DAILY BASIS

REPORT WGP-NGL
(Q69)

Reporting Date June 29, 2024

Location Name Q69-NGL

Client Wasit gas plant

Manager Anoop Kumar Dubey

Prepared By NAGUR SHARIEF SHAIK

Summary

The Number of PIPE FITTERS is Ten and One WPR. Total no of


employees: 11
Overall, the employees at different locations have shown there
performance by using right equipments, Techniques to complete tasks.
Despite facing issues with some gate valves( Using W40) they have
managed to complete.
PIPE FITTERS WPR

NAGUR SHARIEF SHAIK MUNIYARAJA

RAZIB MIAH
DALIMMOLLA
TAMSER ALI
SHOHID ALI
KHOLIL IMAN
ASAD ABDU;L
MAHA ALAM
SHARIFUL ISLAM
NAZRUL

Progress Status

No of Trade Location Type of Job Task Status


Employe
es

6 Pipe FGR & Operations Gate valves Complet


fitters Q69- E-141 Opening e

4 Pipe Q69-E- Maintenan House keeping Complet


fitters 102A ce e

1 WPR Q69-E-102 Maintenan Supervising Complet


ce the Torquing e
team

3 Pipe Q69-E-102 Operations Opening the Complet


fitters valves e

1 Pipe D 151 Operations Top side 6 Complet


fitter Gate Valves e
open

2 Pipe D 151 & 152 Operations Down Gate Complet


fitters valves open e
and plugs
installed
.