HIGHLIGHTS
1 Hourly average values are shown on the graph 3 Actual market results as of 08 February 2023
2 Intervals may be applied with Secondary Price Cap 4 Including data starting from 09 February 2023 which are based on projections.
MARKET OPERATIONS HIGHLIGHTS 07
ILIJAN UNIT 1 600 06/04/2022 19:45 02/07/2023 14:26 End of Cooperation period of Ilijan NGPP
ILIJAN UNIT 2 600 06/05/2022 00:00 End of Cooperation period of Ilijan NGPP
MASINOC UNIT 1 315 12/23/2022 23:40 Planned outage until Feb 21, 2023
SLPGC UNIT 2 149.6 01/07/2023 23:56 Planned outage until Feb 17, 2023
PAGBILAO UNIT 3 420 01/14/2023 00:20 Planned outage
SCPC UNIT 2 150 01/17/2023 07:00 02/07/2023 23:28 Planned outage
QPPL UNIT 1 460 01/20/2023 23:59 Planned outage
PEDC UNIT 1 83.7 01/23/2023 00:55 PMS
GMEC UNIT 1 316 02/02/2023 00:55 02/04/2023 11:00 Maintenance outage for repair of forced draft fan.
KALAYAAN UNIT 3 180 02/02/2023 07:20 Heavy water leak at spherical valve trunnion
KALAYAAN UNIT 4 180 02/02/2023 07:20 Heavy water leak at spherical valve trunnion
STA RITA UNIT 6 265 02/03/2023 23:38 02/04/2023 02:34 From change over from gas to oil
SAN GABRIEL UNIT 1 420 02/03/2023 23:52 Malampaya Turn-around activity
STA RITA UNIT 6 265 02/04/2023 03:27 02/06/2023 11:05 GT protection actuated.
STA RITA UNIT 2 255.7 02/04/2023 20:36 02/05/2023 01:36 Tripped due to activation of GT protection
STA RITA UNIT 2 255.7 02/05/2023 20:31 02/06/2023 05:22 Tripped due to activation of GT protection
STA RITA UNIT 2 255.7 02/06/2023 20:59 02/07/2023 15:30 Tripped due to activation of GT protection
ILIJAN UNIT 1 600 02/08/2023 03:02 02/08/2023 21:52 Emergency shutdown due to hotspot at gas turbine area
STA RITA UNIT 2 255.7 02/08/2023 03:29 02/08/2023 17:48 Tripped due to gas turbine protection actuation.
1 Status as of 09 February 2023
MARKET
02 TRANSACTIONS
MARKET TRANSACTIONS MARKET OPERATIONS HIGHLIGHTS 013
Luzon-Visayas
BILLING PERIOD Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-233
Metered Quantity (GWh) 6,716 6,580 7,224 7,538 7,827 7,226 7,259 7,374 7,280 7,180 6,823 6,388
Bilateral Quantity (GWh) 6,100 5,736 6,493 6,689 7,113 6,627 6,241 6,485 6,313 6,338 5,894 5,421
Spot Quantity (GWh) 616 844 731 849 714 599 1,018 889 967 842 929 967
Daily Average MQ1 (GWh) 217 235 233 251 252 241 234 238 243 232 227 206
Customer ESSP2 (PhP/KWh) 6.51 7.34 6.44 6.42 9.01 8.91 7.13 9.16 9.21 8.62 8.80 5.82
1 Daily Average MQ is computed as [Total MQ / Total No. of Days] for the billing month
2 ESSP refers to Effective Spot Settlement Price. Prices used in the settlement are reflective of zero congestion cost component for Negros-Panay Generator and Loads as per ERC Directive (Until Oct 2022 Billing).
3 Based on Preliminary Settlement
Generation Mix
MARKET OPERATIONS HIGHLIGHTS 014
January 2023
Nov 2022 to Jan 2023
Nov-2022 Dec-2022 Jan-2023
TYPE
GWh % GWh % GWh %
NAT.
1,280 17.2 1,298 18.2 1,116 16.8
GAS
OIL-
140 1.9 318 4.5 36 0.5
BASED
HIGHLIGHTS
P
Decrease in supply levels Demand consumption for WESM rate for December
around 806 MW for December December decreased by 188 2022 is P8.42/kWh, and it
2022. For January, an increase MW or 1.82% compared to the decreased to P5.76/kWh for
of 1,347 MW was recorded. previous month. For January, January 2023
the demand further decreased
Natgas plants use an oil fuel by 914 MW.
during the Malampaya gas
facility maintenance outage.
03 WESM MINDANAO
26
MILLION
CONSUMERS
4 43
PRIVATE
WESM
DISTRIBUTION GENERATION
UTILITIES COMPANIES
28 MINDANAO
COMMERCIALLY LAUNCHED LAST 26 JANUARY 2023
ELECTRIC
COOPERATIVES
10
METERING
SERVICES
PROVIDERS
12
DIRECTLY-
CONNECTED
CUSTOMERS
Summary of Market Results
Capacity, Available Supply, and Demand
Registered
% Available % Outage % De-rated
Capacity, MW
COAL 2,265.9 75.6% 22.1% 2.3%
GEOTHERMAL 103.7 82.1% 0.8% 17.1%
HYDRO 922.6 88.9% 10.7% 0.5%
ROR-HYDRO 194.2 57.5% 14.0% 28.4%
OIL-BASED 672.8 86.6% 4.3% 9.1%
SOLAR 67.2 21.6% 53.0% 25.3%
BIOMASS 29.7 63.7% 12.7% 23.6%
BIOGAS 12.4 10.1% 0.0% 89.9%