Standard Deviation For M-50 Grade of Concrete

(17-11-2022 TO 10-02-2023)

characteristic
compressive
strength
Compressive compliance
Strength of Characteristi
Grade of Date of Date of testing strength of requirements
Sr. No Description each specimen c strength
concrete casting (28 days) sample Fck + 5 (N/mm2)
(N/mm2) fck
(N/mm2) (as per Table
(N/mm2)
11 of IS 456
(Amendment No.
4 -2011)

59.56
1 60.18 59.14 50 58.25
57.69
60.00
2 SOUTH SIDE BUILDING COLUMN Ist lift M-50 20-10-2022 17-11-2022 60.40 60.49 50 58.25
61.07
61.07
3 61.33 60.86 50 58.25
60.18
55.33
4 54.84 55.27 50 58.25
55.64
SOUTH SIDE BUILDING COLUMN Ist lift M-50 30-10-2022 27-11-2022
56.62
5 57.07 56.26 50 58.25
55.10
58.20
8 58.36 57.49 50 58.25
55.91
57.50
9 SOUTH SIDE BUILDING COLUMN Ist lift M-50 5/11/2022 3/12/2022 57.40 57.14 50 58.25
56.53
54.53
10 57.11 57.15 50 58.25
59.80
56.53
11 56.36 56.77 50 58.25
57.42
56.80
12 SOUTH SIDE BUILDING COLUMN Ist lift M-50 15/11/2022 13/12/2022 56.12 50 58.25
12 SOUTH SIDE BUILDING COLUMN Ist lift M-50 15/11/2022 13/12/2022 55.56 56.12 50 58.25
56.00
SOUTH SIDE BUILDING COLUMN Ist lift M-50 15/11/2022 13/12/2022

57.07
13 57.33 56.87 50 58.25
56.22
55.82
14 58.04 56.44 50 58.25
55.47
SOUTH SIDE BUILDING COLUMN Ist lift M-50 17/11/2022 15/12/2022
56.89
15 56.53 56.58 50 58.25
56.31
56.44
17 58.13 57.29 50 58.25
SOUTH SIDE BUILDING COLUMN IInd 57.29
M-50 24-11-2022 22-12-2022
lift 57.16
18 57.69 57.02 50 58.25
56.22
58.22
21 56.44 57.33 50 58.25
SOUTH SIDE BUILDING COLUMN IInd 57.33
M-50 1/12/2022 28-12-2022
lift 58.04
22 57.07 57.57 50 58.25
57.60
54.00
25 58.50 55.38 50 58.25
SOUTH SIDE BUILDING COLUMN IInd 53.64
M-50 3/12/2022 30-12-2022
lift 54.67
26 57.50 56.22 50 58.25
56.50
57.02
28 55.96 55.85 50 58.25
SOUTH SIDE BUILDING RETAINING 54.58
M-50 5/12/2022 2/1/2023
WALL 60.40
29 57.42 59.08 50 58.25
59.42
58.89
SOUTH SIDE BUILDING COLUMN IInd 57.14 50
32 lift
M-50 8/12/2022 5/1/2023 53.32 58.25
59.20
58.49
35 58.04 57.91 50 58.25
SOUTH SIDE BUILDING COLUMN IInd 57.20
M-50 11/12/2022 8/1/2023
lift 58.71
36 57.60 58.25 50 58.25
58.44
60.84
38 61.38 60.38 50 58.25
62.36
63.47
39 58.22 61.33 50 58.25
SOUTH SIDE BUILDING RETAINING
M-50 14-12-2022 11/1/2023
39 61.33 50 58.25
SOUTH SIDE BUILDING RETAINING 58.93
M-50 14-12-2022 11/1/2023
WALL
SOUTH SIDE BUILDING RETAINING
M-50 14-12-2022 11/1/2023
WALL 60.76
40 62.13 61.73 50 58.25
62.31
62.09
41 57.87 59.53 50 58.25
58.62
60.71
44 56.18 57.99 50 58.25
57.07
55.96
SOUTH SIDE BUILDING RETAINING 57.94 50
45 WALL
M-50 15-12-2022 12/1/2023 58.84 58.25
59.02
57.60
46 59.91 59.32 50 58.25
60.44
58.84
48 58.31 58.22 50 58.25
SOUTH SIDE BUILDING RETAINING 57.51
M-50 16-12-2022 13-01-2023
WALL 61.07
49 60.44 58.67 50 58.25
54.49
57.16
51 53.73 56.12 50 58.25
57.47
57.24
52 57.56 57.32 50 58.25
SOUTH SIDE BUILDING RETAINING 57.16
M-50 17-12-2022 14-01-2023
WALL 57.56
53 57.33 57.29 50 58.25
56.98
57.29
54 57.60 57.44 50 58.25
57.42
56.93
55 57.47 57.36 50 58.25
SOUTH SIDE BUILDING RETAINING 57.69
M-50 18-12-2022 15-01-2023
WALL 57.82
56 57.29 57.27 50 58.25
56.71
57.60
57 58.18 57.57 50 58.25
56.93
57.20
SOUTH SIDE BUILDING RETAINING 57.50 50
58 WALL
M-50 21-12-2022 18-01-2023 57.47 58.25
57.82
58.04
59 57.20 57.81 50 58.25
SOUTH SIDE BUILDING RETAINING
M-50 21-12-2022 18-01-2023
WALL

59 57.81 50 58.25
58.18
58.22
60 57.60 57.91 50 58.25
SOUTH SIDE BUILDING RETAINING 57.91
M-50 22-12-2022 19-01-2023
WALL 56.93
61 57.69 57.60 50 58.25
58.18
58.58
63 56.62 57.69 50 58.25
SOUTH SIDE BUILDING RETAINING 57.87
M-50 23-12-2022 20-01-2023
WALL 58.93
64 57.78 57.93 50 58.25
57.07
56.13
SOUTH SIDE BUILDING RETAINING 57.44 50
66 WALL
M-50 26-12-2022 23-01-2023 57.82 58.25
58.36
58.04
69 58.62 58.12 50 58.25
SOUTH SIDE BUILDING COLUMN Iind 57.69
M-50 29-12-2022 26-01-2023
LIFT 60.53
70 54.84 58.23 50 58.25
59.33
56.71
SOUTH SIDE BUILDING COLUMN Iind 57.67 50
73 LIFT
M-50 30-12-2022 27-01-2023 58.44 58.25
57.87
56.36
SOUTH SIDE BUILDING COLUMN Iind 58.56 50
76 LIFT
M-50 31-12-2022 28-01-2023 57.82 58.25
61.51
58.40
80 57.29 57.85 50 58.25
57.87
57.33
SOUTH SIDE BUILDING RETAINING 57.94 50
81 WALL
M-50 31-12-2022 28-01-2023 56.93 58.25
59.56
58.93
82 57.47 58.07 50 58.25
57.82
58.67
83 56.93 57.93 50 58.25
58.18
57.60
SOUTH SIDE BUILDING RETAINING 57.85 50
84 WALL
M-50 2/1/2023 30-01-2023 58.22 58.25
57.73
57.47
85 58.93 58.12 50 58.25
57.96
58.67
86 57.33 57.90 50 58.25
57.69
57.60
SOUTH SIDE BUILDING RETAINING 58.09 50
87 WALL
M-50 4/1/2023 11/1/2023 58.18 58.25
58.49
57.87
88 57.07 57.51 50 58.25
57.60
58.93
89 57.69 58.37 50 58.25
58.49
58.31
90 SOUTH SIDE BUILDING COLUMN M-50 5/1/2023 2/2/2023 58.18 58.10 50 58.25
57.82
58.93
91 57.16 57.94 50 58.25
57.73
58.93
92 58.62 58.25 50 58.25
57.20
57.29
93 57.60 58.07 50 58.25
59.33
56.93
SOUTH SIDE BUILDING RETAINING 57.45 50
94 WALL
M-50 7/1/2023 4/2/2023 56.71 58.25
58.71
58.62
95 57.87 58.07 50 58.25
57.73
57.33
96 59.11 57.75 50 58.25
56.80
57.60
97 59.07 58.28 50 58.25
58.18
SOUTH SIDE BUILDING COLUMN M-50 7/1/2023 4/2/2023
59.16
98 58.49 58.45 50 58.25
57.69
58.62
102 57.42 57.98 50 58.25
57.91
SOUTH SIDE BUILDING COLUMN M-50 10/1/2023 7/2/2023
57.33
103 57.60 57.72 50 58.25
58.22
57.87
104 SOUTH SIDE BUILDING COLUMN M-50 11/1/2023 8/2/2023 58.93 58.00 50 58.25
104 SOUTH SIDE BUILDING COLUMN M-50 11/1/2023 8/2/2023 58.00 50 58.25
57.20
58.49
105 57.64 57.76 50 58.25
57.16
59.47
SOUTH SIDE BUILDING RETAINING 58.28 50
106 WALL
M-50 13-01-2023 10/2/2023 58.04 58.25
57.33
58.40
107 57.20 57.93 50 58.25
58.18

Grade M-50
No of cube sample 228
No of results received 228
Results Confirming 228
Average 57.86
Standard Deviation 1.15
Coeff of variation (MAX 10%) 1.99
Min Value 55.27
Max Value 61.73
Standard Deviation For M-35 Grade of Concrete (October 21)

characteristic
compressive
Avg of the strength
Group of compliance
Strength of Compressive 4 Non- requirements Average
Characteristi
Grade of Date of testing Quantity of each strength of overlapping Compressive
Sr. No Description Supplier Reach No. Date of casting c strength
concrete (28 days) Concrete (cum) specimen sample Consecutive Fck + 4 (N/mm2) Strength
fck
(N/mm2) (N/mm2) test results of (as per (N/mm2)
(N/mm2)
sample Table 11 of IS
(N/mm2) 456
(Amendment
No. 4 2011)

47.40
1 48.10 48.33 35
Down line NS-MMP5/6,MMP4/8 49.50
Up line NS-MMP5/6,MMP4/8 48.60
Up line Standard- 47.43 35 39.00
2 MP24/7,MP24/6,MP24/5,MP24/4,MP24/3,MP24/2,
ULTRATECH Reach-4 M-35 1-Oct-21 29-Oct-21 25 47.50
MP24/1 46.20
Team-2 50.60
3 52.00 51.87 35
53.00
51.20
4 48.60 49.00 35
47.20
UP LINE- 49.70
125/1,125/3,125/4,125/5,126/1,126/2,126/3,126/4,126/5,12 51.00 35 39.00
5 7/1,127/2,127/3
ACC Reach-2 M-35 1-Oct-21 29-Oct-21 24 50.70
Hariom Ent. 52.60
51.60
6 47.00 49.60 35
50.20
47.20
7 48.20 49.27 35
Up line NS-MP24/8 52.40
Up line Standard- 49.70
8 MP23/7, MP23/6, MP23/5, MP23/4, MP23/3,MP23/2, ACC Reach-4 M-35 2-Oct-21 30-Oct-21 21 51.60 50.67 35 39.00
MP23/1 50.70
Team-2
48.00
9 51.20 48.17 35
45.30
48.70
10 52.70 49.97 35
Down Line Standard - 48.50
125/3,125/4,125/5, 126/1,126/2,126/4, 126/5 46.80
11 UP Line Standard- ACC Reach-2 M-35 2-Oct-21 30-Oct-21 18 47.60 46.93 35 39.00
125/2 46.40
Hariom Ent.
51.60
12 48.10 49.90 35
50.00
48.80
13 50.40 49.17 35
48.30
Down line Standard- 46.20
MP24/7, MP24/6, MP24/5, MP24/4, MP24/3,MP24/2, 47.13 35 39.00
14 MP24/1, MP23/7, MP23/6, MP23/5,MP23/4
ACC Reach-4 M-35 3-Oct-21 1-Nov-21 27 46.70
Team-2 48.50
49.50
15 50.50 50.53 35
51.60
50.90
16 47.90 49.10 35
Down line Standard :- 48.50
126/3,127/1,127/2,127/3,127/4,127/5,127/6,128/1,128/2,12 45.80
8/3 47.10 35 39.00
17 Down line NS - 122/7,123/8
ACC Reach-2 M-35 5-Oct-21 2-Nov-21 27.5 47.40
Up line NS -122/7,123/8 48.10
Hariom Ent. 49.50
18 50.40 50.33 35
51.10
51.80
19 49.80 49.60 35
47.20
46.80
20 Down line NS-MP24/8 52.50 49.67 35
Down line Standard- 49.70
MP23/3, MP23/2, MP23/1, MP22/7, MP22/6 MP22/5, ACC Reach-4 M-35 5-Oct-21 2-Nov-21 34 39.00
MP22/4, MP22/3,MP22/2, MP22/1,MP21/7 45.40
21 Team-2 47.10 46.73 35
47.70
49.50
22 51.10 50.87 35
52.00
51.70
23 47.20 49.80 35
UP line standard- 50.50
127/4,127/5,127/6, 128/1,128/2,128/3, 128/4, 128/5 45.00
24 Up line NS-124/6 ACC Reach-2 M-35 6-Oct-21 3-Nov-21 24 46.70 46.70 35 39.00
Down line NS-124/6 48.50
Hariom Ent.
49.80
25 49.20 49.80 35
50.60
49.20
26 52.30 51.40 35
52.80
Up Line Standard- 21/7,22/1,22/2,22/3,22/4,22/5,22/6,22/7 45.10
27 Up line NS-23/8 ACC Reach-4 M-35 6-Oct-21 3-Nov-21 24.5 46.20 46.20 35 39.00
Team-2 47.50
49.90
28 50.80 49.30 35
47.20
50.40
29 48.00 48.50 35
47.30
46.50
30 Down line NS-MP23/8 50.10 49.20 35
Up line Standard - 51.00
MP21/6,MP21/5,MP21/4,MP21/3, MP21/2,MP21/1, ACC Reach-4 M-35 7-Oct-21 8-Nov-21 34 39.00
MP19/6,MP19/5,MP19/4,MP19/3MP19/2, MP19/1 45.20
31 Team-2 47.20 46.30 35
46.50
48.00
32 49.80 49.60 35
51.00
49.20
33 50.50 48.70 35
UP Line Standard- 46.50
129/1,129/2,129/3,129/4, 130/1,130/2,130/3, 49.40
130/4,135/5,130/6,131/1 50.70 35 39.00
34 UP Line NS- 125/6
ACC Reach-2 M-35 7-Oct-21 8-Nov-21 29.5 50.80
Down Line NS- 125/6 51.90
Hariom Ent. 46.10
35 44.80 47.00 35
50.10
48.80
36 47.70 48.80 35
49.90
Down line Standard- 51.20
128/4, 128/5,129/1,129/2,129/3,129/4, 130/1,130/2,130/3, 50.60 35 39.00
37 130/4,135/5,130/6,131/1
ACC Reach-2 M-35 8-Oct-21 8-Nov-21 28.5 51.90
Hariom Ent. 49.80
47.10
38 46.20 47,2 35
48.40
48.40
39 46.70 47.50 35
47.50
52.00
Up line NS- MP22/8
40 Down line NS-MP22/8 48.30 50.50 35
Down line Standard- 51.20
ACC Reach-4 M-35 8-Oct-21 8-Nov-21 35 39.00
MP21/6, MP21/5, MP21/4, MP21/3, MP21/2MP21/1, 50.10
41 MP19/7, MP19/6, MP19/5, MP19/4,MP19/3, MP19/2 51.00 50.80 35
Team-2
51.50
46.40
42 47.10 47.70 35
49.80
48.00
43 52.30 49.20 35
47.50
Down Line Standard-131/2,131/3,131/4,132/1,132/2,132/3 45.10
Up line NS- 126/6, 127/7 46.20 35 39.00
44 Down line NS-126/6, 127/7
ACC Reach-2 M-35 9-Oct-21 8-Nov-21 19.5 47.20
Hariom Ent. 46.30
52.40
45 51.00 49.50 35
45.20
48.60
46 51.30 50.00 35
Up Line Standard-
131/2,131/3,131/4,132/1,132/2,132/3,133/1 50.20
Down line Standard- 48.10
47 133/1,134/1,134/2,134/3, ULTRATECH Reach-2 M-35 10-Oct-21 8-Nov-21 27 46.20 47.30 35 39.00
Up line NS- 128/6 47.50
Down line NS-128/6
49.70
Hariom Ent.
48 51.00 51.20 35
52.90
52.10
49 48.80 50.30 35
50.10
46.50
50 47.10 47.70 35
Turn out- 49.50
Down line SRJ No:- 04 46.30
51 Up line SRJ no:-05 ULTRATECH Reach-4 M-35 11-Oct-21 8-Nov-21 60 47.50 48.20 35 39.00
Team-2 50.70
Prajapati Nagar
49.60
52 48.00 49.50 35
50.80
51.60
53 50.60 51.60 35
52.60
49.50
54 49.20 48.30 35
46.20
Up line Standard-133A/1,133A/2,133A/3,134/1,134/2 50.00
Up line NS- 129/5,130/7 47.70 35 39.00
55 Down line NS-129/7,130/7
ULTRATECH Reach-2 M-35 12-Oct-21 9-Nov-21 19 47.50
Hariom Ent. 45.70
48.60
56 45.10 46.80 35
46.60
48.10
57 46.80 47.50 35
Derailment Guard of T/O 04 & 05 47.60
ULTRATECH Reach-4 M-35 12-Oct-21 9-Nov-21 10 39.00
Team-2 50.50
58 51.20 50.10 35
48.60
45.10
59 43.10 45.40 35
UP line Standard - 48.10
134/3,134/4, 135/1,135/2,135/3,135/4, 135/5,135/6, 136/1 46.20
60 Up line NS- 131/5,131/5 ACC Reach-2 M-35 13-Oct-21 15-Nov-21 24 46.20 45.70 35 39.00
Down line NS-132/4,132/4 44.80
Hariom Ent.
44.10
61 43.10 44.20 35
45.30
42.70
62 44.60 43.20 35
42.20
46.10
Down line NS-MP21/8,MP19/8
63 Up line NS-MP21/8,MP19/8 42.50 43.90 35
Up line Standard- 43.10
ACC Reach-4 M-35 13-Oct-21 15-Nov-21 38 39.00
MP18/7, MP18/6, MP18/5, MP18/4 ,MP18/3, MP18/2, 45.30
64 MP18/1, MP17/8 MP17/7, MP17/6, MP17/5, MP17/4 44.00 45.20 35
Team-2
46.30
45.70
65 46.70 46.80 35
48.00
44.50
66 48.30 46.10 35
Down line Standard - 45.40
134/1,134/2,134/3,134/4,135/1,135/2,135/3,135/4, 42,7
135/5,135/6 44.30 35 39.00
67 Up line NS- 133/2
ACC Reach-2 M-35 14-Oct-21 15-Nov-21 22.5 44.20
Down line NS-133/2 46.10
Hariom Ent. 46.70
68 48.60 46.10 35
43.00
43.50
69 47.00 46.40 35
48.80
Up line Standard- 43.00
70 MP19/1,MP17/3 47.40 45.60 35
Down line Standard- 46.30
MP19/1, MP18/7, MP18/6, MP18/5, MP18/4, MP18/3, ACC Reach-4 M-35 15-Oct-21 15-Nov-21 45 39.00
MP18/2, MP18/1 MP17/8 MP17/7, MP17/6, MP17/5, 43.90
71 MP17/4, MP17/3, MP17/2 44.00 44.50 35
Team-2 45.80
46.60
72 47.50 47.50 35
48.50
43.40
73 46.60 45.20 35
Down line Standard - 45.50
136/1,136/2,136/3,136/4,136/5,136/6,136/7,137/1 43.70
74 Down line NS- 133A/4 ACC Reach-2 M-35 15-Oct-21 15-Nov-21 20 45.00 45.10 35 39.00
Up line NS- 133A/4 46.60
Hariom Ent.
45.30
75 44.80 44.70 35
43.90
45.10
76 42.40 43.80 35
43.90
Up LINE NS:-MP18/8 44.90
77 Down line NS:-MP18/8 42.60 43.80 35
Down line Standard- 43.80
MP17/1, MP16/7, MP16/6, MP16/5, MP16/4, MP16/3, ACC Reach-4 M-35 17-Oct-21 15-Nov-21 32.5 39.00
MP16/2, MP16/1 MP15/6, MP15/5, MP15/4, MP15/3, 47.10
78 MP15/2, MP15/1 45.30 45.20 35
Team-2 43.00
43.10
79 44.30 44.50 35
46.10
42.60
80 43.20 44.10 35
Up line standard - 46.50
136/2,136/3,136/4,136/5,136/6,136/7,137/1,137/2,137/3 45.10
81 Up line NS- 134/5,135/7 ACC Reach-2 M-35 17-Oct-21 15-Nov-21 24 46.30 46.40 35 39.00
Down line NS- 134/5,135/7 47.90
Hariom Ent.
43.70
82 44.80 44.90 35
46.20
46.90
83 48.10 47.10 35
46.20
42.90
84 Up line Standard- 47.10 45.90 35
MP17/2, MP17/1, MP16/7, MP16/6 MP16/5, MP16/4, 47.90
MP16/3, MP16/2, MP16/1 MP15/6, MP15/5, MP15/4, ACC Reach-4 M-35 19-Oct-21 17-Nov-21 32 39.00
MP15/3 MP15/2, MP15/1 48.70
85 Team-2 45.70 46.30 35
44.50
46.60
86 47.50 46.40 35
44.90
42.80
87 42.60 44.50 35
47.90
Upline Standard - 48.00
88 137/4,137/5,138/1,138/2, 138/3, 138/4,138/5,139/1, 139/2 ACC Reach-2 M-35 19-Oct-21 17-Nov-21 21.5 43.90 46.10 35 39.00
Hariom Ent. 46.40
47.00
89 47.70 46.10 35
43.50
48.00
90 Down line Standard- 45.90 46.90 35
137/2,137/3,137/4,137/5,138/1,138/2,138/3,138/4,138/5,13 46.70
9/1 43.60
Down line NS-136/8 44.10 35 39.00
91 UP line Standard-
ACC Reach-2 M-35 21-Oct-21 18-Nov-21 30 43.10
139/3, 139/4 45.50
Up line NS-136/8 45.80
92 Hariom Ent. 46.60 46.70 35
47.60
43.60
93 Down line NS-MP17/9, MP16/8, MP15/7 47.80 46.00 35
Down line Standard- 46.60
MP14/6,14/5 45.90
Up line NS-MP17/9, MP16/8, MP15/7 47.20 35 39.00
94 Up line Standard-
ACC Reach-4 M-35 21-Oct-21 18-Nov-21 27 47.20
MP14/6,MP14/5,MP14/4,MP14/3MP14/2,MP14/1,MP13/6 48.40
,MP13/5 43.50
95 Team-2 44.20 44.30 35
45.10
43.60
93 45.40 45.10 35
46.30
UL-140/1,140/2,140/3,140/4,140/5,140/6,141/1,141/2, 44.10
94 141/3 ACC Reach-2 M-35 22-Oct-21 19-Nov-21 22 47.40 45.00 35 39.00
Hariom Ent. 43.50
45.20
95 47.70 47.10 35
48.50
45.60
96 48.20 46.70 35
46.20
UL NS- MP14/7, MP13/7, DL NS-MP14/7 , 43.10
DL-MP12/6, MP12/5, MP12/4, MP12/3 MP12/2, MP12/1, 45.00 35 39.00
97 PPN1/4, PPN1/3 PPN1/2, PPN1/1
ACC Reach-4 M-35 22-Oct-21 19-Nov-21 29 45.10
46.60
47.40
98 43.10 45.60 35
46.50
46.00
99 46.60 46.80 35
47.90
42.30
DL -
100 139/2,139/3,139/4,140/1,140/2,140/3,140/4,140/5,140/6,14 45.80 45.00 35
1/1,141/2, 46.90
ACC Reach-2 M-35 23-Oct-21 20-Nov-21 32 39.00
DL NS-137/6,UL NS-137/6 43.10
101 Hariom Ent. 44.30 44.60 35
46.30
46.20
102 47.20 45.70 35
43.60
47.30
103 45.80 46.40 35
46.20
UL--141/4,141/5,142/1, 142/2, 142/3, 142/4, 142/5, 142/6 43.80
UL & DL NS- 138/6 46.10 35 39.00
104 Hariom Ent.
ACC Reach-2 M-35 25-Oct-21 22-Nov-21 22 48.20
46.30
47.50
105 43.10 45.20 35
44.80
47.60
106 46.90 46.80 35
DL--141/3,141/4,141/5, 46.00
142/1, 142/2, 142/3 43.20
107 ACC Reach-2 M-35 26-Oct-21 23-Nov-21 21 44.00 44.60 35 39.00
UL-142/7, 143/1, 143/2
Hariom Ent. 46.50
45.80
108 47.20 45.70 35
44.10
46.30
109 46.70 47.10 35
48.20
DL NS-MP12/7, PPN1/5, 43.60
DL-PPN2/2, PPN2/1, PPN3/2, PPN3/1 44.70 35 39.00
110 Team-2
ACC Reach-4 M-35 26-Oct-21 23-Nov-21 24 47.50
43.10
44.30
111 45.80 45.60 35
46.70
47.60
112 48.10 47.40 35
46.60
DL--142/4,142/5,142/6,142/7, 143/1,143/2,143/3,143/4, 46.80
NS-UL & DL--139/5 45.00 35 39.00
113 Hariom Ent.
ACC Reach-2 M-35 27-Oct-21 24-Nov-21 25 45.10
43.20
44.00
114 43.00 43.90 35
44.80
47.40
115 45.50 47.10 35
48.50
DL NS-PPN2/4, PPN2/3, PPN3/4, PPN3/3, PPN4/5, 45.30
116 DL-PPN4/3, PPN4/2, PPN4/1, PPN5/3, PPN5/2, PPN5/1 ACC Reach-4 M-35 27-Oct-21 24-Nov-21 24 43.10 44.00 35 39.00
43.70
44.10
117 46.60 46.30 35
48.10
47.00
118 45.60 45.50 35
43.90
DL-143/5,143/6,UL-143/3,143/4,143/5, 143/6, 143/7,144/1 44.30
119 NS-UL & DL-140/7 ACC Reach-2 M-35 28-Oct-21 26-Nov-21 22.5 45.30 44.40 35 39.00
Hariom Ent. 43.60
45.80
120 43.50 45.00 35
45.70
43.20
121 45.80 43.90 35
42.60
UL- 45.60
122 187/1,187/2,187/3,188/1,188/2,189/1,189/2,189/3,190/1 ACC Reach-4 M-35 28-Oct-21 26-Nov-21 21 43.60 45.50 35 39.00
47.40
47.80
123 43.00 45.00 35
44.00
46.60
124 44.20 45.30 35
DL-143/7, 144/1, 144/2, 144/3, 144/4, 144/5, 144/6, 144/7, 45.00
145/1, 145/2 43.10
125 NS- UL & DL - 141/6 ACC Reach-2 M-35 29-Oct-21 26-Nov-21 28 45.50 44.50 35 39.00
Hariom Ent. 44.90
43.30
126 44.00 44.80 35
47.00
44.10
127 45.70 45.90 35
DL-187/1,187/2,187/3 47.90
UL NS-186/4,187/4,188/4 ACC Reach-4 M-35 29-Oct-21 26-Nov-21 12 39.00
43.60
128 45.00 43.90 35
43.10
43.40
129 46.80 44.70 35
44.00
UL- 48.00
144/2,144/3,144/4,144/5,144/6,144/7,145/1,145/2,145/3,14 45.60 35 39.00
130 5/4,NS-UL & DL-142/8
ACC Reach-2 M-35 30-Oct-21 27-Nov-21 24.5 42.60
Hariom Ent. 46.20
43.10
131 44.10 44.60 35
46.60
47.00
132 43.20 45.30 35
45.60
DL- 43.60
133 188/1,188/2,189/1,189/2,189/3,190/1,190/2,191/1,191/2,19 ACC Reach-4 M-35 30-Oct-21 27-Nov-21 30 45.10 44.30 35 39.00
1/3,UL-190/2,NS-DL-186/4,190/3,NS-UL-187/5,189/4 44.20
47.60
134 45.70 46.50 35
46.20
43.10
135 46.20 44.30 35
43.70
DL-145/3, 145/4, 145/5, 145/6, 145/7, 146/1, 146/2, 44.00
136 146/3,UL-145/5,145/6,UL & DL-NS-143/6 ACC Reach-2 M-35 31-Oct-21 29-Nov-21 24.5 45.30 45.40 35 39.00
Hariom Ent. 47.00
43.70
137 46.90 46.10 35
47.50
46.10
138 43.70 45.00 35
45.30
46.70
DL-191/4,192/1,192/2,192/3,UL-191/1,191/2,NS-UL- 45.00 35 39.00
139 189/4,188/4,187/4, NS-DL-190/3,189/5
ACC Reach-4 M-35 31-Oct-21 29-Nov-21 24.5 43.30
45.10
43.00
140 46.00 44.40 35
44.10

Grade M35 RCC


Total Qty upto 30 September 2021
No of cube sample required as per frequency
No of cube sample casted
No of results received
Results Confirming
Results non confirming
Results awaited
Average
Standard Deviation
Coeff of variation
Min Value
Max Value

Compressive strength graph for M35 (RCC) grade concrete


70.00 Column J

60.00
Moving average
ssive strength N/mm2

(Column J)
50.00

Column L
40.00

30.00 Column M
Total Qty : 2964.5m3 Standard Deviation :
Compressive strength graph for M35 (RCC) grade concrete
70.00 Column J

60.00
Moving average
Compressive strength N/mm2

(Column J)
50.00

Column L
40.00

30.00 Column M
Total Qty : 2964.5m3 Standard Deviation :
20.00 Cube sample required : 398 Coeff. of variance :
No of cube sample casted : 397 Column N
Result received : 397
Result confirm : 397
10.00 Result non confirm : 00
Result awaited : 00

0.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 No of cube sample
Standard Deviation For M-35 Grade of Concrete (December 21)
characteristic
Avg of the compressive
Group of strength
4 Non- compliance
Compressive overlappin requirements Average
Date of Quantity of Strength of Characteristic
Reach Grade of Date of strength of g Compressive
Sr. No Description Supplier testing Concrete each specimen strength
No. concrete casting sample Consecuti Fck + 4 Strength
(28 days) (cum) (N/mm2) fck (N/mm2)
(N/mm2) ve test (N/mm2) (N/mm2)
results of (as per Table
sample 11 of IS 456
(N/mm2) (Amendment
No. 4 2011)

1 35
UL-
174/3,174/4,175/1,175/2,175/3,175/4,
176/5,175/6,175/7,176/1,176/2,176/3, ACC, 39.00
2 Reach-2 M-35 2-Dec-21 30 35
NS-176/8 ULTRATECH
DL-NS-176/8,175/8

3 35

4 35
DL-
175/1,175/2,175/3,175/4,174/3,174/4 39.00
ACC Reach-2 M-35 3-Dec-21 15
UL-NS- 175/8,174/5
5 35

6 35

UL-
7 172/3,173/1,173A/1,173A/2,173A/3, 35
174/1,174/2
DL-173/1,173A/1,173A/2,173A/ ACC Reach-2 M-35 4-Dec-21 30.5 39.00
3,174/1,174/2
8 DL-NS-174/5 35

9 35

10 35
UL- PPN2/1, PPN2/2, PPN1/1, 39.00
ACC Reach-4 M-35 4-Dec-21 12
PPN1/2, PPN1/3
11 35
Standard Deviation For M-40 Grade of Concrete
(29-12-2022 TO 11-02-2023)

characteristic
compressive
strength
compliance
Compressive Characteristic
Grade of Date of testing Strength of each requirements
Sr. No Description Date of casting strength of strength
concrete (28 days) specimen (N/mm2) Fck + 5 (N/mm2)
sample (N/mm2) fck (N/mm2)
(as per Table
11 of IS 456
(Amendment No.
4 -2011)

47.91
1 47.11 47.88 40 48.25
48.62
49.07
2 48.80 48.95 40 48.25
48.98
SHEAR WALL M-40 2/12/2022 29-12-2022
49.96
4 50.22 49.78 40 48.25
49.16
48.27
5 49.78 49.10 40 48.25
49.24
47.51
8 46.80 47.17 40 48.25
47.20
SHEAR WALL M-40 5/12/2022 2/1/2023
47.56
9 46.84 47.01 40 48.25
46.62
50.31
11 46.04 48.52 40 48.25
49.20
45.78
12 SHEAR WALL M-40 15-12-2022 12/1/2023 50.62 47.84 40 48.25
47.11
48.53
13 48.27 48.16 40 48.25
47.69
48.98
14 48.13 48.64 40 48.25
48.80
48.00
15 SHEAR WALL M-40 26-12-2022 23-01-2023 48.58 48.58 40 48.25
49.16
48.80
17 48.40 40 48.25
SHEAR WALL M-40 26-12-2022 23-01-2023

17 47.96 48.40 40 48.25


48.44
47.07
21 46.93 47.23 40 48.25
47.69
49.29
22 SHEAR WALL M-40 27-12-2022 24-01-2023 48.80 48.59 40 48.25
47.69
48.18
25 48.67 48.28 40 48.25
48.00
47.82
28 49.02 48.55 40 48.25
48.80
48.58
29 48.40 48.64 40 48.25
48.93
SHEAR WALL M-40 29-12-2022 26-01-2023
49.16
32 48.40 48.71 40 48.25
48.58
48.71
35 49.24 48.96 40 48.25
48.93
48.49
38 47.69 48.25 40 48.25
51.82
49.29
39 SHEAR WALL M-40 31-12-2022 28-01-2023 48.18 48.64 40 48.25
48.58
46.04
40 51.16 48.55 40 48.25
48.44
47.82
44 48.44 47.91 40 48.25
47.47
48.40
45 SHEAR WALL M-40 31-12-2022 28-01-2023 46.84 47.94 40 48.25
48.58
48.80
46 47.07 48.02 40 48.25
48.18
47.91
48 48.58 48.18 40 48.25
48.04

SHEAR WALL M-40 2/1/2023 30-01-2023


48.80
49 SHEAR WALL M-40 2/1/2023 30-01-2023 47.33 47.94 40 48.25
47.69
47.11
51 47.96 47.87 40 48.25
48.53
48.71
52 48.31 48.09 40 48.25
47.24
47.51
53 SHEAR WALL M-40 3/1/2023 31-01-2023 48.18 48.09 40 48.25
48.58
48.84
54 48.00 48.07 40 48.25
47.38
47.51
55 48.22 47.82 40 48.25
47.73
48.71
56 47.38 47.96 40 48.25
47.78
SHEAR WALL M-40 8/1/2023 5/2/2023
47.87
57 48.71 48.25 40 48.25
48.18
47.11
58 48.80 48.03 40 48.25
48.18
48.58
60 49.02 48.47 40 48.25
47.82
48.27
61 SHEAR WALL M-40 14-01-2023 11/2/2023 48.80 48.70 40 48.25
49.02
48.93
63 48.44 48.40 40 48.25
47.82

Grade M-40
No of cube sample 114
No of results received 114
Results Confirming 114
Average 48.27
Standard Deviation 0.53
Coeff of variation (MAX 10%) 1.10
Min Value 47.01
Max Value 49.78
Standard Deviation For M-25 Grade of Concrete
(29-12-2022 TO 11-02-2023)

characteristic
compressive
strength
compliance
Strength of each Compressive Characteristic
Date of testing requirements
Sr. No Description Grade of concrete Date of casting specimen strength of strength
(28 days) Fck + 5 (N/mm2)
(N/mm2) sample (N/mm2) fck (N/mm2)
(as per Table
11 of IS 456
(Amendment No.
4 -2011)

47.91
1 47.11 47.88 40 48.25
48.62
49.07
2 48.80 48.95 40 48.25
48.98
SHEAR WALL M-40 2/12/2022 29-12-2022
49.96
4 50.22 49.78 40 48.25
49.16
48.27
5 49.78 49.10 40 48.25
49.24
47.51
8 46.80 47.17 40 48.25
47.20
SHEAR WALL M-40 5/12/2022 2/1/2023
47.56
9 46.84 47.01 40 48.25
46.62
50.31
11 46.04 48.52 40 48.25
49.20
45.78
12 SHEAR WALL M-40 15-12-2022 12/1/2023 50.62 47.84 40 48.25
47.11
48.53
13 48.27 48.16 40 48.25
47.69
48.98
14 48.13 48.64 40 48.25
48.80
48.00
15 SHEAR WALL M-40 26-12-2022 23-01-2023 48.58 48.58 40 48.25
49.16
48.80
17 47.96 48.40 40 48.25
48.44
47.07
21 46.93 47.23 40 48.25
47.69
49.29
22 SHEAR WALL M-40 27-12-2022 24-01-2023 48.80 48.59 40 48.25
47.69
48.18
25 48.67 48.28 40 48.25
48.00
47.82
28 49.02 48.55 40 48.25
48.80
48.58
29 48.40 48.64 40 48.25
48.93
SHEAR WALL M-40 29-12-2022 26-01-2023
49.16
32 48.40 48.71 40 48.25
48.58
48.71
35 49.24 48.96 40 48.25
48.93
48.49
38 47.69 48.25 40 48.25
51.82
49.29
39 SHEAR WALL M-40 31-12-2022 28-01-2023 48.18 48.64 40 48.25
48.58
46.04
40 51.16 48.55 40 48.25
48.44
47.82
44 48.44 47.91 40 48.25
47.47
48.40
45 SHEAR WALL M-40 31-12-2022 28-01-2023 46.84 47.94 40 48.25
48.58
48.80
46 47.07 48.02 40 48.25
48.18
47.91
48 48.58 48.18 40 48.25
48.04
48.80
49 SHEAR WALL M-40 2/1/2023 30-01-2023 47.33 47.94 40 48.25
47.69
47.11
51 47.96 47.87 40 48.25
48.53
48.71
52 48.31 48.09 40 48.25
47.24
47.51
53 SHEAR WALL M-40 3/1/2023 31-01-2023 48.18 48.09 40 48.25
48.58
48.84
54 48.00 48.07 40 48.25
47.38
47.51
55 48.22 47.82 40 48.25
47.73
48.71
56 47.38 47.96 40 48.25
47.78
SHEAR WALL M-40 8/1/2023 5/2/2023
47.87
57 48.71 48.25 40 48.25
48.18
47.11
58 48.03 40 48.25
SHEAR WALL M-40 8/1/2023 5/2/2023

58 48.80 48.03 40 48.25


48.18
48.58
60 49.02 48.47 40 48.25
47.82
48.27
61 SHEAR WALL M-40 14-01-2023 11/2/2023 48.80 48.70 40 48.25
49.02
48.93
63 48.44 48.40 40 48.25
47.82

Grade M-40
No of cube sample 114
No of results received 114
Results Confirming 114
Average 48.27
Standard Deviation 0.53
Coeff of variation (MAX 10%) 1.10
Min Value 47.01
Max Value 49.78