIRRUP (m) (pcs) STIRRUPS (pcs)
1.8 25 15 375
4.25 35 15 525
1.4 1669
3 38 11 418
1.35 39 9 351
NO. OF CUTBARS / STEEL BAR THAT REQ'D NO. OF TOTAL WASTAGE
SIZES (m) NO. OF STEEL BAR
CAN BE OBTAINED STEEL BAR (m)
6 4.229 417.25 418 171.4
7.5 5.36 333.80 334 168.4
9 6.43 278.17 279 174.4
10.5 7.5 238.43 239 172.9
12 8.58 208.63 209 171.4
13.5 9.65 185.45 186 174.4
STEELS BARS TO BE ORDERED
TOTAL WASTAGE
LEAST WASTAGE NO. OF 10mm Ø STEEL BARS TO BE
SIZES (m) SIZE OF STEEL BAR TO BE USED (m)
(m) ORDERED (pcs)
(m)
6 171.40
7.5 168.40
9 174.40
168.40 7.5 334
10.5 172.90
12 171.40
13.5 174.40
2ND FLOOR BEAMS
LENGTH OF ONE QUANTITY OF FTB TOTAL NO. OF
BEAMS NO. OF STIRRUPS IN ONE BEAM (pcs) TOTAL (pcs)
STIRRUP (m) (pcs) STIRRUPS (pcs)
B-1 1.96 24 2 48
B-2 3.13 30 4 120 249
B-3 2.06 27 3 81
CALCULATING WASTAGE
NO. OF CUTBARS / STEEL BAR THAT REQ'D NO. OF TOTAL WASTAGE
SIZES (m) NO. OF STEEL BAR
CAN BE OBTAINED STEEL BAR (m)
6 4.29 62.25 63 49.32
7.5 5.36 49.80 50 46.32
9 6.43 41.50 42 49.32
10.5 7.5 35.57 36 49.34
12 8.58 31.13 32 10.03
13.5 9.65 27.67 28 12.33
STEELS BARS TO BE ORDERED
TOTAL WASTAGE
LEAST WASTAGE NO. OF 10mm Ø STEEL BARS TO BE
SIZES (m) SIZE OF STEEL BAR TO BE USED (m)
(m) ORDERED (pcs)
(m)
6 49.32
7.5 46.32
49.32
10.03 12 32
9
10.03 12 32
10.5 49.34
12 10.03
13.5 12.33
RB
LENGTH OF ONE QUANTITY OF FTB TOTAL NO. OF
SPAN (m) NO. OF STIRRUPS IN ONE BEAM (pcs) TOTAL (pcs)
STIRRUP (m) (pcs) STIRRUPS (pcs)
3.65 30 4 120
8.15 60 8 480
8.15 60 8 480 1140
1.4
0.8 10 1 10
7.15 50 1 50
CALCULATING WASTAGE
NO. OF CUTBARS / STEEL BAR THAT REQ'D NO. OF TOTAL WASTAGE
SIZES (m) NO. OF STEEL BAR
CAN BE OBTAINED STEEL BAR (m)
6 4.29 285.00 285 114
7.5 5.36 228.00 228 114
9 6.43 190.00 190 114
10.5 7.5 162.86 163 115.5
12 8.58 142.50 143 120
13.5 9.65 126.67 127 118.5
STEELS BARS TO BE ORDERED
TOTAL WASTAGE
LEAST WASTAGE NO. OF 10mm Ø STEEL BARS TO BE
SIZES (m) SIZE OF STEEL BAR TO BE USED (m)
(m) (m) ORDERED (pcs)
6 114.00
7.5 114.00
9 114.00
114.00 6 285
10.5 115.50
12 120.00
13.5 118.50
SUMMARY ON BEAMS
QUANTITY (pcs) RSB LENGTH (m)
49 6
28 7.5
TOTAL NO. OF 16mm Ø STEEL BARS TO BE ORDERED (pcs)
169 9
0 10.5
35 12
0 13.5
QUANTITY (pcs) RSB LENGTH (m)
285 6
Err:504 7.5
TOTAL NO. OF 10mm Ø STEEL BARS TO BE ORDERED (pcs)
Err:504 9
1 10.5
32 12
Err:504 13.5
TOTAL MASS OF NO. 16 G.I. WIRE (kg) 182.53
E. SLABS
SLAB ON GRADE
IN 13 m SPAN
LENGTH OF CUTBARS LENGTH COVERED SPACING TOTAL PIECES
5.23 5 0.3 18
CALCULATING WASTAGE
SIZES NO. OF CUTBARS / STEEL BAR THAT CAN NO. OF STEEL REQ'D NO. OF TOTAL WASTAGE
(m) BE OBTAINED BAR STEEL BAR (m)
6 1.15 18 18 13.86
7.5 1.44 18 18 40.86
9 1.73 18 18 67.86
10.5 2.01 9 9 0.36
12 2.3 9 9 13.86
13.5 2.59 9 9 27.36
STEELS BARS TO BE ORDERED
SIZES TOTAL WASTAGE LEAST WASTAGE SIZE OF STEEL BAR TO BE USED NO. OF 10mm Ø STEEL BARS TO BE
(m) (m) (m) (m) ORDERED (pcs)
6 13.86
7.5 40.86
9 67.86
0.36 10.5 9
10.5 0.36
12 13.86
13.5 27.36
CALCULATING WASTAGE
(m) (m) (m) (m) ORDERED (pcs)
6 13.86
7.5 40.86
9 67.86
0.36 10.5 9
10.5 0.36
12 13.86
13.5 27.36
CALCULATING WASTAGE
SIZES NO. OF CUTBARS / STEEL BAR THAT CAN NO. OF STEEL REQ'D NO. OF TOTAL WASTAGE
(m) BE OBTAINED BAR STEEL BAR (m)
6 1.4 15 15 25.5
7.5 1.75 15 15 48
9 2.1 7.5 8 7.5
10.5 2.45 7.5 8 19.5
12 2.8 7.5 8 31.5
13.5 3.14 5 5 3
STEELS BARS TO BE ORDERED
SIZES TOTAL WASTAGE LEAST WASTAGE SIZE OF STEEL BAR TO BE USED NO. OF 10mm Ø STEEL BARS TO BE
(m) (m) (m) (m) ORDERED (pcs)
6 25.5
7.5 48
9 7.5
3 13.5 5
10.5 19.5
12 31.5
13.5 3
IN 6 m SPAN
LENGTH OF CUTBARS LENGTH COVERED SPACING TOTAL PIECES
13.36 12 0.3 41
CALCULATING WASTAGE
SIZES NO. OF CUTBARS / STEEL BAR THAT CAN NO. OF STEEL REQ'D NO. OF TOTAL WASTAGE
6 2.47 5 5 5.7
7.5 3.09 3.334 4 5.7
9 3.71 3.334 4 11.7
10.5 4.33 2.5 3 7.2
12 4.94 2.5 3 11.7
13.5 5.56 2 2 2.7
STEELS BARS TO BE ORDERED
SIZES TOTAL WASTAGE LEAST WASTAGE SIZE OF STEEL BAR TO BE USED NO. OF 10mm Ø STEEL BARS TO BE
(m) (m) (m) (m) ORDERED (pcs)
6 5.7
7.5 5.7
9 11.7
2.7 13.5 2
10.5 7.2
12 11.7
13.5 2.7
SUMMARY ON SLABS
QUANTITY (pcs) RSB LENGTH (m)
0 6
124 7.5
TOTAL NO. OF 10mm Ø STEEL BARS TO BE ORDERED (pcs)
62 9
SOLVING BY AREA METHOD
TYPE OF SLAB MULTIPLER MASS OF TIE WIRE (Kg)
ONE WAY SLAB 0.126 1.73
TWO WAY SLAB 2.182 106.13
SUMMARY ON SLABS
QUANTITY (pcs) RSB LENGTH (m)
0 6
124 7.5
TOTAL NO. OF 10mm Ø STEEL BARS TO BE ORDERED (pcs)
62 9
9 10.5
0 12
7 13.5
TOTAL MASS OF NO. 16 G.I. WIRE (kg) 116.28
F. STAIRS
USING DIRECT COUNTING METHOD
QUANTITY OF QUANTITY OF
SPECIFICATION TOTAL LENGTH SIZE OF STEEL BAR
CUT BARS STEEL BAR
C1 1.5 5 1 6m x 10mm Ø GRADE 33 RSB
C2 0.6 8 1 6m x 12mm Ø GRADE 33RSB
C3 3.6 7 3 7.5m x 12mm Ø GRADE 33 RSB
C4 5.5 9 3 10.5m x 12mm Ø GRADE 33 RSB
C5 1.2 16 1 10.5 x 12mm Ø GRADE 33 RSB
C6 0.5 60 6 10.5 m x 12mm Ø GRADE 33 RSB
C7 1.3 23 3 10.5m x 10mm Ø GRADE 33 RSB
C8 1.9 6 2 9m x 16mm Ø GRADE 33 RSB
SUMMARY ON STAIRS
QUANTITY (pcs) RSB LENGTH (m)
TOTAL NO. OF 10mm Ø STEEL BARS TO BE ORDERED (pcs)
1 6
10 10.5
TOTAL NO. OF 12mm Ø STEEL BARS TO BE ORDERED (pcs)
10 10.5
III. FORMWORKS
A. FOOTING
PLYWOODS
PERIMETER AREA QUANTINTY TOTAL AREA AREA OF PLYWOOD PIECES OF PLYWOOD
6 10.8 15 162 2.88 57
LUMBER AND NAILS
MULTIPLIER BOARD FOOT PIECES OF 2"X2"X18' LUMBER MASS OF NAILS
29.67 1691.19 282 50.74
B. COLUMN
PLYWOODS
PERIMETER AREA PCS TOTAL AREA AREA OF PLYWOOD PIECES OF PLYWOOD
1.5 12.91 33 170.88 2.88 60
D. BEAMS
FOOTING TIE BEAM
PLYWOODS
PERIMETER AREA QUANTINTY TOTAL AREA AREA OF PLYWOOD PIECES OF PLYWOOD
1.05 63.82 1 LOT 63.82 2.88 23
ROOF BEAM
PLYWOODS
PERIMETER AREA PCS TOTAL AREA AREA OF PLYWOOD PIECES OF PLYWOOD
1.05 46.94 1 LOT 46.94 2.88 17
F. STAIR
PLYWOODS
PIECES OF
WAIST SLAB THREAD RISER LANDING TOTAL AREA AREA OF PLYWOOD
PLYWOOD
0.125 0.2 0.3 2.5 3.125 2.88 2
IV. SCAFFOLDINGS
DIAGONAL BRACE
LONGEST LENGTH QUANTITY TOTAL LENGTH MULTIPLIER BOARD FOOT PIECES OF 2"X2"X10' MASS OF NAILS
6.61 15 99.15 11.67 743.97 224 22.32
HORIZONTAL SUPPORT
TOTAL LENGTH MULTIPLIER BOARD FOOT PIECES OF 2"X2"X20' MASS OF NAILS
71.53 4.67 334.0451 51 1.53
C. STAGING OF SLAB
TOTAL AREA MULTIPLIER BOARD FOOT PIECES OF 2"X3"X20' MASS OF NAILS
203.663 9.1 1853.3333 186 5.58
V. STEEL WORKS
TRUSS
I. TRUSS 1
TOTAL LENGTH
SPECIFICATION LENGTH QUANTITY (PCS) TOTAL LENGTH STEEL C - CHANNEL
PER TRUSS
X1 3.65
X2 3.15
X3 0.32
X4 0.53
X5 0.3
X6 0.3
X7 0.5
Y1 0.43 TOTAL PIECES = 45.36 / 10m = 4.536
SAY 5 PIECES USE 5 PCS. OF 2" x 4" x
11.34 4 45.36
1.20 x 10m GALVANIZED STEEL C -
CHANNEL
TOTAL PIECES = 45.36 / 10m = 4.536
SAY 5 PIECES USE 5 PCS. OF 2" x 4" x
Y2 0.46 11.34 4 45.36
1.20 x 10m GALVANIZED STEEL C -
Y3 0.53 CHANNEL
Y4 0.46
Y5 0.33
Y6 0.22
Y7 0.16
II. TRUSS 2
TOTAL LENGTH
SPECIFICATION LENGTH QUANTITY (PCS) TOTAL LENGTH STEEL C - CHANNEL
PER TRUSS
Y8 1.35
Y9 1.32
Y10 1.15
Z1 1.1
Z2 0.62 TOTAL PIECES = 7.21 / 8m = 0.90 SAY
7.21 1 7.21 1PIECE USE 1 PC. OF 2" x 4" x 1.20 x 8m
Z3 0.6 GALVANIZED STEEL C - CHANNEL
Z4 0.34
Z5 0.3
Z6 0.23
Z7 0.2
III.TRUSS 3
TOTAL LENGTH
SPECIFICATION LENGTH QUANTITY (PCS) TOTAL LENGTH STEEL C - CHANNEL
PER TRUSS
Z8 1
Z9 1
Z10 1 TOTAL PIECES = 4.79/ 6m = 0.79 SAY
4.79 1 4.79 1PIECE USE 1 PC. OF 2" x 4" x 1.20 x 6m
X8 1 GALVANIZED STEEL C - CHANNEL
X9 0.47
X10 0.32
C- PURLINS
SAG ROD
NUMBER OF INTERSECTION OF TRUSS AND C - PURLINS TOTAL PIECES OF ANGLE BAR CLEATS
60 USE 60 PIECES OF ANGLE BAR CLEATS
WELDING ROD
WEIGHT OF C -
WEIGHT OF STEEL
PURLINS PER TOTAL WEIGHT MULTIPLIER TOTAL WELDING ROD IN KG.
TRUSS PER METER
METER
13.08 17.9 30.98 2% 0.62
PREPARED BY:
CLAIRE TABOR
QS Student - BSCE 3A
CONFORME:
III. FORMWORKS
SPECIFICATION QTY.
1.2m x 2.4m PLYWOOD 234
2" x 2" x 10' LUMBER 179
2" x 2" x 14' LUMBER 471
2" x 2" x 16' LUMBER 128
2" x 2" x 18' LUMBER 282
2" x 2" x 20' LUMBER 268
COMMON NAILS (KG) 208.34
TOTAL
IV. SCAFFOLDING
SPECIFICATION QTY.
2" x 2" x 10' LUMBER 224
2" x 2" x 16' LUMBER 287
2" x 2" x 20' LUMBER 237
2" x 3" x 12' LUMBER 75
2" x 3" x 22' LUMBER 40
COMMON NAILS (KG) 85
TOTAL
V. STEEL WORKS
SPECIFICATION QTY.
2" x 4" x 1.20 x 10m GALVANIZED STEEL C - CHANNEL 5
2" x 4" x 1.20 x 8m GALVANIZED STEEL C - CHANNEL 1
2" x 4" x 1.20 x 6m GALVANIZED STEEL C - CHANNEL 1
"2 x 3" x 1.20 x 10m C- PURLINS 17
10mm Ø X 10m SAG ROD 20
ANGLE BAR CLEATS 60
WELDING ROD (KG) 1
TOTAL
CANVASS SHEET
CANVASS SHEET
CANVASS SHEET
ITEM OF WORK:
AS OF: APRIL,09 2024
FORMWORKS & STAGING
SPECIFICATION UNIT SUPPLIER 1 COST (₱)
III. FORMWORKS AND SCAFFOLDINGS
1.20m x 2.40m x 1/2" PLYWOOD per pc PhilCon ₱574.00
0.90m x 1.8m x 1/4" PLYWOOD per pc PhilCon ₱381.00
2" x 2" x 8' LUMBER (COCO) per bd.ft. PhilCon ₱20.39
2" x 2" x 10' LUMBER (COCO) per pcs. PhilCon ₱285.00
2" x 2" x 14' LUMBER (COCO) per pcs. PhilCon ₱300.00
2" x 2" x 18' LUMBER (COCO) per pcs. PhilCon ₱545.00
2" x 2" x 20' LUMBER (COCO) per pcs. PhilCon ₱650.00
2" x 2" x 22' LUMBER (COCO) per bd.ft. PhilCon ₱20.39
2" x 2" x 24' LUMBER (COCO) per bd.ft. PhilCon ₱20.39
2" x 3" x 12' LUMBER (COCO) per pcs. PhilCon ₱380.00
2" x 3" x 20' LUMBER (COCO) per pcs. PhilCon ₱950.00
ASSORTED CWN kgs. PhilCon ₱69.18
CANVASS SHEET
PREPARED BY:
CLAIRE TABOR
QS Student - BSCE 3A
CONFORME:
#REF!
HEET
HEET
HEET
HEET
K. CRISTOBAL
BSCE 3A
ABOR
BSCE 3A
OSE P. PASCUA
t Instructor
PROJECT: PROPOSED TWO STOREY RESIDENCE
LOCATION: DILAN PAURIDO ,URDANETA CITY PANGASINAN
SUBJECT: CE 111 - QUANTITY SURVEYING
MASONRY WORKS
USING 10 X 20 X 40 CM CHB
A. CONCRETE HOLLOW BLOCKS
FOR GROUND FLOOR
AREA NO. PER sq.m NO. OF PCS
12.61 12.5 158
23.78 12.5 297
23.78 12.5 297
15.54 12.5 194
14.79 12.5 185
19.30 12.5 241
19.44 12.5 243
12.61 12.5 158
5.44 12.5 68
11.94 12.5 149
11.84 12.5 148
TOTAL: 2138
B. MORTAR FOR BLOCK LAYING
AVERAGE THICKNESS (0.0125)
THICKNESS WIDTH LENGTH VOLUME (CUBIC METER)
0.0125 0.1 16 0.02
TOTAL VOLUME: 0.2
AREA (M2) 48
REFER TO TABLE 3-4
VERTICAL REINFORCEMENT AT 80CM
NO. OF PIECES
48 1.6 76.8 12.8
TOTAL NO. OF PIECES OF 10MM X 6.0 RSB 13
VERTICAL REINFORCEMENT EVERY 3 LAYERS
NO. OF PIECES
48 2.15 103.2 17.2
TOTAL NO. OF PIECES OF 10MM X 6.0 RSB 18
G. GI TIE WIRE
REFER TO TABLE 3-5
USING 25 CM TIE WIRE
TILE WORKS
FLOOR FINISH 1
0.60 X0.60 CERAMIC TILES FLOOR FINISH (GLAZE)
LOCATION LENGTH WIDTH AREA
LIVING ROOM 3.63 4.66 16.9158
BEDROOM 1 3.32 3.78 12.5496
FLOOR FINISH 2
0.60 X0.60 TEXTURE CERAMIC TILES FLOOR FINISH (GLAZE)
LOCATION LENGTH WIDTH AREA
KITCHEN 2.32 3.18 7.3776
BEDROOM 2 3.07 3.18 9.7626
BEDROOM 3 2.88 2.3 6.624
MASTERS BEDROOM 3.32 3.78 12.5496
FLOOR FINISH 3
0.20 X 0.20 CERAMIC TILES FLOOR FINISH (UNGLAZE)
LOCATION LENGTH WIDTH AREA
TOILET AND BATH GROUND FLOOR 2.72 2.5 6.8
TOILET AND BATH (MASTERS) 2.72 2.5 6.8
FLOOR FINISH 4
0.60 X 0.60 CERAMIC FLOOR TILES UNGLAZE
LOCATION LENGTH WIDTH AREA
BALCONY 3.63 2.28 8.2764
FLOOR FINISH 4
0.60 X 0.60 CERAMIC FLOOR TILES UNGLAZE
LOCATION LENGTH WIDTH AREA
BALCONY 3.63 2.28 8.2764
TOTAL AREA
FF1 29.4654 30
FF2 36.3138 37
FF3 13.6 14
FF4 8.2764 9
FLOOR FINISH 1
TOTAL AREA = 30 SQM
200 CM X 200 CM CERAMIC TILES FLOOR FINISH (GLAZE)
REFER TO TABLE
NUMBER OF TILES
AREA MULTIPLIER NUMBER OF PIECES
30 26 780
SAY 780 PIECES OF 200 CM BY 200 CM CERAMIC GLAZED TILES
PORTLAND CEMENT
REFER TO TABLE
AREA MULTIPLIER NUMBER OF BAGS
30 0.33 9.9
SAY 10 BAGS OF PORTLAND CEMENT
SAND
REFER TO TABLE
FLOOR FINISH 2
TOTAL AREA = 37 SQM
200 CM BY 200 CM TEXTURE CERAMIC TILES FLOOR FINISH (GLAZE)
REFER TO TABLE
NUMBER OF TILES
AREA MULTIPLIER NUMBER OF PIECES
37 26 962
SAY 962 PIECES OF 200 CM BY 200 CM CERAMIC GLAZED TILES
PORTLAND CEMENT
REFER TO TABLE
FLOOR FINISH 3
TOTAL AREA = 14 SQM
600 MM X 600 MM CERAMIC TILES FLOOR FINISH (UNGLAZE)
REFER TO TABLE
NUMBER OF TILES
AREA MULTIPLIER NUMBER OF PIECES
14 2.92 40.88
SAY 41 PIECES OF 600 MM X 600 MM CERAMIC TILES FLOOR FINISH (UNGLAZE)
PORTLAND CEMENT
REFER TO TABLE
NUMBER OF TILES
AREA MULTIPLIER NUMBER OF PIECES
6 2.92 17.52
SAY 18 PIECES OF 600 MM X 600 MM CERAMIC TILES FLOOR FINISH (UNGLAZE)
PORTLAND CEMENT
REFER TO TABLE
WALL FINISHES
WF2 (4 LAYER OF 200 CM BY 200 CM CERAMIC TILES) GLAZE
LOCATION LENGTH OF WALL
KITCHEN 3.07
BEDROOM 2 3.07
BEDROOM 3 2.88
TOTAL 9.02
TOTAL AREA = 10 SQM
200 CM X 200 CM CERAMIC TILES FLOOR FINISH (GLAZE)
REFER TO TABLE
NUMBER OF TILES
AREA MULTIPLIER NUMBER OF PIECES
10 26 260
HEIGHT OF WALL 3.4O METERS
TOTAL LAYERS 17 4 LAYERS 62 PIECES OF TILES
SAY 62 PIECES OF 200 CM BY 200 CM CERAMIC GLAZED TILES
PORTLAND CEMENT
REFER TO TABLE
PAINTING WORKS
WALLS LENGTH AREA
WALL 1 0.275 0.935
WALL 2 0.425 1.445
WALL 3 15.45 52.53
WALL 4 1.65 5.61
WALL 5 1.025 3.485
WALL 6 1.05 3.57
WALL 7 1.25 4.25
WALL 8 0.45 1.53
WALL 9 0.5 1.7
WALL 10 5.05 17.17
WALL 11 0.275 0.935
WALL 12 0.425 1.445
WALL 13 12.35 41.99
WALL 14 1.65 5.61
WALL 15 1.025 3.485
WALL 16 1.05 3.57
WALL 17 1.25 4.25
WALL 18 0.45 1.53
WALL 19 0.5 1.7
WALL 20 5.05 17.17
TOTAL AREA: 173.91
CONCRETE NEUTRALIZER
TOTAL AREA MULTIPLIER NUMBER OF GALLON
173.91 30 5.8
NO. OF PINTS CONCRETE NEUTRALIZER 2.4
SAY 3 PINTS
1 PINT IS EQUAL TO 0.473 LITERS
ACRYLIC LATEX PAINT AT 40SQM PER 4 LITERS
TOTAL AREA MULTIPLIER NUMBER OF CANS
173.91 40 4.35
SAY 5 CANS
FOR SECOND COAT
NUMBER OF CANS MULTIPLIER TOTAL
5 2 10
ADD 10 &
ORDER 11 CANS AT 4 LITER
SUMMARY OF MATERIALS (PAINTING WORKS)
MATERIALS QUANTITY AREA TOTAL GALLON
CONCRETE NEUTRALIZER 0.02 174 3.48
CONCRETE PRIMER 0.04 174 6.96
PATCHING COMPOUND 0.05 174 8.7
SEMIGLOSS (DOUBLE COAT) 0.08 174 13.92
WOOD /TIMBER PAINTING MATERIALS
MATERIALS QUANTITY AREA TOTAL
GLAZING PUTTY 0.05 174 8.7
FLAT WALL ENAMEL 0.04 174 6.96
ENAMEL QUICK DRY 0.04 174 6.96
PAINT THINNER 0.25 174 43.5
TINTING COLOR 0.01 174 1.74
METAL/STEEL PAINTING MATERIALS (PER SQM)
MATERIALS QUANTITY AREA TOTAL
RED OXIDE PRIMER 0.04 174 6.96
ENAMEL PAINT 0.1 174 17.4
PAINT THINNER 0.25 174 43.5
TINTING COLOR 0.01 174 1.74
DOORS
3'' X 6'' DOOR JAMB
DOORS HEADER JAMB QUANTITY
D1 4 8 4
D2 3 7 2
D3 3 7 2
AD1 8 7 1
AD2 6 7 1
ORDER
HEADER JAMB
3'' X 6'' X 14' 3'' X 6'' X 16'
3'' X 6'' X 14' 3'' X 6'' X 16'
3'' X 6'' X 14' 3'' X 6'' X 16'
3'' X 6'' X 18' 3'' X 6'' X 16'
3'' X 6'' X 16' 3'' X 6'' X 16'
SUMMARY OF MATERIALS (DOOR JAMBS)
3'' X 6'' X 14' 8 PCS
3'' X 6'' X 16' 1 PC
3'' X 6'' X 18' 1 PC
SUMMARY OF MATERIALS (DOOR HEADER)
3'' X 6'' X 16' 1O PCS
WINDOWS
WINDOWS JAMBS HEADER/SILL MULION
W1 8 FT 4 FT 4 FT
W2 8 FT 4 FT 4 FT
W3 8 FT 7 FT 4 FT
W4 5 FT 12 FT 3 FT
W5 3 FT 5 FT 3 FT
W6 3 FT 2 FT 1.5 FT
WINDOWS TRANSCOM QUANTITY
W1 4 FT 3
W2 4 FT 2
W3 7 FT 4
W4 12 FT 1
W5 5 FT 1
W6 2 FT 1
SUMMARY OF MATERIALS (WINDOW JAMBS)
3'' X 6'' X 8' 9 PCS
3'' X 6'' X 6' 1 PC
3'' X 6'' X 4' 2 PCS
SUMMARY OF MATERIALS (WINDOW HEADER/SILL)
3'' X 6'' X 12' 1 PC
3'' X 6'' X 8' 5 PCS
3'' X 6'' X 6' 6 PCS
3'' X 6'' X 4' 1 PC
SUMMARY OF MATERIALS (WINDOW MULION)
3'' X 6'' X 6' 12 PCS
SUMMARY OF MATERIALS (WINDOW TRANSOM)
3'' X 6'' X 12' 1 PC
3'' X 6'' X 10' 5 PCS
3'' X 6'' X 6' 6 PCS
3'' X 6'' X 4' 1 PC
WINDOW FRAMES
WINDOWS JAMBS HEADER/SILL MULION
W1 8 FT 4 FT 4 FT
W2 8 FT 4 FT 4 FT
W3 8 FT 7 FT 4 FT
W4 5 FT 12 FT 3 FT
W5 3 FT 5 FT 3 FT
W6 3 FT 2 FT 1.5 FT
WINDOWS TRANSCOM QUANTITY
W1 4 FT 3
W2 4 FT 2
W3 7 FT 4
W4 12 FT 1
W5 5 FT 1
W6 2 FT 1
FIBER GLASS FRAME WINDOW
WINDOWS SIZE TOTAL LENGTH TO BE FRAMED
W1 32
W2 32
W3 56
W4 60
201
W5 15
W6 6
FIBER GLASS FRAME TO BE ORDER (1/2 INCH)
SIZE OF CUT (SQ.FT) TOTAL PIECES SAY 3 PIECES OF 80 SQ.FT 1/2 INCH FIBER
80 2.5125 GLASS
CEILING WORKS
FLOOR AREA (1ST FLOOR)
DESCRIPTION LENGTH WIDTH AREA
LIVING ROOM 3.85 6.225 23.96625
BEDROOM (1ST FLOOR) 3.875 4 15.5
TOILET AND BATH 2.35 2.9 6.815
KITCHEN 3.075 4.1 12.6075
FLOOR AREA (2ND FLOOR)
DESCRIPTION LENGTH WIDTH AREA
MASTER BEDROOM 3.8 5.05 19.19
T &B MASTER BEDROOM 2 2.9 5.8
BEDROOM 2 4.1 3.075 12.6075
BEDROOM 3 3.85 3.075 11.83875
HALLWAY 1.18 5.85 6.903
TOTAL AREA OF
115.228
GROUND AND SECOND FLOOR
SAY 116 SQM
TIMBER-FRAMED CEILING
REFER TO TABLE
INTERIOR CEILING
ROOFING WORKS
LENGTH = 11.3M
G.I SHEETS
REFER TO TABLE 6-8
OTHER FINISHES
FLOOR FINISH 5 AND FLOOR FINISH 6
NON-SKID CEMENT FLOOR FINISH
NON-SKID PLAIN CEMENT FLOOR FINISH
LOCATION LENGTH WIDTH AREA
PORCH 3.63 2.28 8.2764
BALCONY 2.88 2.32 6.6816
FRONT STAIRS 0.6 3.63 2.178
BACK STAIRS 0.6 2.28 1.368
TOTAL AREA 18.504
SAY 19 SQM
REFER TO TABLE 2-1
USING CLASS C MIXTURE (40KG CEMENT)
CEMENT (PCS.) SAND (M3)
142.5 9.5
SAY 143 BAGS OF 40 KGS. CEMENT "B" SAY 9.5 CUBIC METER OF SAND
PREPARED BY:
CLAIRE TABOR
QS Student - BSCE 3A
CONFORME:
CANVASS SHEET
ITEM OF WORK:
AS OF: MAY 19, 202
ARCHITECTURAL WORKS
SPECIFICATION UNIT SUPPLIER 1 COST (₱)
MASONRY WORKS
CONCRETE HOLLOW BLOCKS PCS Topmost Hardware ₱19.00
CEMENT BAGS PhilCon ₱248.00
SAND CUBIC PhilCon ₱500.00
GRAVEL CUBIC PhilCon ₱530.00
10 MM X 6 M RSB PCS PhilCon ₱162.00
NO. 16 G.I TIE WIRE KGS PhilCon ₱65.00
CANVASS SHEET
ITEM OF WORK:
AS OF: MAY 19, 202
ARCHITECTURAL WORKS
SPECIFICATION UNIT SUPPLIER 1 COST (₱)
TILE WORKS
200 CM X 200 CM GLAZED TILES PCS Wilcon ₱1,020.00
PORTLAND CEMENT BAGS PhilCon ₱45.00
SAND CUBIC PhilCon ₱500.00
GRAVEL CUBIC PhilCon ₱530.00
TILE GROUT BAGS Wilcon ₱145.00
600 MM X 600 MM UNGLAZED TILES PCS Wilcon ₱1,560.00
CANVASS SHEET
ITEM OF WORK:
AS OF: MAY 19, 202
ARCHITECTURAL WORKS
SPECIFICATION UNIT SUPPLIER 1 COST (₱)
PAINTING WORKS
CONCRETE NEUTRALIZER 4 Liters Evercoat Painting ₱562.00
CONCRETE PRIMER 4 Liters Paint Republic ₱675.00
PATCHING COMPOUND 5Kgs SampCloudMan ₱763.37
SEMIGLOSS (DOUBLE COAT) Liter CMS Paint Depot ₱3,321.00
GLAZING PUTTY Liter Brix Industries ₱224.00
FLAT WALL ENAMEL Gallon Gazelle Building ₱790.00
ENAMEL QUICK DRY 4Liters Gazelle Building ₱813.00
PAINT THINNER 4 Liters Cane Industrial ₱420.00
TINTING COLOR Liters Evercoat Painting ₱523.00
RED OXIDE PRIMER 4 Liters SCL Hardware ₱559.00
ENAMEL PAINT 4 Liters Gazelle Building ₱980.00
CANVASS SHEET
ITEM OF WORK:
AS OF: MAY 19, 202
ARCHITECTURAL WORKS
SPECIFICATION UNIT SUPPLIER 1 COST (₱)
DOORS AND WINDOWS
3'' X 6'' X 18' PCS PhilCon ₱1,900.00
3'' X 6'' X 16' PCS PhilCon ₱1,700.00
3'' X 6'' X 14' PCS PhilCon ₱1,590.00
3'' X 6'' X 12' PCS PhilCon ₱1,376.00
3'' X 6'' X 10' PCS PhilCon ₱1,267.00
3'' X 6'' X 8' PCS PhilCon ₱1,112.00
3'' X 6'' X 6' PCS PhilCon ₱1,112.00
3'' X 6'' X 4' PCS PhilCon ₱1,112.00
80 SQ.FT FIBER GLASS PCS PhilCon ₱150.00
CANVASS SHEET
ITEM OF WORK:
AS OF: MAY 19, 202
ARCHITECTURAL WORKS
SPECIFICATION UNIT SUPPLIER 1 COST (₱)
CEILING WORKS
80 SQ.FT FIBER GLASS PCS PhilCon ₱150.00
1.20 X 2.40 PLYWOOD PCS PhilCon ₱580.00
4' x 8' FICEM BOARD PCS JamesHardie ₱877.00
4' x 8' GYPSUM BOARD PCS Ritemore Enterprise ₱440.00
METAL FURING (5m) PCS Metalink ₱121.00
CARRYING CHANNEL (5m) PCS Metalink ₱125.00
HANGER ROD PCS Metalink ₱12.00
CHANNEL CLIP PCS Metalink ₱4.00
WALL ANGLE (3m) PCS Cebu Bulders ₱55.00
RIVET BOX Cebu Bulders ₱150.00
METAL SCREW PCS Cebu Bulders ₱170.00
CANVASS SHEET
ITEM OF WORK:
AS OF: MAY 19, 202
ARCHITECTURAL WORKS
SPECIFICATION UNIT SUPPLIER 1 COST (₱)
ROOFING WORKS
0.80 X 1.80 G.I SHEETS PCS Shopee ₱900.00
CANVASS SHEET
ITEM OF WORK:
AS OF: MAY 19, 202
ARCHITECTURAL WORKS
SPECIFICATION UNIT SUPPLIER 1 COST (₱)
OTHERS
10mm X 10mm SQUARE STEEL BAR PCS Shopee ₱220.00
30mm X 30mm SQUARE STEEL BAR PCS RS Pro Stainless ₱456.12
30mm x 30 mm SQUARE STEEL BAR PCS RS Pro Stainless ₱7,849.00
PREPARED BY:
CLAIRE TABOR
QS Student - BSCE 3A
CONFORME:
TILE WORKS
SPECIFICATION QTY.
200 CM X 200 CM GLAZED TILES 1804
PORTLAND CEMENT 33
SAND 6
GRAVEL 1
TILE GROUT 14
600MM X 600 MM UNGLAZED TILES 59
TOTAL
PAINTING WORKS
SPECIFICATION QTY.
CONCRETE NEUTRALIZER 4
CONCRETE PRIMER 7
PATCHING COMPOUND 9
SEMI GLOSS (DOUBLE COAT) 14
GLAZING PUTTY 9
FLAT WALL ENAMEL 7
ENAMEL QUICK DRY 7
PAINT THINNER 88
TINTING COLOR 4
RED OXIDE PRIMER 7
ENAMEL PAINT 18
CAMEL HAIR PAINT BRUSH 10
PAINT ROLLER 4 INCHES 10
TOTAL
CEILING WORKS
SPECIFICATION QTY.
1.20 X 2.40 PLYWOOD 335
TOTAL
ROOFING WORKS
SPECIFICATION QTY.
0.80 X 1.80 G.I SHEETS 13.5
0.80 X 3.60 G.I SHEETS 13.5
0.80 X 2.40 G.I SHEETS 13.5
RIVETS 6.5
G.I WASHERS 18
G.I STRAP 4
LEAD WASHERS 15.5
TOTAL
OTHERS
SPECIFICATION QTY.
10mm X 10 mm SQUARE STEEL BAR 34
30mm X 30 mm SQUARE STEEL BAR 4
30mm X 30 mm SQUARE STEEL BAR 7
TOTAL
HEET
HEET
HEET
HEET
HEET
HEET
AY K. CRISTOBAL
t - BSCE 3A
E TABOR
t - BSCE 3A
E ROSE P. PASCUA
ment Instructor
HITECTURAL WORKS)
ORKS
UNIT COST TOTAL COST
₱20.00 ₱42,760.00
₱250.00 ₱20,000.00
₱530.00 ₱5,830.00
₱550.00 ₱550.00
₱192.00 ₱5,952.00
₱75.00 ₱75.00
₱75,167.00
KS
UNIT COST TOTAL COST
₱1,050.00 ₱1,894,200.00
₱50.00 ₱1,650.00
₱530.00 ₱3,180.00
₱550.00 ₱550.00
₱150.00 ₱2,100.00
₱1,560.00 ₱92,040.00
₱1,993,720.00
ORKS
UNIT COST TOTAL COST
₱700.00 ₱2,800.00
₱750.00 ₱5,250.00
₱763.00 ₱6,867.00
₱3,321.00 ₱46,494.00
₱240.00 ₱2,160.00
₱790.00 ₱5,530.00
₱813.00 ₱5,691.00
₱575.00 ₱50,600.00
₱560.00 ₱2,240.00
₱579.00 ₱4,053.00
₱1,091.00 ₱19,638.00
₱576.00 ₱5,760.00
₱1,096.00 ₱10,960.00
₱168,043.00
NDOWS
UNIT COST TOTAL COST
₱1,900.00 ₱1,900.00
₱1,700.00 ₱18,700.00
₱1,590.00 ₱12,720.00
₱1,376.00 ₱2,752.00
₱1,267.00 ₱6,335.00
₱1,112.00 ₱15,568.00
₱1,112.00 ₱27,800.00
₱1,112.00 ₱4,448.00
₱90,223.00
RKS
UNIT COST TOTAL COST
₱580.00 ₱194,300.00
₱194,300.00
ORKS
UNIT COST TOTAL COST
₱900.00 ₱12,150.00
₱1,730.00 ₱23,355.00
₱1,450.00 ₱19,575.00
₱169.79 ₱1,103.64
₱150.00 ₱2,700.00
₱1,900.00 ₱7,600.00
₱165.31 ₱2,562.31
₱69,045.94
NT ₱2,654,746.42