AAGC-C0 1 30-C|V-ROD-Un-FCR- 00000 I
EXPOLTN
w K .

CWJV Field Change Request


No: CWJV-FCR-O0177 A

Name: Mert USTAOMER Position Date: 151011201

lDescription & Details of Proposed Change: Sketch/Drawingorfurtherdetailsattàhed? fiv", trll.


Bridging of 1200mm DEWA water line by modified Tabreed Slab

for Proposed Chanþe: (Continue on separate sneet rf regurred)


lReason
ïhe methodolgy of demolition is changed, spa ns will be cut and removed by crane. Scaffolding will be set over the
Tabreed line. Loads comíng from scaffolding is attached.
DEWA service is laying below the Tabreed line and cannot be protected by the original design

ue on
CDRL Packaoe No Design Dwg / Doc. No. Revision
Protection Slab Type-1 AAGC-C0r 30-CtV-ROD-UTt-DRW-000052 B

.Snop Drawing Title / Description Revision


Attached sketch

(Continue on on Safetv? l-lv"t


'6ú".tr- E]¡,o
o-a .{l*(:t.¿¡v\ cl.,\
ì¡ aCc¿*âsz,t¡-c¡-. {e Å-e-l b.
1

Accepted by Designer? Zves lro Change Accepted by ? nruo

Design Discipline
Name:
ælæ sisnature:
1)
-J o6 o I
Lead Name: rdl Date:
Director / Technical Manager / lnterface Manager
Comments (if any): Proposal
Memb€rs
[ves Elruo

EXpOLlf{K -
%
Name: Position
z-t -lb
Date

Review : (if required) Proposals accepted by lnterfacing Ent¡ty? f]ves lruo


(if any)

Name: Position Signature Date

change relates to permanent works, reference of letter or endorsement received from Engineer confirming No Objection:
Reference: s o s.
Name: Position Signature Date

Comments (if any): -s Change lmplemented & Verified? fl".r fl*o


.B
ú!
É
"ffffff Þ
(\
q/ goxg\Da
A
Tabreed protection slab on other direction
sitting on last Tabreed slabs on each side

Tabreed line

Tabreed line

protect¡on slab
protection
slab for reed
slab
do stand on 1200

A 1200mm ng with protections slab


Modified tabreed slab without toe to b ridge 1200mm
Modified tabreed slab without toe line

t
Tabreed slab as per design
Tabreed

SECTION A-A 1200 mm line

SECTION B.B

*'...

EXFOLINK - t,

%
S..ig.îî .o It
2 4 6 7
SPN

t
I
SPAI{

2
E

'|

1213 1V,5

cqpActÞ
c GRq,ðþ Wfft Ut{ SoL
FoRCSI.rtSfiUs.¡8 8aRlt,¡cC¡PACfIY250@
eflll
SECTION
115

t,TIfTY PIPES

PRECAST COI¡CREIE PAilEt

83.' (-Ð.
SIEÉ,
f12 IFTì¡IB
¡tlf. HOON((IYPI

E
lrfEßþtES)
i:- æ
lr l_\
C=
t
l."Flrexrc
[Y4
o a
(:)
i'OoffÐ

J
REFER

J
OËTAIL
FOR CÀST+|-S|TU SU8

F
æ I
I
l,\
I
í:-\ TYPE 1
I L
1:25
Well Certified Scaffolding Contracting LLC

Mefro Loadins Platform Ca lculation Sheet

Bay Dimension 36mL x 10m W:360m2

Bay V/eight: 700 ton : 6864KN


68641360: l9.06KNAyf2

Scaffolding ledger Span: 0.9 m x 0.9 m : 0.81m2

DEAD LOAD :19.06 KN/m2


LIVE LOAD :2.50 KN/m2

SELF WEIGHT OF FORMWORK:0.5KN

TOTAL LOAD: D.L + L.L + SW


: I 9.06+2.5+0.5 :22.06 KN/m2

1.1 Load Per Les:

'-.llii';l.il
l

o ö o
':-il il-t
T

o o o

Members of
a a o EXPOLtf.úK
k -

Total Weight from Bay: 22.06 KN/m2 1íàcciona


-l I
6O(tr&^t
'.---

:22.06 x 0.90 x0.90 : 17.86

Load per leg : 17.86 KN < 22.5 KN O.K. 'oSatb"


I

Factor of safety is 2 to I = 22.5 Kn


LIre I I C e rt if e d Sc afo lding

Max load per leg is 45kn

The standard effective length is 1000mm between 2 ledgers.

1.2 Timber Beam If20 lsecondarv):-


/ Spacing between secondary : 0.25m
/ Load From Container : 22.06 x 0.25:5.51 KN/m'

A. Chec k For Moment :-

Allowable Moment: 5Kn

Allowable Shear: l lkn

Moment of Secondary : WLzll}


:5.51 x (0.90)2110:0.44 KN.M

:0.44 KN.M < 5.00 KN.m' O.K "Safe"

B. Check For Shear :-

Q:O.9xWxL: 0.6 x 5.51 x 0.90

:2.97 KN

:2.97 << l l KN O.K "Safe"


C. Check For deflection :

A : WL4\145XEI

: 5.5lx (0.90)a x l0l 100 x145x 850 x 4600


n : 2.04mm < (L/270 : 9001270 : 3.33 mm) O.K 'oSafe"

1.3 Timber Beam H20 (Primarv):-

Allowable Moment: 5Kn

Allowable Shear: 1lkn


Members
Êvñ^r ai.r,
Iltell Certifred Scafolding

Total Load:3.60KN/m2

Space between primary beam : 0.90 m

Load Per one Timber Beam :22.06 x 0.90: l9.85KN/m

A. Check for Moment:-

Moment of primary beam : WL2/10


: 9.85 x (0.90)2110 :t.6IKN.M
1

: 1.61 KN.M < 10.0 KN.m'(Double fnq O.K "Safe"


B. Check Shear:-

Q : 0.6x W xL: 0.6 x19.85 x 0.90


:10.72 KN

:10.72 < 22 KN (Double fÛq O.K "Safe"

C. Check for deflection:

A : WL4\I45XEI

: 19.85 x (0.90)a x 10 / 100 xl45x 850 x 4600


n : 0.74mm < (L/270 : 900/270 : 3.33 mm) O.K "Safe,,

Mem r5

FVn^t
-atll/
RPNg77
RPN976 RPN975
RPN974 RPN973
RPN972

ftd P,h¡llllE!¿l-tun

RPN977
RPN976 RPN975
RPN974 RPN973
RPN972 RPNg

RPN 977
RPN 976 RPN 975
I
RPN 974 RPN 973
I
RPN 972 RPN 971
I

;
-i.. l--.
....-,.1"..,,.
.--, ,,-.-_L
':r
l. l_r" - lr'

,,"i
Design Verification of Protection Slabs

'- I '¿ ,

¡"*-,

t¡,\
e*t?tvnt Calculation Sheet
Project Name Route 2020 Project Number: RAL|PPDDloTT

Reference Sheet : Revision date: Feb-18

ncept Preliminary Schematic Detailed


design design
v r state CDRL PKG. No.

Calculation title; Design Verification of Protection Slab Revision: Sheet no:

Verification level

Program(s):

Hardware

Calculation details References/results

Contents
1.0 lntroduction
2.0 Design verification of Protect¡on Slab at location I
3.0 Des¡gn ver¡ficat¡on of Protection Slab at locat¡on 2

4.0 Design verification of Protect¡on S¡ab at location 3

Irr¡ r,.hr.:r5 of
EXTDLINK.
eqftffi
di\i:';irrna - , !i{

Or¡t¡nator Rev¡€wer 1 Reviewer 2 Approver Submitted by


Name MSK RS 5C NKC 55

Sígneture * e- ,e a
Date Feb-78 Feb-78 Feb-78 Feb-18 Feb-18

CONTENTS AMEÍVOMEñ¡Í RECORO

shect(s) Rcv Ðate Description org Rev App


Calculation sheet
Reference Sheet ñev¡sion date: Feb-1 I
tifle: Oesign Verificat¡on of Protect¡on Slab Revision Sheet no;

Ref e r e ncesr re s Lrlls

1.0 lntroduction
ïhis Report pertains to ver¡f¡cat¡on of the prolect¡on slabs proposed for the temporary protect¡on of
the utilit¡es ín tie-in area of zone 1A of R2020. Protection ot the util¡ties is requ¡red to fac¡l¡tate the Reference calculalion no.
temporary scaffolding to remove the exist¡ng viaduct superstructure for the t¡e-in with the new
AAGC-C0130-CtV-ROD-
mêtro line viaduct. uTl-cAL-000001-B -
The design of the protection slabs arrangement provided at below 3 locations have been verified for Detailed Des¡gn of
Protection slabs
for the foads from the scaffolding prov¡ded to support the existing deck dur¡ng demolition works.
The vertical loads from scaffold leg as provided in document no. WCS/WWBD/CAU00"I rev. 02 have WCSAAM/BD/CAUOOI -
applied as point loads on the slabs at the location of the scaffold leg and the an-angement provided by Suppliers Des¡gn
calculation for scaffold
CWJV. The end of the slabs are supported on another planks which are provided to protect the
ut¡lit¡es in another d¡rect¡on. The protection slabs are modeled as plate elements using "Midas Civil"
Sofhvare. The end of the slabs are supported on the ground and are represented by very week linear
springs. ïhe soil spring are applied to lhe nodal point of the p¡ate elements based on the tributary
area of the node. The span of lhe slab over the utility crossing has been considered as un-supported.
The protection structure w¡ll consists of the precasucastis situ RCC plank of width 12'l5mm placed
side by side.

Loads and Load combinat¡ons are cons¡dered as per relevent Euro codes and UK nat¡onal annexures.

¡-
ø,
'< >
z
&
ú.
=
B
l I' t
uJ
ô- @
Ë Ë È t¡J
ô-
t- c, 6 .4t
t¡¡ t¡¡ t¡¡
33r.=" Ë Ê Ê Ê
Location 1
w27f2941,73t

Location 2

WPE?
rl¡¡
,;
ÈcL,; t¡l
cL>cL
ÈÈ

Location 3
cltzneu Calculation sheet
0 Sheet dale: Fâb-1 I

tifle: DBsign Veriflcât¡on ot Prolect¡on Slab Rêvis¡on no:

1.1 Material Properties


1.1,1 Concrete
Grade F"r.crt Fck.Cube Density Eç Table 3. I ol EN I 992- |- |
Mpa Mpa kN/m3 Gpa Cl I 6.1 ; Desþn Easls
Superstructure c30/37 30 37 25.0 33.0

Coefficient of thermal expansion 1.00E-05 rc


Poisson's ratio 0.2 Cl3.t.1:BSEN1992-t I
Type of cement Class N
Relative Humidity 850h

1.1.2 Rê¡nforcement
Grade of untensioned re¡nforcement 5008
Yield Stress of reinforcement 500 Mpa
Dens¡ty of reinforcement 78.5 kN/m3
Modulus ol Elast¡city 200 Gpa
Coeff¡cient of thermal expansion Es 1.008-05 fc

L1.4 Partial factors lor materials


Des¡on s¡tuat¡ons lc fot concretg y" for reinforcing steel
Ct 2.4-2.2: BS EN 1992-1-1
Persistent & Transient 1.5 1 .15

Clear Gover
Nominal clear cover to any reinforcement of various slructural elements to be considered in the
design shall bs as given below

Precast Planks 40 mm

f.1.5 Servicíability and Crack Width checks


S¡nce thêse protection slabs are only temporary structure and will only be used only for a short
duration no serviciability stress checks ,Crack Width checks and Defelction are performed.

1.1.6 ultimate check

The section will be checed only for the ultimate section capacity

1.1.7 Modulus of Subgrade Reaction

Modulus of subgrade roaction 5000 kN/m3


very soil has beên considered conservatively to caluculato the soil springs.

1.1.8 Load Factors

ULS Combination
Load Type Factor
Dead Load 1.4125
SIDL 1.2740 ,\lr,- ¡ )et i Df
Live Load 1.7000 EXPÇr.tj'J'( _
\c¡¡1".:"{í
S,'.iç.1¡
"".1,H
2.0 Design Verffication of Protection Slab
(Location 1)

È
Calculation sheet
Reference AAGC-C01 60-BES-ELE-COS-CAL-000003 Shs6t: Flevision date Jan-17

litle Design Verif¡cal¡on ôf Protection Slab at Location 1 Flêvision: Sheet no:

References/resr.rlts

2.O Design Check for Type 8A & 8B Slab

Length of slab = 7,80 m


Width of slab = 1.215 m
Depth of slab = 0.600 m
Density of Concrete = 25.00 kN/m3
2.1 Dead load

0.600 x 25.00 15.0 kN/m2

2.2 Dead load (others)

Self weight of Supêr structure to be dismantled and self weight of scuffolding Refer document number
shall be considered to be as (Per Leg)
16.20 kN = "wcs^ /wBD/cAUoo1'
Design calculation for scaffold
9of11)

Fio Showino Load position from each leo of scuff,

2.3 Reaction from type 8A slab transferred on to Type 1 & Type 8c Plank

,l
l/
15
!t

Fio Showind Dead Load R€act¡on

I
I
r0
.J,....' 25
j I'.- '9 t,ì

:
,''l
-t-,
ril I ' :-- -'
{fl
i
II:.1
L.: r - '., s rrf
I
t-: ¿ i -.'-
i:'.. - -
€;YFîrìr,¡'<.
fi*fhti'.'
rtll
''
ti.¿rr; ..1,Í

lr {l^cci,.,na
;
{-
.' Gir¿'' :'t ìt
Fio Showino Load Reaction
Calculation sheet
Sheet Revision date: Jan-17

Calculation t¡tle: Verlflcation of Protect¡on Slab at Locat¡on 1 Revis¡on: Sheet no:

Reaction from type 8A slab transferred on to Type 1 & Ïype 8c Plank

Reaction due to DL = 71 kN

Reaction due to DL (Others)


83 kN

Reaction Per Support = 154 kN

I No of planks resting on Type 1 & Type 8c Plank


= 2.00

Load intensity coming on to the Type 1 & Type 8c Plank


2 x 154.0 I (2x 1.215 x 1.215 ) = 104.3 kN/m2

lvli r nl ':i 1

v.ìi1i rilr/
/\a:,: I'i \-
L-45¡ -,.-t
rL¡ .,ù O

r,r q'J
(+¿f(lona ooiej;,^¡
eItùYYt: Calculation sheet
60-BES-ELE-COS-CAL-000003 Sheêt dale: J¿n-17

Calculat¡on title: Verificat¡on of Protection Slab at Location 1 Fìevis¡on: no

R efere nces 4e su lls


2'4@
Bendinq Moment & Shear Forces

tl{

ta
!2
7L
61
:0

29

3 I

J!: øæ¡e:

Bendinq Moment due to Dead Load


rcl@-&
a3l
¡19


ô2
69
s1
45
33

I ,i"

Bendino Moment due to Load from Scuffoldinq


l@-tw

313

2a:
2!6

ls1

e6

q

-1¡

t a' 4 3

Bendino Moment -ULS


5s8-!)?
¿LO
t7r
133

c
-24
-6¡
-10¡

-11t
-211

,14¡-- .i),

Shear Force -ULS


i!ic.rri:itri r¡{

EXp0! i:'j'<
Calculation sheet
1 60-BES-ELE-COS-CAL-000003 Sheet date: Jan-17

t¡tle: Verif¡cation of Protection Slab at Location 1 Rev¡sion:

Summarv of Forces

Max bending moment 341 kN-m


Shear force coresponding to max Bending moment 12 KN

Max Shear Force 158 KN


Bending moment coresponding to max Shear force 0 kN-m

$/ìÈ¿'rr l,3rs

ExP*jÞ
Calculation sheet
60-BES-ELE-COS-CAL-000003 Sheet date: Jan-17

Ca¡culation title: Ver¡fication of Protection Slab at Locat¡on 1 Revlsion: no

References/resulls
2.5 Midas Output for Tvpe 1 Plank
Bendino Moment & Shear Forces
!WåY
10

!
!
3
2

Sl:5ffi1c¡1

Bendinq Moment due to Dead Load


l{ffi-xW
t2a
116
¡o5
93

70
sa
11
55

0
-0

t ,J" ,L I
I

s¡: 5¡¡¿ !r* P¡-

Bending Moment due to Load from Scuffoldinq


lffi{/
19t
t7ø
150
L42
l2a
¡01

tt
53
3{

æ: Ôecl G

Bendino Moment -ULS


ffi-vw
z2\
¡ô¡
141
r00
60
?o
0
-6û
-tqo
-t¡1
-1A¡
-2¿!

-¿-
6¡ ñs¿l B

Shear Force -ULS

Mernbers ol
Calculation sheet
Beference 60-BES-ELE-COS-CAL-000003 Sheal dals: Jan-17

l¡tle: Verificalion of Protection Slab at Location I Rovision: no

References/results
2,6 Base Pressure

-!¡
-23
-3t
-ts
-121 -s7

-tt
.121 -90
-\02
-t !,
-L24

,121

-121 @r *.cÈ 5É

Max Base Pressure = 124 kN/m2

Summarv of Forces

Max bending moment 189 kN-m


Shear force coresponding to max Bending moment 21 KN

Max Shear Force 110 KN


Bending moment coresponding to max Shear force 81 kN-m

ñìemhers oi

Exp¡_;,,1Ì_!Í;
Calculation sheet
60-BES-ELE-COS-CAL-000003 Sheet date: Jan-1 7

t¡ile Dêsign Ver¡f¡cat¡on of Protection Slab at Location 1 Revision: no

Re le re nr;es /res ults

2.5 Midas Output for Tvpe 8C Plank


Bendino Moment & Shear Forces
þÉû-!Íy

¡a

38
33

?1

Id
t0
5

Bendino Moment due to Dead Load


rc¡ff*y
2Aø

t29

!74
153
J 121
102
f6
5t

i
I

Bendinq Moment due to Load from Scuffolding


ltrltr-h!?
¡69
121

3¡1
299
256
213
171

-0

Bendinq Moment -ULS


SM-Yry

183
136
ô9
¡2
0
-52

- 193
-¿r0

-.ui..,..-tj¿ --

Shear Force -ULS

r\¡ ,¡1,¡r Í
ù

EXP
cttùwt" Calculation sheet
AAGC-C0 1 60-BES-ELE-COS-CAL-000003 Sheet date: Jan-1 7

Calculation t¡tle: Design Verificat¡on oÍ Protect¡on Slab al Locat¡on 1 Fìevision: no

References/results
2.6 Base Pressure

-15
_3¡
-{6
-t2
-11
-9¿
,r5
-123
-101 99 .ß ät -l16
- 154
Þ
1¡7 -* {x¡ -75 -169

-rol ,* ^ql å
!l
.tot € {t .s

6¡ Õect 5!5

Max Base Pressure 169 kN/m2

Summarv of Forces

Max bending moment 462 kN-m


Shear force coresponding to max Bending moment 23 kN

Max Shear Force 181 KN


Bending moment coresponding to max Shear force 203 kN-m

f, c

î '¡,- - ' '(.t


111 t-1T'l
\--.'--"o o
l

Calculation sheet
Fìefsronce 60-BES-ELE-COS-CAL-000003 Shest date: Jan-'|7

lillêi Verificalion of Protect¡on Slab al Location '1


Revislôn: n0:

Referencesi resulls
2.7 Midas Output for Tvpe 6 Plank
Bendinq Moment & Shear Forces

f"""ï


51! Sq*A¡68¡

Bending Moment due to Dead Load


lÆ-fW
62t
565
506
452
395
339
2¿2
226
169

3l: 5¡Ðl tñ 6È-

Bendino Moment due to Load from Scuffoldino


ffi-&
1094
t96
69t

6â'
5r9
499
199

199

-0

Bending Moment -ULS


¡25
356
2Ee
2lt
150
et

-56

-19{
-262
-13¡

c!! ãec¡ As

Shear Force -ULS

lvie¡,r irer s
Calculation sheet
AAGC-C0 1 60-BES-ELE,COS-CAL-000003 Sheet date: Jan-17

Calculation title: Design Ver¡fication of Prolection Slab at Location I Bevision: no:

Referencesi results
2.8 Base Pressure

-1?
-34
-51
-6¿

-t0l

-1 35
r8l I¿'i
-152
.tr5 186 -163
186 -t¿6

ß. ù.ct 15

Max Base Pressure 186 kN/m2

Summarv of Forces

Max bending moment 1088 kN-m


Shear force coresponding to max Bending moment 24 kN

Max Shear Force 302 KN


Bending moment coresponding to max Shear force 439 kN-m

l!ir-.,,r',ci c rLf

f: ì.'r -,t ì r rl
Galculation sheet
Reference AAGC-C0 l 60-BES-ELE-COS-CAL-000003 Sheet dato: Jan-17

t¡lle: Dos¡gn Vor¡fication of Protsction Slab al Location 1 Flêv¡sion: no

Feferences/resrllts
Summarv ol Forces

Type of Design BM. Moment Capacity Design Base Required Base


Status
Slab (kN-m) (kN-m) Pressure (kN/m2) Pressure (kN/m2)
Type 8A 341 704
Type 1 189 288 124 200 OK
ïype 8C 462 704 169 200 OK
Type 6 1 088 1 568 186 200 OK

Referênce Documents

Design Documents
AAGC-C01 30-CrV-ROD-UTl-CAL-000001
AAGC-C01 30-CtV-ROD-UTt-CAL-000003

Drawings
AAGC-C0130-ClV-ROD-Uïl-DRW-000052 to 63

lv¡i:rtti-,cf5

EXt t¡,.
3.0 Design Verification of Protection Slab
(Location 2)
Calculation sheet
date: Feb-1 I
Calculation tille: Dosign Vêrifical¡on of Protection Slab al Location 2 Revision:

References/resulls

3.0 Design Check for Type 2 Slab

Length of slab = 6.40 m


Width of slab = 1.215 m
Depth of slab = 0.500 m
Density of Concrete = 25.00 kN/m3

3.1 Dead load

0.500 x 25.00 12.5 kN/m2

3.2 Dead load (others)

Self weight of Super structure to be dismantled and self weight of scuffolding Refer document number
shall be considered to be as (Per Leg) 16.20 kN = 'wcsM/wBD/oAL/oo1"
Design calculation for scaffold
9of1l)

F¡q Showinq Load position lrom eâch leo ot scuffold¡nq

3.3 Reaction from type 8A slab transferred on to Type 1 & Type 8c Plank

l0

Flo Showlno Dead Load Reaction

:-r
':i
'r r
-r i
J I lil I
26
liI -.t'll-l..
---+:l-'r f-.
i ..- li;

J
li I,
-r'- t. _ " .l-1.-
+-".i -:-" , -:,-'
I
l i
"- - t-,.t ...::- - ð.- -'
I

-l i
_9
Ì
t

F¡o Showino Load Rsact¡on


lvi¡r:rb¡:r s of
l

Calculation sheet
0 Sheêt date: Feb-1 I
lille: Design Verificalion of Protection Slab al Locat¡on 2 Revlsion: no:

Relerencesiresulls
Reaction from type 2 slab transferred on to Type 1

Reaction due to DL = 48 KN

Reaction due to DL (Others) 132 KN

Total 180 KN

No of planks resting on Type 1 Plank


4.00

Load intensity coming on to the Type 1 Plank


4x 180.0/(4x 1.215x 1.215) = 121.9kN/m2

L .. '; .t. of

t
ù

{- i' I
Calculation sheet
Rsference 0 Shsêt Rsvision date: Feb-1 I
title Design Veril¡calion of Protection Slab al Location 2 Revision: n0:

References/results
3.4 MÍdas Output for Tvpe 2 Plank
Bendino Moment & Shear Forces

t
lffi-fyy

5A

{6

¡¡

22
t6
to

-3

J
s*mtGãi

Bendino Moment due to Dead Load


l@f-ry

I ttz
t35
l3ô
12¡
to{
6?
7q
s2
39

-16

q !

f:
Âry

Bendino Moment due to Load from Scufiolding


w-ry

t 333
¡0¡
268
235
243
110
147

I
¡44
12
39
0
-26

93 l. 1

Bendino Moment -ULS


3ffi-Vry
¡l?
¿62
2ô{
¡¡6
a!
JO
4
-a{
-¡¡a
-zo2
-¿60
-rl!

Shear Force -ULS

li
Calculation sheet
Reference U Shoat dats: Feb-18

tltle: Verilicalion of Protsclion Slab at Localion 2 Rôvislon: no:

Rel€rencesi resulls

Summarv of Forces

Max bending moment 332 kN-m


Shear force coresponding to max Bending moment 12 KN

Max Shear Force 181 KN


Bending moment coresponding to max Shear force 0 kN-m

ñ,.'_ r. - ì. .;
Of

€xP-1. !?.,¡K -
b---r---Fqat
\.!.- r\¡ j -ì:o
q.,
Calculation sheet
Referêncê U Sheel dâté: Feb-1 I
title: Design Verification of Prolection Slab at Location 2 Revision: Shêèt no:

Referenceslr€sulls
3.5 Midas Outpul for Tvpe 1 Plank
Bendinq Moment & Shear Forces
¡.ffi-Ð

Fr 5Em¡ô¡1

Bendinq Moment due to Dead Load


¡W-Ér
tz7
u6
¡0{
92
8t
69

a6
f5
23
t¿

s¡ s¡Þ! f¡ø P¡-

Bendinq Moment due to Load from Scuffoldino


M-lryy
r9¡
t?6
t59
ld¡
l2a
t06

53
,5

6: õ€ct æ

Bendinq Moment -ULS

1¿?
t{5
104
62
2!
0
-62
-1oa
-1{5
-¡û7
i !__ -224

t¡ ¡.c¡ E

Shear Force -ULS


Calculation sheet
Reference U Shsst date: Feb-1 I
t¡tle: Verif¡calion of Protection Slab at Location 2 Revis¡on:

Fìeferences/results
3.6 Base Pressure
þ

-12
-ôJ

-t06

-rtg
-:ó9
-130
-2r!

Max Base Pressure 233 kN/m2

Summarv of Forces

Max bending momênt 188 kN-m


Shear force coresponding to max Bending moment ¿o KN

Max Shear Force 107 KN


Bending moment coresponding to max Shear force 121 kN-m

t-
I

i
I
I

I
Calculation sheet
Sheet date: Feb-18

tiile Design Verifical¡on of Protoction Slab at Locat¡on 2 Fìevision: Sheet no:

Referenceslresulls
Summarv of Forces

Type of Design BM Moment Capacity Design Base Required Base


Status
Slab (kN-m) (kN-m) Pressure (kN/m2) Pressure (kN/m2)
fype 2 332 576
Type 1 189 288 233 250 OK

R€tersnce Documents

Deslgn Documenls
AAGC-C01 30-CtV-ROD-UTr-CAL-000001
AAGC-C01 30-CrV-ROD-UTt-CAL-000003

Drawings
AAGC-C01 30-ClV-ROD-UTl-DRW-000052 to 63

lvi.r¡i,.,,
4.0 Design Verification of Protection Slab
(Location 3)

EXÍ'-tl :1"<
t - - -'-t-
-J

t^ a,'¡l
Calculation sheet
0 Sheet date: Feb-1 I
Calculalion t¡tle: Design Verif¡cat¡on of Prolectjon Slab at Localion 3 Revision: no

Ref erencesl'results

4.0 Design Check for Type 6 Slab

Length of slab = 11.30 m


Width of slab = 1215 m
Depth of slab = 0.800 m
Density of Concrete = 25.00 kN/m3

4.1 Dead load

0.800 x 25.00 20.0 kN/m2

4.2 Dead load (others)

Self weight of Super structure to be dismantled and self weight of scuffolding document number
shall be cons¡dered to be as (Per Leg) = 16.20 kN D/CAU001',
Design calculation for scaffold
(Page9ofl1)

Fio Showínc Load positíon from each leo of scuffoldíno

4.3 Reactíon from type 8A slab transferred on to Type 1 & Type 8c Plank

33

Fio Showino Dead Load Reaction

1 49
¡6
r9

Flq Show¡no Load R€âction


e*t?ttw: Calculation sheet
Sheet dalê Feb-1 I
t¡ilê: Design Ver¡f¡cation of Protect¡on Slab al Localion 3 Revis¡on: no:

Reaction from type 2 slab transferred on to Type 1

Reaction due to DL = 136 kN

Reaction due to DL (Others) 233 kN

Total = 369 kN

No of planks resting on Type 1 Plank


2.00

Load intensity coming on to the Type 1 Plank


2x 369.0/( 2.200 x 1.500) = 223.6kN1m2

Â. i:i: t¡;i gf
Ea'1n,¡.\.tr,l
eløtttvlt Calculation sheet
Sheet Revision date Feb-18

tille Design Verification of Protect¡on Slab at Localion 3 Revis¡on: Sheet no:

Rclerencesrre sirlts
4.4 Midas Output for Tvpe 2 Plank
Bendinq Moment & Shear Forces
KElfi-YW
i!5
7e6
251
22¿
199

¿3
54
0
-4

i: sctffi¡6t¡

Bendino Moment due to Dead Load


l{ffi-&t
521

T {29
379
330
230
23L

tJ2

5T: sc.êJor&rq '

Bendinq Moment due to Load from Scuffoldino


SY¡t84ry
I t36

T
1ø19
36e

?¡6
ã35
5¿5
{ll
303
\92
0
-29

t€

Bendinq Moment -ULS


5W-Vly

I 55¡
455
J55

H 156
56
û

I
-la:
-213

- 112

Shear Force -ULS


Calculation sheet
Refefsnce 0 Sheet Fìav¡s¡on date: Feb-18

Calculation t¡tle: Design Verification of Protect¡on Slab at Location 3 Revis¡on: no:

Relerences/fesults

Summarv of Forces

Max bending moment B0


1 I kN-m
Shear force coresponding to max Bending moment 51 kN

Max Shear Force 360 KN


Bending moment coresponding to max Shear force 0 kN-m

t
Calculation sheet
0 Sheet Fìevision date: Feb-1 I
Calculation title: n Verification of Protection Slab at Localion 3 Rev¡sion: n0

Refefences/re sulls
4.5 Midas Outpul for Duct Bank
Bendinq Moment & Shear Forces

a
-0
-0
,'| ri ?t 1l
ll

Bendinq Moment dueto Dead Load

I
c
-l2l
- !46
-2{e
-J1C
-372
-435
-{9t

-621
nt ¡P-rú :¡ -643

s: SIDI aroF et-

Bendino Moment due to Load from Scuffoldinq


¡{M.?
3

-1?l
-¡61
-34 9

-¡3-.

-513
-?0¡
-te9
tÑronùo .srF
-96ó
å,rtê

Bendinq Moment -ULS

4A

-l {5
- l9r
-234
-2e4
-330

,':.f il .sf $r+;f¡'i¡]1"í¡¡=¡ìÈir'ì,ç,i-ìid,l:n',,*o,o"r)tàor*..s.rt.Þ,¡¡:3;r**o,*


*, 1¡-rs!l*\ !..sr.,*
,',\ '

Shear Force -ULS

.li
Calculation sheet
0 Sheet Revision date: Feb-1 I
title: Dssign Verification of Prolêclion Slab at Location 3 Rêvision: no:

References/resulls

Summarv of Forces

Max bending moment 966 kN-m


Shear force coresponding to max Bending moment 48 KN

Max Shear Force 376 kN


Bending moment coresponding to max Shear force 395 kN-m

E.)i - 'i
\t
i -J
eh?¡n Calculation sheet
Reférence 0 Sheet lRevision aate Feb-1 I

calculalion litle: Design Verification of Protection Slab at Location 3 Revision: no


lsneet
Fleferencesi resulls

Summarv of Forces

Type of Design BM. Moment Capacity


Status
Slab (kN-m) (kN-m)

lype 2 'I 180 1 568 OK


Duct Eank 966 2572 OK

Reference Documenls

Design Documents
AAGC-C01 30-CrV-ROD-UTl-CAL-000001
AAGC-C01 30-CtV-ROD-UTl-CAL-000003

Drawings
AAGC-C0130-ClV-ROD-UTl-DRW-000052 to 63
e?.e-t<-\,- 1 * Atral:^uÅ Rec,e v,pá
Ó^ cL¿Tu Carr¡

6 wlaþô tlsvwTa- â¡,-c.i { drrr"" n"r. ftry,tï At^ (

f¡!!
-
-.-

¡f¡tæi-r?1r5r-i¡L-i,Ë

ffi ,,.

Nótc l-

7.7198 1067

l_ PE
I
I
43
3.7000

.SMH NF t, !
l .,, IMHC _ -Btr )- -smH$*- + lsl*tr: ir ,
-SMH
UMHS è v\Hc UMHS uMhlr

,rorrJ
rE a
I I

PE ¡
-à -l T E I
,/ ln
TYPE 1

WELL CERTIFIED SCAFFOLDING CON LLC
FogTBQ(Ufl01 re+ür{)¡stfl7
F.gO, Ilr ûr¡¡r elüg, Dl,B ¡. FAt+gñ ({)fl{ltl2
TilTfEAF¡gffiÁTES lloü+llt Eäln$e

Project Demolition of Metro Bridge Section

Title Design calculation for scaffold

I\ tt
G,l. c^{ailcn3 Èn¿,"ru e-¿ (vÞ,,cr,J'(ri

'pevtø.,t-: q l1^¿<< coJd$an o."-lE


U

Å*þ- uL.+Ln flt-e lø..,Å<


1
Pzwi ò¿ J iv.. "fL¿s. c*^.Aù^! Å'rrÅ V€

þ -8,n *,W" å 4Ç,r {L- À¿si7*. V¿r./-.i cYlt

?"ohocftw 9(.,b, , "


Document No. Revision Designer Checker Date
wcs/wwBD/cAl/001 0l Agnel Sebin l8-01-2018
02 PKS Sebin 29-01-2018

c 1
CALCUTATIONS
R€V 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARÉD BY: PKS
Fosrgoxoal.or le.{7r{)2!0{5t7 DESIGN DEPARIMENT
Atg,nro![ !dù9, Dt t^l. FA)t rgtl (l)3tË12
OATE:
ritflÐlRAtsßRArEs t ü+f¡l æaaDsoe 28-Jan-18

PROJECT NAME: Demolition of Metro Br¡dge Section PROJECT CODE:


LOCATION / DESCRIPTION: Scaffold Des¡gn VERIFIED/ APPROVED BY: Sebin

of
1.Wind Analvsis
Basic wind speed,Vb = 25.Om/sec
Site Altitude in 'm' above MSL,As = 10.0m
Height of Scaffold lncluding Bridge parapet = 10.0m
Factor,Sa = '1.01
Direction Factor,Sd =1
Seasonal Factor,Ss =1
Probability Factor,Sp = 0,745
(Duration of scaffold is less than one year)
Site Wind Speed,Vs = 18.81m/sec
Effective Wind Speed,Ve = VsxSb
= 1.78
Hence Effective Wind Speed,Ve = 33.48
Therefore the value of dynamic pressure,qs = 0.6l3xVe2
= 687.3N/mm2
say = 0 69kN/m2

Table 4 Factor ^S5


for standa¡d nrethod
-
Site ¡! country o! uD to 9 kD into towa Site i¡ tom. erteudhg > I ku uprind from the eite
EffectÍr'e height Closes distance to s€a upwind Ef,fective Leight Closest distuce to *a upwiad
Hc H"
lrn kE
E r 0.1 l0 > 100 Ê 10 > 100
1"48 1_40 1.35 r.26 1.18 f .L5 T.O7
5 1.65 1.62 1.57 1,45 õ 1_50 1.45 1,36
10 1.?8 1.78 1.73 1.62 10 1.73 1.69 1-58
1õ 1.85 1.S5 1.82 L.7l 15 1.8c 1.82 L-71
20 1_90 1_90 r..89 t.7'l 20 1.90 1.89 L.77
30 1.96 1.96 1.96 1.85 30 1_96 1.96 1-85
50 2.01 2_04 2.01 1.95 50 2.0{ 2.04 1.95
100 2-t2 2,L2 ,1' !.07 100 t 1t 2.t2 2.07
NoTE I l!¡€r¡¡alarioE Eay be Eed vithi¡ each table.
NOTE 2 Tle figues i¡ rhi¡ table hare bee¡ derived. ftom æfereace [5]-
NOTE 3 Values asue a diagolaldimæion¿= 5m-
NOTE ¡ If ¡te - lUO e ue the diæctioaal Bethod qf Section 3-

Standard
900 900

@
ô
o
-.- ".,". .1
_. -¡ Base plate(150x'150)
@
ô
ó
"
l-- . -:¡ Ledger

,:, i
t"-
I
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
@4a01
FogT 3(})c rEl,:.trl{) 2664687 OEs16N DEPARTMENI
Àr.Th.û¡n!lddig,0tt L F^r+g7l(1)3€0ttl2
DATE: 28-Jan-18
$rfrEDARAEãtn rES l,lù+gñ62847t30¡

NAME: Demolit¡on of Metro Br¡dge Section PROjECT CODÊ:

/ DESCRIPTION: Scaffold Design VERIFIED/ APPROVED BY: Sebin

check

1. DL + Trackform plinth weicht for each sesment of l5O 36m soan

Den¡sty of concrete 24.5 kN,/m3


SDL 31.8 kN/m (Only trackform pl¡nth is considered)

OL +SDt DL+SDL
No of lo.,r"r."n. sDL per (pcr lpcr
Typc ofreßmcnt C/5 ¡rca lcnrth saßlnGnt lwo rc8mant ¡crmcntl ¡crmsntl
m2 m Nos lktr¡ KN KN Tons
Pier segment 9.557 1.95 2l 457 62 519 50
Transit¡on 5.79 4 2l 536 127 563 64
Ivp¡cal sesment 5.742 4 6l 504 727 631 61
Total span 361 Total 6150 s94

2.DL + Treckform Þlinth welsht for eech sesment of ISO 28.5m span

Denisty of concrete 24.5 kN,/m3


SDL 31.8 kN,/m (Only trackform plinth is considered)

D[+SDL Dl +SOL
No of Dl- (Scgment $ÞLpcr [Per lpc¡
lypêof æEmrnt CIS ¡rce Lcnçth ielment wrl rs3!n€nt re¡mentl ¡s8n€nt)
m2 m ilos kñt ktú KN foís
Pier segment 9.557 1.95 2 457 62 519 50
ïransitíon 5.79 4 2 536 727 663 64
Tvpical seement-1 5.142 4 2 504 727 631 61
lYpical seßment-2 5.742 2.84 3 357 90 441 4t
Total span 28.5 Total 4967 479

3.DL + Trackform Dl¡nth we¡sht for each segment of ISO 31.5m spañ

Denisty of concrete 24.5 kN/m3


sDL 31.8 kN/m (only trackform pl¡nth is considered)

0t+sDt Dl,+SDL
lô of Dt fsc¡mcnt SDtprr lp¡r fpg
lìrD.otltrrnaÍt C/3rru¡ l¡rtrl|r ¡qrnant unl t$tEnt ¡¡lncntl ¡rgnentl
t'/tz tn f,o3 kft¡ kr[ KH folrl
Pier segment 9.557 1.95 2 457 62 519 50
Transition 5.79 4 2 536 r27 663 64
Ivoícal segment-1 5.L42 4 3 504 127 631 61
TvDical secment-2 5.1,42 3.75 2 472 119 592 57
Total span 31.5 Total 5MO s25
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PR€PARÊD BY: PKS
PGÍrcX@s0t 1e{fir{}rõða6E7 DESIGN DEPARTMENT
F-30,Ih.OrmtuIdn9.DtB l. FÐC+glt(1)3t$tl2
Iil|IED ARÁ6 ilRAIÉ] Moù +f11 62ô1ru$e
DATE: 28-Jan-18

NAME: Demol¡t¡on of Metro Br¡dge Sect¡on PROJECI CODE:


TION / OESCRIPIION: Scaffold Design VERIFIED/ APPROVED BY: Sebin

Consider the Heavy Trans¡tion Segment


Weight 70f
686.70 kN
of the segment 10.00 m
of segment 4.00 m
Live load 0.50 kN/m'?
Total Live load 20 kN
load to be supported by scaffold excluding cutting amachine 706.70 kN
Number of Legs supporting the transtion segment 65.00 Nos.
Load on one leg 10.87 kN
of Cutting Machine 10 kN
(weight of cutting machine is taken by m¡nimum 9 standards)
Load on one standard 1.11 kN
total load on one standard 11.98 kN
an impact load of 10%(During cutt¡ng/l¡fting) 13.18 kN < 54.5 kN ok
ical data sheet enclosed )

Crue Faclo¡ç

lmpect
LJft EoulDmènt ufting SPeed
Factor
lm/mln l
v
Aree ],48 m2 Stationrry Gane,
Revolving Crane, < 90 1.O - 1,2
R¿llmountcd Crane

Statlonary Craner
Rêvolv¡nt Crane, > 90 1.3 . 1.4
Rall.mountld Cran€
tifting adl
trånsporting wlt*r
excðvatof on evèn 1,5 - 1,65
o ground

\l Lifting md tranr
porting
with mvator on ¿ 2.0
uneven ground

of parapet/m run 1.48 m2


Load of parapet 36.26 kN
Dens¡ty of concrete 24.50 kN/m3
of parapet/o.90 spac¡ng 32.63 kN
So Load on one leg 16.32 kN < 54.5 kF¡ ok
(Technical data sheet enclosed )
normal to inclined surface r5 !,2 kN
along the inclined surface r 5ri kN .: 5 l{) kN {)!.
Hence addit¡onal check couplers not required
(Coupler capacity enclosed)

f'
l

CALCULATIONS
RÊV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
i POEÍ X'X @s01 lr +g7r{}2õ81t87 DESIGN DEPARTMENT
F-ge,fll.A¡rug¡iûr&ougå¡. F f +gll(l)3tHl2 DATE: 28-Jan-18
uilfïED ARAS AilRAIES t¡ù +t71 6¿t47t339
l

NAME: Ðemol¡t¡on of Metro Br¡dge Section PROJECT CODE:


TION/ DESCRIPTION: Scaffold Design VERIFIED/ APPROVED 8Y: Sebin

Ioadinos
F{Êl'il lssue A
Datê 12103198 Paae. 492

CUPLOK Support - Grade 50 Verticals


Permíssíble Loads - General Formwork and all Main Lifts
When jacks are braced, base and top lifts are considered as main lifts

_q E
vertiGl Top gç gE
ñ

i Vertlcl fop
FlEt Horizon¡al Lsel
I
one cup dryn

è
I e =
i
I
I
I The permissible load per vertical, when using forkheads or
headplates, are shown on the following pages with separate
graphs for top lifts and base lifts. Thís information applíes
I
for jacks unbraced. The strengÌth of the jack is automatically
allowed for by reading off against the appropriate vðlue of
extension and horizontal load.

Values are given for the case of the horizontal in the first
cup from the top or bottom of the vertical and for the
horizontal in the second cup. The horizontal ín the f¡rst cup
is to be prefened. The permissible loads per vertical are
shown on pages 493 to 505.

The tables below show the permissible loads per vertical for
all main lifts. The values apply regardless of the type of
formwork to be supported.

Internal VeÉicals
tift (m) Vertical Load lkNl
1.8m B.Yt 2.5m & 2-7m Brvs
1.00 57.O s7.o
1.50 55.0 54.0
2.OO 4fJ.o 36.O
2.SO 26.O 25.0

Ets
=o
EÊ utt 600 9{}0 1200 1800 2500
Êa lm)
¡ñ
dBå
tn q7n 57.O 57.0 57.O
1-ç 55_5 s4-s 53.5 52.O 51-O
Vêrticâl Base
tãu ¿.9 Jð"U llf-u 14_S 34,O ?2.O

@ SGB
CALCULATIONS
REV Z

WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS


PO{II KDC 62/tl0l TEL: rCrl{) 268a887 DESIGN DEPARÏMENT
F\f9,n¡ùñldt¡iDUt ¡. FAr {gfi (l) 3E0ü'12
DATE: 28Jan-18
tñIfTEDARAI EilNATES iloü+e7! 62ô17æ3e

PROJECT NAME: Demol¡tlon of Metro Br¡dge Section PROJECT CODE:


LOCATION / OESCRIPTION: Scaffold Des¡gn VERIFIED/ APPROVED BY: Sebin

Sectio¡r 6 BS ã973;r993

Table 17 Snfe workinß loads for individual couplers and fittings


-
Prrt or Section of Clss¡ Type of fitting \pe of load Safe working lord
&s r r39
Part 2:1982 Right nngle coupler Slip along a tube s.3 kN
Seclion 2.1:1991 A
Section 2. l:1991 B Right ungle eoupler Slip along a tube 9.4 kN
Prrt 2:19S9 S¡¡'ivel coupler Slip along a tube
Section ?.1:19,91 A Swiçel coupler Slip along a tube
Section 2.1:1991 A Parallel coupler Tension 4.? kN
Sect.i,¡n 2.1:1991 A Sleeve coupler r enston 1_5 kN
- ftictional
Port 2:1982 Sleeve coupler Tension 3.0 kN
Sectio¡ 2.1:1991 B - frictional
Section 2.1:1901 B rÌleeve coupler Bending 0.59 kN m
- lrictional
Part 2:1982 Sìeeve coupler Bending 0.79 kNm'
- frictional
Pùr.2;198? Putlog coupler Force t,o pull the tube iI.53 kN
Section 2-2:1991 axinll¡- out of the coupler
gtrength
Pari; *1981 'Ioint pin {expanding spigot Shear 21.0 kN
Sectic¡n 2.2:1991 coupler)
Part 2:19ðt Ptrtkrg ends Shear strength 1.12 hbí
Section 1.9:1991
P¿rt 2:1982 Adjustablc baso plate Axial compre.esion 30.0 kN
Section 2.2:1991
NOTEt In 1982. ull fìltings wr,rrr ep'xi.ficd in BS ì1ù9-1.
N{)TE! Fittingsin¡æord¡nmryrthBSlt"!9.!.1:!991 ¡rem¡rkedrithEN?tandshFreflpÞropÎiåtÈ-^{*or'B-
I llùsed {rr1 ,itdel tuhe in rr-c,)Klrn\ìe srth BS t |.?9. I r 1983 iù{e threword and 6,2)"

Self weight+SDL per m2 L7.92 kV/m2

of bay 0.90
UDL 16.13 kN/m

of H beam,Design Bending Moment,Shear force and Deflections are enclosed and


found that ¡ts ãdequate

lv,.- '.-';,rl
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED 8Y: PKS
Fogf Eo¡cc¡a{0t ttt;+9fi{41?sat87 DESIGN DEPARTMENT
F-g9,nrq¡illr¡t¡rg,Dttå1, F x+elr(¡)tE0äf2
DATE: 28-lan-18
rt{flEÅ8,Ä! El{RArE ilù +e7r 62ôa7l33e

NAME: Demol¡t¡on of Metro Bridge Section PROJECT CODE:

/ DESCRIPIION: Scaffold Design VERIFIED/ APPROVED BY: Sebin

VARIO GT 24
MUTTIFLEX Statie V*ll¡r;s, Ixample I
G i ¡'r{ rir {.}v 8rv i {.? v\,r'

Gf 21 Vr20 The following marlmun section proportlos and supportlorcos arc æsumed;

= 14.0 kN (permlssrbls shesr lorcê lor slrutl,


perm. 05
.
perm. 0, 13.0 kN ipermissrbls shear lorcs lor Ìie),
p6rm.M = 70kNm lpermissrblôbond¡ngmomènt),
l, = 8000 cnli
E = 10000fllmmt (Europeansofrwood:SorlClassSl0/MSl0)
2A 21
*H- H
,a0. .ao,

StEt¡cValuos
gf!{ vl¡t
turm Sb6år Forc€ O oD ¡4.ô tN l1-o kN
û:13.O kN
turd 86ndñg trlomeor M l0 kNm 5OlNm
Momsil of lne(rð l. SOOO cñ' 4290 cnr¡
Fraruràl Sl¡ado¡h E¡- AOO kNm: {29 lNñ:
6.9 ko/ñ 5.9 kq/ñ

ffir
TIÜe: Job Rot:
Shê€t No: 1 of
Customer: Prepd-by: Date: 28-JaÈ1B
Eench: Chkd. by: DetÊ:
E¡EAM BENDINGANALYSIS
E¡ôam Lângth 3.9O m
Mom€nt of ln€rlla 858-OO cm4 Elastic Modulus IOO0O N/mm2

APPLIËD LOADING
D¡slributed Loåds
End 1 End 2 End 1 Éîd2
16.01 l6"to kN/m o.ooo 3.9OO m

REACTIONS (+ve UP) ... Non-Revers¡ble t

8.33 KN ... al O.15O m


,6,14 KN ... at 1.o5O m
13.60 KN -.. rt 1.950 m
16.18 l(N .., ât 2.850 m
8.37 KN ... a! 3.750 m

MAXIMUM LOADS & DEFLECTIONS


Måx. R€action 1ô. r8 KN at 2.850 m
Mar. Såg BM o.92 kN.m al 3.4(}0 m
Ma. Hog BM 1.34 kN.m ãt 2.850 m
8.52 KN ât 2.650 m
Mex. Seg Defl€ctfon o.72 mm át 3-3lio m
Max, Hog OoÍ€ct¡on o.3s mm at 3.900 m
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKs
P08f BO( @sol re* +l7r{{)2sa¡87
F.30, nf OnËlrIüû Dt gÁ¡.
DESIGN DEPARTMENÏ
FAf +Ctr (l)38612
wmDÆÄ8a¡RArHl ilü+971628an30e DATE: 28-len-78

PROJECT NAME: Demol¡tion of Metro Br¡dge Sect¡on PROJECT CODE:


TION / DESCRIPTION: Scaffold Design VERIFIED/ APPROVED BV: Sebin

str
Tlllei Job R6f:
Shêet No: 2 ot
Customer: Prepd.by: Dåte: 2&.Jan-18
Branch: Chkd. by: Date:
BEAM BENDINGANALYSIS

8.3 16.f 13.6 't6.2 8,4

SHEAR FORCE DISTRIBUTION - Max. 8.5 kN

BENDING MOMENT DISTRIBUTION - Max. Sag 0.9 kN.m - Max. Hog 1.3 kN.m

sag

Hog

DEFLECTION OISTRIEUTION - Max. Sag 0.7 mm - Max. Hog 0.4 mm

Hog

sag
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
i
Po{rf !O)ú@L{,t ÌG*|¡rl{{)268{887 OESIGN D€PARTMENT
l
F99, th. O¡.rr ùddns omAl. FÁX +Elt (4) 3EÐ.l2
tt{ß80á¡.C86ffi4'fE3 l,loö:+f7162û17HFe
DATE: 28-Jan-l8

i NAME: Demolition of Metro Bridge Section PROJECT CODE:

l / DESCRIPTTON: Scaffold Design VERIFIED/ APPROVED BY: 5ebin

Max¡mum React¡on of Standards 16.2 kN

ize of scaffold board-225x450mm long

Bearing pressure 160 kN/m'z

Bending Moment on scaffold board 0.81 kNm


I
j

Bending Moment of scaffold Board 0.468 kNm


I
I
{
I
Hence needed two layers of scaffold board,capacity 0.936 t<t¡m > 0.81 kNm ok

I
I

BS 6973:1993 Scction 6
i

Table l3(å) Propert¡es ofscâffold boârds* T'lxis såfety cæfficient ¡È relrted to the hêight of the
- scaflbld, and the ¡econmended value for thie iactor,
(1, is det€rmined ns folloq.s-

c-t+l 4
whe¡e
63 x 225 t3z.O I 300 /r is the celculated moximum height of the
i ûs¡ed on ¡ msinrum w,rrkiDs srrÈ¡ð of 9-Sõ N/6Dr.
sca{fold bssed on the atÞinment of
t Bo¡ü¡lc us.d on O¿¡1, maximum allt¡wable stresse-c in the
st¡r¡rdordg (in rnì

Pressure(Refer sheet number-1) 0.69kN/m2


Cons¡der max¡mum height ¡ncluding parapet 10.00 m
acting on scaffold and parepet/m w¡dth 6.87 kN/m
Bay width 0.90 m
wind on one l¡ne of standrads along the cross sect¡on of bridge 6.19 kN

Overturn¡ng Moment 30.93 kNm


overturn¡ng Moment is very very small compared with self weight of Scaffold w¡th or w¡thout Br¡dge segments
Hence,okay

ing Force 6.19 kN


Along the cross section there are 13 standrads are provided in each bay
So effect ofwind load on each standards 0.48 kN
l¡d¡ng res¡stance is obta¡ned by multiplying leg load with friction coefficient(O.40),its very very h¡gh

Moment is only 30.93kNm ,¡ts very very small compared w¡th res¡ting moment due to self weight of scaffold
r weight of bridge segments.So always standrads are under compress¡on only.
CATCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
P$r¡oc@aaol ìq? +971{}2tôa47 DESI6N DEPARTMENT
F30,ïlì. O¡û! !¡fú9, DUI¡{, F rr{no380t12
U,ImDARAE gfnA'IEs líô:+glf 6284n3le
DATE: 28-Jan-18

r
PROJECT NAME: Demolition of Metro Br¡dte Sect¡on PROJECT CODE:
LOCATION / DESCRIPTION: Scaffold Design VERIFIED/ APPROVEO BY: Sebin
l

Total Vert¡cal load 706.70 kN


Consider 2.50% 17.67 kN

Number of Rows of Standards 5 Nos.


on one row 3.53 kN
height of f¡rst bay 7.50 m
Max¡mum react¡on on end standards 2.55 kN

2.6s{x)
l

3.15
I 4.50

j
Hence axial load on extreem standards 1.56 kN
I

load on Brace(66 degree inclination with Horizontal) 3.10 kN < 5.30 kN

umber of Rows of Standards 13 Nos.


load on one row 1.36 kN
height of first bay 7.50 m
Max¡mum reaction on end standards 2.83 kN
load on Brace(66 degree inclination with Hor¡zontal) 5,35 kN - 5.30 kN

Maximum Leg(Standard) capacity for 1.50m l¡ft 54.5 kN > 37.52 ok


numbers of H20 are used
Allowable Bending Moment 10.00 kNr > 7.OO ok
Shear force 22.00 kN > 2r.70 ok

Reaction of Standards 37.5 kN

of scaffold board-450x450mm

Bearin6 pressure 185.19 kN/m2

Moment on scaffold board 0.937 kNm


ble Bending Moment of scaffold Board 0.468 kNm
Hence needed two layers of scaffold board,capacity 0.936 kNr - 0.937 kNm ok

r.¡ í
CALCULATIONS
RËV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
PoETEOX@r{01 18.¡7t{}2684E87 OE516N DEPARTMENT
F-S,n q¡ñi8{ilñg, gt tA¡. FÁr+fl1({)380til2
DATE: 28-Jan-18
$IÍTEOáRA¡ $INAIES ilû+e71626{7$3e

PßOJÊCT NAME: Demolit¡on of Metro Bridge Section PROJECT CODE:

IOCATION/DESCRTPTION: ScaffoldDesign VERIFIED/ APPROVED 8Y: 5ebin

ffir'
'l-¡llê: Job Rôt;
Sh€êt Nô: 13 of
Customer: Prepd.by: Þate: 28'-Jâ^-'18
Élrâñchr Chkd. bvl Dãte:
ÊIEAM E}ENE'INGANALYSIS
B€a6 Length 3^9o m
Mom€nt of n€rlla f 858-OO cm4 Elast¡c Modulus IOOOO Nlmm2

APPLIED LOADING
Distr¡butêd Loâds
Énd 1 End2 End I Éñd 2
18.40 l8-4O kN/m -.. ar o-ooo 3.9OO m

REACTIONS (+ve UP) .". Non-Reversible !


3.47 kN .. at O-15O m
37.52 KN at 1.O5O m
30_7V KN at 3.250 m
o.oo KN at 3.750 m
MAXIMUM LOADS & DEFLECTIONS
Max- Reâction 37.52 KN .-- at 'l.O5O m
Max, Sag BM 5.73 kN.m ,.. at 2.250 ñ
Max- Hog BM 7.O2 kN.m .-- at 1-O5O m
Max, Slìeaa Force 21.67 KN ... at 1.O5O m
Max. Sag Detlætlon 27.06 mm .,- at 2.2OO m
Mâx- Hog Deflection 'r5.90 mm .-- at 3-9oO ñ

GTT¡tt€: Job Rof:


Sheêl No: 14 oÍ
Custom€r: Prepd.by: Oate: 2A-Jan-14
Brañch: Chkd. by: Dale:
BEAM BENDINGANALYSIS

3-5 37.5 30.4

SHEA'R FORCE OISTRIE¡U]-ION - Mãx, 21.7 kN

BENOTNG MOMÉNÌ OISTRIBUTION - Max. Sag 5.2 kN.m - Mâx. Hog 7-O kN-m

sag
HÞ9

¡.tf

r':: -1 '-"1