REGISTRO DE OPERACIONES /

PUNTO FIRMA DE OFICIALES


FECHA CODIGO (LETRA)
(NUMERO) EMCARGADOS
Date Code (letter)
Item (number) Record of Operations/signature of
Officials in charge
10th Aug R-22 (2kg) leaked from Provision Fridge Compressor to the
PART III - A 1.3.2 atmosphere (not deliberately)Ships position: 35-23.0 N/150-38.0E
2010

//Signature of Engineer in Charge – Name / Rank // & //Date//


11th Aug Renewed discharging valve of Provision Fridge Compressor
PART III - A 1.2
2010 Ships position: 35-23.0 N/150-38.0E
11th Aug Charged R-22(4kg) to Provision Fridge Compressor
PART III - A 1.1
2010 Ships position: 35-23.0 N/150-38.0E Ozone
Discharged R-22 (1/2kg) from Provision Fridge Compressor to depleting
11th Aug
PART III - A 1.3.1 the atmosphere deliberately for purging substances
2010
Ships position: 35-23.0 N/150-38.0E

//Signature of Engineer in Charge – Name / Rank // & //Date//


15th Aug Discharged R-22(15Kg) to the shore facility
PART III - A 1.4
2010 Ships position: 35-23.0 N/150-38.0E
15th Aug Received R-22 (20kb) onboard
PART III - A 1.5
2010 Ships position: 35-23.0 N/150-38.0E
//Signature of Engineer in Charge – Name / Rank // & //Date//

16th Sept Singapore


H 26.1
2010
H 26.2 Started 0900 LT / Finished 1800 LT
IFO380 3500.00 MT
H 26.3 Bunkering
No. X FO Tank (P) 0 954.0 MT
No. X FO Tank (S) 0  986.0 MT
OUT SIDE
No. Y FO Tank (S) 0 1560.0 MT
Emission
16th Sept Ships position 1-16.5N, 103-52.4E Control
PART III - B 2 Area
2010 Type of fuel: RMG380, API: 12.89, Density@15°C: 980.0kg/m3
Sulphur content: 3.8%

//Signature of Engineer in Charge – Name / Rank // & //Date//


REGISTRO DE OPERACIONES /
PUNTO FIRMA DE OFICIALES
FECHA CODIGO (LETRA)
(NUMERO) EMCARGADOS
Date Code (letter)
Item (number) Record of Operations/signature of
Officials in charge
Change over HFOLSFO completed, 06 Oct, 1330 hrs
06th Oct 2010 PART III - B 5 >> 3
Ships position: xx-xx.xx N/yy-yy.yyE
Total LSFO - 700m3
Sett tk - 60 m3
FO switch
ENTERING
Serv tk - 60 m3
No X FO tank (P) - 280 m3 Emission
Control
No X FO tank (S) – 300 m3 Area.

//Signature of Engineer in Charge – Name / Rank // & //Date//

10th Oct 2010 H 26.1 Rotterdam

H 26.2 Started 0800 LT / Finished 2000LT


IFO380 4000.00 MT
H 26.3
No. X FO Tank (P) 0  1000.0 MT
No. X FO Tank (S) 0  1000.0 MT
No.Y FO Tank (P) 0 2000.0 MT
Ships position 51-55.0N, 4-30.0E Bunkering
10th Oct 2010 PART III - B 2
Type of fuel: RMG380, API: 12.89, Density@15°C: 980.0kg/m3
IN SIDE
Sulphur content: 3.8% Emission
Control
//Signature of Engineer in Charge – Name / Rank // & //Date// Area.

10th Oct 2010 PART III - B 3.1 Sulphur content of Fuel used does not exceed 1.0% m/m.
Confirm separate FO Tanks are available for storing Low &
Normal Sulphur FO (tank arrangement attached to ORB) and FO
10th Oct 2010 PART III - B 4
switching arrangement & procedure available on board ( attached
to ORB)
//Signature of Engineer in Charge – Name / Rank // & //Date//
REGISTRO DE OPERACIONES /
PUNTO FIRMA DE OFICIALES
FECHA CODIGO (LETRA)
(NUMERO) EMCARGADOS
Date Code (letter)
Item (number) Record of Operations/signature of
Officials in charge
16th Oct 2010 Change over LSFOHFO commenced, 16 Oct, 0845 hrs
PART III - B 5 >> 3
Ships position: xx-xx.xx N/yy-yy.yyE
Total LSFO - 300m3 FO switch
Sett tk - 40 m3 EXITING
Serv tk - 40 m3 Emission
No X FO tank (P) - 120 m3
Control
No X FO tank (S) – 100 m3 Area.

//Signature of Engineer in Charge – Name / Rank // & //Date//

20 Oct 2010 0.2m3, Solid sludge by Waste Oil Incinerator


C 12.3
1.0 hr (Started 0900 LT / Finished 1000 LT)
0.5m3 sludge from W.O Service tank by Waste Oil Incinerator
C 12.3
7.0 hrs (Started 1000 LT / Finished 1700 LT)

Retained in W.O. Service Tank (1.1 0.6m3)

//Signature of Engineer in Charge – Name / Rank // & //Date// Incinerator


operation
20 Oct 2010 Start: xx-xx.xx N / yy-yy.yyE Time XXXX hrs
Part III - D 7 >> 5
Stop: xx-xx.xxN / yy-yy.yyE Time XXXX hrs
Average O2 in combustion chamber = 8.7% (as per type approval
Part III - D 8 >> 6
cert if O2 meter not fitted to monitor O2 content continuously)
Part III - D 9 >> 7 Combustion chamber gas outlet temp = xxx deg. C

//Signature of Engineer in Charge – Name / Rank // & //Date//