2 Vasant Electrical panel One Fire point Fire Point available 1-Adopt

kunj room & DG set available near near to the standalone fire
area & metre to the location electrical panel suppression system
room with three sand room area.
to prevent
bucket and 1
DCP & 1 Co2 electrical fires in
fire cabinet or panel.
extinguisher. Note: Manual 2- DG set must be
Operated enclosed from all
Fire/Emergency the side include
alarm system overhead shed
should be provided protection.
in case of power
(Target date – 20-
failure we can use
this one. May 2024)
3- Combustible
items must be
removed from
surrounding of DG
set to control
fire.
4- Only Authorized
person must be
entering in
Electrical panel &
DG set area.
5- Do not store any
flammable material
inside the meter
panel room.
6- Manual
Operated
Fire/Emergency
alarm should be
implemented at
prominent location
which is being
identifiable by
every person..
Cylinder One Fire point Fire Point 1. 1- Provide MSDS
Storage available near available near and SDS with
area to the location to the cylinder identification
with three sand storage area. . labels.
bucket and 1 (Target Date – 20-
DCP & 1 Co2 May- 2024)
fire
extinguisher.

Vasant
Kunj
Station

2. Oxygen and
provision for Note: Manual LPG cylinder must
Manual Operated be
Operated Fire/Emergenc store
Manual y alarm system separately.
Operated provided. Identification
Fire/Emergenc marking must be
y alarm in open provided. (Target
area. date – 20-May
2024)

3- Cylinders must
Note: Tie up be tied with chain
Tie up with fire with fire with safety cap.
stations is not stations should With immediate
available. be done for all effects.
the Four
station 4- Manual
including Operated
batching plant Fire/Emergency
and Casting alarm should be
yard implemented at
prominent
location which is
being identifiable
by every person.
(Target – when
required)

5- Fire station tie


up should be
done. (Target
date – 14
June 2024)
Scrap yard No Fire Point Fire Point with 1-ABC type & CO2
& Tower available near ABC type & Fire extinguisher
Crane Area to the location CO2 Fire with Three sand
extinguisher bucket must be
with Three provided. in fire
sand bucket point
should be 2-Unwanted
Storage provided. material should
Room be segregate
properly in scrap
yard
3-Do not mix
wood and steel
Cement Go scrap must me
down store separately.
4-Green Mesh/
Hessen cloth &
Water proofing
Fabric Must be
store in a proper
manner.

Store Fire point 25Kg DCP 1. Segregate all


Room available with cartage type items in store
(Container CO2 & ABC fire properly in well-
) type Fire Extinguisher ventilated area
Extinguisher required near and Store
with 3 fire store area. Flammable
buckets. material and
chemicals (such
as acid, paints &
Note: Manual other corrosive
No provision operated Fire liquids) in
for Extinguisher approved
Manual containers in a
Operated separate Safety
Fire/Emergenc cabinet to
y isolated them and
take preventive
measures on fire
hazard.
Tie up with fire
stations is not 2- Segregation of
available essential and
non-essential
material should
be required and
store them
separately
3- Do not store
Highly flammable
liquids (Diesel,
Chemical,
Shuttering oil &
Paints) inside the
Container it must
be store
separately.
4- Use of Dip tray
to control oil
spillage inside
container.
5- Modular Fire
Extinguisher
should be
installed in Diesel
or gas storage
area.
6- Access must be
clear all the time
with emergency
fire exit door.
7- Provide spill kit
near mechanical
workshop & Dip
tray near
diesel/oil storage
area to avoid oil
spillage
Wooden No Fire Point Fire Point with A lot wooden
scrap available near ABC type & scrap/ tree
to the location CO2 Fire branches store
extinguisher behind the wash
with Three room area.
sand bucket Segregation of
should be essential and
Note- Wooden provided. non-essential
scrap must be material should
removed from be required and
site timely. store them
separately
Remove all the
Wooden scap
from the site .
Office Fire point Fire Point with Remove all
Common available with ABC type & CO2 unwanted files
Area CO2 & ABC Fire from the office
type Fire extinguisher areas. (Target
Extinguisher must be date – 19-May
with 3 fire checked on 2024)
buckets. daily basis
Segregation of
Provision for essential and non-
Manual essential material
Operated should be
Fire/Emergenc required and store
y alarm in open Note: Manual them separately.
area. Operated (Target date – 20-
Fire/Emergency May 2024)
alarm system
should be Do not use
provided. damage electrical
Equipment’s/
wire, replace the
wear and tear
wire by new one.
(Target date – 20-
May 2024)

Manual
Operated
Fire/Emergency
alarm should be
implemented at
prominent
location which is
being identifiable
by every person.
(Target – when
required)
5. Fire station tie
up should be
done. (Target date
–1 June 2023)
Canteen & No Fire Point Fire Point with 1-Maintain good
Steel Yard available near ABC type & CO2 House keeping to
to the location Fire avoid fire hazard.
extinguisher 2- Remove all the
with Three sand waiste ondaily
bucket should basis.
be provided. 3 Segrigate all
unwanted
material from the
location and store
tem in designated
places.
4-ABC type & CO2
Fire extinguisher
with Three sand
bucket must be
provided. in fire
point and also
display MSDS.
5-Emergency
contact number
must be display
6-Do not use
damage electrical
quipments/wire,
replace the wear
and tear wire by
new one
7-Segregation of
essential and non-
essential
Office Fire point Fire point must Remove all
Common available with be maintained unwanted files
Area CO2 & ABC on regular from the office
Mahipa type fire basis areas. (Target
3 l pur Extinguisher date – 19-May
. station with 3 fire 2024)
buckets. Segregation of
essential and
non-essential
Mechanical material should
alarm system be required and
installed store them
separately.
(Target date – 20-
May 2024)
Do not use
damage electrical
Equipment’s/
wire, replace the
wear and tear
wire by new one.
(Target date – 20-
May 2024)
Manual Operated
Fire/Emergency
alarm should be
implemented at
prominent
location which is
being identifiable
by every person.
(Target – when
required)
Fire station tie up
should be done.
(Target date –1
June 2023)

Martial Fire point Calculate the Segregation of


storage in available with fire load and essential and
front of CO2 & ABC increase the non-essential
office type fire fire point as material should
Extinguisher per be required and
with 3 fire requirements. store them
buckets. separately
Do not mix wood
Note- 25Kg and steel scrap
DCP cartage must me store
type fire separately.
Extinguisher Remove all
required unwanted
near/office material from the
store area. site.
Electrical Fire point Fire Point 1-Adopt
panel available with available near standalone fire
room CO2 & ABC to the electrical suppression
type fire panel room system to prevent
Extinguisher area. electrical fires in
with 3 fire cabinet or panel.
buckets. 2- DG set must be
enclosed from all
Note: Manual the side include
Operated overhead shed
Fire/Emergenc protection.
y alarmsystem (Target date – 20-
should be May 2024)
provided in 3- Combustible
case of power items must be
failure we can removed from
use this one. surrounding of
DG set to
control fire.
4- Only
Authorized
person must be
entering in
Electrical panel &
DG set area.
5- Do not store
any flammable
material inside
the meter panel
room.
6- Manual
Operated
Fire/Emergency
alarm should be
implemented at
prominent
location which is
being identifiable
by every person

Store CO2 & ABC 25Kg DCP 1. Segregate all


Room type Fire cartage type items in store
Extinguisher fire properly in well-
available. . Extinguisher ventilated area
required near and Store
store area. Flammable
material and
No provision Fire Point with chemicals (such
for ABC type & as acid, paints &
Manual CO2 Fire other corrosive
Operated extinguisher liquids) in
Fire/Emergenc with Three approved
y alarm sand bucket containers in a
should be separate Safety
provided. cabinet to
isolated them and
Tie up with fire take preventive
stations is not measures on fire
available Note: Manual hazard.
operated Fire
Extinguisher 2- Segregation of
essential and
non-essential
material should
be required and
store them
separately
3- Do not store
Highly flammable
liquids (Diesel,
Chemical,
Shuttering oil &
Paints) inside the
Container it must
be store
separately.
4- Use of Dip tray
to control oil
spillage inside
container.
5- Modular Fire
Extinguisher
should be
installed in Diesel
or gas storage
area.
6- Access must be
clear all the time
with emergency
fire exit door.
7- Modular fire
extinguisher must
be installed
8- Provide spill kit
near mechanical
workshop & Dip
tray near
diesel/oil storage
area to avoid oil
spillage
Cylinder No Fire point Fire Point with 1. ABC type &
Storage available near ABC type & CO2 Fire
area to the location. CO2 Fire extinguisher with
extinguisher Three sand
with Three bucket must be
sand bucket provided. in fire
should be point and also
provided display MSDS.
(Target date – 20-
May 2024)
Oxygen and LPG
cylinder must
be
store
separately.
Identification
marking must be
provided. (Target
date – 20-May
2024)

Cylinders must be
tied with chain
with safety cap.
(Target date – 20-
May 2024)

Manual
Operated
Fire/Emergency
alarm should be
implemented at
prominent
location which is
being identifiable
by every person.
(Target – when
required)

Fire station tie up


should be done.
(Target date – 14
June 2024)
Bottom No fire points Fire Point with 1- ABC type &
shaft available near ABC type & CO2 Fire
to the location. CO2 Fire extinguisher with
extinguisher Three sand
with Three bucket must be
sand bucket provided. in fire
should be point and also
provided. display MSDS.
(Target date – 20-
May 2024)
2-Segregation of
essential and
non-essential
material should
be required and
store them
separately.
(Target date – 20-
May 2024)
3-Acess & Egress
area must be
clean all the time
and display
emergency exit
signages .
4-Display Fire
hazard related
posters to aware
work force.

Canteen & Fire point Fire Point 1-Maintain good


Rest available with available near House keeping to
Shelter CO2 & ABC to the rest avoid fire hazard.
type fire shelter area. 2- Remove all the
Extinguisher waiste ondaily
with 3 fire Note:- Fire basis.
buckets. point Access 3 segrigate all
must be clear unwanted
all the time. material from the
location and store
tem in designated
places.

Steel Yard No fire points Fire Point with ABC type & CO2
available near ABC type & Fire extinguisher
to the location. CO2 Fire with Three sand
extinguisher bucket must be
with Three provided. in fire
sand bucket point and also
should be display MSDS.
provided. Emergency
contact number
must be display
Do not use
damage electrical
Equipments/wire,
replace the wear
and tear wire by
new one
Segregation of
essential and
non-essential
material should
be required and
store them
separately
Remove all
unwanted files
from the office
areas

You might also like