The BMT Construction Cost Table is a useful guide to the cost of building a house as well as a variety of
building types including townhouses, residential apartments, office blocks, industrial warehouses,
supermarkets, shopping centres, hotels and motels. Choose your finish then multiply by the regional
variations table below to find out the approximate cost per construction type per square metre in your
area.
3BR weatherboard project home, level block, single level, shelf design $1,460 $1,635 $2,022
3BR brick veneer project home, level block, single level, shelf design $1,557 $1,733 $2,070
3BR full brick project home, level block, single level, shelf design $1,550 $1,728 $2,146
4BR weatherboard home, level block, single level, unique design $2,069 $2,190 $2,734
4BR brick veneer home, level block, single level, unique design $2,178 $2,283 $2,872
4BR full brick home, level block, single level, unique design $2,472 $2,824 $3,067
3BR brick veneer project home, level block, two level, shelf design $1,623 $1,793 $2,211
3BR full brick project home, level block, two level, shelf design $1,683 $1,893 $2,322
4BR brick veneer home, level block, two level, unique design $2,278 $2,574 $2,988
4BR full brick home, level block, two level, unique design $2,517 $2,891 $3,155
2BR single level brick veneer townhouse including allowance for common property $2,289 $2,603 $2,933
2BR 2 level brick veneer townhouse including allowance for common property $2,350 $2,648 $3,077
3BR single level brick veneer townhouse including allowance for common property $2,268 $2,581 $2,900
3BR 2 level brick veneer townhouse including allowance for common property $2,328 $2,713 $3,088
3 level walk-up unit complex, concrete structure, ground floor parking $2,410 $2,587 $3,138
Chat with us!
https://www.bmtqs.com.au/construction-cost-table 1/3
3/2/22, 1:30 AM Cost to Build a House | Building Costs Australia
3 level walk-up unit complex, concrete structure, basement parking $2,361 $2,538 $3,088
4-8 level unit complex, including lift, concrete structure, ground floor parking $2,753 $2,961 $3,588
4-8 level unit complex, including lift, concrete structure, basement parking $2,692 $2,900 $3,528
8 or more level unit complex, including lift and basement car parking $2,856 $3,242 $4,122
High Bay Warehouse, standard configuration, concrete floor, metal clad $1,182 $1,335 $1,440
High Bay Warehouse, standard configuration, concrete floor, pre-cast concrete wall clad $1,452 $1,534 $1,710
Single level boutique motel including A/C, guest facilities $3,819 $4,370 $5,746
Single level tavern/hotel including A/C, excluding loose item fit out $3,187 $3,793 $4,563
1-4 level open plan offices, including A/C & lifts, excluding fit out $2,482 $2,768 $3,252
4-8 level open plan offices, including A/C & lifts, excluding fit out $2,878 $3,088 $4,151
8 levels and over, including A/C & lifts, excluding fit out $4,117 $4,348 $4,546
Calculations explained
The above costs are calculated based on a Gross Floor Area (GFA) rate.
Typically GFA can be defined as the sum of the fully enclosed covered floor
area and the unenclosed covered floor area of a building at all floor levels,
measured in a square metre rate.
Penthouses
Costs provided are an average price for typical buildings, allowing for preliminaries, builders profit and
overheads. Costs can provide no more than a rough guide to the probable cost of building, as costs
can vary significantly based on site conditions, level of fitout and design.
This will give you an approximate cost for the construction type per square metre in your Hobart 95% - 120%
area.
Adelaide 95% - 108%
Disclaimer
Available online or as an app for your iPhone, iPad or Android phone or tablet.
NT ACT
Darwin Canberra
(/contact- (/contact-
us/darwin) us/canberra)
© BMT Tax Depreciation 2022 All rights reserved. Legal and privacy (/legal-privacy) Customer feedback (/customer-feedback) Manage
email preferences (/unsubscribe)