SCHEDULE CCP COG PIPELINE INSTALLATION

PT. ANGEL ENGINEERING UTAMA

Date : 2024.07.01 - Rev.00


Project : KP - COG MAIN PIPELINE - CCP
Client : PT. Krakatau Posco
No Contract :
Contenents : Fabrication & Istalation
◈ Fabrication & Installation Schedule
May (05).2024 June (06).2024 July (07).2024 August (08) 2024 September (09) 2024 October (10) 2024
NO DESCRIPTION Progress
25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27
MR CCP

Plan 0%
A. PREPARATION & PROCUREMENT
Actual 0%

1. Document and Material Approval

2. Engineering/Design Drawing
100%
3. Purchase and Delivery Material
99%

4. Measurement (on Site)


Plan 0%
B. FABRICATION & INSTALLATION
Actual 0%

1 Preparation Material (Sandblasting & Coating)

2 Install Schaffolding
Fabrication Spool Pipe & Pipe Support Tie In & Moving Piping Mateial Zona 5
3 Piping Work (Pipe Fababrication & Installation )
Fabrication Spool Pipe & Pipe Support Tie In Installation Spool Pipe & Pipe Support
3.1 A. COG Main Pipeline 300A (Pipe Zona 1-4)
B. COG Main Pipeline 300A & 100A (Vertical Pipe & Fabrication Spool Pipe & Pipe Support Moving Piping Mateial Zona 5 Installation Spool Pipe & Pipe Support
3.2
Pipe Zona 5 )
Fabrication Spool Pipe & Pipe Support Tie In Installation Spool Pipe & Pipe Support
3.3 C. COG Main Pipeline 65A
Fabrication Spool Pipe & Pipe Support Installation Spool Pipe & Pipe Support
3.4 D. COG Main Pipeline 100A (Drain Line)

3.5 Pipe Support


Steel Structure (Deck Fabrication & installation )
4
(E,F,G,H & I)
5 Pipe Cover (J, K, L & M)

6 Painting Finishing Totch up

7 Uninstall Scaffolding
Plan 0%
C. TESTING & COMMISIONING
Actual 0%

1 NDT Test (RT 10%)

2 Testing (Pressure Test) Air tightmess

4 PAT (Test Run No Load)

5 FAT & FAC (Commissioning & Final Adjustment)

Plan Progress Plan

Actual Progress Actual

8 8 8 8 8 8 44 44 44 44 44 44 44 44 44 44 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 43 43 43 43 43 43 43 43 43 43 43 43 43 43 43 14 14 14 14 14 14 14 14 14 14 14 14 14 14

Manpower M/D
8 16 24 32 40 48 92 136 180 224 268 312 356 400 444 488 536 584 632 680 728 776 824 872 920 968 1016 1064 1112 1160 1208 1256 1304 1352 1400 1448 1496 1544 1592 1640 1688 1736 1784 1832 1880 1928 1976 2024 2067 2110 2153 2196 2239 2282 2325 2368 2411 2454 2497 2540 2583 2626 2669 2683 2697 2711 2725 2739 2753 2767 2781 2795 2809 2823 2837 2851 2865

Daily
0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.2 0.2 0.2 0.2 0.2 0.2
Production
Total
Installed Quantity Production
0.4 0.8 1.3 1.7 2.1 2.5 2.9 3.6 4.2 4.8 5.4 5.9 6.5 7.0 7.5 8.1 8.6 9.2 9.7 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

Progress Rate
2% 4% 6% 8% 11% 13% 15% 18% 21% 25% 27% 30% 33% 36% 38% 41% 44% 47% 50% 52% 55% 58% 60% 63% 65% 67% 70% 72% 74% 76% 79% 82% 85% 88% 91% 95% 96% 96% 97% 98% 99% ####
(%)

Crane 55 Ton Crane 55 Ton Crane 55 Ton Crane 55 Ton

Heavy Equipment
Cargo Crane
Cargo Crane 35 ton Cargo Crane 35 ton Cargo Crane 35 ton
35 Ton

Schedule Plant
- Actial
PT.ANGEL ENGINEERING UTAMA

Jl. Palem Boluevard L8 Rt 004 Rw 010


Kel. Kotabumi Kec. Purwakarta Cilegon - Banten
Hp. 081314946353 / 087718551817 Telp. 0254 - 340664
PT. ANGEL ENGINEERING UTAMA

TARSONO

November (11) 2024


Remark
29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29

14 14 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
3,013

2879 2893 2901 2909 2917 2925 2933 2941 2949 2957 2965 2973 2981 2989 2997 3005 3013
3,013

19.64

19.64

100%

9 Day

22 Day