Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

www.ida-global.

com
This drawing depicts design intent only and is to be read in
SW17 conjunction with detailed drawings showing precise
structural, mechanical and electrical specifications. Prior to
commencing work, contractors and consultants must :
verify all dimensions on site
SW16 produce shop drawings
check calculations
E02
600

verify materials to be used.


IN-TFL Designers verification of layout, finishing and details must be
-4002 obtained. Specifications not made must be obtained from
the architect or designer.

ALL RIGHTS RESERVED.


Reproduction prohibited unless authorised in writing by ida

EQ EQ

1000

E01
IN-TFL
-4002

J2 JOINERY PLAN
IN-TFL SCALE 1:15
-1101

PT03
600

S01
IN-TFL-
4002
20
SW17

SM01

100
SM01 Chamfered edge
SM01

40
25
PT03 PT03
Finger full handle
SW16
to match "LA01" finish

SM01 SW17 SW17 SM01 S.Steel bin attach to door


100

100
SM01 PT03 SM01
40

40
LA02 21/08/23 - ISSUED FOR DETAILED DESIGN
25

25
SW16 SW16 Date Description
LA01
Project

735
AL MURJAN HOSPITAL

900
soft closing lift-down hinge Jeddah, ksa
1100

mechanism
LA01 LA01 Owner
735

735

LA01 LA02
900

900

Al Murjan
Investment & Development
Magnetic catch
Project No. : BH21-030
Scale : A3 = 1:15/ 1:10, A1 = 1:30/ 1:20
Drawn By : IQ
25 Checked By : SA/ AB/ NA

100
100

100

LA01 CAD File : X-IN-TFL-4000


FFL +0000
Drawing Title
LA01 outline of S.Steel bin SK01 LA01
attach to flip-down door JOINERY DETAIL J2
25 975 575 25
1000 600
S01 SECTION TYPICAL FLOOR
IN-TFL SCALE 1:10
-4002 DETAIL
E01 JOINERY PLAN E02 JOINERY PLAN Drawing No. Revision
IN-TFL IN-TFL
-4002
SCALE 1:15
-4002
SCALE 1:15
IN-TFL-4002 -
Drawing Status

DETAILED DESIGN

You might also like