Schedule
Schedule
Plan 0%
A. PREPARATION & PROCUREMENT
Actual 0%
2. Engineering/Design Drawing
100%
3. Purchase and Delivery Material
99%
2 Install Schaffolding
Fabrication Spool Pipe & Pipe Support Tie In & Moving Piping Mateial Zona 5
3 Piping Work (Pipe Fababrication & Installation )
Fabrication Spool Pipe & Pipe Support Tie In Installation Spool Pipe & Pipe Support
3.1 A. COG Main Pipeline 300A (Pipe Zona 1-4)
B. COG Main Pipeline 300A & 100A (Vertical Pipe & Fabrication Spool Pipe & Pipe Support Moving Piping Mateial Zona 5 Installation Spool Pipe & Pipe Support
3.2
Pipe Zona 5 )
Fabrication Spool Pipe & Pipe Support Tie In Installation Spool Pipe & Pipe Support
3.3 C. COG Main Pipeline 65A
Fabrication Spool Pipe & Pipe Support Installation Spool Pipe & Pipe Support
3.4 D. COG Main Pipeline 100A (Drain Line)
7 Uninstall Scaffolding
Plan 0%
C. TESTING & COMMISIONING
Actual 0%
8 8 8 8 8 8 44 44 44 44 44 44 44 44 44 44 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 43 43 43 43 43 43 43 43 43 43 43 43 43 43 43 14 14 14 14 14 14 14 14 14 14 14 14 14 14
Manpower M/D
8 16 24 32 40 48 92 136 180 224 268 312 356 400 444 488 536 584 632 680 728 776 824 872 920 968 1016 1064 1112 1160 1208 1256 1304 1352 1400 1448 1496 1544 1592 1640 1688 1736 1784 1832 1880 1928 1976 2024 2067 2110 2153 2196 2239 2282 2325 2368 2411 2454 2497 2540 2583 2626 2669 2683 2697 2711 2725 2739 2753 2767 2781 2795 2809 2823 2837 2851 2865
Daily
0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.2 0.2 0.2 0.2 0.2 0.2
Production
Total
Installed Quantity Production
0.4 0.8 1.3 1.7 2.1 2.5 2.9 3.6 4.2 4.8 5.4 5.9 6.5 7.0 7.5 8.1 8.6 9.2 9.7 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
Progress Rate
2% 4% 6% 8% 11% 13% 15% 18% 21% 25% 27% 30% 33% 36% 38% 41% 44% 47% 50% 52% 55% 58% 60% 63% 65% 67% 70% 72% 74% 76% 79% 82% 85% 88% 91% 95% 96% 96% 97% 98% 99% ####
(%)
Heavy Equipment
Cargo Crane
Cargo Crane 35 ton Cargo Crane 35 ton Cargo Crane 35 ton
35 Ton
Schedule Plant
- Actial
PT.ANGEL ENGINEERING UTAMA
TARSONO
14 14 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
3,013
2879 2893 2901 2909 2917 2925 2933 2941 2949 2957 2965 2973 2981 2989 2997 3005 3013
3,013
19.64
19.64
100%
9 Day
22 Day