10-10 SHEET METAL FIELD

10-12 S.M. FIELD OVERTIME


10-15 SHEET METAL - Detailing Labor
10-17 SHEET METAL DETAILING LABOR OT
10-20 SHEETMETAL SHOP
10-22 S.M. SHOP OVERTIME
10-25 INSULATORS SHOP
10-27 INSULATORS SHOP - OVERTIME
10-30 SHEETMETAL MAINTENANCE
10-40 PIPEFITTERS/FITTING
10-42 P.F./FITTING OVERTIME
10-50 PIPEFITTERS-SERVICE
10-52 P.F./SVC. OVERTIME
10-55 PIPEFITTERS/START-UP
10-57 P.F./START-UP OVERTIME
10-60 WAREHOUSE & DRIVERS
10-62 W.H. & DRIVERS OVERTIME
10-65 INSULATORS
10-67 INSULATORS OVERTIME
10-70 ENGINEERING & DESIGN
10-72 ENG. & DESIGN OVERTIME
10-75 VN CAD
10-76 PI CAD
10-80 MANAGEMENT
10-82 MANAGEMENT OVERTIME
10-85 MANAGEMENT - OTHER
10-87 MANAGEMENT - OTHER OVERTIME
10-90 CONTROLS
10-92 CONTROLS - OVERTIME
20-10 SUBCONTRACT COSTS
30-10 L&P: PLAN CHECK
30-20 L&P: PERMITS
30-30 L&P: SURETY BONDS
30-60 TRAVEL
40-10 EQUIPMENT JOB COST
40-15 EQUIPMENT/TOOLS ON SITE
40-20 WELDING GAS CHARGES
40-25 EQUIPMENT RENTAL
50-00 MATERIALS
50-10 SHEETMETAL MATERIALS
50-15 ROUND DUCT MATERIALS
50-17 ROUND DUCT MATERIALS - LINED
50-20 PIPING MATERIALS
50-25 PARTS & MATERIALS SVC./PM
50-30 START-UP MATERIALS
50-35 INSULATOR MATERIALS
50-40 CONTROLS
60-65 CONTINGENCY