NUMALIGARH REFINERY LIMITED

Purchase Order 4500026558-Z_N/20.04.2023 Submission status (Vendor


Number: must select one status)

Supply Requisition TP-1P30A-ME-RFP-0044-C1


X Information
(SR)Number:

Vendors Name: ADVANCE VENTILATION PVT LTD X Review

NRL Document
Number (Mandatory) Certified final

Rev. No. 1 As Built

Rev. Date 10.06.2024 Cancelled

Vendors Reference TP-1P30A-ME-0044-PID-0025 Superseded


Number:(If Any )

Document Title: P & I DIAGRAM FOR HVAC SYSTEM - SRR BUILDING

Equipment / Tag Number(S):

Document Item:

Purchaser Review and Comments Shall Not Be Assumed to Indicate Either Responsibility Or Liability For Accuracy And
Completed Of This Document Or To Alter Any Contractual Terms And Conditions.

Contractor Review Code


Numaligarh Refinery Expansion Project (NREP), Numaligarh Refinery Limited (NRL)
Project N° : 200663C001

Compliance Report for Client Comments / Observations

TEPL Comments /
Document No & Title Sr.No TEPL Comments / Observation AVPL Action / Resolution AVPL Action / Resolution
Observation

Rev 0
Vendor to provide tie-in table for interface connection between T.EN and
1 Tie-in number from TEN to be provided
advance.
2 AHU Shall be 100% standby Noted & Updated
Noted & Updated
Cooling Water Supply/Return line as per
All interconnection piping shall be as per project PMS. Vendor to
3 PMS (Doc.no.NR-0ZZZZ-PI-SPE-0001) i.e
mentioned in PMS on PID accordingly.
A3A, ASME Rating 150, Material CS, ASME
Group 1.1
Chilled water cooling coil shall be equipped with flow control valve with
4 N/A Or these are DX System
modulating temperature controller and globe valve in bypass.
5 ENGINEERING/CONSOLE ROOM Noted & Updated
6 Details shall be updated based on revised heat load Noted & Updated
7 Mention in legend Noted & Updated
TP-1P30A-ME-0044-PID-
8 Line size shall be mentioned Noted & Updated
0024
9 Vendor shall use project legend and symbols for PID development. Noted & Confirmed
P & ID Diagram For
Vendor shall consider process design basis overall Doc. No. TP-1ZZZA-
HVAC System SRR
10 PR-BOD-0001 (Latest revision) and PID design basis Doc. no. TP- Noted & Confirmed
Building
1ZZZA-PR-BOD-0002 (Latest revision) for P&ID preparation.
Vendor shall consider project piping material specifications for PID
11 Noted & Confirmed
preparation.
Vendor shall provide tie-in numbers at all places where Technip/ Vendor
battery limit interface is required. Tie-in no. shall be as per scope markup
12 Tie-in number from TEN to be provided
PID provided with ITB. At all other places, Tie-in numbering shall be in
the range of 000150-000199
At all places, where vendor needs to provide line no. and instrument tag
no. following range shall be followed:
13 Noted & Updated
1) Line no.: XX1500-XX1600, where XX is the service code
2) Instrument no.: 000150-000199
Steam traps to be indicated by vendor on steam lines based on run
14 N/A Or these are DX System
length.
15 Shall be inline with condenser unit datasheet capacity Noted & Updated
As mixing box is required, vendor to update the representation
16 Noted & Confirmed
accordinly.
17 Shall be inline with condenser unit datasheet capacity Noted & Updated
Responded by : Mohd Imran Haider
Discipline :
Date : 10.06.2024
P & I DIAGRAM FOR HVAC
SYSTEM - SRR BUILDING
1 10