SH02-ALC60-CIVIL-MOS-004 (MS & Risk Assessment for Erection of Tower Crane)

You might also like

Download as pdf
Download as pdf
You are on page 1of 5
lent CONTRAGTOR : M/s Allied Contracting LLC < ELLINGTON PROIECT = G + 2P + 12 Floor on plot No.347-4831 at Al Merkadh cuewT [M/s Ellington Properties Development LLC CONSULTANT. ; M/s Dubai Consultants METHOD STATEMENT SUBMITTAL APPROVAL APPLICATION Crane ‘ae a oT Aap at DeometfinesuancmcvLmoEo [Rave ‘Desf: acess ‘tbo Stoment& Rsk Assssint fr Eroton of Tomar | 1 Hard Copy 1 Ho 2 SattCopy 2a Is ott Teng LLC Tare Enea, ‘Mid Catan tLe Mirae Prisons z Enea ean, ‘vba Constant AiPrades opt Sram = ra = Sa Ferm nc ane Shean foe gromantonw asa beac Rati hat iy, = I ee Sa popo.aui GLa agsiwiguu #@ — SOLITUDE TRADING i Safe Work Method Statement (SWMS) ERECTION OF TOWER CRANE \ : PROPOSED G+2P+12F RESIDENTIAL TWIN TOWERS Projoct PLOTILOCATON 3474934 at AL MARKADH, DUBAI Cliont : ELLINGTON PROPERTIES DEVELOPMENT LLC , ‘Consultant :DUBAICONSULTANTS ~ Main Contractor: ALLIED CONTRACTING LLC TC Subcontractor: SOLITUDE TRADING LLC Consutanis | Cent | foroa oj) ag4a ga R SOLITUDE TRADING Lc deta the metods and quay contr obo kmplererod ely ot Erecton ‘rane win the scope of Cutactor at Buldng. The method eliement to munctes and doines sks waved aug he process ofan tha Tower Crane SANY (6510.81 whe ens he highest sf eve. v cope of works covers nlite orton of Tver ei Shine a basis and reference stondard Comp 24 Drawings and constuction orgaizain design (1) Layout plan of project construction antl tomar rane, 2 (76510-87) Constucion organization design of poet: (@) Themanapamant of twer crane operon scheme to proc canon, (A). operation manval of ower rane (5) Tecnica perfomance an techie! rameters of motile eae 22, Main rogutotions and standards [ eatcony Nave ‘Standart No ator atone | crow rane dein spacteaton) ‘685164.2000, Inaisry_| CTectieal spctestion for eae of ower crane eecion| Stondard | and uso and lsmanting of Bung constuction? eam Tndisry |i epaiieaon fer ally haeting and eoaon af 7" stondard | Bung constr “orien Indusry | CTectracalspeciicaton fr npacon of mechanical = snsard_|equpnenton constuction stab ro.o.sub Goi agviwtguy SOLITUDE TRADING ttc. 2, Installation Sequences tering sbededechors (ng ae) ondaton a pr mule reeanmendatns A oving pope erate toto concrete ater peo ke (1) atatng Basemat fe) 2 (2) Installing Standard Mast . 2) netang telescoping Coge (2) talig sowing aonb (©) Ietating pat of th counts (8) astating counter torod (stating a couter i asarbly (8) nang tower ep assembly (9) tasting sscamby (10) Istaing res ofthe counteneights (11) Winn hoisting rope and hak (2) Instating waning tht and anemomeer (49) Power cconecton antes un > SITE preparation are complet fr foundation easing on anchor mast as por location exist casted foundation. > As per reparation, Al tower erane pats delivered to location s ro0.4.ui GJOiV agsinguy SOLITUDE TRADING Luc scutes ime" i es ete it Seca tr ce fk ef eadh hewaises | wmekeonm teens

You might also like