2023.3.31 Form 563. Action Plan EFB

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

AOC Proposed Schedule of Events INSTRUCTIONS

Print or type. Complete the applicant information and the


column labeled “Date Proposed.” Submit with formal
application for AOC certificate.

Name of Applicant Date Submitted Revision Number CAAV Control Number


VSA 31/12/2022

DATE DATE
EVENTS NOTE
PROPOSED ACCOMPLISHED
PHASE 2 – INITIAL APPLICATION REVIEW G650ER

Submit Formal Application Package 15/4/2023

Formal Application Meeting


PHASE 3 – DOCUMENT CONFORMANCE
Receive Interim Approval to Start Training 05/2023

Start Operations Training 2022

All manuals approved/accepted 08/2028

Other Event? N/A

Flight Crew Training


Begin Instructor Training 07/2023

Begin Basic Indoctrination 07/2023

Begin Emergency Training 07/2023

Begin Aircraft Type-Specific Ground Training 07/2023

Begin Simulator/Aircraft Flight Training 07/2023

Begin DPE Training 07/2023

Begin Proficiency Checks 07/2023

Other Event? N/A

Cabin Crew Member Training


Begin Instructor Training N/A

Begin Basic Indoctrination N/A

Begin Emergency Training N/A

Begin Aircraft Ground Training N/A

Begin Competency Check Evaluator Training N/A

Begin Competency Checks N/A

Other Event? N/A

Flight Dispatcher Training


Begin Instructor Training 07/2023

Begin Basic Indoctrination 07/2023

Begin Aircraft Ground Training 07/2023

Begin Competency Check Evaluator Training 07/2023

Begin Competency Checks 07/2023

Other Event? 07/2023


Maintenance System Control Training
Begin Instructor Training 07/2023

Begin Basic Indoctrination 07/2023

Begin Aircraft Systems Training 07/2023

Begin Maintenance Control Training 07/2023

Other Event? 07/2023

PHASE 4 – INSPECTION & DEMONTRATION


Aircraft ready for Conformity Inspection 07/2023

Ready for Training Records Inspections 07/2023

Ready for Pre-Operational Inspections 07/2023

Begin Evacuation Demonstration (if required) 07/2023

Begin Ditching Demonstration (if required) 07/2023

Demonstration OpSpecs Generated 07/2023

Begin Demonstration Flights SGN - CXR

Complete Demonstration Flights SGN - PQC

PHASE 5 – FINAL CERTIFICATION

Expect AOC to be issued 15/08/2023

Conduct first commercial air transport flight 20/08/2023

Validation Flight Sequence N/A

Notes

FSSD Form 563 Schedule of Events [2]2015

You might also like