Instructions
1. Operator: Perform audit daily for 1 week and document any findings and corrections made below. 4. Production Manager: Perform the Layer 3 audit once during the month.
2. Supervisor: Perform the Layer 2 audit once per week 5. Production Manager: See the QA manager for any nonconformances listed.
3. Supervisor: Document any findings and corrections made below. 6. QA Manager: Issue CAR’s to the Production Manager as required based on the 3 audits performed.