Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PLAN VIEW

FRONT ELEVATION RIGHT SIDE ELEVATION

REPUBLIC ACT NO.9266


OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED
PROJECT TITLE: TITLE: PERSPECTIVE SELLING AREA QTY: 1 SHEET NO.
AND SEALED, AS AN INSTRUMENT OF SERVICE ARE THE INTELLECTUAL PROERTY AND
DOCUMENTS OF ICITC, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS MATERIAL: TUBULAR TRUSS TYPE AND PLYBOARD CLADDING
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR MAKE
COPIES OF THE SAID DOCUMENTS FOR THE REPETITION OF AND FOR THE OTHER PROJECTS DRAWN BY: MARK KENJI B. QUIACHON AND JONATHAN REYES
OR BUILDINGS, WHETHER EXECUTED PARTLY OR AS A WHOLE, WITHOUT THE WRITTEN
CONSENT OF ICITC OR AUTHOR OF THE SAID DOCUMENTS
All measurements are to be verified on site by the contractor. All discrepancies are to be
immediately reported to the designers and project managers. Contractors are to prepare
and submit shop drawings for designers approval prior to commencement of work. Failure
to do so, frees the designer from any liabilities on the design and its construction.
CHESTERFIELD BOOTH CHECKED BY:
APPROVED BY:
DATED RELEASED:
ENGR. RAFAEL TENSUAN
ENGR. RAFAEL TENSUAN
4/19/24
4

You might also like