PETRONAS TECHNICAL STANDARDS

Plant Model Review

PTS 12.03.01
April 2019

© 2019 PETROLIAM NASIONAL BERHAD (PETRONAS)


All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form
or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright
owner. PETRONAS Technical Standards are Company’s internal standards and meant for authorized users only.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 2 of 38

FOREWORD

PETRONAS Technical Standards (PTS) has been developed based on the accumulated knowledge,
experience and best practices of the PETRONAS group supplementing National and International
standards where appropriate. The key objective of PTS is to ensure standard technical practice across
the PETRONAS group.

Compliance to PTS is compulsory for PETRONAS-operated facilities and Joint Ventures (JVs) where
PETRONAS has more than fifty percent (50%) shareholding and/or operational control, and includes
all phases of work activities.

Contractors/manufacturers/suppliers who use PTS are solely responsible in ensuring the quality of
work, goods and services meet the required design and engineering standards. In the case where
specific requirements are not covered in the PTS, it is the responsibility of the
Contractors/manufacturers/suppliers to propose other proven or internationally established
standards or practices of the same level of quality and integrity as reflected in the PTS.

In issuing and making the PTS available, PETRONAS is not making any warranty on the accuracy or
completeness of the information contained in PTS. The Contractors/manufacturers/suppliers shall
ensure accuracy and completeness of the PTS used for the intended design and engineering
requirement and shall inform the Owner for any conflicting requirement with other international
codes and technical standards before start of any work.

PETRONAS is the sole copyright holder of PTS. No part of this document may be reproduced, stored
in a retrieval system or transmitted in any form or by any means (electronic, mechanical, recording
or otherwise) or be disclosed by users to any company or person whomsoever, without the prior
written consent of PETRONAS.

The PTS shall be used exclusively for the authorised purpose. The users shall arrange for PTS to be
kept in safe custody and shall ensure its secrecy is maintained and provide satisfactory information
to PETRONAS that this requirement is met.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 3 of 38

Table of Contents

INTRODUCTION..................................................................................................... 4
SCOPE .............................................................................................................................4
GLOSSARY OF TERMS .....................................................................................................4
SUMMARY OF CHANGES ................................................................................................5
MODEL REVIEW .................................................................................................... 6
GENERAL .........................................................................................................................6
3D-CAD MODEL ..................................................................................................... 7
GENERAL .........................................................................................................................7
SAFETY, OPERATIONAL AND MAINTENANCE ASPECTS ..................................................8
3D-CAD SYSTEM FOR CONSTRUCTION ...........................................................................8
FEATURES WITH 3D-CAD TECHNOLOGY.........................................................................8
SCOPE OF MODEL REVIEW .................................................................................. 10
General ........................................................................................................................ 10
ORGANISATION OF A 3D-CAD MODEL REVIEW .................................................... 13
GENERAL ...................................................................................................................... 13
TOOLS .......................................................................................................................... 13
TEAM COMPOSITION .................................................................................................. 14
HANDLING OF COMMENTS ......................................................................................... 15
MODEL REVIEW CLOSE-OUT REPORT AND ARCHIVING ......................................... 16
GENERAL ...................................................................................................................... 16
BIBLIOGRAPHY .................................................................................................... 17
APPENDIX 1: TYPICAL COLOUR CODE FOR 3D-CAD MODELS ............................................ 18
APPENDIX 2: GUIDELINE FOR DEVELOPMENT OF 3D-CAD MODEL DETAILES .................... 20
APPENDIX 3 : CHECKLIST FOR ITEMS TO BE REVIEWED DURING FEED .............................. 22
APPENDIX 4 : CHECKLIST FOR ITEMS TO BE REVIEWED DURING DETAILED ENGINEERING 24
APPENDIX 5: CHECKLIST FOR THE OVERALL 3D MODEL REVIEW ...................................... 27

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 4 of 38

INTRODUCTION

This PTS provides minimum requirements and recommendations for 3D-CAD modelling
(Three Dimensional Computer Aided Design) for visualisation check during Front End
Engineering Design (FEED), Detailed Engineering, Procurement, Construction/Installation,
Hook-up and As-built stages. The review shall cover on accessabilty, safety, operability,
maintainability and constructability of new projects including revamp/rejuvenation,
considering PETRONAS lesson learnt and best practices. This PTS is applicable for both
upstream and downstream facilities.

SCOPE

This PTS covers the execution for 3D-CAD modelling at various design phases of the project.
The scope includes the following

i. Preparation of 3D-CAD models.

ii. The application of 3D-CAD features (e.g. clash check, colours, tagging, line and
equipment number, etc.)

iii. 3D-CAD visualisation

iv. Model review sessions.

Details of visualisation tools other than 3D-CAD tools (e.g. virtual reality) are not covered by
this PTS. Owner’s approval shall be obtained for application of the tools proposed by the
Contractors.

The 3D model review shall be carried out at the 30%, 60% and 90% of the 3D model
development during engineering phase as per appendix III & IV. All applicable items in the
Check List shall be completed prior to the formal review session of each stage.

The 3D model preparation may not be required for small brown field project scope of work
e.g. like to like changes or minor changes that does not effect the overall Equipment and
Piping Layout. These type of changes can be covered by 2D-CAD drawing and shall be agreed
by the Owner.

GLOSSARY OF TERMS

General Definition of Terms & Abbreviations

Refer to PTS 00.01.03 for PTS Requirements, General Definition Of Terms, Abbreviations &
Reading Guide.

Specific Definition of Terms

None.

Specific Abbreviations

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 5 of 38

No Abbreviation Description

1 3D-CAD Three Dimensional Computer Aided Design

2 2D-CAD Two Dimensional Computer Aided Design

3 CAD Computer Aided Design

4 HFE Human Factor Engineering

Acoustic Induced Vibration / Flow Induced


5 AIV / FIV
Vibration.

3D model development has completed all


30%, 60% and 90% progress
6 items as listed in the appendix III and/or
appendix IV during engineering phase.
Table 1.1: Specific Abbreviations

SUMMARY OF CHANGES
This PTS 12.03.01 (April 2019) replaces PTS 12.03.01 (June 2015).

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 6 of 38

MODEL REVIEW

GENERAL

The Contractor shall prepare the 3D-CAD model based on PFD, P&ID, Equipment Layout,
Structural Drawing and other documents/drawings as applicable. Contractor shall perform
internal check by its own team prior to formal 3D-CAD model review by a team comprising of
Contractor and Owner.

The 3D-CAD model used during the internal and formal reviews shall be developed based on
agreed fixed revision of the live engineering data (i.e. PFD, P&ID, Equipment Layout,
Structure, etc.) being used for development of the project. The status date shall be indicated.

The internal review shall be carried out in detail, check each system, item by item as per P&ID.
Any proposed changes shall be discussed and agreed upon with Owner prior to formal review.

The formal review shall be carried out and the findings shall be immediately recorded with
tag and reference number.

If required by the contract, a physical block model shall be constructed by the Contractor
using wooden or plastic blocks, representing in a simplified form of the equipment, buildings
etc. The scale of a physical model should be 1:100, 1:50 or 1:33.3 as agreed with owner’s
requirement. A formal check shall also be conducted joint by Contrator and owner.

3D Model review pre-requisits

The following pre-requisits activities shall be performed by Contractor prior to formal 3D


Model review at the respective stage (percentage) of the model as per table below:

No Pre-requisit Items 30% 60% 90%


1 Model intergration accros all disciplines √ √ √

2 Piping stress analysis √ √

3 Clash checks √ √

4 HFE - VCA √ √

5 Materials handling study √ √

Table 2.1: 3D Model Review Pre-Requisits

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 7 of 38

3D-CAD MODEL

GENERAL

The 3D-CAD model is developed during the FEED and Engineering phases to facilitate
procurement, fabrication, construction, installation, commissioning, operation and
maintenance of the plant facilities with added visualization features.

The model also provides the capability to present screened review all modelled details and
the ability to suppress specific items or details.

The graphical data of the 3D-CAD system is an integral part of an engineering database
supporting the design process.

The 3D-CAD engineering database enables the integration and consistency of the different
design stages and the different subjects, such as above & underground piping, foundations,
steel structures, equipment, instrumentation and electrical equipment into one 3D-model.

The 3D-CAD system shall be able to produce the following deliverables as minimum:

i. Detailed engineering drawings such as Equipment Layout, Piping General


Arrangement, Piping isometrics and etc.

ii. Material Take-off (Bills of Material).

iii. Reports such as line lists, instrument data, clashes check, mock-ups.

iv. Data models (files)

v. All 3D model files and associated databases including attributes, definitions and
set-ups for all reports, drawings and other documents extracted from the 3D
model.

vi. Piping and in-line component catalogues or databases

vii. Piping Specifications

viii. Piping Isometrics including fabrication drawings – pipe spooling and welding
isometrics

ix. Electrical and Instrument drawings

x. Structural drawings

xi. Clash check reports

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 8 of 38

SAFETY, OPERATIONAL AND MAINTENANCE ASPECTS

The 3D-CAD system shall be structured in such a way to enables each discipline involved to
check whether the plant or facilities has been designed in compliance with the specified
criterias with respect to engineering, safety, operability, maintenability and erection of the
plant. This shall include:

i. Accessibility for maintenance and firefighting,

ii. Location of valves, constructability and HFE requirement

iii. Process instrumentation,

iv. Routing of the piping adequate for the process,

v. Location of emergency shut-down stations,

vi. Proper and safe location of vents and drains,

vii. Engine intakes and exhausts,

viii. Compressor intakes,

ix. Accommodation air intakes,

x. Location of fire protection and fire-fighting equipment,

xi. Escape routes,

xii. Emergency Shower/Eye Wash,

xiii. Primary Structural Framing, Secondary Structural Framing, Tertiary Structural,


Structural Joint & Strengthening Detailing and Other Structural Component,

xiv. Location of electrical and instrumentation,

xv. Materials handling.

3D-CAD SYSTEM FOR CONSTRUCTION

A 3D-CAD system should be made available at site during construction phase for the
development of construction drawings, general reference, as-builting, etc.

FEATURES WITH 3D-CAD TECHNOLOGY

Owner and Contractor shall agree on the required minimum deliverables as specified in
Section 3.1.5 prior to the set-up of the 3D-CAD system and the applicable engineering
database(s).

The 3D-CAD system shall be programmed to provide clash checks and its acceptance criteria.
Only the differences from the programmed clash checks should be checked during the model

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 9 of 38

review. Clash check findings shall be rectified and Clash Check Report shall be made available
for the 60% and 90% 3D model review.

The 3D-CAD technology shall allow the following application:

i. Definition of classified 3D-shapes (soft boxes) to indicate free volumes in order


to:
a) Check for the presence of unwanted equipment in certain area
classification zones.
b) Check headroom available.
c) Check absence of tripping hazards.
d) Check absence of obstructions in access and escape routes.
e) Check correct location of valve handwheels.
f) Check for reach and clearance for activities.
g) Check clear access for lifting and cranes.
h) Check manhole cover opening area.
i) Check space provision for tube bundle pulling.
j) Check space provision for pig handling.
k) Check clear space for filters and strainers
l) Check for Stairway angle
m) Check for clearance and clash of Topside Lifting Sling & Padeye to deck
equipment/components

ii. Identification of deviations from normal engineering practices.

iii. Modelling of foundations and underground systems.

iv. Consistency between the 3D-CAD model and the P&ID.

The colours used in the 3D-CAD model shall be in accordance with Appendix I where practical.
Any changes of colour if required, Contractor shall obtain written approval from Owner.

The 3D CAD model shall be developed in accordance with the guidelines as specified in
Appendix II: Guideline for Development of 3D-CAD Model Details.

The 3D model should be able to fully interface with the intelligent P&ID’s in order to ensure
the consistency of data across the various documentation as well as the visualization and
validation of those data.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 10 of 38

SCOPE OF MODEL REVIEW

GENERAL

The Contractor shall check the functionality of the 3D-CAD features as agreed with the
Owner. The model shall be checked against the latest approved revision of the P&ID and
equipment layout drawings.

Process design data stated in the P&ID shall be checked prior to formal model review.
However if the model review found other more feasible and economical solutions without
jeopardising the design functionality or safety, the Project Manager shall be informed for
further assessment (e.g. HAZOP) of the proposed change(s). If the proposed change is agreed
to be implemented, then the P&ID shall be made consistent with 3D-CAD model.

The review checklists as listed in Appendix III and Appendix IV shall be used for FEED and
detailed engineering stages respectively.

The 3D model review shall be carried out at the 30%, 60% and 90% of 3D model development
during detailed engineering phase. Model review and the stages during FEED phase shall be
agreed in advance by the Owner depending on the size of the project.

All piping systems, equipment and instrumentation that have been checked and accepted at
each review stage shall be marked on the P&ID for tracking purposes.

Any point that has not been accepted shall be tagged and recorded for rectification by the
Contractor and subject to further review during follow-up checks.

When a modification is proposed the review team shall ensure it suits its purpose, not in
conflict with other requirements, practical, safe, in accordance with the P&ID and cost
effective. The team shall consult the appropriate specialists of other disciplines if necessary.

The checklists in Appendix V should be used during the overall 3D model review. However,
Contractor shall note that the checklist is not exhaustive and shall not overrule sound
judgement.

The following disciplines from the Contractor and Owner should be represented during the
formal model review as applicable. The Contractor representatives shall be qualified and
experienced on the respective project for the model review.

i. Process technology;

ii. Operations;

iii. Maintenance;

iv. Mechanical and Piping;

v. Technical safety and operability;

vi. Civil / Structural;

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 11 of 38

vii. Instrument;

viii. Electrical;

ix. Project;

x. Pipelines (as applicable)

xi. Packages items representative (as applicable)

Other relevant specialists should be consulted at an early stage of model design if required
(e.g. for solids handling, slurry transport).

Human Factors Engineering analysis shall be carried out prior to 60% 3D model review and
the results should be used as input to the model review. All items that have been categorised
by the VCA shall be colour coded in the 3D Model for ease of identification.

For the 60% 3D model review, the piping routing and pipe supports modelled shall be based
on the Pipe Stress Analysis. Material Handling study requirements and recommendations
shall be incorporated into the model for the 60% 3D model review session.

Each model review shall be concluded with a statement describing which aspects are fixed at
this stage.

If required by the contract, future piping and equipment shall be modelled completely in
order to demonstrate ease of future installation and commissioning into the facilities without
jeopardizing the production, HSE and structural weight limit.

Sub-contracted work and package supplier equipment shall be shown in the model at 30% of
3D model review with sufficient detail (e.g. overall size, distance from reference points) to
fulfil the objectives of the model reviews. If this is not practical, an alternative method shall
be used and agreed with the Owner. For this reason, a specification for ergonomic and review
requirements should be set-up and discussed with the respective package supplier during the
bid clarification meeting.

Dedicated 3D review of Vendor’s packaged equipment shall be conducted if the model is not
available during the pre-determined 30% or 60% plant 3D model review sessions. It should
be conducted before the 90% 3D plant model review in order to enable a full and integrated
review of the plant and the Vendor equipment packages.

Deluge valve stations shall be located in areas which provides unobstructed and direct access
from the roads. They should be located in the vicinity of the equipment or group of
equipment within the coverage of the deluge valve station.

For offshore facilities that have Living Quarters (LQ), the following shall be modelled as a
minimum:

i. Main HVAC equipment and major ducts to enable space allocation and for clash
checks.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 12 of 38

ii. Black and grey water system, header & sub header line above the ceiling & inside
HVAC shaft room.

iii. Potable water system (Hot & Cold water) including header line inside HVAC shaft
room

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 13 of 38

ORGANISATION OF A 3D-CAD MODEL REVIEW

GENERAL

Contractor shall notify the review team members with adequate notice before the review
date. They shall also be informed on the location, duration, type of review, participants and
number of drawings for the constructed model to be reviewed.

Prior to the commencement of a model review, the project background (e.g. Design basis,
scope of work), current applicable equipment layout drawings and P&ID shall be sent to the
review team members in advance for familiarisation.

TOOLS

A 3D-CAD model presentation for a group of people should be performed using a large screen
having a high resolution. The system shall have sufficient capacity to allow the display of a
complete model of at least one area or unit of a plant. The computer system should be of
sufficient capacity to move easily through the model, rotate the view angle around the
equipment and zoom-in/zoom-out almost instantaneously. Point-to-point distance
measurements should be possible on request. Main computer manipulations, such as
switching to another process unit should not take more than 5 minutes. The 3D model review
software shall be agreed by Owner prior to the review session. Reference items, mobile
cranes, bundle pulling equipment, etc. and an operator of the same scale as the model under
review, shall be available. The model operator's dimensions should be representative of the
applicable population.

The following information shall be available prior to the review:

i. PFD;

ii. P&ID;

iii. Lifting plan/studies;

iv. Fire safety studies;

v. HSE and HFE reviews;

vi. Listing of agreed standards;

vii. Level of completeness of model (listing of clashes) and quality of catalogues.

viii. Other relevant information including vendor information, as required.

ix. Material Handling Philosophy (for example valves, tube bundles, pumps, etc.
during maintenance)

x. Equipment/Material Handling

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 14 of 38

TEAM COMPOSITION

A team shall be established comprising of members from the Contractor and Owner for the
model review as described in Section 4.0. Contractor shall appoint a Team Leader typically
from mechanical background with adequate experience in technical content of 3-D
modelling. The team shall also comprise a 3D System Operator to operate the modelling
software during the review session.

Team member’s responsibilities are as described below:

i. Team Leader:

a) Guide the team through the model with the assistance of the system
operator.

b) Ensure review process is efficient

c) Reporting of comments made and the subsequent follow-up.

d) Discuss any conflicting recommendations made by each individual team.

e) Co-ordinate the tag handling process.

ii. 3D System Operator:

a) Understand the technical terms used in Oil and Gas, petrochemical and
refinery technology.

b) Clarify the design of the model to the team members when necessary.

c) Coordinate model reviews

d) Produce model review reports

iii. Team members’:

a) Identify shortcomings in the degree of completion.

b) Recommend required rectification by providing input to the design,


operations and maintenance.

c) Checklist as per Appendix III, IV & V shall be used as reference during the
model review.

The composition of the review team should be the same person as far as practicable for all
the stages of the model review.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 15 of 38

HANDLING OF COMMENTS

The team shall decide if the level of completion of the model is in line with the requirements
defined in Section 4.0 and respective appendices after every stage of review.

The 3D-CAD tools should have sequence reference facilities to describe the comments given
by the review team. The text of each reference shall be complete and unambiguous and
include a “snapshot” to avoid confusion in a later stage of the review process. The tagged
items shall be reviewed with the Contractor within 2 weeks and a record shall be produced
showing which tag items will be implemented or rejected, with reasoning. The relevant
specialist shall be consulted, and the other team members shall be informed, before a tag
item is deleted or significantly changed.

Before the next review starts, all agreed tag items shall be implemented in the 3D-CAD model.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 16 of 38

MODEL REVIEW CLOSE-OUT REPORT AND ARCHIVING

GENERAL

Colour prints-outs (screen dumps) at various angles shall be taken of the 3D-CAD model at
30%, 60% and 90% completion. Where applicable, comment tag items shall be visible on the
printouts.

The comment tag detail should have the information as follows:

i. Review session (30%, 60% or 90%)

ii. Comment running number as agreed between Owner and Contractor

iii. Name of personnel/discipline & organization who commented

iv. Area of the unit

v. Comment description

vi. Equipment number

vii. Line number

The above print-outs shall be handed over to the Owner for archiving. The 30%, 60%, 90%
and final version of the 3D-CAD model shall also be handed over to the Owner for electronic
archiving.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 17 of 38

BIBLIOGRAPHY
In this PTS, reference is made to the following Standards/ Publications. Unless specifically
designated by date, the latest edition of each standard shall be used, together with any
supplements/revisions thereto:

PETRONAS TECHNICAL STANDARDS


Index to PTS PTS 00.01.01
PTS Requirements, General Definition of Terms, Abbreviations &
Reading Guide PTS 00.01.03

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 18 of 38

APPENDIX 1 : TYPICAL COLOUR CODE FOR 3D-CAD MODELS

1. PIPING
Process
Liquids Brown
Gas Light Green
Steam/condensate White
Flushing/Lube oil Brown
Fuel gas/fuel oil Yellow
Heat transfer fluid ("hot oil") Brown
Cooling water Green
Service/Potable Water White
Instrument air/tool air Blue
Nitrogen Orange
Chemical Orange
Relief/drain/slops Black
General purpose Purple
Fire-fighting water Red

2. SEWERS, TRENCHES AND TRUNKING


Surface water sewer Beige
Oil contaminated sewer Black
Cooling water sewer Green
Electric cable trench/tray/ladder Red
Instrument cable trench/tray/ladder Pink
Telecom cable Brown

3. EQUIPMENT, STEEL, CONCRETE AND MAINTENANCE FACILITIES


Structural steel Steel blue
Concrete Light grey
Mechanical equipment – Static White
Mechanical equipment - Rotating Dark grey
Electrical equipment Magenta
Hoisting beams, davits and other typical Yellow with black stripes
fixed maintenance facilities/equipment

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 19 of 38

Laydown area volume White wireline


Emergency escape route Red

For all other items the choice of the colour coding is at the discretion of the model builder,
subject to approval by Owner’s project team.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 20 of 38

APPENDIX 2 : GUIDELINE FOR DEVELOPMENT OF 3D-CAD MODEL DETAILES

i. Equipment – All equipment outline shapes, including all nozzles, ducts, platforms, stacks,
supports and space reservation for maintenance access ways and equipment withdrawal
volumes

ii. Piping – All above and underground piping regardless of size, including all piping components,
supports/hangers, insulation and in-line and on-line instruments

iii. Structural – Steel and concrete structures including - Primary Structural Framings, Secondary
Structural Framing, Tertiary Structural, Structural Joint & Strengthening Detailing and Other
Structural Component

iv. Civil – Civil foundations, cable trenches, ducts, duct banks, underground pits, bund walls, piles
and pile caps. Earthworks, terrain modelling with roads, paving , fencing and gates

v. Drainage and sewerage – including all underground piping and fittings, sumps, manholes,
valves, valve pits, ditches, channels, culverts, effluent treatment pits/structures/ and sewerage
septic tank

vi. Plant Buildings – structure, floors, walls, roof, suspended floor and ceilings, floor screed, floor
and roof penetrations, doors, windows, stairs, landings, ladders and hand railing.

vii. Building HVAC – equipment, refrigerant, piping, drains, ductwork and insulation

viii. Electrical – As a minimum shall include cable trays, transformers, generators, electrical panel,
lighting, local control station, outdoor switchgear, motors and junction boxes with
underground interfaces

ix. Instrumentation – Location of all field instruments and instrument process connections, cable
trays/ladders, junction boxes and frames, analyzer houses, analyzer shelters and frames, and
locally mounted instrument control panels. Instrument junction boxes, local panels, etc., shall
be modelled complete with access/maintenance volumes, instrument air tubing and impulse
lines need not be shown.

x. Insulation and Fire Proofing – Outline

xi. Fixed Fire Protection and Fire Fighting System – Fire main routing, hydrants, fixes water
monitors, hose cabinets, deluge valve manifolds, CO2 storage cylinders, dry risers and foam
systems. Fire points, fire alarm telephones and fire detector systems

xii. Tanks – Outline, shape, nozzles, ladders and platforms

xiii. Existing Plant and Facilities – For reference as required, but shall include all interface and tie-in
requirements.

xiv. Supplier packages shall be an intelligent model and have the same level of detail as rest of the
facility or plant.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 21 of 38

xv. The line-up shall be followed systematically and strict attention shall be paid to details, since
seemingly minor items can cause accidents. Start, for instance, with the unit feed system, check
furnaces as a separate block, then proceed to internal circulation and product rundown circuits
and conclude with a check on safety, firefighting and utility systems. Critical pipes (to be
determined by piping/process engineers) require special attention (e.g. two-phase flow pipes).

xvi. Pipeline components – Pipelines, risers, pig launchers/receivers, finger type slugcatcher.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 22 of 38

APPENDIX 3 : CHECKLIST FOR ITEMS TO BE REVIEWED DURING FEED


The 3D model review during FEED is recommended subject to individual project’s preference. The
requirement and number of review stages shall be specified in the project scope of work or CTR (Cost,
Time & Resource). The stages of review and items to be reviewed should be as per checklist below.

ITEMS TO BE REVIEWED 30 60 90
% % %
1 Location and orientation of all equipment and all space consumers √ √ √
(including future extensions)
2 Primary Structure Framing (Steel & Concrete): Beam, Column, Truss √ √ √
3 Major piping (to be agreed by project owner) that influences √ √ √
equipment layout and positions
4 Escape routes (on grade and elevation) √ √ √
5 Pipe racks √ √ √
6 Dropout/bundle pulling areas √ √ √
7 Laydown areas √ √ √
8 Flare boom location, heat radiation radius and height √ √ √
9 Bridge location and bridge supports √ √ √
10 Flare piping, slope and supports √ √ √
11 Living quarter location and dimension √ √ √
12 Helideck location √ √ √
13 Boat landing location and rig approach location √ √ √
14 Riser(s) locations √ √ √
15 Clash check √ √ √
16 Buildings in outline e.g. Living quarters, temporary shelters, √ √
laboratory, warehouse, maintenance workshops, control room,
analyser houses/shelters, and switchgear rooms
17 Riser guards √ √
18 Equipment nozzles orientation √ √
19 Fireproofing and Insulation √ √
20 Blast walls √ √
21 Bund walls √ √
22 Main access ways / operational access √ √
23 Concrete foundations, slabs, paving and roads √ √
24 Packaged unit location and orientation √ √
25 Main Pipe Support Structures √ √
26 Outline of underground main electrical and instrumentation √ √
trenches
27 Main electrical and instrumentation cable trays / racks, 12” and √ √
larger
28 Underground drainage systems. This include underground Oily √ √
drainage (AOC/COC and closed drain), chemical drains, if any,
including catch basins, manholes, pits, vessels, and separation/
treatment facilities
29 Buildings Floor Plans, e.g. Living quarters, temporary shelters, √ √
laboratory, warehouse, maintenance workshops, control room,
analyser houses, and switchgear rooms

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 23 of 38

30 Mobile crane aprons √ √


31 Operator walkways/platforms, ladders and stairways √ √
32 All other piping 4” and larger for offshore (for onshore minimum √ √
pipe size to be agreed by project owner)
33 Platforms for valves and equipment for operation and maintenance √ √
34 Permanent cranes and hoisting beams (based on lifting study) √ √
35 Pipe supports locations and types √ √
36 Firefighting systems (hydrants, monitors, water spray systems, foam √ √
systems, etc.)
37 Electrical equipment and lighting √ √
38 Utility stations location √ √
39 Analyzer houses,and shelters locations √ √
40 Location of Junction Box, instrumentation, sample point location √ √
and steam manifolds (e.g. smothering and tracing), stanchion etc.
41 Any changes to the model “in-between” reviews √ √
42 The revisions resulting from the 30 % model review √
43 HFE and VCA findings incorporation √
44 The revisions resulting from the 60% model review √
45 Vent Boom and its location √ √ √
46 Telecom Tower and its location √ √ √
47 Boat Fender/Bumper √ √ √
Table A3.1: Checklist for Items to be Reviewed During FEED

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 24 of 38

APPENDIX 4 : CHECKLIST FOR ITEMS TO BE REVIEWED DURING DETAILED ENGINEERING

ITEMS TO BE REVIEWED 30% 60% 90%


1 Location and orientation of all equipment and all space consumers √ √ √
(including future extensions)
2 Structures (steel and concrete inclusive fire proofing) √ √ √
3 Blast walls √ √ √
4 Bund walls √ √ √
5 Plot determining piping / ducts √ √ √
6 Main access ways / operational access √ √ √
7 Major piping that influences equipment layout and positions √ √ √
8 Concrete foundations, slabs, paving and roads √ √ √
9 Packaged unit location and orientation √ √ √
10 Escape routes (on grade and elevation) √ √ √
11 Pipe racks and main pipe support structures √ √ √
12 Outline of underground main electrical and instrumentation trenches √ √ √
13 Main electrical and instrumentation cable trays / racks, 12” and larger √ √ √
14 Underground sewer systems and collecting and separation/treatment √ √ √
systems drainage / sewage
15 Underground Oily drainage (AOC/COC and closed drain), chemical √ √ √
drains, if any, including catch basins, manholes, pits, vessels, and
separation/ treatment facilities
16 Buildings in outline, e.g. Living quarters, temporary shelters, laboratory, √ √ √
warehouse, maintenance workshops, control room, analyser
houses/shelters, and switchgear rooms
17 Dropout/bundle pulling areas √ √ √
18 Laydown areas √ √ √
19 Mobile crane aprons (based on available cranes and lifting study) √ √ √
20 Major operator walkways and stairways √ √ √
21 Major large bore and critical process piping √ √ √
22 Analyzer houses, shelters and frames √ √ √
23 Flare boom location and the height √ √ √
24 Bridge location and bridge supports √ √ √
25 Flare piping, slope and supports √ √ √
26 Living quarter location and dimension √ √ √
27 Helideck location √ √ √
28 Boat landing location and rig approach location √ √ √
29 Riser(s) locations √ √ √
30 Riser guards √ √ √
31 Equipment nozzles orientation √ √ √
32 Clash free report/Clash check √ √ √
33 Firefighting systems (hydrants, monitors, water spray systems, foam √ √ √
systems, etc.)
34 Utility stations √ √ √
35 Equipment saddles √ √
36 Fireproofing and Insulation √ √
37 Main Pipe Support Structures √ √

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 25 of 38

38 Buildings Floor Plans in outline, e.g. Living quarters, temporary shelters, √ √


laboratory, warehouse, maintenance workshops, control room,
analyser houses, and switchgear rooms
39 The revisions resulting from the 30 % model review √ √
40 Location of spading points √ √
41 All other pipings, largely completed √ √
42 Stairway and Vertical Ladder √ √
43 Access and Service Platform √ √
44 Platforms for valves and equipment and for operation and maintenace √ √
45 Permanent cranes and hoisting beams (based on lifting study) √ √
46 Final dimensions of table tops, structures and steel constructions √ √
47 Secondary steelworks and bracing √ √
48 Eyewash and safety shower locations √ √
49 Pipe supports locations and types √ √
50 Local operation panels √ √
51 Instruments transmitters and outlines of junction boxes, secure √ √
instrument air vessels; panels and cabinets inclusive stands, safety
critical sensors / switches, stanchion etc.
52 Electrical equipment such an outdoor panels, major and lighting towers √ √
53 Outlines of heat tracing manifolds √ √
54 Operating vessels for Remote Operated Valves (ROVs), (hydraulic and √ √
pneumatic)
55 All other piping predominantly completed including fire proofing and √ √
insulation
56 Any changes to the model “in-between” reviews √ √
57 All remaining utility piping, including fusible plug piping and supports √ √
58 All instrument tags √ √
59 All lighting √ √
60 Location of Junction Box, instrumentation, sample point location and √
steam manifolds (e.g. smothering and tracing)
61 Any late or special items √
62 The revisions resulting from the 60% model review √
63 HFE and VCA findings incorporation √ √ √
64 Material Handling preliminary report √
65 Material Handling recommendation & incorporation in 3D Model √ √
66 Secondary Structural Framing: Stringer √ √ √
67 Vent Boom/Tower √ √ √
68 Telecom Tower √ √ √
69 Boat Fender/Bumper √ √ √
70 LiftBoat Davit, √ √ √
71 Caisson, √ √ √
72 Conductor & Conductor Guide Cone, √ √ √
73 Grated/Plate Floor √ √
74 Handrail, √ √
75 Monorail and its support, √ √
76 Maintenance padeye, √ √
77 Coaming, √ √
78 Drip pan, √ √

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 26 of 38

79 Hatch cover √ √
80 Structural Joint & Strengthening Detailing: Haunch, Ring, Insert Plate, √ √
Wing Plate, Stiffener, Doubler Plate, Bolted Connection
Table A4.1: Checklist for Items to be Reviewed During Detailed Engineering

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 27 of 38

APPENDIX 5: CHECKLIST FOR THE OVERALL 3D MODEL REVIEW

1. SUMMARY
Checklists provided herewith are intended to facilitate an effective and efficient review of
the 3D-CAD model. It also aims to improve the overall quality of the 3D-CAD model and to
identify and eliminate potentially hazardous situations as far as practicable.

The scope of this checklist is applicable to oil refineries, chemical plants, gas plants,
exploration and production facilities (onshore and offshore including floaters), and
supply/marketing installations and to specific items such as storage facilities and/or jetties,
road/rail loading facilities and complicated manifolds.

The checklist is comprehensive but should not be considered to be fully exhaustive. Review
checklist items may be added to address review items that are specific to a particular facility
in order to achive the objective of the review as stated herewith in this document.

2. OVERALL 3D-CAD MODEL CHECKLIST

A GENERAL YES NO
1 Is the proposed set-up logical and optimal with respect to process
integration?
2 Are roads properly defined with respect to their logical approach to
unit(s)? Consider also the movements area, including its marine location
and rail and road connections. Include road dimensions, considering main
roads (unrestricted) and restricted access roads.
3 Is erection possible during construction: furnaces, columns, large vessels,
reactors, air-cooled heat exchanger structures, flare header and flare
plot?
4 Have area classification requirements been taken into account?
5 Is the location of the Utilities area logical and optimal in relation to the
process units?
6 Is the location of the (Products) Movements Area logical and optimal in
relation to the process units?
7 Is the prevailing wind direction considered in relation to the location of
tank farms, LPG storage or gas plants, buildings, stacks, flare and oil
collecting systems, like sewers, oil catcher basins, air cooler banks and
areas containing H2S or HF?
8 Has a sterile area been provided around the flare stack?
9 Have appropriate separation distances been taken into account between
units, storage areas and buildings as well as public fences?
10 Have appropriate separation distances been taken into account between
units, storage areas and buildings as well as public fences?
11 Is the risk at the perimeter fence deemed to be within the ALARP?
12 Is the noise level at the perimeter fence in accordance with the legislated
maximum allowable limit by the host country?

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 28 of 38

13 If the Wellhead platform is designed for Tender Assisted Drilling Rig


(TADR); is there sufficient overhead clearance provided? Is the top
elevation accessible during rig up? Is the minimum TADR envelope
clearance provided as advised by respective drilling engineer?
14 If the Wellhead platform is designed for Jack Up Drilling; are all the
intended slots reachable by the pedestal crane? Is the pedestal crane not
interfering with jack up rig approach?
15 Is sufficient clearance provided between wellhead christmas tree and
overhead structural framing during installation? Are the wellhead
christmas tree wing valves within operator reach? Is sufficient clearance
provided between each christmas tree for ease of operation and
maintenance access?
16 Is sufficient area being provided for well clean up and coil tubing activities
on the main deck?
17 Is the door opening for launcher/ receiver facing out to the sea and away
from process area? Is sufficient maintenance envelope provided for
pigging activity?
18 Is sufficient Living Quarters ceiling height provided? Does the Living
Quarters plumbing system meet the minimum slope requirement? Is the
routing of Living Quarters plumbing and HVAC ducting, above ceiling and
clash free?
19 Is the riser completely modelled all the way including the bend and the
Emergency Shut Down (ESD) valve?
20 Is there any intermediate landing provided on the offshore platform
stairways or ladders as required?
21 Can the maintenance jib (or monorail) crane, on the pedestal crane,
directly access to supply boat?
22 Is sufficient clearance or maintenance envelope being provided for Y
strainers and bucket strainer (top entry and bottom drain point)? Is
sufficient clearance being provided for cracking and tightening flange
bolts?
23 Are the chemical drums storage and handling areas being provided with
coaming? Is there sufficient space provided if operations are to store
drums (empty or with chemicals) on the platform?
24 Are the risers being located away from the crane and boat landing (to
avoid from potential drop object and boat impact)?
25 Can the water from the firewater monitor reach its attended coverage
area without the interference from any equipment, drilling rig etc?
26 If there is a process requirement for equal distribution in P&ID; Is the
piping provided symmetrical?
27 Are the lighting poles around edges of platform collapsible type?
28 Is the boat approach opposite the prevailing wind? Is the boat landing
reachable by crane?
29 Can the seawater lift pump be directly access by pedestal crane from top?
30 Is the pipe dead end within 7m?
31 Can the future scope of installation supply items like pipes and equipment
easily be installed and commissioned into the facilities without
jeopardizing the production and HSE?

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 29 of 38

32 Can the hook-up or tie-inspool ie flowlines be easily installed and


commissioned into the facilities without jeopardizing the production and
HSE?
33 Are all the pipe supports included inside the model based on the latest
stress analysis reports (static and dynamic, AIV/FIV)?
34 Clash check of all piping route to Primary/Secondary Structural Framing
B PROCESS UNITS
1 Have separation distances within the equipment layout area been taken
into account? Consider furnace, column, main equipment, flare, engines,
oil collection areas like, catchbasin and manholes, are vent outlet located
to 'safe location'.
2 Is the routing of the main piping in piperacks, pipe sleepers, bridges and
trenches defined?
3 Is the location of the battery limit specified (by unit or complex)?
4 Is a maintenance area available e.g. for pulling of heat exchangers
bundles?
5 Is a maintenance area available for furnace tube pulling?
6 Is a maintenance area available for removal of large pieces of rotating
equipment such as compressors or gas turbines? Is a protective
compressor building required?
7 Are heavy valves or valve actuators, drop out spools, vessels/filters with
internals accesible by crane or if not, have lifting devices been provided?
8 Is the area sufficient for e.g. catalyst or solid handling activities?
9 Is the paving (or compacted ground) designed to support heavy
equipment and cranes?
10 Are the underground piping adequately protected against damage due to
heavy equipment and cranes?
11 Is sufficient lay down area(s) available?
C GENERAL SAFETY AND OPERABILITY
1 Consider all equipment with respect to its ergonomic aspects. This
includes accessibility, operability and maintenance as well as safety. This
applies in particular for accessibility to pump suction and discharge valves
and motor operated valves.
2 Check proper escape routes from elevated equipment and all platforms.
Check that at least two exits are present on every platform which is
regularly in use by operators. This applies for platforms at structures,
around and underneath air-cooled heat exchangers, vessels, on top of
furnaces and other frequently used working areas by operations and
maintenance. Have ladders and staircases been installed on the outside
of structures?
3 Check that there are no obstructions in the path of escape ways and that
escapes ways are as straight as practical. Ensure the exit is directed away
from a process area. All staircases should route at ground level to an open
area to allow an unobstructed escape way.
4 Check that there are no head bumpers, shin splitters or tripping hazards.
5 Are remote shutdown panels of Remotely Operated Valves (ROVs) and
depressuring valves installed at safe distances and can they be easily
reached in case of emergency? Can the equipment concerned be seen
from these locations?

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 30 of 38

6 Check for proper smooth connections between platforms and table tops.
7 Are emergency/smothering steam headers at a safe distance from the
equipment to be protected, e.g. in hydrogen service or furnaces?
8 Check that operators manipulating drain valves of open drain systems can
see the drained effluent. Provide tundishes as required.
9 Check that water seals trapped in goosenecks can be displaced by
hydrocarbons, i.e. ensure enough static head of oil is available.
10 Check if utility stations have been provided at the operational platforms
as required.

11 Have platforms been provided at places where work is expected during


shutdowns? Consider also access to spading at those places where
scaffolding would be a nuisance, expensive or unsafe. (In such cases install
additional platforms or adapt existing platforms). Platforms large enough
shall be sufficient strong to carry the additional weight if they are used to
store spades.
12 Check that there are no oily (or hydrocarbon) pits, catch basins or
manholes near hot pumps, furnaces, etc or under piperack, pipe
sleeperway, stairs/ladders landings, and platforms.
13 Check that steam exhaust cannot cause personnel hazards, either from
spraying droplets of hot water or by causing icy or wet surfaces.
14 Are steam rings provided where specified?
15 Check that hydrocarbon open vent are located in a safe location?
16 Be alert for the possibility of relative movement between connected
equipment (e.g. due to different thermal expansion or wind load).
17 Check that inlet valves of silencers on steam pipes for warming up or start-
up are operable in a safe manner without risk of pouring hot condensate
from the silencer outlet on the operator below.
18 Are hot and cold pipes and surfaces near walkways properly insulated for
personnel protection?
19 Check that the suction of the air blower of buildings such as living
quarters, maintenance workshops, electrical or instruments rooms,
analyser house and control room etc is taken from a non-hazardous area.
20 Are hoisting devices provided or is access for hoisting devices provided
for heavy parts (above 25 kg)?
21 Are field instruments display visible (readable) from the operating
platform or from the ground?
22 Are lifesaving equipment such as liferaft, lifebuoy, emergency rope
ladders, etc provided in adequate quantity and proper location in the
offshore platform decks and bridge?
23 Is the helideck location and orientation approved by the Company
(and/or host country) civil aviation authority?
24 Have mustering areas been provided on the platform or complex? Is the
area adequate for the POB (Personnel On Board)?
25 Check stairway angle.
26 Does Heavy duty handrail use at laydown area?
D FIRE PREVENTION AND SAFETY EQUIPMENT
1 Check the accessibility of the unit for manual fire-fighting operations.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 31 of 38

2 Can fire water hydrants, monitors and deluge valve stations be safely
accessed?
3 Can a fire truck manoeuvre easily?
4 Can all locations be reached by a fire truck if one road is blocked?
5 Fire-risk pumps handling liquids above their auto-ignition temperature or
handling very light liquids such as propane and butane shall be located:
 in the open;
 in non-congested areas;
 at least 3 m from pipe racks and major process structures;
 so that they are accessible for firefighting;
 So that escalation of a possible pool fire from e.g. a seal failure
is prevented.
6 Only pumps handling burnable liquids below their auto-ignition
temperature may be placed in between a pipe rack and equipment like
columns.
7 Only pneumatic driven diapraghm pumps handling non-flammable liquids
may be placed under pipe racks or structures.
8 Can hot pumps be properly protected by fire water spray systems or
monitors?
9 Check location of fire hydrants, fixed, mobile and portable firefighting
equipment. Consider this in relation to the equipment to be protected
and the likelihood of a fire.
10 Check presence of fireproofing of steel structures with respect to credible
fires. Protect vessels, columns, flare headers, main pipe racks, if required.
11 Check whether the layout of water spray pipes and nozzles is adequate to
cool LPG vessels.
12 Are fire detectors and tubing present on hot pumps and LPG pumps?
13 Are detectors for fire, gas, smoke and H2S strategically located?
14 Are warning and alarm lights for fire, gas, smoke and H2S strategically
located?
15 Are fire water deluge manifolds safely located in relation to the
equipment they protect?
16 Are TV cameras for plant monitoring strategically located to enable a
good view of the high risk areas?
17 Check if emergency showers and eyewash showers are strategically
located, e.g. near equipment handling caustic, ammonia, Adip and other
aggressive chemicals. Valves are not allowed between the main header
and the safety equipment.
18 Check the flange orientation of liquid full LPG systems.
E PIPING
1 Is piping entering and leaving the plant logically grouped together at the
battery limit?
2 Are valves, spading positions, flushing and draining and instrument
connections properly located, in relation to normal operations as well as
shutdowns? Take special care of manifolds relief valves and large control
valves.
3 If spades have been provided, is there sufficient storage area when the
spacers are installed?

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 32 of 38

4 If spectacle blinds are fitted, are they accessible and can they be turned
safely? Consider additional or adapted platforms where applicable.
5 Has the number of flanges been minimised? This is particularly relevant
for systems containing substances above their auto-ignition temperature
and systems containing very toxic substances.
6 Check the elevation of piping and its clearance to walkways and
maintenance equipment (e.g. lifting equipment). Avoid head bumpers.
7 Are start-up and circulation pipes short? Have dead ends been avoided?
Can the system be flushed and drained?
8 Do vapour pipes, including steam pipes, freely branch off from the top of
main pipes?
9 Can piping subject to thermal expansion indeed expand? Check that
nozzles and branches (e.g. instruments) on expanding piping do not touch
obstructions, such as support beams.
10 Look for pockets in vapour pipes where condensation may occur. Has
external heating been applied on those pockets which cannot be
avoided?
11 Are long small diameter pipes (e.g. instrument impulse pipes) supported
properly to prevent breakage due to vibration?
12 Check for adequate space and jacking facilities to remove man-hole
covers, especially for those with inserts.
13 Pipes should not pass through table tops (or deck for offshore platforms).
Where this cannot be avoided, ensure a protective kerb (or coaming for
offshore platforms) is provided around the open area to prevent any
rainwater or hydrocarbon contaminated water from entering the area (or
deck) below. All rain water disposal pipes from a table top (or deck) shall
be extended to the underground drain (AOC/COC) piping or to the
Hazardous/non hazardous drain for offshore platforms
14 Have dead end sections been avoided, e.g. in steam and water pipes, in
pipes with high pour point material and piping in general?
15 Has piping been designed for ease of drainage and/or venting?
16 Check the position of eccentric reducers. Normally the straight part is on
the bottom of horizontal pipes, except in pump suction pipes where
vapour pockets may cause cavitation of the pump.
17 Do compressor suction pipes slope towards the knock-out drum? If not
Process, Rotating Equipment Specialist should be consulted. Each low
point of the compressor suction should have a low point drain.
18 Check that small bore cooling water pipes emerge from the top of the
header.
19 Are stripping steam pipes short and horizontal, or sloping from the last
valve?
20 Verify that two-phase flow vertical piping has been checked for flow
stability, also for the turndown case.
21 Check absorber gas feed inlets for pockets near the inlet to avoid
absorbent entering the gas inlet pipe.
22 Is piping with instrument connections positioned such that these
connections are easily accessible? Is the measurement point in the
correct process location? Have the necessary platforms and walkways
been provided?

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 33 of 38

23 Is there adequate straight length upstream and downstream of a flow


meter or orifice flange?
24 Is there sufficient space around an ultrasonic flow meter to allow proper
installation of the flow meter sensor in the horizontal plane without
touching adjacent pipes?
25 Is the straight length of inlet pipes as specified at column inlets, knock out
vessels and cyclones?
26 Are maximum angles with the vertical as specified for piping containing
solids adhered to?
27 Have special provisions for commissioning and initial start-up been
properly addressed? (e.g. temporary large blow spools and silencers).
28 Has hot, large and critical piping been checked for thermal expansion?
29 Has piping been checked for pressure surge, AIV, FIV, where applicable?
30 Are the piping incoming and outgoing to/from the piperack perpendicular
and midway the piperack run levels? Are piperack levels based on largest
piping on the piperack on 90deg elbow fitting make up?
31 Does the piping on piperacks change elevation when changing direction?
32 Check if the piperack has been designed with a provision for future piping
of 20% or as defined in the design basis.
33 Check that pipe bridge over road crossings meet the minimum
unobstructed vertical clearance from road surface of 4m for plant road
and 6m for main roads have been provided.
34 Are hot oil users inlet nozzles located lower than the outlet nozzle of the
hot oil heater in order to avoid vapour lock?
35 Are relief valves located at higher elevation than the flare header? Are the
header sloping towards the Knock Out Vessel?
36 Have drop out spools been provided for heat exchanger heads or pressure
vessel for access or ventilation purposes during vessel entry?
37 Are GRP piping type of resin and jointing method as approved by project
owner. Is appropriate catalogue or database used in the development of
the model?
F VALVES
1 Have valves in pipe bridges and piperacks been avoided as much as
possible?
2 Check for the presence of chain-operated valves (only allowed in
exceptional cases).
3 Check that there are no valves installed with the stem pointing
downward.
4 Check that gate and butterfly valve stems on “dirty” service are
positioned on the horizontal plane. Check that gate valve stems on flare
lines are positioned on the horizontal plane.
5 Are hand wheels easily accessible for operation and not obstructing
walkways or platforms? (Consider the stems, especially when in the open
position.)
6 Are valves for emergency operations operable from grade level? Are
valves that need frequent attention (C-1) as per valve criticality
assessment easily accessible?
7 Check for valves in vertical pipes which may accumulate liquid (e.g. water
or condensate).

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 34 of 38

8 Check that control valve assemblies are located at ground level or on the
first platform, except when otherwise required for process reasons.
9 Has installation of valves outside of platforms been avoided?
10 Have check valves or double-block valves been installed in utility
connections to process equipment and piping?
11 Have spring-loaded/self closing and/or extra block valves been used
where valves may freeze up when draining or sampling?
12 Check that hot oil (Heat Transfer Fluid) valve stem are positioned in the
horizontal plane or at a maximum of 45deg. This is to prevent
accumulation of hot oil in the insulation if the packing is leaking, since
most Hot oil is carcinogenic.
13 Check that DBB has been provided where required by the PTS.
14 Check that stripping steam pipes to columns have a drain pipe for
condensate removal and a vent pipe near to the column.
G HEAT EXCHANGERS AND BOILERS
1 Is the piping arrangement and supporting acceptable with respect to
removal of shell and channel covers as well as the withdrawal of tube
bundles? Consider the removal of inlet and outlet piping. Has the bundle
pulling device sufficient plot space?
2 Check whether bundles can be pulled and lowered safely from platforms
and stacked exchanger arrangements.
3 Check stacked heat exchangers for the possibility of oil spills on hot heat
exchangers or other equipment beneath, especially during maintenance
work. In this case, consider a large oil collecting funnel underneath, or
check the possibility to take both out of service.
4 Check if the drain and vent valves are correctly located as specified on the
P&ID, hence drains at lowest points and close to the block valves if so
specified.
5 Check whether cranes, bundle pulling equipment and vehicles can enter
for pulling and transportation of bundles.
6 Check whether heat exchangers can be cleaned in situ. Are the required
provisions present (e.g. valves, cleaning pipes, etc.)?
7 Check that exchangers in LPG (any other fluid that require this) service
have been provided on the water outlet side with a vent pipe to a safe
location or to a flare system to allow gas to escape in case of tube leak.
H PUMPS AND COMPRESSORS
1 Is valving around pumps and compressors accessible and operable?
2 Note that the hook-up around pumps provided with seal oil pipes, steam
pipes, flush oil, steam tracing etc. needs considerable plot space. These
small size support pipes may not been indicated in the model. Ensure
adequate pump accessibility.
3 Also, ensure start/stop poles are not obstructed.
4 Can the pump and compressor safely be handled for maintenance such as
strainer/filter sieve/cartridge removal respectively? Pay special attention
to spading-off possibilities and draining of the casing and the strainer.
5 Is removal of the pump and the electric motor practical?
6 Ensure that heat tracing around equipment or valves can be dismantled
to allow removal.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 35 of 38

7 Is the flow in suction piping smooth? Check for the required straight
length of the suction pipe for pumps or compressor suction and discharge
line.
8 Have high points in pump suction pipes been avoided?
9 Check volumes which must be drained when a filter or the pump needs
to be opened.If the volume is very large, enlarge the size of drain valves
to achieve a reasonable draining time. Also check that the drain piping
of filters and casing is short and straight.
10 For pumps with a vertical suction pipe and an elevated strainer, check
that opening of such a strainer does not result in spilling flammable liquid
and possible ignition on nearby hot surfaces.
11 Are pump priming facilities adequate? Is the vent valve at the highest
point at discharge and suction side?
12 Is location of the local compressor panel practical?
13 Are compressor seal oil tanks provided with their vents to the atmosphere
at a safe location?
14 Are lube oil storage drums or rundown tanks properly protected against
ingress of rain water and is the storage area properly drained?
15 Are compressors with bottom inlet pipes at the suction provided with
liquid drains to a closed system?
16 Is instrumentation (e.g. panels, detectors) easily accessible for
maintenance?
17 Has plant vibration been considered in the location of instruments and
electrical equipment?
18 Is there space for cranes to enter and manoeuvre?
I FURNACES AND BOILERS
1 Check that suction of air blowers is taken from a non-hazardous area.
2 Check that observation windows, access doors, header box covers, etc.
are not obstructed.
3 Is space available for withdrawing and cleaning tubes? Is there space for
cranes to enter and manoeuvre?
4 Is piping at burners arranged in such a way that insertion and removal of
ignitors and burner guns is not hampered?
5 With regard to the safety of fuel systems:
 Are heavy fuel and LBF (low boiling fuel) systems sufficiently
segregated?
 Are adequate provisions made to prevent liquid fuels from entering
atomising steam and steam-out pipes?
 Are low-points in fuel gas pipes avoided between the fuel gas knock-
out vessel and the burners or has tracing been provided?
 Are locations of flame arrestors, straight pipe lengths, etc. of low
pressure and waste gas in accordance with specifications?
6 Are emergency/smothering steam headers at a safe distance?
7 Make sure that dry emergency or smothering steam is made available,
with:
 outlet branches positioned on top of mains;
 steam pipes without pockets;
 Sufficient steam traps and drain point provided.

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 36 of 38

8 On manually-started furnaces, are fuel valves of fuel oil and fuel gas
within reach when looking at the burners through the observation
windows?
9 Is the emergency shutdown switch at a safe location?
10 For multiple furnaces: check for a logical and clear layout of each furnace
and its local start-up panel.
11 Can a furnace be spaded off at its flue gas duct for furnace entrance and
repair? This is required when multiple furnaces are connected to a
common flue gas duct and one of the furnaces is required to continue to
operate.
J VESSELS AND COLUMNS
1 Check for unnecessary dedicated drain piping (e.g. where draining a
vessel or column to grade can be done via existing piping such as drains
of pumps).
2 Check that manholes are within reach of hoisting equipment? Ensure
proper space on platforms for turning the manhole covers and for
entering equipment.
3 Are instrument tappings and local instruments and level glasses readily
accessible? Note that a levelglass on a vessel or column actually may
protrude 500 mm into the platform area and thus form an unacceptable
obstruction.
4 Check that instrument support poles, such as those used for pressure
transmitters, are not obstructing a walkway of a platform around a
column.
5 Has insulation for personnel protection been provided? Check especially
hot vapour and product pipes which can be easily touched from
platforms.
6 Can the pipes follow the expansion of the equipment when heating up
and cooling down? Pay special attention to supports on both hot and cold
structures.
7 Check free movement of platforms (thermal expansion).
8 Check if specified elevations of vessels and columns on P&ID are adhered
to.
9 Check that the barometric seals of vacuum equipment are at the specified
height. This also applies for relative elevations of vessels belonging to a
vacuum system.
10 For columns with structured packing, ensure there are utility connection
point nearby the manholes.
K RELIEF SYSTEMS:FLARE AND VENT SYSTEMS
1 Flare pipes shall have no pockets and shall slope continuously to the flare
knock-out drum.
2 If a platform is installed for spading a part of the flare pipe whilst the main
flare pipe is still in use, ensure that there is enough space to do the work.
Check that there is a proper escape way from this platform.
3 Check that inlet pipes to relief valves are provided with drain connection.
4 Check that outlet pipes from relief valves are self-draining into the flare
header. An exception may be made for liquid (e.g. DN 20  DN 25) thermal
relief valves which do not need to be self-draining on both sides if the

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 37 of 38

pipes would become too long. Check that connections are made on top
or 45deg perpendicular to the flare header.
5 Ensure that process relief valves and process thermal relief valves are not
routed to grade. They should end in a closed system.
6 Check the accessibility of relief valves sets for maintenance and
inspection. Have relief valves been installed at proper elevations relative
to the flare header? All relief valves should be accessible for removal (by
hoisting equipment if necessary).
7 Is safety/relief valve piping as short as possible when discharging into a
closed system?
8 Check relief valves discharging to atmosphere for safe location and
direction. Ensure that hot equipment is not located below discharge
points to the atmosphere if any hydrocarbons can be released. For a
waste gas seal vessel, pay special attention to this check.
9 Can relief valves be blocked-in and drained?
10 Check relief valve outlet pipe arrangements such that supports can be
provided to cope with reaction forces.
11 Is reactor vent gas safely routed during a regeneration?
12 Is the distance from the flame arrestor to the vent outlet as specified?
13 Ensure that flame arrestors in pipes to the atmosphere can be accessed
for removal and maintenance.
14 Check that the spindles of flare main block valves, if gate valves, are in a
horizontal position. This prevents a blocked flare pipe if the wedge should
fall down.
L OIL MOVEMENTS
1 In addition to the above checkpoints, the following shall apply for oil
movement installations.
2 Has the tankfarm been designed in accordance with the agreed
specifications, inclusive of separation distances and bund holding
capacity?
3 LPG storage: are safety requirements fulfilled, including distances, valves,
piping, pressure relief provisions, and civil aspects?
4 Tank farms: is the layout logical in relation to battery limits, pipe tracks,
blending and loading area?
5 Check that storage tanks are laid out maximum two “tanks-deep” and
that at least 2 sides are accessible for fire fighting. Dead end road in
between tanks are not allowed.
6 Are tanks and bund areas accessible for firefighting equipment?
7 Are tanks draining to an environmentally acceptable system?
8 Storage tanks with a blanketing system: is layout adequate, including its
vapour routing?
9 Check that piping to/from any tank is not routed through another tank’s
bunded area.
10 Vapour recovery systems: consider layout and maintenance aspects.
11 Jetties: are adequate working envelopes provided for hoses and loading
arms and is the width of the jetty sufficient for the required equipment?
12 For tank farms and pipe tracks: can rainwater and spilled oil be drained
adequately?

13.127.144 mfarizi.saulius@mmhe.com.my mfarizi.saulius@mmhe.com.my 02/08/2022 07:35:12 G


PTS 12.03.01
PLANT MODEL REVIEW April 2019
Page 38 of 38

M ENVIRONMENTAL CHECKS
1 Check if any process liquid drained from equipment can be handled in an
environmentally acceptable manner, in line with general approach of
closed loops for liquid draining or vents. If required install funnels to the
oil collecting system.
2 Check drainage from pump casings and pump strainers.
3 Check drainage from process filters and coalescers.
4 Check drainage from fuel filters of furnaces.
5 Are drains from sample points of plants and storage tanks minimised by,
for example, closed loops?
6 Check drainage from instruments in analyser houses.
7 Check drainage from heat exchangers when opened for bundle cleaning
or repairs. Consider also the effect of liquid spillage when opening both
heads as well as when pulling the bundle.
8 Check drainage of sour or spent seal and lube oils from compressors.
9 Check drainage from pipes at the battery limit prior to spading the unit.
10 Check vent to atmosphere from an analyser house.
11 Check that liquid collected in an open oil are routed into collecting pit for
recovery and treatment.
12 Check that ground water testwell to test for pollution are located at
various locations in the plant.
13 Check where vents of seal chambers of reciprocating compressors are
routed to.
14 Check that unloading and storage of chemicals, additives, caustic,
ammonia etc. can be carried out without environmental impact.
15 Check that the distance around plants is in accordance with any local
regulations, including noise limitations.
Table A5.1: Overall 3D-CAD Model Checklist