Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Report: Building Damage Assessment – Retrieval Shaft

Retrieval Shaft Area BCS Reports -Lot -1


Whether
Distance From Category As within
SL. Type of
BIN Retaining per Influence Remarks
No. Building
Structure (m) M/s.AIMIL Ltd of
Excavation
STAGED ANALYSIS
1 RS E 001 Commercial 0.9 2, Slight YES
REQUIRED
STAGED ANALYSIS
2 RS E 002 Commercial 2.4 0, Negligible YES
REQUIRED
STAGED ANALYSIS
3 RS E 006 Public 10.7 1, Very Slight YES
REQUIRED
STAGED ANALYSIS
4 RS E 018 Commercial 1 2, Slight YES
REQUIRED
STAGED ANALYSIS
5 RS E 018A Commercial 2.2 0, Negligible YES
REQUIRED
STAGED ANALYSIS
6 RS E 018B Commercial 3.3 0, Negligible YES
REQUIRED
Above Tunnel
7 RS M 001 Alignment
2, Slight NOT ANALYZED
Above Tunnel
8 RS M 002 Alignment
2, Slight NOT ANALYZED
Above Tunnel
9 RS M 004 Alignment
1, Very Slight NOT ANALYZED
Above Tunnel
10 RS M 008 Alignment
1, Very Slight NOT ANALYZED
Above Tunnel
11 RS M 009 Alignment
2, Slight NOT ANALYZED
Above Tunnel
12 RS M 012 Alignment
2, Slight NOT ANALYZED
STAGED ANALYSIS
13 RS W 001 Commercial 5.9 1, Very Slight YES
REQUIRED
STAGED ANALYSIS
14 RS W 002 Commercial 0.5 1, Very Slight YES
REQUIRED
STAGED ANALYSIS REQUIRED.
(Since it is in tunnel zone,
15 RS W 003 Commercial 0.05 2, Slight YES distance is taken as 0.05 m
instead of 0 m)
STAGED ANALYSIS
16 RS W 033 Commercial 8.2 2, Slight YES
REQUIRED
STAGED ANALYSIS
17 RS E 004 Commercial 8.4 2, Slight YES
REQUIRED
Residential
STAGED ANALYSIS
18 RS E 005 & 9.5 2, Slight YES
Commercial
REQUIRED
STAGED ANALYSIS NOT
19 RS E 008 Commercial 20.3 2, Slight NO
REQUIRED

- Page 5 -
Report: Building Damage Assessment – Retrieval Shaft

Retrieval Shaft Area BCS Reports -Lot -1


Whether
Distance Category As
within
SL. Type of From per
BIN Influence Remarks
No. Building Retaining M/s.AIMIL
of
Structure (m) Ltd
Excavation
Above Tunnel
20 RS M 003 Alignment
2, Slight NOT ANALYZED
Above Tunnel
21 RS M 007 Alignment
2, Slight NOT ANALYZED
STAGED ANALYSIS
22 RS E 007 Residential 15 2, Slight YES
REQUIRED
STAGED ANALYSIS
23 RS E 019 Commercial 9 2, Slight YES
REQUIRED
Temporary
24 RS E 020 - 0, Negligible NOT ANALYZED
Structure
Above Tunnel
25 RS M 011 Alignment
0, Negligible NOT ANALYZED
STAGED ANALYSIS NOT
26 RS W 012 Residential 46.5 2, Slight NO
REQUIRED
STAGED ANALYSIS NOT
27 RS W 013 Residential 48.9 2, Slight NO
REQUIRED
STAGED ANALYSIS NOT
28 RS W 018 Residential 53 2, Slight NO
REQUIRED
STAGED ANALYSIS NOT
29 RS W 020 Commercial 53.1 2, Slight NO
REQUIRED
Commercial, STAGED ANALYSIS
30 RS E 017A 16.4 3, Moderate YES
Residential REQUIRED
Above Tunnel 1, Very
31 RS M 005 NOT ANALYZED
Alignment Slight
Above Tunnel
32 RS M 006 Alignment
2, Slight NOT ANALYZED
Above Tunnel
33 RS M 010 Alignment
2, Slight NOT ANALYZED
RS W 004 & Residential & STAGED ANALYSIS
34 2.8 2, Slight YES
005 Commercial REQUIRED
STAGED ANALYSIS NOT
35 RS W 011 Residential 44.6 3, Moderate NO
REQUIRED
STAGED ANALYSIS NOT
36 RS W 026A Residential 37.9 2, Slight NO
REQUIRED
STAGED ANALYSIS NOT
37 RS W 035 Commercial 43 2, Slight NO
REQUIRED
STAGED ANALYSIS
38 RS E 003 Commercial 8 2, Slight YES
REQUIRED

- Page 6 -

You might also like