Quarterly Work Performance Evaluation (Self)

Name: Safeer Mughal Position: Sub Technician


Department: Maintenance S. No: G6-12
No. Work Performance Self-Evaluation Score
1st 1. Carried out daily, weekly, ( ) Excellent
Quarter monthly and quarterly
2023 inspections in power house and
(  ) Good
weir site.
2. Carried out annual
maintenance activities in ( ) Satisfactory
powerhouse and weir site.
3. Practicing of lathe machine to ( ) below standard
improve skills
4. Performed guide vanes gap
( ) deficient
inspection.
5. Troubleshooting of faults.
6. Collection of oil samples from
weir site hydraulic systems
7. Performed cleaning activates
from intake by trash rack
cleaner
8. Provide support to C&I team to
install pipe for upstream
gauging station
9. Participated in stay vanes touch-
up painting works.
10. Carried out the weekly,
monthly, quarterly and annual
activities at weir site.
11. Carried out dehydration of
hydraulic oil.
12. Carried out replacement of
bottom seal of by-pass inlet
gate.
13. Carried out paint work
firefighting system.