Technical Query Request Form Revision: 002

PART 1 COMPLETED BY ORIGINATOR

Originator’s Name Monthir Saleh Originator Signature

Contractor MADAR ALFAYHAA Co. Date 28 Jun 2024

Installation of Carbon Steel Pipe Culverts


Subject TQ No. ANRD-INF-MFC-CI-8502-0003 Rev. 001
on MCPP Access Road

KBR Site
KBR Site Representative signature
Representative Name

Documentation Involved:

System/Sub-system
No.

Please ‘check’ the


categories Engineering , Specification , Material , Quality , Construction , Commissioning , HSE

Please ‘check’ the


priority: High , Medium , Low

DETAILS OF ENQUIRY
Regarding the SGTF Access Road, where the existing Geogrid elevation is close to the design coarse base layer elevation, MFCO suggests
changing the final road slope from 2:100 to 1:100 to avoid demolishing the existing Geogrid from station 0+200 to station 0+400.

ORIGINATORS RECOMMENDATION(S):
Regarding the SGTF Access Road, where the existing Geogrid elevation is close to the design coarse base layer elevation, MFCO suggests
changing the final road slope from 2:100 to 1:100 to avoid demolishing the existing Geogrid from station 0+200 to station 0+400.

PART 2 ENGINEERING RECOMMENDATIONS

RECOMMENDATION(S) Accepted , Accepted with comments , Rejected

Discipline Engineer
Name & Position

Discipline Engineer
Date
Signature

PART 3 APPROVAL

Engineering Lead agrees with actions proposed as response to Technical Query.

Engineering Lead
Date
Name &Signature

NOTE: The Engineering Lead shall ensure that Process Risk Management (PRM), Health, Environment, Safety and Security (HESS) and Quality
Control (QC) issues are addressed if applicable.

PART 4 WORK IMPLEMENTATION

Follow Engineering If necessary, work to be completed under SI / FI / VO / Design


Recommendations the following Instruction: Engineering workpack
Technical Query Request Form Revision: 002

Number:

TITLE NAME SIGNATURE DATE

KBR Representative

PART 5 POST WORK VERIFICATION & INSPECTION


The undersigned hereby agree that the above actions have been inspected and are complete.
This includes updates to Go Completions database for tags, ITR’s etc.

TITLE NAME SIGNATURE DATE

Originator

KBR Representative

PART 6 CLOSE OUT

TITLE NAME SIGNATURE DATE

KBR Representative