Medical Gas IS/ISO 7396 -1:2016 + A1: 2017 M-Line Supply Manifold
Manifold with NRV & Gas Guru Filling Manifold
HP Flexible Tail Pipe / HTM 02-01 Part A : 2006
Medi Alart
Copper Pigtail
08
®
Features
Ÿ Each cylinder is connected through High Pressure (HP) Non Return Valve (NRV) to header
Ÿ Gas specific connections to manifold header
Ÿ Connection option of HP Flexible hose (IS / ISO 21969 : 2009) or annealed Copper tailpipe
Ÿ Suitable for all variants of Medical Gases
Ÿ Header mounted on Mild Steel Angle Iron.
08
®
2000
160
8
120
2000
160
80
80
200
200
PRESSURE GAUGE PRESSURE GAUGE
240
240
40
40
4000 4000
1
0 psi 0 psi
kg/cm 2 kg/cm 2
0 0
0 28 0 28
5 3 4
6 4'
6. SS Breaded Flexible/Copper Tail pipe (1-mtr.)
1. High Pressure Pipelines
7. MAIN CONTROL HP PRESSURE VALVE(ISOLATION VALVE)
2. ISI VALVE WHEEL TYPE 8. LINE SAFETY VALVE
3. BRASS ADOPTER FOR STOCK PRESSURE GAUGE 9. STOCK PRESSURE GAUGE
4. OUTLET BRASS ADOPTER FOR INLET 10. 3/4 Inches Male Adopter
5. MS CHANNEL
Supply to Hospital
Power Supply
7 8
230 V
1
2 2 6
5
5
9
4
OXYGEN(O2)
OXYGEN(O2)
OXYGEN(O2)
OXYGEN(O2)
OXYGEN(O2)
OXYGEN(O2)
3
1 Fully Automatic Control Panel 5 Heator For CO2 / N2O Gas (Op.)
Op.-Optional
Technical Information
Conforms to : IS / ISO 7396 - 1 : 2016 + A1 : 2017, HTM 02-01 Part A : 2006
Manifold header with HP NRV Brass
Extension Connection 1/2" BSP
Mounting Bracket Mild Steel angle
Test Pressure 1.5 times of max. working pressure (150 bar)
Ordering Information
Description Variant Order Code
Modular manifold (including 3 Block assemblies, 6 high pressure NRVs, 6 Copper Tail Pipe 3+3
assemblies.)
Modular manifold (including 4 Block assemblies, 8 high pressure NRVs, 8 Copper Tail Pipe 4+4
assemblies.)
Modular manifold (including 6 Block assemblies, 12 high pressure NRVs, 12 Copper Tail Pipe 6+6
assemblies. )
Modular manifold (including 8 Block assemblies, 16 high pressure NRVs, 16 Copper Tail Pipe 8+8
assemblies.)
Modular manifold (including 10 Block assemblies, 20 high pressure NRVs, 20 Copper Tail Pipe 10+10
assemblies. )
Note : Contact us for customized configuration
10
®
Mediline Introduces
First time in INDIA AN ISO 9001 : 2008 Certified Co.
with CE certified products
Plant Operator
Control Panel
Plant Incharge
Our fully automatic control panel with SMS alert system will send SMS to the operator when the Gas
Cylinders gets EMPTY either, left bank or right bank,If the operator doesn't replace the Cylinders with in 20
minutes then the alert SMS will be sent to the Plant in charge automatically. The status of the Gas Bank
can also be checked by the SMS.
• Customized as per desired requirement
60601-1-8:2006 20/AVS/2473
cc-2585
NABL
07
®
12
®
13
®
Digital Fully Automatic Gas Control Panel(ME-2D) Gas Services Oxygen N2 O AIR 4 AIR 7 N2 CO2 Mixed Gas
Digital Display Micro Two source system Med. Air (AR 4) 150 2175 4.2 61 3500
processor with 2 banks of Med. Air (AR 7) 150 2175 7 102 3500
controlled gas cylinders
Nitrogen 150 2175 4.2 61 3500
CO2 110 1600 4.2 61 3500
Other Comp. Gas 150 2175 4.2 61 3500 Specify Gas
Automatic Gas Changeover Panel (LED-ME-2E) Gas Services Oxygen N2 O AIR 4 AIR 7 N2 CO2 Mixed Gas
15
®
Emergency Manifold
or O2 Liquid Tank
PSA Plant
2 3
4
1 Microprocessor based digital LCD with Touch screen operation
60601-1-8:2006 20/AVS/2473
cc-2585
NABL
10
®
ME-3D
Features
Ÿ Logic-controlled auto change-over
Ÿ Constant uninterrupted supply
Ÿ High flow output - 3500 lpm @ 4.2 bar
Ÿ Stable discharge pressure & flow
Ÿ Visual & audible signal
2
Ÿ Pressure unit display options - bar, psi & kg/cm
Ÿ Optimization of residual gas in cylinders
17
®
Oxygen Left Bank 3/4” BSP* 3/4” BSP* High Pressure regulator relief valve setting 15.5 bar (225psi)
Oxygen Right Bank 3/4” BSP* 3/4” BSP* Line Pressure relief valve setting 5.17 bar (75psi)
Micro Three source System Oxygen Left Bank 150 2175 4.2 61 3500
processor with 3 banks of gas Oxygen Right Bank 150 2175 4.2 61 3500
LED Indicators cylinders & LMO/PSA
controlled LMO/PSA 4-5 73 4.2 61 3500
plant as Primary Source
of Oxygen Emergency Bank 4.2 61 4.2 61 3500
Oxygen Left Bank 3/4” BSP* 3/4” BSP* High Pressure regulator relief valve setting 15.5 bar (225psi)
Oxygen Right Bank 3/4” BSP* 3/4” BSP* Line Pressure relief valve setting 5.17 bar (75psi)
LMO/PSA 3/4” BSP* 3/4” BSP* Input : 220-240V AC
Emergency Bank
Power Supply Adaptor
3/4” BSP* 3/4” BSP* Output : 12V / 5 Amp DC
18
®
Micro Three source System Oxygen Left Bank 150 2175 4.2 61 3500
processor with 3 banks of gas Oxygen Right Bank 150 2175 4.2 61 3500
Soft Touch Display controlled cylinders & LMO/PSA
plant as Primary Source LMO/PSA 4-5 73 4.2 61 3500
of Oxygen Emergency Bank 4.2 61 4.2 61 3500
Oxygen Left Bank 3/4” BSP* 3/4” BSP* High Pressure regulator relief valve setting 15.5 bar (225psi)
Oxygen Right Bank 3/4” BSP* 3/4” BSP* Line Pressure relief valve setting 5.17 bar (75psi)
LMO/PSA 3/4” BSP* 3/4” BSP* Input : 220-240V AC
Power Supply
Emergency Bank 3/4” BSP* 3/4” BSP* Output : by SMPS
19
®
PSA Plant
INSTALLATION DIAGRAM
20
®
O2 Purity Analyzer
Inlet Pressure Outlet Pressure Flow Order
Switching
Display Manifold Setup Gas Services (Max) (Max) lpm Reference
Mode
bar psi bar psi (Max)
21