Vnat Ti&Pb-weekly Qsir-Ww11'23
Vnat Ti&Pb-weekly Qsir-Ww11'23
GF Install instructions
Entegris Flaretek Section IX
GF install Instructions
Section IX
GF install Instructions Entegris Flaretek
Code Requirements Other
Proj
WORK WEEK WW41 WW42 WW43 WW44 WW45 WW46
Overall Line Inspected (In-Progress) 13 13 18 46 48 26
(In-
CSA 2 5 3 3 0 0
Progress)
INSPECTED
LINE
MECHANICAL 4 3 10 18 4 14
ELECTRICAL 7 5 5 25 44 12
LSS 0 0 0 0 0 0
Overall NCR Rate 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
(In Progress)
MECHANICAL 0 0 0 0 0 0
ELECTRICAL 0 0 0 0 0 0
LSS 0 0 0 0 0 0
NCR Closed 0 0 0 0 0 0
NCR Open 0 0 0 0 0 0
NCR Closure by week 0 0 0 0 0 0
NCR
Overall NCR Closure (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
No. of FIF 2 3 0 0 0 0
No. of FIF Closed 2 3 0 0 0 0
No. of FIF Open 0 0 0 0 0 0
FIF
Structural Works 0 0 0 0 0 0
Architectural works (Cleanroom/ID) 0 0 0 0 0 0
Cables
MECHANICAL ELECTRICAL
0 0 0 0 0 0
& ELV
LSS
Low 1 0 0 0 0 0
RISK LEVEL Medium 0 2 0 0 0 0
High 1 1 0 0 0 0
Critical 0 0 0 0 0 0
Non-Critical 0 0 0 0 0 0
Project scope Handover summary
WW47 WW48 WW49 WW50 WW51 WW52 WW53 WW1'23 WW2'23 WW3'23 WW4'23 WW5'23 WW6'23 WW7'23
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
100% 100% #DIV/0! 100% 100% 100% 100% 100% 100% #DIV/0! #DIV/0! #DIV/0! 100% #DIV/0!
41 44 0 17 11 1 1 31 13 0 0 0 23 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Findings Type
TI-Fuji CAC-Utility Inspection Tool VNAT TI TI B-E/28-29 11' 2023 14/03/2023 Cuong Tai Kumar N/A In-Progress Electrical Electrical Walk CSB001 Fuji CAC 0 3 N/A N/A N/A N/A NA NA NA NA N/A N/A N/A
CSB001.
TI-FujiCAC-QAQC for tools CSB001 VNAT TI TI B-E/28-29 11' 2023 14/03/2023 Cuong Tai Kumar N/A Final Electrical Electrical Walk CSB001 Fuji CAC 0 3 N/A N/A N/A N/A NA NA NA NA N/A N/A N/A
ntel1922- FUJI CAC PB Nov' Batch VNAT PB Dis Nov'21 Batch K22A 11' 2023 15/03/2023 Hai Tu Kumar QAM- Final Electrical Electrical Walk FORM 4 PANEL Fuji CAC 1 6 DWN Other Insufficient N/A Provide Redline Drawing & As-built Drawing for the Submit Redline Drawing 23/3/2023 OPEN NON-CRITICAL
2,3 - T&C F4 panels TS1D2H25C 2,3 Kumar TS1D2H25C. Documents/Dwg changes in cable routing and tray installation.
ntel1922- FUJI CAC PB Nov' Batch VNAT PB Dis Nov'21 Batch K22A 11' 2023 15/03/2023 Hai Tu Kumar QAM- Final Electrical Electrical Walk FORM 4 PANEL Fuji CAC 1 6 DWN Workmanship Detailed Poor Workmanship N/A Pending Earth Loop Impedance Test since no relevant Conducted 20/3/2023 20/3/2023 4 CLOSED NON-CRITICAL
2,3 - T&C F4 panels TS1D2H25C 2,3 Kumar TS1D2H25C. Description testing equipment brought on-site
ntel1922- FUJI CAC PB Nov' Batch VNAT PB Dis Nov'21 Batch K22A 11' 2023 15/03/2023 Hai Tu Kumar QAM- Final Electrical Electrical Walk FORM 4 PANEL Fuji CAC 1 6 DWN Workmanship Detailed Poor Workmanship N/A Earth Cable contacting with Neutral Bar inside the MSB Rectify during next warmdown N/A OPEN NON-CRITICAL
2,3 - T&C F4 panels TS1D2H25C 2,3 Kumar TS1D2H25C. Description panel
ntel1922- FUJI CAC PB Nov' Batch VNAT PB Dis Nov'21 Batch K22A 11' 2023 15/03/2023 Hai Tu Kumar QAM- Final Electrical Electrical Walk FORM 4 PANEL Fuji CAC 1 6 DWN Equipment Labels poor/ wrong N/A Remove 'SPARE' tag at MSB panel Removed 20/3/2023 16/3/2023 1 CLOSED NON-CRITICAL
2,3 - T&C F4 panels TS1D2H25C 2,3 Kumar TS1D2H25C. labelling/Tagged
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
System/
SITE FINDINGS DESCRIPTOR FCE
No. Inspection Description Site/ Const. Project Area/Tool ID Work Week Date Observed Foreman QCR QAR Captured Inspection Discipline Inspection Type Equipment/ Trade Qty of Lines Finding Root Cause IMCS/Spec Findings Description Corrective Action Target Actual Closure Days to Status Risk Level Remarks
Building Phase Observed (DB PE) (DB QAQC) (QAM) By Phase Tool ID Supplier Finding Inspected Category Closure Date date Rectify
Findings Type
Overall Finding
17.5
12.5
7.5
3
2
2.5 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
WW41 WW42 WW43 WW44 WW45 WW46 WW47 WW48 WW49 WW50 WW51 W
Findings
FIF 2 3 0 0 0 0 1 1 1 0 0
NCR 0 0 0 0 0 0 0 0 0 0 0
PUNCHLIST/DWN 0 0 0 0 0 0 0 0 0 0 0
FIF Open 0 0 0 0 0 0 0 0 0 0 0
NCR Open 0 0 0 0 0 0 0 0 0 0 0
PUNCHLIST/DWN 0 0 0 0 0 0 0 0 0 0 0
Open
TOTAL
CSA
MECHANICAL
ELECTRICAL
LSS
ROOT CAU
Poor Housekeeping 0%
0%
Inconsistent Painting 2%
0%
poor/ wrong labelling/Tagged 5%
2%
Poor Housekeeping 0%
0%
Inconsistent Painting 2%
0%
poor/ wrong labelling/Tagged 5%
2%
Poor/insufficient support 2%
0%
Poor Setting out 0%
NCR RATE
LSS 5 0
ELECTRICAL 494 0
MECHANICAL 339 0
CSA 60 0
TOTAL 898 0
FINDINGS CATEGORY
FIF 37 90%
NCR 0 0%
PUNCHLIST/DWN 4 10%
TOTAL 41
RISK LEVEL
HIGH 5 12%
MEDIUM 11 27%
LOW 21 51%
CRITICAL 0 0%
NON-CRITICAL 4 10%
41
QAM 21 51%
DB/GC 20 49%
41
ROOT CAUSE
ROOT CASUE QTY RATE
IMCS Violation (Note: defects under this category shall define as NCR-in 0 0%
Code Violation 0 0%
Non-Conformance Materials/Parts/Components 1 2%
Insufficient Documents/Dwg 3 7%
Wrong/defect material installed/Mis-use of Material 2 5%
Construction not as per IFC/approved shop dwg 2 5%
Expired materials/Testing equipments 1 2%
Design Issue (design misses/applicability) 0 0%
Competency requirement failed/Insufficient Qualification - Characterizati 0 0%
Process/BOQ/ MOS Violation 1 2%
Testing Fail 0 0%
Wrong material handling/storage/Damaged 4 10%
Site Constraints (no clearance /space management) 0 0%
Poor Workmanship 22 54%
Poor Setting out 0 0%
Wrong installation method 0 0%
Poor/insufficient support 1 2%
Esthetical issue 1 2%
poor/ wrong labelling/Tagged 2 5%
wrong colour coding 0 0%
Inconsistent Painting 1 2%
Coordination/Supervision 0 0%
Poor Housekeeping 0 0%
TOTAL 41
Overall Findings by Week
12
4 4
3
2
1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
WW49 WW50 WW51 WW52 WW53 WW1'2 WW2'2 WW3'2 WW4'2 WW5'2 WW6'2 WW7'2 WW8'2 WW9'2 WW10' WW11'
3 3 3 3 3 3 3 3 3 23 23
1 0 0 0 0 0 3 0 0 2 12 0 4 8 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
FINDINGS CATEGORY
PUNCHLIST/DWN
100.0% 10%
100.0%
100%
100%
FIF
100% 90%
ROOT CAUSE
54%
10%
RATE
100%
100%
100%
100.0%
100.0%
OPEN RATE CLOSED CLOSED RATE CLOSED TIMELY CLOSED TIMELY RATE
0% 37 100% 1 3%
#DIV/0! 0 #DIV/0! 0 #DIV/0!
50% 2 50% 0 0%
5% 39 95% 1 3%
17.5
12.5
7.5
4
2.5
0 0 0 0 0 0 0 2
WW9'2 WW10' WW11'
3 23 23
8 0 0
0 0 0
0 0 4
0 0 0
0 0 0
0 0 2
95%
100% 100%
80%
80%
60%
50%
50%
60%
40%
40%
27%
20%
5%
20%
3%
3%
12%
0%
0%
0%
FIF NCR P UNC H L I ST/ OVER AL L
DWN
0%
OPEN RATE CLOSED RATE CLOSED TIMELY RATE HIGH MED I UM LO
90% 100%
RISK LEVEL QAM VS DB/GC
100%
80%
60%
51%
51%
49%
40%
27%
20%
12%
10%
0%
0%
HIGH MED I UM L OW C R I TI C AL NON -C R I TI C AL QAM D B/ GC
GC
49%
D B/ GC
HIGHLIGHTS DETAILS
NO. WW Description
1 44 Lack of IFC drawing, DMRF during QAQC demo
DETAILS
NCR
NCR IN-PROGRESS
HIGH
CONSTRUCTION STAGE
MEDIUM
FIF
LOW
HANDOVER STAGE
NCR or DWN
CRITICAL
NON-CRITICAL
Root Cause Analysis from Vietnam
NCR can be used to the contractor requesting Construction Complete acceptance (code/spec non conformance)
Not meeting a commercial requirement in proposal or quotation. Direct impact of commissioning process and safety. Custom
may notice/ experience product deficiency. Items may impa
critical site activities/task & allow to repair/complete at later date without jeopardize schedule.
Not meeting a commercial requirement in proposal or quotation & Not affecting project schedule. Ind
impact on comissioning process and safety. Items that can be completed before final acceptance & allow equipments to opera
Defects that cause system not able to operate and/or immediately endanger operation personal. Project with critical punch
shouldn't be handed-over. So normally the project schedule will be delayed once detect critical punch. All critical punch list ite
documented must be closed prior to book the final handover meeting.
Defects during handover but not fall into critical punch definition. Project with non-critical punch can be handed-over with an
agreed close date documented.
VS
Test Failed
eter - Failure Mode Identified
apacity, Resourcing
Scheduled Delivery
ity - Complexity, Issue
7
Root Cause Analysis from Malaysia
*Based on the most common root cause & classified based on its risk level
Non-Conformance M
Insufficient Docu
Wrong/defect materi
Construction not
Expired materials/
IMCS/BOQ/ MOS Violation
Design Issue (desig
Competency requir
Testing Fail
Wrong material han
Site Constraints
Poor Workmanship
Poor Setting out
Wrong installation
Poor/insufficient s
Esthetical issue
poor/ wrong labelli
wrong colour codi
Inconsistent Painti
Coordination/Super
Poor Housekeepin
Defects list
IMCS Violation (Noted: defects under this category shall define as NCR-in progress)
Code Violation
Non-Conformance Materials/Parts
Insufficient Documents/Dwg
Wrong/defect material installed
Construction not as per IFC/approved shop dwg
Expired materials/Testing equipments
Design Issue (design misses/applicability)
Competency requirement failed
Process/BOQ/MOS Violation
Testing Fail
Wrong material handling/storage
Site Constraints (no clearance /space management)
Poor Workmanship
Poor Setting out
Wrong installation method
Poor/insufficient support
Esthetical issue
poor/ wrong labelling
wrong colour coding
Inconsistent Painting
Coordination/Supervision
Poor Housekeeping
alysis from Malaysia
d on the most common root cause & classified based on its risk level
High
Medium
Medium
Low
QAQC KPI for DB General Contractors
BB/PB/TI
FIF
Details
Construction Stage (FIF/NCR in-progress)
High Medium
Defects Overdue 3 Days 5 Days
COR Capturing by DB >70%
Lagging
COR Closure Rating >85%
COR Closure Rating Timely >85%
NCR (final) 95% (Inspection without NCR/Total line inspecte
NCR (in-progress) ?
DWN ?
ITP Zero
Leading Trainings 2/Month
Internal Audits 1/Month
Value Add Engineering 1/Month
Note: Risk level Classification will be maintained for QAM main guideline.
However, individual project indicator is subjected to approved QAP/alignment with DB & intel PM for respective proj
QAQC KPI to align with FCE KPI. To be advise by Julies/Sathesh
General Contractors
BB/PB/TI
FIF
e (FIF/NCR in-progress) Handover Stage (NCR-Final/DWN)
Low Critical Non- Critical
7 Days 1 Day 7 Days
>70%
>85%
>85%
tion without NCR/Total line inspected, use 4 weeks data)
?
?
Zero
2/Month
1/Month
1/Month
Legends
subjected to changes
fixed. CANNOT change
System/ Trade Finding
QAR Captured by Inspection Phase Discipline
Equipment Supplier Category
N/A Demo N/A
Doan QAM-Doan In-Progress CSA TCB SMART CFuji CAC FIF
Liet QAM-Liet Final Mechanical MTRB001 MAC NCR In-pro
Lap QAM-Lap Electrical HBC001 NCR Final
Kiet QAM-Kiet LSS TEC001 DWN
Kumar GC-Tai N/A
GC-Chi FRD001
GC-Thao BAL003
GC-Cuong BTR001
GC-Tu BAL204
GC-Cau HPO005
JLL-Phat BAL005
JLL-Hai BAM020
JLL-Thanh BAL002
JLL-Tuan HBC004
QAM- Kumar JDC002
BAL002
EPX206
EBO080
TCB216
HTC009
ACL006
SEC014
WET LAB
BAL009
BAL004
EPX205
EPX019
BAL001
CAM012
EPX207
PMR003
ULTRA SONIC
HDMT OKI
DFX008
HDMTGL003,004
HDMTGL01
HDMxWS#CR2061
EPX VALE1
HHV007 DEMO, DIA010 convert, ACL042 convert.
ACL042.
HDMTGL003,004 DEMO
PB OCT'22
FCE Finding CSA
Category Inspection Type
N/A N/A
FIF Architectural
NCR In-progressBaseplate Grout
NCR Final Chemical Resistant Coating
DWN Concrete Placement
Epoxy Anchors
Epoxy Reinforcing Steel
Exterior/Siding
Fab Shop Inspection
Fab Shop Steel Audit
Fire Proofing
Fire Stopping
Geo
In-Situ Load Testing
Light Gauge Cold Formed Steel
Mechanical
Non-Destructive Testing of Welds (UT, MT
Onsite Steel-Bolting
Onsite Steel-Welding
Painting and Coatings
Pile Installation (Driven, Cast-in-Place)
Post Tension Concrete
Proprietary Anchors
Reinforced Concrete
Reinforcing Steel
Soils
Structural Glazing
Structural Masonry
Structural Steel Welding/Bolting
Structural Wood
Un-Reinforced Concrete
Water Proofing
Wedge Anchors
Other
N/A
IMCS Violation (Note: defects under this category shall define as NCR-in progress)
Code Violation
Non-Conformance Materials/Parts/Components
Insufficient Documents/Dwg
Wrong/defect material installed/Mis-use of Material
Construction not as per IFC/approved shop dwg
Expired materials/Testing equipments
Design Issue (design misses/applicability)
Competency requirement failed/Insufficient Qualification - Characterization
Process/BOQ/ MOS Violation
Testing Fail
Wrong material handling/storage/Damaged
Site Constraints (no clearance /space management)
Poor Workmanship
Poor Setting out
Wrong installation method
Poor/insufficient support
Esthetical issue
poor/ wrong labelling/Tagged
wrong colour coding
Inconsistent Painting
Coordination/Supervision
Poor Housekeeping