Professional Documents
Culture Documents
RCC Estimate
RCC Estimate
Level: Sub-Structure
Dimension Dimension
height till
to long Dir. to short Dir. Rebar-1 (mm) Nos
EGL (ft)
Of footing Of footing
C1= 15 15 5 25 4
C2= 15 15 5 25 3
C3= 15 15 5 25 3
Column Mark
C4= 15 15 5 25 3
C5= 16 15 5 25 3
C6= 16 15 5 25 3
Ratio 1:1.5:3 Long Direction Rebar Short Direction
Dry Sylhet Stone/ Weight of
Cement Rebar Spacing Nos of length of Rebar
Volume Sand Bats rebar
Bags (mm) ( (inch) rebar rebar (ft) (mm)
(ft3) (ft3) (ft3) (kg)
45.00 6.55 12.27 24.55 16 6 8 48 23.09 12
50.00 7.27 13.64 27.27 16 6 10 50 24.05 12
0.00 0.00 0.00 0.00 16 5.5 0 0 0.00 12
0.00 0.00 0.00 0.00 16 5.5 0 0 0.00 12
0.00 0.00 0.00 0.00 16 5 0 0 0.00 12
0.00 0.00 0.00 0.00 16 4.5 0 0 0.00 12
TOTAL QUANTITY= 13.82 25.91 51.82 18 25mm=
20mm=
16mm= 47.14
12mm=
10mm=
20mm=
16mm= 39.23
12mm=
10mm=
Ratio 1:1.5:3