Professional Documents
Culture Documents
Earthing Documentation
Earthing Documentation
General Information
Proprietor of the building
Name: The Nook Hotel
Drawings, photos
Implementation plans, Photos of the overall earth-termi- Sample photos of connection
drawing No.: nation system points
Purpose of documentation
Acceptance / Completion Repeat test
Continuity test
Test result of the continuity test between the connection parts ≤ 0,2 W achieved? Yes No
Test result
The system is according to the existing plans: Yes No
The system is without deficiencies with regard to the requirements of DIN 18014:2014-03: Yes No
The test revealed the following deficiencies:
Stamp
Location Date
Consultants Signature