A 53 D 1686194312 English
A 53 D 1686194312 English
Simple Transaction
Classification: 1. Construction/erection/addition/alteration/
renovation/repair/legalization of the following
structures under group J Section 701 Division of the
NBCP:
i. Private garage not more than ninety (90)
square meters;
ii. Carport;
iii. Sheds not less than six (6) square meters;
iv. Agricultural buildings;
v. Fences less than 1.80 meters in height;
vi. Tanks and towers.
2. Repairs which do not involve alteration/changes from
the building plans covered by a previously issued
Building Permit, Repair Permits other than those
mentioned in Section 301.3 of the NBCP (exemption
from Building and Repair Permit).
3. Signage for advertising and business signs; and,
4. Stand-alone permit applications for Building Service
Equipment and other support facilities including:
i. Mechanical;
ii. Sanitary;
iii. Electrical
iv. Electronics; and,
v. Accelerographs.
Revised as of 2/8/2023
renovation / repair / legalization of the following
Highly Technical Type of Project Activity / Structures:
1. Commercial buildings exceeding 9 storey;
2. Market buildings exceeding 9 storey;
3. All applications belonging to Group D of the
NBCP;
i. Mental hospitals, Sanitaria and Mental
Asylums and those belonging to Division D-
3 of the NBCP;
ii. Public and Private hospitals (Division D-2 of
the NBCP);
iii. Nursing homes for ambulatory patients,
school and home, belonging to Division D-3
of the NBCP;
4. Those belonging to Group H and I of the NBCP;
i. Recreational or similar public assembly
buildings, such as stadia, sports complex,
convention centers, etc.
ii. Structures that have a non-regular form, as
classified in the Structural Reference
Standards; and,
iii. Those buildings / structures whose use has
very advance structure calculation method
in design, as classified in the Structural
Reference Standards.
5. All types of occupancy of more than 9 storeys.
6. All other building/s or structure/s with occupancy
and use as for Disaster Response as defined by
the National Disaster Risk Reduction and
Management Council (NDRRMC).
7. Special Structures such as but not limited to
Aerodome Facilities, Fixed Gateway Transit and
Passenger Rail Systems, Historical Building and
Structures, Historic Centers / Heritage Zones,
Wind Turbine Energy Generating Facilities,
Immobilized vehicle and Vessels, Motion Picture
and Television Production, Studio Soundstages
and approved production facilities, Offshore
Energy Facilities, Piers and water-surrounded
facilities, Solar Photovoltaic (PV) System,
Towers and Underground structures and
windowless buildings
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
APPLICATION FORMS
1.4 sets duly accomplished application forms To be submitted by the owner / applicant / contractor.
completely and properly filled-out – Unified
Building (notarized), Civil/Structural, Sanitary, Forms can be secured at Pasig City Hall 6 th floor, Office of
Electrical, Mechanical (if any), Electronics (if the building Official or can be downloaded at the official
any) application forms. website of the City Government (www.pasigcity.gov.ph).
TECHNICAL DOCUMENTS FOR ARCHITECTURAL, STRUCTURAL, SANITARY / PLUMBING
2.4 sets of complete plans with key plan,
location map and vicinity map duly signed To be submitted by the owner / applicant / contractor.
and sealed by an Engineer and Architect and
signed by the owner / applicant.
3. 1 copy of latest Verification Survey Plan
To be submitted by the owner / applicant / contractor.
and Survey Report -originally signed and
sealed by a Geodetic Engineer.
4.1 copy of Bill of materials signed and To be submitted by the owner / applicant / contractor.
sealed by an Engineer / Architect.
5.1 set Material Specification signed and To be submitted by the owner / applicant / contractor.
sealed by an Engineer / Architect.
6. 1 set of Complete Structural Design and
To be submitted by the owner / applicant / contractor.
Analysis signed and sealed by a Civil /
Structural Engineer (ring bind).
7. 1 set of Seismic Load Analysis – for 3-
To be submitted by the owner / applicant / contractor.
storey and up signed and sealed by a Civil /
Structural Engineer
8. 1 set of Soil Boring Test – for 3-storey and
To be submitted by the owner / applicant / contractor.
up signed and sealed by a Civil / Structural
Engineer with DPWH accreditation.
9. 1 copy of latest PTR and Valid PRC ID and
UAP / IAPOA (for Architect) of Licensed To be submitted by the owner / applicant / contractor.
Engineers / Architect originally signed and
sealed.
10. Rainwater Collection System(City
To be submitted by the owner / applicant / contractor.
Ordinance No. 13 series of 2017), to be
incorporated in Plumbing Plan
11. 1 copy of Sewerage Treatment Plant
(STP) analysis originally signed and sealed To be submitted by the owner / applicant / contractor.
by Sanitary Engineer, ALL PAGES
(if applicable)
12. 1 copy of duly accomplished Green
Building Evaluation Checklist – for Building/s To be submitted by the owner / applicant / contractor.
with 10,000 sq. m. Gross Floor Area (GFA)
(if applicable)
TECHNICAL DOCUMENTS FOR ELECTRICAL
13. 4 sets of Electrical plan duly signed and
To be submitted by the owner / applicant / contractor.
seal by a Professional Electrical Engineer
and signed by the owner / applicant.
14. 1 set detailed Bill of Materials for
To be submitted by the owner / applicant / contractor.
Electrical works originally signed and sealed
by a Professional Electrical Engineer (PEE)
15. 1 set Scope of Works for electrical works To be submitted by the owner / applicant / contractor.
originally signed and sealed by PEE
16. 1 set Electrical Design Analysis, Short
To be submitted by the owner / applicant / contractor.
Circuit and Voltage Drop Calculation,
originally signed and sealed by PEE.
17. 1 set Electrical Specification originally To be submitted by the owner / applicant / contractor.
signed and sealed by PEE.
18. 1 latest copy of PTR and PRC ID of To be submitted by the owner / applicant / contractor.
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Professional Electrical Engineer (PEE) /
Registered Electrical Engineer (REE) /
Registered Master Electrician (RME),
originally signed and sealed.
TECHNICAL DOCUMENTS FOR MECHANICAL
19. 4 sets of Mechanical plan, duly signed
and seal by a Professional Mechanical
To be submitted by the owner / applicant / contractor.
Engineer and signed by the owner / applicant.
(Per equipment)
20. 1 set Detailed Bill of Materials for
Mechanical works, originally signed and
To be submitted by the owner / applicant / contractor.
sealed by a Professional Mechanical
Engineer (per equipment).
21. 1 set of Scope of Mechanical Works
To be submitted by the owner / applicant / contractor.
originally signed and sealed by PME
22. 1 set Mechanical Specification (per
equipment) originally signed and sealed by To be submitted by the owner / applicant / contractor.
PME.
23. 1 set of Load Design Computation – for
elevator / escalator signed and sealed by
To be submitted by the owner / applicant / contractor.
PME. (Or to be indicated on mechanical
plan)
24. 1 copy of Certificate of Structural Stability
originally signed and Sealed by a Structural
Engineer and copy of latest PTR and PRD ID
of Structural Engineer – for Elevator and To be submitted by the owner / applicant / contractor.
Escalator (for rehabilitation,
modernization, replacement and
upgrading)
25. 1 latest copy of PTR and PRC ID of
Professional Mechanical Engineer (PME)
To be submitted by the owner / applicant / contractor.
originally signed and sealed / Licensed
Mechanical Engineer (ME)
TECHNICAL DOCUMENTS FOR ELECTRONICS
27. 4 sets of Electronics plan duly signed and
seal by a Professional Electronics Engineer To be submitted by the owner / applicant / contractor.
and signed by the owner / applicant.
28. 1 set Detailed Bill of Materials for
Electronic works originally signed and sealed
To be submitted by the owner / applicant / contractor.
by a Professional Electronics Engineer
(PECE)
29. 1 set Scope of Electronic Works originally
To be submitted by the owner / applicant / contractor.
signed and sealed by PECE.
30. 1 set Electronics Specifications originally
To be submitted by the owner / applicant / contractor.
signed and sealed by PECE.
31. 1 set of Electronic Design Analysis
(voltage Drop and Battery Sizing) –
applicable for 5 - Storey building and above, To be submitted by the owner / applicant / contractor.
originally signed and sealed by a Professional
Electronics Engineer.
32. 1 latest copy of PTR, IECEP and PRC ID
of Professional Electronics Engineer (PECE) To be submitted by the owner / applicant / contractor.
originally signed and sealed.
PROOF OF OWNERSHIP
33. 1 copy of Certified True Copy of Original
or Transfer Certificate of Title (TCT/OCT)/
Condominium Title covering the subject lot /
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
unit – within the last 4 months.
If in case the applicant is not the registered
owner of the said lot / unit, in addition to
TCT/OCT/Condominium Title, the following
documents must be attached, whichever is
applicable:
a. 1 copy of duly notarized Deed of
Absolute Sale To be submitted by the owner / applicant / contractor.
b. 1 copy of duly notarized Deed of
Donation
c. 1 copy of Assignment of Rights or any Registry of Deeds, (Old BIR Building) Pasig City Hall
proof of land ownership and Complex.
possession.
d. 1 copy of duly notarized Affidavit of
Consent from the Unit / Lot Owner.
d.1. 1 copy duly notarized Extra
Judicial Settlement (if
registered owner is
deceased)
d.2. 1 copy duly notarized Special
Power of Attorney
34. 1 copy of Tax declaration of land and
To be submitted by the owner / applicant / contractor.
building (if any)
35. 1 copy of Lease Contract (if leased) To be submitted by the owner / applicant / contractor.
CLEARANCE / CERTIFICATION
36. 1 copy CEDULA (Residence Certificate) nd
2 Floor, City Treasurer’s Office, Pasig City Hall.
(Photocopy)
37. 1 copy of Updated Tax Receipt. (original) 2nd floor, Real Property Tax Division, Pasig city Hall.
38. 1 copy Certificate of No Improvement or rd
3 floor, City Assessor’s Office, Pasig City Hall
with Improvement(original)
6th floor, Pasig City Planning and Development Office, Pasig City
39. 1 copy of Locational Clearance(original)
Hall.
40. 1 copy of DOLE Clearance (original) Department of Labor and Employment
41. 1 copy Home Owners Association
From the HOA where the building will be constructed
Clearance (if any) (original)
42. 1 copy Barangay Clearance(original) From Barangay where the building will be constructed.
43. 1 copy of previously approved Certificate of
Occupancy (Photocopy) (for renovation, To be submitted by the owner / applicant / contractor.
repair/improvement applications)
44. 1 copy of Secretary’s Certificate. Authority
to Sign with attached photocopy of ID of
Owner/applicant and representative (if
To be submitted by the owner / applicant / contractor.
corporation) (original copy)
45. 1 copy of duly notarized Authorization Letter
with attached photocopy of ID of
Owner/applicant and representative (original
To be submitted by the owner / applicant / contractor.
copy) (if applicable)
46. CAAP Clearance (original) (if applicable) Civil Aviation Authority of the Philippines (CAAP) office
47. DOH Clearance (original) (if applicable) Department of Health office
48. PHIVOLCS Clearance (if structure is near
fault line) (original)
PHIVOLCS office
49. DPWH Clearance (original)(if applicable) DPWH office
50. MMDA Clearance (original) (if applicable) MMDA office
51. CENRO Clearance (original) (if
CENRO office
applicable)
52. 1 copy of Environmental Compliance
Certificate from DENR (original) (if applicable)
DENR office
Revised as of 2/8/2023
FEES TO PROCESSING
# CLIENT STEPS OFFICE ACTIONS PERSON RESPONSIBLE
BE PAID TIME
Receive and check
completeness of Clarisa Gabion
30 mins. OBO Receiving Officer
application documents
Submit duly (Simple and
based on the checklist
accomplished Complex) Rowena Gatchalian
of requirements EMS Receiving Officer
application forms .
and supporting 40 mins.
If complete, issue
documents and (Highly Technical)
acknowledgement BFP Receiving Officer
claim receipt (stub).
acknowledgement Michael Jim Martin
receipt (stub). Encode received Encoder
application and 10 mins.
documents. Maricris H. Tuazon
Encoder
Site Inspection
Check condition of the
lot and its boundaries Engr. Jullian Vicktor Caingat
Check adopted 1 day Bldg. Inspector
setback (Simple, Complex
Check status of and Highly
construction Technical) Engr. Aubrey Mae Matienzo
Bldg. Inspector
Prepare Inspection
Report
Technical Evaluators
Ar. Arvin Michael L.
Mendoza
(Land Use and Zoning)
Revised as of 2/8/2023
FEES TO PROCESSING
# CLIENT STEPS OFFICE ACTIONS PERSON RESPONSIBLE
BE PAID TIME
Sign and approve Engr. Francis Jerome P.
1hr. Ronquillo
Order of Payment OIC, Building Official
Refer to
NBC
(PD1096)
prescribed
Schedule
of Fees
Received payment Cashier
and 2017
Pay Permit Fees and issue Official 15 minutes. City Treasurer’s Office
Revised
Receipt (O.R.)
Pasig
Revenue
Code and
Fire Code
of the
2 Philippines
Check / Record O.R.
Number, and assign
bldg. Permit Number /
Electrical Permit
Number / Mechanical
Permit Number /
Electronics Permit 2 hr. Denise Anne A. Santos
Recording Officer
Number, encode on (Simple and
Present O.R. to permit forms, stamp Complex)
Ronaldo De Castro
OBO plans and permits. Filing Officer
2hrs.
Prepare Fire Safety (Highly Technical) BFP Inspector
Evaluation Clearance
Segregation of plans
and documents for
applicant and office
copy.
Signed and approved City Fire Marshall
Fire Safety Evaluation
Clearance and
Checklist Assigned BFP Inspector
1 hr.
Signed and approved
Engr. Francis Jerome P.
the Building and
Ronquillo
Ancillary plans and OIC, Building Official
Permit
Release approved
Claim approved Building and Ancillary
Denise Anne A. Santos
3 Building plans plans and Permit and 10 minutes Recording Officer
and Permit approved FSEC and
Checklist to applicant
3 days (Simple)
7 days (Complex)
TOTAL:
20 days (Highly
Technical)
Revised as of 2/8/2023
2. APPLICATION FOR CERTIFICATE OF OCCUPANCY
Revised as of 2/8/2023
i. Mental hospitals, Sanitaria and Mental
Asylums and those belonging to Division D-
3 of the NBCP;
ii. Public and Private hospitals (Division D-2
of the NBCP);
iii. Nursing homes for ambulatory patients,
school and home, belonging to Division D-3
of the NBCP;
4. Those belonging to Group H and I of the NBCP;
i. Recreational or similar public assembly
buildings, such as stadia, sports complex,
convention centers, etc.
ii. Structures that have a non-regular form, as
classified in the Structural Reference
Standards; and,
iii. Those buildings / structures whose use has
very advance structure calculation method
in design, as classified in the Structural
Reference Standards.
5. All types of occupancy of more than 9 storeys.
6. All other building/s or structure/s with occupancy
and use as for Disaster Response as defined by
the National Disaster Risk Reduction and
Management Council (NDRRMC).
7. Special Structures such as but not limited to
Aerodome Facilities, Fixed Gateway Transit and
Passenger Rail Systems, Historical Building and
Structures, Historic Centers / Heritage Zones,
Wind Turbine Energy Generating Facilities,
Immobilized vehicle and Vessels, Motion Picture
and Television Production, Studio Soundstages
and approved production facilities, Offshore
Energy Facilities, Piers and water-surrounded
facilities, Solar Photovoltaic (PV) System,
Towers and Underground structures and
windowless buildings
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
APPLICATION FORMS
Pasig City Hall, 6th floor, Office of the building Official or
1. 1 Duly accomplished Unified application
can be downloaded at the official website of the City
forms for Certificate of Occupancy
Government (www.pasigcity.gov.ph).
2. 3 copies of duly accomplished and
notarized Certificate of Completion signed by
the owner / applicant and signed and sealed To be submitted by the owner / applicant / contractor
by the duly licensed Architect or Civil Engineer
in-charge of construction. Forms can be secured at Pasig City Hall, 6 th floor, Office of
*If the construction was undertaken through a the building Official or can be downloaded at the official
contract, the Certificate of Completion shall be website of the City Government (www.pasigcity.gov.ph).
signed by the contractor/Authorized Managing
Officer.
3. 2 sets duly accomplished Electrical
Completion Forms, originally signed and
To be submitted by the owner / applicant / contractor
sealed by a Professional Electrical Engineer
(PEE) and Electrical Engineer In-charge.
Forms can be secured at Pasig City Hall, 6 th floor, Office of
*If the construction was undertaken through a
the building Official or can be downloaded at the official
contract, the Certificate of Completion shall be
website of the City Government (www.pasigcity.gov.ph).
signed by the contractor/Authorized Managing
Officer.
4. 2 sets duly accomplished Mechanical
Completion Forms, originally signed and
To be submitted by the owner / applicant / contractor
sealed by a Professional Mechanical Engineer
(PME) and Mechanical Engineer In-charge.
Forms can be secured at Pasig City Hall, 6th floor, Office of
*If the construction was undertaken through a
the building Official or can be downloaded at the official
contract, the Certificate of Completion shall be
website of the City Government (www.pasigcity.gov.ph).
signed by the contractor/Authorized Managing
Officer.
5. 2 sets duly accomplished Electronics
Completion Forms, originally signed and
To be submitted by the owner / applicant / contractor
sealed by a Professional Electronics Engineer
(PECE) and Electronics Engineer In-charge.
Forms can be secured at Pasig City Hall, 6 th floor, Office of
*If the construction was undertaken through a
the building Official or can be downloaded at the official
contract, the Certificate of Completion shall be
website of the City Government (www.pasigcity.gov.ph).
signed by the contractor/Authorized Managing
Officer.
To be submitted by the owner / applicant / contractor
6. 1 Duly accomplished CFEI application form
originally signed and sealed by PEE
Forms can be secured at Pasig City Hall, 6 th floor, Office of
(if with Application for Meralco meter)
the building Official
PLANS
7. 2 sets copy of approved plans
(Architectural, Structural, Plumbing/Sanitary,
Electrical, Mechanical (per equipment) (if any),
Electronics (if any)). To be submitted by the owner / applicant / contractor.
*For verification purpose, to be returned to
owner together with the approved certificate of
Occupancy
8. 4 sets As-Built Plans signed and sealed by
respective Engineers and signed by owner /
applicant (Architectural, Structural,
Plumbing/Sanitary, Electrical, Mechanical (per
To be submitted by the owner / applicant / contractor.
equipment) (if any), Electronics (if any))
*In case there are changes in the approved
plans
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Mechanical Engineer. (Per equipment)
*if with major changes
26. 3 copies of latest PTR and PRC ID of PME
To be submitted by the owner / applicant / contractor.
/ ME originally signed and sealed.
27. 1 copy of duly notarized Affidavit of
Change of Mechanical Engineer To be submitted by the owner / applicant / contractor.
(if applicable)
TECHNICAL DOCUMENTS FOR ELECTRONICS
28. 1 copy of detailed Bill of Materials for
Electronic works (actual cost) originally signed To be submitted by the owner / applicant / contractor.
and sealed by PECE.
29. 3 copies of latest PTR, IECEP and PRC ID
To be submitted by the owner / applicant / contractor.
of PECE originally signed and sealed.
30. 1 copy of duly notarized Affidavit of
To be submitted by the owner / applicant / contractor.
Change of Electronics Engineer (if applicable)
FEES TO PROCESSIN
# CLIENT STEPS OFFICE ACTIONS PERSON RESPONSIBLE
BE PAID G TIME
Bldg. Inspector
Conducting final 1 day
inspection, verification Engr. Kristie Anne B. Austria
(Simple and (Line and Grade)
and/or review of the Complex)
building/ structure Engr. Ferdinand A. Cata
based on submitted (Sanitary)
as-built plans and
supporting documents 7 days Engr. Diana C. Operio
Prepare inspection (Highly (Electrical)
Technical)
report Engr. Jayson C. Valmonte
(Mechanical)
Revised as of 2/8/2023
FEES TO PROCESSIN
# CLIENT STEPS OFFICE ACTIONS PERSON RESPONSIBLE
BE PAID G TIME
Technical Evaluators
Assigned BFPInspector
Refer to
NBC
(PD1096)
prescribed
Schedule of 1 hr.
Fees and (Simple and Engr. Rommel D. Gonzal
Complex) Assessment officer
Prepare Order of 2017
Payment Revised 2 days Engr. Ramil P. Coronado
Pasig (Highly Assessment officer
Revenue Technical)
Code and
Fire Code of
the
Philippines
2
Received payment
Cashier
Pay Permit fees and issue official 15 minutes
City Treasurer’s Office
receipt (O.R.)
Revised as of 2/8/2023
FEES TO PROCESSIN
# CLIENT STEPS OFFICE ACTIONS PERSON RESPONSIBLE
BE PAID G TIME
Check and Record
O.R. No.
Assign Certificate of
Occupancy/Use
Number encode on 1 hr. Denise Anne A. Santos
permit forms, stamp (Simple and Recording Officer
plans and permits. Complex)
Present O.R. to
Ronaldo De Castro
OBO 2hrs.
Segregation of plans Filing Officer
and documents for (Highly
applicant and office Technical) Assigned BFP Inspector
copy.
7 days
TOTAL: (Complex)
20 days
(Highly
Technical)
Revised as of 2/8/2023
3. APPLICATION FOR DEMOLITION PERMIT
Demolition Permit, an Accessory Permit issued by the Building Official for construction activities
being undertaken before or during the application/processing of Building Permits. This document
advises an owner/applicant to proceed with the demolition of a specific project/building/structure or
portions thereof after the accompanying principal plans, specification and other pertinent documents
with the application are found satisfactory and substantially conforming with the National Building Code
of the Philippines (NBCP) and its Implementing Rules and Regulations.
Office or Division:
Office of the Building Official
Complex Transaction:
Any type of occupancy / use with area of more than three
hundred (300) square meters.
Type of G2C – Government to Citizens
Transaction: G2B – Government to Business
G2G – Government to Government
Who may avail:
Any person, firm, or corporation including government
agency or instrumentality who planned to demolish any
building or structure.
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Judicial Settlement (if
registered owner is
deceased)
d.2. 1 copy duly notarized Special
Power of Attorney
4. 1 copy of Tax Declaration of lot and
3rdfloor, City Assessor’s Office
building
5. 1 copy of Tax Clearance or updated Tax
2nd floor, Real Property Tax Division
Receipt
6. 1 copy of Barangay Clearance for From the office of the Barangay where the building/structure
demolition. to be demolished is located
From HOA Office where the building/structure to be
7. 1 copy of Homeowner’s Clearance
demolished is located.
8. 1 copy of CEDULA (Community Tax
City Treasurer’s Office, 2nd Floor Pasig City Hall
Certificate)
9. 1 copy of Demolition Methodology – signed
and sealed by the supervising Civil Engineer / To be submitted by the owner / applicant / contractor.
Architect
10. 1 copy of Cost of Demolition and duration
of demolition – signed and sealed by the To be submitted by the owner / applicant / contractor.
supervising Engineer/Architect.
11. 1 copy of latest PTR and Valid PRC ID of
To be submitted by the owner / applicant / contractor.
the supervising Civil Engineer or Architect
12. 1 copy of Authorization Letter with
attached photocopy of ID of Owner/applicant To be submitted by the owner / applicant / contractor
and representative (original copy)
13. 1 copy of Secretary’s Certificate.
Authority to Sign with attached photocopy
To be submitted by the owner / applicant / contractor
of ID of Owner/applicant and representative
(if corporation) (original copy)
Evaluate
methodology for Engr. Cherry Lee-Demiao
1hr.
demolition, technical Evaluator
requirements
Revised as of 2/8/2023
FEES TO PROCESSING PERSON
# CLIENT STEPS OFFICE ACTIONS
BE PAID TIME RESPONSIBLE
P500 –
processing
fee
(commerci
al)
P500 –
inspection
fee
(commerci
al)
P200 – Engr. Rommel D. Gonzal
Prepare Order of Assessment officer
processing
Payment 1 hr.
fee Engr. Ramil P. Coronado
(residential Assessment officer
)
P200 –
inspection
fee
(residential
)
Demolition
fee
P4.00/sq.m
.
Receive payment
Cashier
Pay permit fees and issue official 15 minutes
City Treasurer’s Office
receipt
Check and record
OR number and
assign demolition
permit number,
2 encode on permit
forms, stamp plans Denise Anne A. Santos
and permits. Recording Officer
Claim approved
Release approved
permit and plans Denise Anne A. Santos
3 Demolition Permit 5 minutes Releasing Officer
and plans
sign on Logbook
TOTAL: 3 days
Revised as of 2/8/2023
4. APPLICATION FOR SIGN PERMIT
Sign Permit, an Accessory Permit issued by the Building Official being undertaken prior to or
during the processing of building permit. The coverage is spelled out in the accessory permit form
including the expiry period. These shall be signed by the concerned owner/applicant and by the
concerned professionals. This includes removal of signs.
Office or Division:
Office of the Building Official (OBO)
Complex Application
Construction/erection/ alteration/renovation/repair/
legalization of Billboard Structures
Type of G2C – Government to Citizens
Transaction: G2B – Government to Business
G2G – Government to Government
Who may avail: Any person, firm, or corporation including government
agency or instrumentality who planned to
construction/erection/ alteration/ renovation/
repair/legalization of signage for advertising and business
signs on any building or structure.
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Owner/applicant and representative (if
corporation) (original copy)
TECHNICAL DOCUMENTS FOR ELECTRICAL (FOR SIGN AND SIGN STRUCTURES EQUIPPED WITH
ELECTRICAL DEVICES/ MACHINERY RATED LESS THAN 500 KVA OR LESS THAN 600 VOLTS)
11. 4 sets of Electrical plan, duly signed and
To be submitted by the owner / applicant / contractor.
seal by a Professional Electrical Engineer and
signed by the owner / applicant.
12. 1 set detailed Bill of Materials for Electrical
To be submitted by the owner / applicant / contractor.
works originally signed and sealed by a
Professional Electrical Engineer (PEE)
13. 1 set Scope of Works for electrical works To be submitted by the owner / applicant / contractor.
originally signed and sealed by PEE
14. 1 set Electrical Design Analysis, Short
To be submitted by the owner / applicant / contractor.
Circuit and Voltage Drop Calculation, originally
signed and sealed by PEE.
15. 1 set Electrical Specification originally To be submitted by the owner / applicant / contractor.
signed and sealed by PEE.
16. 1 latest copy of PTR and PRC ID of
Professional Electrical Engineer (PEE) /
To be submitted by the owner / applicant / contractor.
Registered Electrical Engineer (REE) /
Registered Master Electrician (RME) originally
signed and sealed.
documents
Engr. Jullian
Inspect location of Vicktor Caingat
Bldg. Inspector
project site 2 days
(Simple and
Prepare inspection Complex) Engr. Aubrey Mae
report Matienzo
Bldg. Inspector
1
Engr. Cherry Lee-
Demiao
Evaluate technical Structural Evaluator
requirements for sign 1hr.
permit Engr. Vicente F.
Villanueva Jr.
ElectricalEvaluator
Refer to
NBC Engr. Rommel D.
(PD1096) Gonzal
prescribed Assessment officer
Prepare Order of
Schedule 1 hr.
Payment Engr. Ramil P.
of Fees
and 2017 Coronado
Assessment officer
Revised
Pasig
Revised as of 2/8/2023
FEES TO PROCESSING PERSON
# CLIENT STEPS OFFICE ACTIONS
BE PAID TIME RESPONSIBLE
Revenue
Code
Engr. Francis
Approve Tax Order of Jerome P.
1 hr.
Payment Ronquillo
OIC, Building Official
Cashier
Receive payment and
Pay permit fees 15 minutes City Treasurer’s
issue official receipt Office
TOTAL: 3 days
Revised as of 2/8/2023
5. APPLICATION FOR FENCING PERMIT
Fencing Permit, an Accessory Permit issued by the Building Official being undertaken prior to or
during the processing of building permit. The coverage is spelled out in the accessory permit form
including the expiry period. These shall be signed by the concerned owner/applicant and by the
concerned professionals. This includes fencing, for fence not exceeding 1.80 meters high.
Office or Division:
Office of the Building Official (OBO)
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
8. 1 copy of Tax Declaration of Land 3rdfloor, City Assessor’s Office
9. 1 Certification that there are no back taxes
2nd floor, Real Property Tax Division
or updated Tax Receipt
10. 1 copy of Barangay Clearance. Barangay Hall where the project/construction is located
11. 1 copy of Homeowner’s Clearance HOA Office where the project/construction is located
12. 1 copy of CEDULA (Community Tax
City Treasurer’s Office, 2nd Floor Pasig City Hall
Certificate)
13. 1 copy of latest PTR and Valid PRC ID of
To be submitted by the owner / applicant / contractor.
the supervising Civil Engineer or Architect
14. 1 copy of Authorization Letter with
attached photocopy of ID of Owner/applicant To be submitted by the owner / applicant / contractor
and representative (original copy)
15. 1 copy of Secretary’s Certificate.
Authority to Sign with attached photocopy
To be submitted by the owner / applicant / contractor
of ID of Owner/applicant and representative
(if corporation) (original copy)
Engr. Jullian
Vicktor Caingat
Inspect location of project Bldg. Inspector
site
2 days
Prepare inspection report Engr. Aubrey Mae
Matienzo
Bldg. Inspector
1
Evaluate technical Engr. Cherry Lee-
requirements for fencing 1hr. Demiao
permit Structural Evaluator
Refer to
NBC Engr. Rommel D.
(PD1096) Gonzal
prescribed Assessment
Schedule officer
Prepare Order of Payment
of Fees 1 hr.
and 2017 Engr. Ramil P.
Revised Coronado
Pasig Assessment
Revenue officer
Code
Engr. Francis
Approve Tax Order of Jerome P.
1 hr.
Payment Ronquillo
OIC, Building Official
Revised as of 2/8/2023
FEES TO PROCESSING PERSON
# CLIENT STEPS OFFICE ACTIONS
BE PAID TIME RESPONSIBLE
Cashier
Receive payment and
Pay Permit fees 15 minutes City Treasurer’s
issue official receipt
Office
Check and record OR
number and assign
Fencing Permit number Denise Anne A.
Present OR to OBO Santos
Segregation of plans and Recording Officer
documents for applicant 30 minutes
and office copy.
Engr. Francis
Sign and Approve Fencing Jerome P.
Permit and plans Ronquillo
OIC, Building Official
Claim approved
Fencing permit and Denise Anne A.
Release approved
3 plans 5 minutes Santos
Fencing Permit and plans Releasing Officer
Sign on Logbook
TOTAL: 3 days
Revised as of 2/8/2023
6. APPLICATION FOR EXCAVATION AND GROUND PREPARATION PERMIT
Excavation and Ground Preparation Permit, an Accessory Permit issued by the Building Official
being undertaken prior to or during the processing of building permit. The coverage is spelled out in the
accessory permit form including the expiry period. These shall be signed by the concerned
owner/applicant and by the concerned professionals.
Office or Division:
Office of the Building Official (OBO)
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Judicial Settlement (if
registered owner is
deceased)
d.2. 1 copy duly notarized Special
Power of Attorney
8. 1 copy of tax declaration of Land 3rdfloor, City Assessor’s Office
9. 1 Certification that there are no back taxes
2nd floor, Real Property Tax Division
or updated tax receipt (original)
10. 1 copy of Barangay Clearance (original) Office of the Barangay
11. 1 copy of homeowner’s clearance
HOA Office
(original)
12. 1 copy of CEDULA (community tax
City Treasurer’s Office, 2nd Floor Pasig City Hall
certificate) (Xerox)
13. 1 copy of latest PTR and Valid PRC ID of
To be submitted by the owner / applicant / contractor.
the supervising Civil engineer or Architect
14. 1 copy of Authorization Letter (original
To be submitted by the owner / applicant / contractor
copy)
15. 1 copy of Secretary’s Certificate.
Authority to Sign (if corporation) (original To be submitted by the owner / applicant / contractor
copy)
1 Evaluate technical
requirements for Engr. Cherry Lee-
1hr. Demiao
Excavation and Ground Structural Evaluator
Preparation permit
Refer to
NBC
(PD1096) Engr. Rommel D.
prescribed Gonzal Assessment
Prepare Order of schedule officer
Payment of Fees 1 hr.
and 2017 Engr. Ramil P.
Revised Coronado
Pasig Assessment officer
Revenue
Code
Revised as of 2/8/2023
FEES TO PROCESSING PERSON
# CLIENT STEPS OFFICE ACTIONS
BE PAID TIME RESPONSIBLE
Cashier
Receive payment and
Pay permit fees 15 minutes City Treasurer’s
issue official receipt
Office
Claim approved
Excavation and Release approved
Ground Preparation Excavation and Ground Denise Anne A.
3 5 minutes Santos
permit and plans Preparation permit and Releasing Officer
plans
Sign on Logbook
TOTAL: 3 days
Revised as of 2/8/2023
7. APPLICATION FOR CERTIFICATE OF FINAL ELECTRICAL INSPECTION
CFEI is being issued to Residential, Commercial and Industrial establishments who are applying for
Meralco Service Meter connection. As stipulated in article 1.2.2.2 of the Philippine Electrical Code, “no
electrical installation, alteration, and/or addition shall be connected to any power supply or any other
source of electrical energy without a Certificate of Final Electrical Inspection/Completion (DPWH Form No.
96-006-E or as amended) obtained from the government authority concerned.
Office or Division:
Office of the Building Official (OBO) / Electrical Division
Revised as of 2/8/2023
FOR EXISTING BUILDING / STRUCTURE OR UNIT
To be submitted by the owner / applicant / contractor.
1 copy of duly accomplished CFEI application
Forms can be secured in Pasig City Hall 6 th floor, Office of
form with sketch of location
the building Official or can be downloaded at the official
website of the City Government (www.pasigcity.gov.ph).
1 copy of Yellow Card from Meralco Meralco Business Center
1 photocopy of TCT/Lot Award / NHA
To be submitted by the owner / applicant / contractor.
Clearance (Proof of Ownership)
1 photocopy of Tax Declaration of Land and
To be submitted by the owner / applicant / contractor.
Building
1 photocopy of latest Tax Receipt / Tax
Clearance for Land and Building
1 photocopy of previously approved Building
Permit / Occupancy Permit of the existing
To be submitted by the owner / applicant / contractor.
building / structure (for verification purposes
only)
1 set of Electrical Plan / Electrical Load
Schedule, originally signed and sealed by a To be submitted by the owner / applicant / contractor.
Professional Electrical Engineer
1 set of Electrical Plan and Permit for
To be submitted by the owner / applicant / contractor.
Commercial / Industrial establishment
1 photocopy of Business Permit for
To be submitted by the owner / applicant / contractor.
Commercial / Industrial establishment
1 copy of Fire Safety Inspection Certificate
(FSIC) for Business – for Commercial / To be submitted by the owner / applicant / contractor.
Industrial establishment
1 copy of Barangay Clearance for CFEI From Barangay Hall where the house / building / structure
application purposes. is located
Picture of Building / Structure, Service
To be submitted by the owner / applicant / contractor.
Entrance and Panel Board
ADDITIONAL REQUIREMENTS IN CASE THE APPLICANT IS NOT THE LAWFUL OWNER OF THE
PROPERTY, WHICHEVER IS APPLICABLE
1 copy of duly notarized Contract of Lease /
Duly notarized Affidavit of Consent signed by
To be submitted by the owner / applicant / contractor.
the property owner or all of the immediate
Heirs of the Property Owner.
1 copy of duly notarized Extra Judicial
To be submitted by the owner / applicant / contractor.
Settlement
1 copy of duly notarized Deed of Absolute
To be submitted by the owner / applicant / contractor.
Sale
1 copy of duly notarized Deed of Donation To be submitted by the owner / applicant / contractor.
1 copy of Duly Notarized Special Power of
To be submitted by the owner / applicant / contractor.
Attorney signed by the Property Owner.
1 photocopy of Memorandum of Agreement
(MOA) between the Lot Owner and HOA, for
To be submitted by the owner / applicant / contractor.
properties under the CMP of the City
Government
Homeowners’ Association Clearance originally
Office of the HOA President where the property is located
signed by the HOA President.
Duly Notarized Affidavit of Substitution from
Office of the HOA President where the property is located
the HOA
Photocopy of Certification from UPAO and
UPAO and PHRU Office, 6th Floor, Pasig City Hall
PHRU
Grant of Right of way Meralco Business Center
Authorization to process CEI, with photocopy
of ID of both the Owner and the
To be submitted by the owner / applicant / contractor.
Representative.
Revised as of 2/8/2023
CEI REQUIREMENTS FOR TELECOMS
1 copy of duly accomplished CFEI application
To be submitted by the owner / applicant / contractor.
form with sketch of location
1 copy of Yellow Card from Meralco Meralco Business Center
1 photocopy of TCT / Lot Award / NHA
To be submitted by the owner / applicant / contractor.
Clearance (Proof of Ownership)
1 photocopy of Tax Declaration of Land and
To be submitted by the owner / applicant / contractor.
Building
1 photocopy of latest Tax Receipt / Tax
To be submitted by the owner / applicant / contractor.
Clearance for Land and Building
1 copy of Contract of Lease To be submitted by the owner / applicant / contractor.
Photocopy of Excavation Permit for Pole
Excavation Permit Office, 3rd Floor, Pasig City Hall
Installation
TPMO Clearance TPMO Office
Clearance from Engineering Department Office of the City Engineer, 6th Floor, Pasig City Hall
Approved Electrical Permit for Cell Site /
To be submitted by the owner / applicant / contractor.
Antenna
Approved Electronics Permit for Cell Site /
To be submitted by the owner / applicant / contractor.
Antenna
Certificate of Use To be submitted by the owner / applicant / contractor.
Picture of Building / Structure, Service
To be submitted by the owner / applicant / contractor.
Entrance and Panel Board
Authorization to process CEI, with photocopy
To be submitted by the owner / applicant / contractor.
of ID of both owner and representative.
Revised as of 2/8/2023
FEES TO PROCESSING PERSON
# CLIENT STEPS OFFICE ACTIONS
BE PAID TIME RESPONSIBLE
P.D. 1096
(The
National
Building
Code of
the
Philippines
) and from
the
Revised
Local
Revenue
Code of
Pasig City.
Engr. Vicente F.
Villanueva Jr.
Sign and approve Order 30 Head, Electrical Section
of Payment minutes
Engr. Francis Jerome P.
Ronquillo
OIC, Building Official
Check and Record O.R.
Claim Order of
No.
Payment, Pay
Fees to Cashier Jessa T. Estrella
2 and Present Recording Officer
Assign Wiring Permit
O.R. to
number
Electrical Permit
Section
Prepare CFEI
Engr. Ricardo Q.
Tresvalles
CFEI Inspector
30
minutes Engr. Diana C. Operio
CFEI Inspector
TOTAL: 3 days
Revised as of 2/8/2023
8. APPLICATION FOR PERMIT TO OPERATE OF MECHANICAL EQUIPMENT
Permit to Operate (PTO), a document issued by the Building Official, certifying that the mechanical
equipment/machinery was completed, can be operated and safe for public use within a specific expiry
periodthereof after the accompanying principal plans, specification and other pertinent documents with the
application are found satisfactory and substantially conforming with the Philippine Mechanical Code,
National Building Code of the Philippines (NBCP) and its Implementing Rules and Regulations.
Office or Division:
Office of the Building Official (OBO)/Mechanical Division
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
of Mechanical Engineer (if applicable)
Authorization letter to process with attached
photocopy of ID of the Owner and the To be submitted by the owner / applicant / contractor.
Representative
FOR GENERATOR, PUMPS AND OTHER MECHANICAL EQUIPMENT
2 sets of duly accomplished Certificate of To be submitted by the owner / applicant / contractor.
Completion for Mechanical originally signed
and Sealed by a Professional Mechanical Forms can be secured in Pasig City Hall 6 th floor, Office of
Engineer with signature of Applicant and the building Official or can be downloaded at the official
Mechanical Contractor. website of the City Government (www.pasigcity.gov.ph).
4 sets as-built Mechanical plan originally
signed and sealed by a Professional
Mechanical Engineer (PME) with signature of To be submitted by the owner / applicant / contractor.
Applicant.
(In case there are changes in the approved
plans)
1 copy of approved Mechanical permit to
To be submitted by the owner / applicant / contractor.
install and Mechanical plan
1 set of detailed Bill of Materials (actual cost)
for mechanical works originally signed and To be submitted by the owner / applicant / contractor.
sealed by PME.
1 copy of Mechanical Specification originally
signed and sealed by PME
To be submitted by the owner / applicant / contractor.
(In case there are changes in the approved
plans)
3 copies of latest PTR and PRC ID of PME
To be submitted by the owner / applicant / contractor.
originally signed and sealed
1 copy of Certificate of Safe Operating
Condition originally signed and sealed by To be submitted by the owner / applicant / contractor.
PME.
1 copy of Certificate of Structural Stability
originally Signed and Sealed by a Structural
Engineer and 1 copy of latest PTR and PRC To be submitted by the owner / applicant / contractor.
ID of Structural Engineer if machine room is
above Ground floor (if applicable)
1 copy of duly notarized Affidavit of Change
To be submitted by the owner / applicant / contractor.
of Mechanical Engineer (if applicable)
1 copy of CENRO Clearance 4th floor, CENRO Office, Pasig City Hall
1 copy of Certificate of Occupancy (if
To be submitted by the owner / applicant / contractor.
applicable) (Photocopy)
1 copy of Authorization Letter to process with
attached photocopy of ID of the Owner and To be submitted by the owner / applicant / contractor.
the Representative
Revised as of 2/8/2023
FEES TO PROCESSING PERSON
# CLIENT STEPS OFFICE ACTIONS
BE PAID TIME RESPONSIBLE
Received and check Carmi Kynne
completeness of 30 minutes Castillo
Submit duly Receiving Officer
application documents
accomplished
application forms and Encode received
application and Carmi Kynne
supporting documents 10 minutes Castillo
documents and endorsed Receiving Officer
to assigned PTO inspector
Inspect status / condition
of mechanical equipment
and verify correctness of
plans submitted based on
actual installation. Engr. Jonathan
2
Days P. Paloyo
Prepare inspection report PTO Inspector
Engr. Erliza S.
Suela
Head, Mechanical
Sign and approve the Section
Permit to Operate /
1 hr. Engr. Francis
Certificate of Operation of
compliant application Jerome P.
Ronquillo
OIC, Building Official
TOTAL: 3 days
Revised as of 2/8/2023
9. APPLICATION FOR MECHANICAL PERMIT TO INSTALL OF CONSTRUCTION ELEVATOR,
HOIST, GONDOLA
Mechanical Permit, a stand-alone permit issued by the Building Official allowing the owner/applicant to
erect/install/dismantle/move mechanical equipment machinery (i.e. construction elevator, hoist, gondola)
thereof after the accompanying principal plans, specification and other pertinent documents with the
application are found satisfactory and substantially conforming with the Philippine Mechanical Code,
National Building Code of the Philippines (NBCP) and its Implementing Rules and Regulations.
Office or Division:
Office of the Building Official (OBO)/Mechanical Division
Revised as of 2/8/2023
FEES TO PROCESSIN PERSON
# CLIENT STEPS OFFICE ACTIONS
BE PAID G TIME RESPONSIBLE
Receive and check
completeness of
application
documents, if 30 minutes Carmi Kynne Castillo
Submit duly Receiving Officer
complete issue stub
accomplished
number
application forms
and supporting
Encode received
documents and claim
application and
acknowledgement
documents and
receipt. Carmi Kynne Castillo
endorse to Mechanical 10 minutes Receiving Officer
Evaluator for schedule
of inspection
Evaluate submitted
plans and documents.
If complete and
compliant, prepare 2 hrs. Engr. Erliza S. Suela
Mechanical Evaluator
assessment of permit
fees
1 All
regulatory
fees and
assessme
nt for
Mechanic
al are
based on
pertinent
sections
of P.D.
1096 also
known as
“The Engr. Erliza S. Suela
Prepare Order of 30
National Mechanical Evaluator
Payment minutes
Building
Code of
the
Philippine
s”, and
from the
Revised
Local
Revenue
Code of
Pasig
City.
Revised as of 2/8/2023
Engr. Erliza S. Suela
Mechanical Evaluator
1
2 Engr. Erliza S. Suela
hour
Mechanical Evaluator
Sign and approve
Mechanical Permit Engr. Francis Jerome P.
Ronquillo
OIC, Building Official
Preparation of owners
copy and office copy
of plans and Ronald De Castro
Filing Officer
documents.
Carmi Kynne Castillo
Claim approved Issue approved Releasing Officer
3 Mechanical Permit Mechanical Permit 5 minutes
and sign on logbook Ronald De Castro
Releasing Officer
TOTAL: 3 days
Revised as of 2/8/2023
10. APPLICATION FOR STRUCTURAL PERMIT AND MECHANICAL PERMIT TO INSTALL OF TOWER
CRANE, PLACING BOOM
Structural Permit and Mechanical Permit, are permits issued by the Building Official allowing the
owner/applicant to erect/install/dismantle/move mechanical equipment machinery (i.e. tower crane, placing
boom) thereof after the accompanying principal plans, specification and other pertinent documents with the
application are found satisfactory and substantially conforming with the Philippine Mechanical Code,
National Structural Code of the Philippines (NSCP) and the National Building Code of the Philippines
(NBCP) and its Implementing Rules and Regulations.
Revised as of 2/8/2023
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1 copy of latest PTR and PRC ID of Civil Engineer
To be submitted by the owner / applicant / contractor
originally signed and sealed
1 copy of Authorization Letter to process with
To be submitted by the owner / applicant /
attached photocopy of ID of the Owner and the
contractor.
Representative
FEES TO PROCESSING
# CLIENT STEPS OFFICE ACTIONS PERSON RESPONSIBLE
BE PAID TIME
Receive and check Clarisa G. Gabion
completeness of OBO Receiving Officer
Submit duly application
30 minutes
accomplished documents, if Carmi Kynne Castillo
application complete issue stub Receiving Officer
Revised as of 2/8/2023
FEES TO PROCESSING
# CLIENT STEPS OFFICE ACTIONS PERSON RESPONSIBLE
BE PAID TIME
All
regulatory
fees and
assessment
for
Mechanical
are based
on pertinent
sections of
P.D. 1096 Engr. Rommel D. Gonzal
Assessment officer
Prepare Order of also known 30
Payment as “The minutes Engr. Ramil P. Coronado
National Assessment officer
Building
Code of the
Philippines”,
and from
the Revised
Local
Revenue
Code of
Pasig City.
Engr. Erliza S. Suela/
Engr. Jayson C. Valmonte
Mechanical Evaluator
Sign and approve
1 hr.
Order of Payment Engr. Francis Jerome P. Ronquillo
OIC, Building Official
Claim approved
Carmi Kynne Castillo
Structural and Issue approved Releasing Officer
3 Mechanical Structural and 5 minutes
Permit and sign Mechanical Permit Ronald De Castro
Releasing Officer
on logbook
TOTAL: 7 days
Revised as of 2/8/2023
11. APPLICATION FOR PERMIT TO OPERATEOF TOWER CRANE, CONSTRUCTION ELEVATOR,
PLACING BOOM, HOIST, GONDOLA
Permit to Operate (PTO), a document issued by the Building Official, certifying that the mechanical
equipment/machinery (i.e. tower crane, construction elevator, placing boom, hoist, gondola) was completed
and can be operated/use within a specific expiry period thereof after the accompanying principal plans,
specification and other pertinent documents with the application are found satisfactory and substantially
conforming with the Philippine Mechanical Code, National Building Code of the Philippines (NBCP) and its
Implementing Rules and Regulations.
Office or Division:
Office of the Building Official (OBO)/Mechanical Division
Revised as of 2/8/2023
1 copy of Authorization Letter to process with
attached photocopy of Valid ID of the Owner To be submitted by the owner / applicant / contractor.
and the Representative.
Revised as of 2/8/2023
FEES TO PROCESSING PERSON
# CLIENT STEPS OFFICE ACTIONS
BE PAID TIME RESPONSIBLE
Submit duly
Receive and check Carmi Kynne
accomplished
completeness of 30 minutes Castillo
application forms and
application documents Receiving Officer
supporting documents
Encode received
application and Carmi Kynne
documents and endorsed 10 minutes Castillo
to assigned PTO inspector Receiving Officer
for schedule of inspection
Inspect status / condition
of mechanical equipment
and verify correctness of
plans submitted based on
actual installation.
2 Engr. Jonathan P.
Prepare inspection report Paloyo
1 days PTO Inspector
Evaluate documents for
compliance. If found
complete and compliant,
prepare Certificate of
Operation
Final Evaluation of PTO
and submitted documents
/ requirements. If found Engr. Erliza S.
1 hr. Suela
complete and compliant, Head, Mechanical
sign the Certificate of Section
Operation
Engr. Francis
Sign and approve Permit Jerome P.
1 hr. Ronquillo
to Operate OIC, Building Official
Carmi Kynne
Claim approved Permit Castillo
Issue approved Permit to
2 to Operate Certificate 5 minutes Releasing Officer
Operate
and sign on logbook Ronald De Castro
Releasing Officer
TOTAL: 3 days
Revised as of 2/8/2023
Feedback and Complaints
How to file a complaint For any complaints, concern/s, an applicant may reach out our
office located at 6th floor, Office of the Building Official, Pasig city
Hall thru:
1. Formal Letter;
2. Via official email address of the office
(obo@pasigcity.gov.ph)
How complaints are processed After the complaint letter has been receive and read, the office
will conduct immediate actions and make a response letter
signed by the Head of Office and may send via email
Contact Information 8643 1111 loc 1682 / 0969 124 9060 (OBO)
8643 1111 loc 1672 (Electrical and Mechanical Section)
obo@pasigcity.gov.ph
Revised as of 2/8/2023