Structural Calculation Sheet

GRP ROOF
GRAVITY FILTERS TANK

JUBAIL - DAMMAM

DESALINATION PLANT PHASE 2

Prepared by: ENG ABOOBACKER Document Number Revision No Date:

Checked by: 1 13-02-24


GRAVITY FILTERS

1 JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


Index of content

LIST OF FIGURES: 2

INTRODUCTION: 3

1.1 SCOPE OF DESIGN: 3


1.2 SOFTWARE USED: 3
1.3 MATERIAL OF DESIGN: 3
1.4 REFERENCE DRAWINGS: 3
1.5 LOADS: 3
2 STRUCTURAL DESIGN 5
2.1 GENERAL MODEL OF ROOF 5
2.2 LOADS ON ROOF 6
2.3 GRP ROOF DESIGN – ALOWABLE STRESS CHECK 8
2.4 DEFLECTION CHECK: 9

List of Figures:

Figure 1: General Model of Structure ............................................................................................................................ 5


Figure 2: General Model (Full Sections) ....................................................................................................................... 6
Figure 3: Self weight of the angle roof........................................................................................................................... 6
Figure 4: Live Load on the Roof .................................................................................................................................... 7
Figure 5: Temperature load 20C difference ................................................................................................................... 7
Figure 6: maximum shear under service loads .............................................................................................................. 8
Figure 7: maximum stress under service loads .............................................................................................................. 8
Figure 8: Deflection under service load ......................................................................................................................... 9

|JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


INTRODUCTION:
1.1 SCOPE OF DESIGN:
This report is prepared for the design calculations of the GRP ROOF IN GRAVITY FILTERS TANK which
is part of the STP of JUBAIL DESALINATION PLANT PHASE 2.

The system consists of composite GRP TRIPLE BARREL RESTING ON A BIG BARREL.

1.2 SOFTWARE USED:


STAADPRO ADVANCED CONNECT Edition V22
Auto Cad 2024

1.3 MATERIAL OF DESIGN:


GRP Fiberglass:
Young’s Modules, E= 1.8 x 10+0 kg/m2

Poisson’s Ratio, υ = 0.33

Density, γ = 1937.46 kg/m 3


Thermal Coff. Α = 8x10-6 1/C

1.4 REFERENCE DRAWINGS:


GRAVITY - FILTERS

1.5 LOADS:
1-7-1 DEAD LOAD
Self-weight of GRP ROOF, Calculated by
software. Thickness ROOF = 6mm

1-7-1 Live LOAD


2.5 KN/M2 to be distributed above the location of the supports.

1-7-2 TEMPERATURE LOAD


To be considered as 20 C in the temperature difference.

3 |JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


1-7-3 Load Combination according to SBC 301:
1,4 D
1,2 D + 1.6LL +1.2 TL
1.2D + 1.0LL
1.2D
0.9D
Definitions:
D = Dead loads
L= Live Load
T = Temperature loads

JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


2 STRUCTURAL DESIGN
The GRP ROOF is resting on wall for GRAVITY FILTERS TANK.

Figure 1: General Model of Structure

|JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


Figure 2: General Model (Full Sections)

2.2 LOADS ON ROOF

Figure 3: Self weight of the girder.

JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


Figure 4: Live Load on the girder

Figure 5: Temperature load 20C difference.

JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


2.3 GRP ROOF DESIGN – ALOWABLE STRESS CHECK
By considering Tresca ( Top & Bot.) stress for the worst combination

Figure 6: Tresca Top under Service Load.

Max VALUE = 55.8 MPa

JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


Figure 7: Tresca bottom under Service Load
Max stress value = 59.6
MPa

. Both values less than allowable value 210Mpa – design is OK and satisfied

JUBAIL,DAMMAM– Desalination Plant phase 2 – Rev 0.0


2.4 DEFLECTION CHECK:
From Staad pro by considering all types of loads the values of deflection will
be as the following.

Figure 8: Deflection under service load

Max value of the deflection in Y direction at node (39190) =

17.23mm

CONCLUSION:

THE DEFLECTION ABOVE AT THE NODE 39190 IS LESS THAN THE MAXIMUM ALLOWABLE DEFLECTION
WHICH IS L/13650, 1900/13650= 62.5mm. SO, THE DEFLECTION IS BELOW THAN THE MAXIMUM.
AN ADDITIONAL STIFFENER WAS ADDED TO THE BIG BARREL TO RESTRAIN IT FROM BUCKLING AND
ITS FIXED FROM SIDE TO SIDE, WITH A TOTAL AMOUNT OF 3 GRP STIFFENERS.

IN CONCLUSION THE WHOLE DESIGN IS SAFE.