Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DATE : JUNE 18, 2024

TO :SIR GEORGE

FROM :GLEN MAGBA

SUBJECT :CIVIL AND PAINTING LABOR COST, PROPOSED BRUNOS BARBERS,GREENBELT 5

SCOPE OF WORKS:

• PAINTING WORKS

• TILING WORKS

• CEILING WORKS

• PARTITION WORKS

• INSTALLATION OF CABINET AND BACKWALL MIRROR

LABOR FEES:

• MOBILIZATION = 80,000

• PAINTING WORKS = 180,000

• INSTALLATION OF TILES AT BOH AND MAIN AREA = 100,000

• CEILING PREPARATION AND CLOSING = 80,000

• PREPARATION AND CLOSING OF PARTITION = 100,000

• INSTALLATION OF CABINET AND WALL MIRROR = 50,000

TOTAL LABOR COST: 590,000

You might also like