GAMUDA

Next-Gen Digital IBS


- Where Buildings Are Manufactured -

Ts Lim Hui Yan


Executive Director
The building and construction industry is responsible for
more than 30% of global carbon emissions
and nearly a third of all the wastes.

2
Prefabrication in Malaysia
Automation

Precast System

Formwork System

Bricklaying /
Block Work
 Productivity
 Quality
 Sustainability

Productivity

3
Prefabrication in Malaysia
Automation

Precast System

Formwork System

Bricklaying / Gamuda Next-Generation Digital IBS


Block Work Enhanced Sustainability via Digital Manufacturing in Construction
Cloud-based – BIM – IoT-AI Robotic Manufacturing

 30% Improved Productivity


 55% Reduced Reliance on Foreign Workers
 40% Reduced Embodied Carbon
 Consistent Manufactured Quality

Productivity

4
5
© 2022 Gamuda Industrial Building System Sdn Bhd [Gamuda IBS]
Next-Generation
Digital IBS
Where buildings are manufactured digitally
– designed for sustainability & excellence

© 2022 Gamuda Industrial Building System Sdn Bhd [Gamuda IBS] 6


Enhancing Sustainability
via Digital Construction

01 Sustainable Digital Construction Ecosystem


 Transform traditional delivery models with a system that
facilitates improved resource usage & efficiency
 Cutting-edge robotic, Automation, BIM, AI, Machine Learning, AR
VR predictive engineering

02 DfX – Design for Excellence & Sustainability


 Design with sustainability in mind
 Allows design flexibility & creativity

03 Upskill Local Talent

7
 Capacity building
 Sustainable talent pipeline for construction
CONVENTIONAL DIGITAL IBS
2D Drawings 3D Computer Graphics Model - BIM
• Design co-ordination is concurrent and fast.
Architect Design Development • Early clash detection, avoiding errors.
Sequential & in silo • Factory production is automated, dictated by BIM.
Repetitive and slow • Processes on one digital platform (BIM).
Structural

Mechanical & Electrical PROCUREMENT


DIGITAL & BILLINGS
PROJECT
MANAGEMENT ARCHITECTS
Contractor Works Execution Paperless
Sequential
CLOUD ROBOTIC
Structural Works • Concrete PRODUCTION
• Rebar
COMPUTING No human
Work Trades

• Brick wall labour.


• Piping & plumbing STRUCTURAL M&E
Mechanical & Electrical Works • Wiring & sockets ENGINEERS ENGINEERS
• Finishes WORK
• Fittings TRADES LOGISTICS /

8
Architectural Works • Façade DELIVERY
Construction
A Planning & Execution
Single Source of Truth
Cloud-Based
BIM Driven 1

Digital Data driven analysis and


Construction continuous improvement

Ecosystem
 Single source of truth 3 2 Robotic
 Optimised Efficiency Quality Production
 Improved Productivity Assurance Reduced Reliance on
LoD 500 As-Built for Life to ease Foreign Workers
post construction maintenance

Advanced Construction Planning & Simulation AI-IoT Enabled Robotic Manufacturing Digital Aided Progress Tracking 9
BIM Quality Assurance
Advanced Project Execution Simulation

10
Cloud-Based BIM Driven Manufacturing

Robotic Formwork Robotic Rebar Controlled Casting & Quality Curing & Assured
Making Processing Surface Finishing Quality

11
Precast Installation
Cloud-Based Recording
BIM Driven Progress App
Tracking

12
Cloud-Based BIM Driven Quality Assurance

13
Gamuda Next-Gen Digital IBS Track Record

7
Manufacturing Now

Active Projects

TRACK RECORD
• Amber Residences @ Twentyfive.7 Special Cast:
• Aranda @ Kota Kemuning • Tun Razak Exchange (TRX) Retail Mall
• Danau Ria @ Gamuda Gardens • Starbucks @ Gamuda Cove
• Enso @ Gamuda Cove • KVMRT Underground Escape Shaft 3*
• GAIA Residences @ Gamuda Gardens • Data Centre

14
• Gapura Bayu @ Jade Hills
• GEMS Residences @ Putrajaya
• Hilltop Residences @ Gamuda Gardens
• Laman Adonis @ Kundang Estates
• Lucentia Residence
• Maya Residences @ Gamuda Cove
• Palma Sands @ Gamuda Cove
• Residensi Idaman @ Cyberjaya
• Seri Seraya @ Puncak Bestari
Latest
Achievements

Sustainable Digital Construction Model Solar Energy Powered Factory

40% reduced embodied carbon <1% Construction Wastage

30% increase in productivity X2 Employment opportunities for local workforce

55% reduced reliance on foreign workforce > 6,000 homes built and still counting

15
Thank you