/.frr
AAGC-C0 1 30-C|V-ROD-Un-FCR- 00000 I
EXPOLTN
w K .
ue on
CDRL Packaoe No Design Dwg / Doc. No. Revision
Protection Slab Type-1 AAGC-C0r 30-CtV-ROD-UTt-DRW-000052 B
Design Discipline
Name:
ælæ sisnature:
1)
-J o6 o I
Lead Name: rdl Date:
Director / Technical Manager / lnterface Manager
Comments (if any): Proposal
Memb€rs
[ves Elruo
EXpOLlf{K -
%
Name: Position
z-t -lb
Date
change relates to permanent works, reference of letter or endorsement received from Engineer confirming No Objection:
Reference: s o s.
Name: Position Signature Date
Tabreed line
Tabreed line
protect¡on slab
protection
slab for reed
slab
do stand on 1200
t
Tabreed slab as per design
Tabreed
SECTION B.B
*'...
EXFOLINK - t,
%
S..ig.îî .o It
2 4 6 7
SPN
t
I
SPAI{
2
E
'|
1213 1V,5
cqpActÞ
c GRq,ðþ Wfft Ut{ SoL
FoRCSI.rtSfiUs.¡8 8aRlt,¡cC¡PACfIY250@
eflll
SECTION
115
t,TIfTY PIPES
83.' (-Ð.
SIEÉ,
f12 IFTì¡IB
¡tlf. HOON((IYPI
E
lrfEßþtES)
i:- æ
lr l_\
C=
t
l."Flrexrc
[Y4
o a
(:)
i'OoffÐ
J
REFER
J
OËTAIL
FOR CÀST+|-S|TU SU8
F
æ I
I
l,\
I
í:-\ TYPE 1
I L
1:25
Well Certified Scaffolding Contracting LLC
'-.llii';l.il
l
o ö o
':-il il-t
T
o o o
Members of
a a o EXPOLtf.úK
k -
:2.97 KN
A : WL4\145XEI
Total Load:3.60KN/m2
A : WL4\I45XEI
Mem r5
FVn^t
-atll/
RPNg77
RPN976 RPN975
RPN974 RPN973
RPN972
ftd P,h¡llllE!¿l-tun
RPN977
RPN976 RPN975
RPN974 RPN973
RPN972 RPNg
RPN 977
RPN 976 RPN 975
I
RPN 974 RPN 973
I
RPN 972 RPN 971
I
;
-i.. l--.
....-,.1"..,,.
.--, ,,-.-_L
':r
l. l_r" - lr'
,,"i
Design Verification of Protection Slabs
'- I '¿ ,
¡"*-,
t¡,\
e*t?tvnt Calculation Sheet
Project Name Route 2020 Project Number: RAL|PPDDloTT
Verification level
Program(s):
Hardware
Contents
1.0 lntroduction
2.0 Design verification of Protect¡on Slab at location I
3.0 Des¡gn ver¡ficat¡on of Protection Slab at locat¡on 2
Irr¡ r,.hr.:r5 of
EXTDLINK.
eqftffi
di\i:';irrna - , !i{
Sígneture * e- ,e a
Date Feb-78 Feb-78 Feb-78 Feb-18 Feb-18
1.0 lntroduction
ïhis Report pertains to ver¡f¡cat¡on of the prolect¡on slabs proposed for the temporary protect¡on of
the utilit¡es ín tie-in area of zone 1A of R2020. Protection ot the util¡ties is requ¡red to fac¡l¡tate the Reference calculalion no.
temporary scaffolding to remove the exist¡ng viaduct superstructure for the t¡e-in with the new
AAGC-C0130-CtV-ROD-
mêtro line viaduct. uTl-cAL-000001-B -
The design of the protection slabs arrangement provided at below 3 locations have been verified for Detailed Des¡gn of
Protection slabs
for the foads from the scaffolding prov¡ded to support the existing deck dur¡ng demolition works.
The vertical loads from scaffold leg as provided in document no. WCS/WWBD/CAU00"I rev. 02 have WCSAAM/BD/CAUOOI -
applied as point loads on the slabs at the location of the scaffold leg and the an-angement provided by Suppliers Des¡gn
calculation for scaffold
CWJV. The end of the slabs are supported on another planks which are provided to protect the
ut¡lit¡es in another d¡rect¡on. The protection slabs are modeled as plate elements using "Midas Civil"
Sofhvare. The end of the slabs are supported on the ground and are represented by very week linear
springs. ïhe soil spring are applied to lhe nodal point of the p¡ate elements based on the tributary
area of the node. The span of lhe slab over the utility crossing has been considered as un-supported.
The protection structure w¡ll consists of the precasucastis situ RCC plank of width 12'l5mm placed
side by side.
Loads and Load combinat¡ons are cons¡dered as per relevent Euro codes and UK nat¡onal annexures.
¡-
ø,
'< >
z
&
ú.
=
B
l I' t
uJ
ô- @
Ë Ë È t¡J
ô-
t- c, 6 .4t
t¡¡ t¡¡ t¡¡
33r.=" Ë Ê Ê Ê
Location 1
w27f2941,73t
Location 2
WPE?
rl¡¡
,;
ÈcL,; t¡l
cL>cL
ÈÈ
Location 3
cltzneu Calculation sheet
0 Sheet dale: Fâb-1 I
1.1.2 Rê¡nforcement
Grade of untensioned re¡nforcement 5008
Yield Stress of reinforcement 500 Mpa
Dens¡ty of reinforcement 78.5 kN/m3
Modulus ol Elast¡city 200 Gpa
Coeff¡cient of thermal expansion Es 1.008-05 fc
Clear Gover
Nominal clear cover to any reinforcement of various slructural elements to be considered in the
design shall bs as given below
Precast Planks 40 mm
The section will be checed only for the ultimate section capacity
ULS Combination
Load Type Factor
Dead Load 1.4125
SIDL 1.2740 ,\lr,- ¡ )et i Df
Live Load 1.7000 EXPÇr.tj'J'( _
\c¡¡1".:"{í
S,'.iç.1¡
"".1,H
2.0 Design Verffication of Protection Slab
(Location 1)
È
Calculation sheet
Reference AAGC-C01 60-BES-ELE-COS-CAL-000003 Shs6t: Flevision date Jan-17
References/resr.rlts
Self weight of Supêr structure to be dismantled and self weight of scuffolding Refer document number
shall be considered to be as (Per Leg)
16.20 kN = "wcs^ /wBD/cAUoo1'
Design calculation for scaffold
9of11)
2.3 Reaction from type 8A slab transferred on to Type 1 & Type 8c Plank
,l
l/
15
!t
I
I
r0
.J,....' 25
j I'.- '9 t,ì
:
,''l
-t-,
ril I ' :-- -'
{fl
i
II:.1
L.: r - '., s rrf
I
t-: ¿ i -.'-
i:'.. - -
€;YFîrìr,¡'<.
fi*fhti'.'
rtll
''
ti.¿rr; ..1,Í
lr {l^cci,.,na
;
{-
.' Gir¿'' :'t ìt
Fio Showino Load Reaction
Calculation sheet
Sheet Revision date: Jan-17
Reaction due to DL = 71 kN
lvli r nl ':i 1
v.ìi1i rilr/
/\a:,: I'i \-
L-45¡ -,.-t
rL¡ .,ù O
r,r q'J
(+¿f(lona ooiej;,^¡
eItùYYt: Calculation sheet
60-BES-ELE-COS-CAL-000003 Sheêt dale: J¿n-17
tl{
ta
!2
7L
61
:0
29
3 I
J!: øæ¡e:
9¡
ô2
69
s1
45
33
I ,i"
313
2a:
2!6
ls1
e6
5¡
q
-1¡
t a' 4 3
c
-24
-6¡
-10¡
-11t
-211
,14¡-- .i),
EXp0! i:'j'<
Calculation sheet
1 60-BES-ELE-COS-CAL-000003 Sheet date: Jan-17
Summarv of Forces
$/ìÈ¿'rr l,3rs
ExP*jÞ
Calculation sheet
60-BES-ELE-COS-CAL-000003 Sheet date: Jan-17
References/resulls
2.5 Midas Output for Tvpe 1 Plank
Bendino Moment & Shear Forces
!WåY
10
!
!
3
2
Sl:5ffi1c¡1
70
sa
11
55
0
-0
t ,J" ,L I
I
tt
53
3{
æ: Ôecl G
-¿-
6¡ ñs¿l B
Mernbers ol
Calculation sheet
Beference 60-BES-ELE-COS-CAL-000003 Sheal dals: Jan-17
References/results
2,6 Base Pressure
-!¡
-23
-3t
-ts
-121 -s7
-tt
.121 -90
-\02
-t !,
-L24
,121
-121 @r *.cÈ 5É
Summarv of Forces
ñìemhers oi
Exp¡_;,,1Ì_!Í;
Calculation sheet
60-BES-ELE-COS-CAL-000003 Sheet date: Jan-1 7
¡a
38
33
?1
Id
t0
5
t29
!74
153
J 121
102
f6
5t
-ô
i
I
3¡1
299
256
213
171
-0
183
136
ô9
¡2
0
-52
- 193
-¿r0
-.ui..,..-tj¿ --
r\¡ ,¡1,¡r Í
ù
EXP
cttùwt" Calculation sheet
AAGC-C0 1 60-BES-ELE-COS-CAL-000003 Sheet date: Jan-1 7
References/results
2.6 Base Pressure
-15
_3¡
-{6
-t2
-11
-9¿
,r5
-123
-101 99 .ß ät -l16
- 154
Þ
1¡7 -* {x¡ -75 -169
-rol ,* ^ql å
!l
.tot € {t .s
6¡ Õect 5!5
Summarv of Forces
f, c
Calculation sheet
Fìefsronce 60-BES-ELE-COS-CAL-000003 Shest date: Jan-'|7
Referencesi resulls
2.7 Midas Output for Tvpe 6 Plank
Bendinq Moment & Shear Forces
f"""ï
nï
51! Sq*A¡68¡
6â'
5r9
499
199
199
-0
-56
-19{
-262
-13¡
c!! ãec¡ As
lvie¡,r irer s
Calculation sheet
AAGC-C0 1 60-BES-ELE,COS-CAL-000003 Sheet date: Jan-17
Referencesi results
2.8 Base Pressure
-1?
-34
-51
-6¿
-t0l
-1 35
r8l I¿'i
-152
.tr5 186 -163
186 -t¿6
ß. ù.ct 15
Summarv of Forces
l!ir-.,,r',ci c rLf
f: ì.'r -,t ì r rl
Galculation sheet
Reference AAGC-C0 l 60-BES-ELE-COS-CAL-000003 Sheet dato: Jan-17
Feferences/resrllts
Summarv ol Forces
Referênce Documents
Design Documents
AAGC-C01 30-CrV-ROD-UTl-CAL-000001
AAGC-C01 30-CtV-ROD-UTt-CAL-000003
Drawings
AAGC-C0130-ClV-ROD-Uïl-DRW-000052 to 63
lv¡i:rtti-,cf5
EXt t¡,.
3.0 Design Verification of Protection Slab
(Location 2)
Calculation sheet
date: Feb-1 I
Calculation tille: Dosign Vêrifical¡on of Protection Slab al Location 2 Revision:
References/resulls
Self weight of Super structure to be dismantled and self weight of scuffolding Refer document number
shall be considered to be as (Per Leg) 16.20 kN = 'wcsM/wBD/oAL/oo1"
Design calculation for scaffold
9of1l)
3.3 Reaction from type 8A slab transferred on to Type 1 & Type 8c Plank
l0
:-r
':i
'r r
-r i
J I lil I
26
liI -.t'll-l..
---+:l-'r f-.
i ..- li;
J
li I,
-r'- t. _ " .l-1.-
+-".i -:-" , -:,-'
I
l i
"- - t-,.t ...::- - ð.- -'
I
-l i
_9
Ì
t
Calculation sheet
0 Sheêt date: Feb-1 I
lille: Design Verificalion of Protection Slab al Locat¡on 2 Revlsion: no:
Relerencesiresulls
Reaction from type 2 slab transferred on to Type 1
Reaction due to DL = 48 KN
Total 180 KN
L .. '; .t. of
t
ù
{- i' I
Calculation sheet
Rsference 0 Shsêt Rsvision date: Feb-1 I
title Design Veril¡calion of Protection Slab al Location 2 Revision: n0:
References/results
3.4 MÍdas Output for Tvpe 2 Plank
Bendino Moment & Shear Forces
t
lffi-fyy
6¡
5A
{6
¡¡
22
t6
to
-3
J
s*mtGãi
I ttz
t35
l3ô
12¡
to{
6?
7q
s2
39
tó
-16
q !
f:
Âry
t 333
¡0¡
268
235
243
110
147
I
¡44
12
39
0
-26
93 l. 1
li
Calculation sheet
Reference U Shoat dats: Feb-18
Rel€rencesi resulls
Summarv of Forces
ñ,.'_ r. - ì. .;
Of
€xP-1. !?.,¡K -
b---r---Fqat
\.!.- r\¡ j -ì:o
q.,
Calculation sheet
Referêncê U Sheel dâté: Feb-1 I
title: Design Verification of Prolection Slab at Location 2 Revision: Shêèt no:
Referenceslr€sulls
3.5 Midas Outpul for Tvpe 1 Plank
Bendinq Moment & Shear Forces
¡.ffi-Ð
Fr 5Em¡ô¡1
53
,5
6: õ€ct æ
1¿?
t{5
104
62
2!
0
-62
-1oa
-1{5
-¡û7
i !__ -224
t¡ ¡.c¡ E
Fìeferences/results
3.6 Base Pressure
þ
-12
-ôJ
-t06
-rtg
-:ó9
-130
-2r!
Summarv of Forces
t-
I
i
I
I
I
Calculation sheet
Sheet date: Feb-18
Referenceslresulls
Summarv of Forces
R€tersnce Documents
Deslgn Documenls
AAGC-C01 30-CtV-ROD-UTr-CAL-000001
AAGC-C01 30-CrV-ROD-UTt-CAL-000003
Drawings
AAGC-C01 30-ClV-ROD-UTl-DRW-000052 to 63
lvi.r¡i,.,,
4.0 Design Verification of Protection Slab
(Location 3)
EXÍ'-tl :1"<
t - - -'-t-
-J
t^ a,'¡l
Calculation sheet
0 Sheet date: Feb-1 I
Calculalion t¡tle: Design Verif¡cat¡on of Prolectjon Slab at Localion 3 Revision: no
Ref erencesl'results
Self weight of Super structure to be dismantled and self weight of scuffolding document number
shall be cons¡dered to be as (Per Leg) = 16.20 kN D/CAU001',
Design calculation for scaffold
(Page9ofl1)
4.3 Reactíon from type 8A slab transferred on to Type 1 & Type 8c Plank
33
1 49
¡6
r9
Total = 369 kN
Â. i:i: t¡;i gf
Ea'1n,¡.\.tr,l
eløtttvlt Calculation sheet
Sheet Revision date Feb-18
Rclerencesrre sirlts
4.4 Midas Output for Tvpe 2 Plank
Bendinq Moment & Shear Forces
KElfi-YW
i!5
7e6
251
22¿
199
¿3
54
0
-4
i: sctffi¡6t¡
T {29
379
330
230
23L
tJ2
T
1ø19
36e
?¡6
ã35
5¿5
{ll
303
\92
0
-29
t€
I 55¡
455
J55
H 156
56
û
I
-la:
-213
- 112
Relerences/fesults
Summarv of Forces
t
Calculation sheet
0 Sheet Fìevision date: Feb-1 I
Calculation title: n Verification of Protection Slab at Localion 3 Rev¡sion: n0
Refefences/re sulls
4.5 Midas Outpul for Duct Bank
Bendinq Moment & Shear Forces
a
-0
-0
,'| ri ?t 1l
ll
I
c
-l2l
- !46
-2{e
-J1C
-372
-435
-{9t
-621
nt ¡P-rú :¡ -643
-1?l
-¡61
-34 9
-¡3-.
-513
-?0¡
-te9
tÑronùo .srF
-96ó
å,rtê
4A
-l {5
- l9r
-234
-2e4
-330
.li
Calculation sheet
0 Sheet Revision date: Feb-1 I
title: Dssign Verification of Prolêclion Slab at Location 3 Rêvision: no:
References/resulls
Summarv of Forces
E.)i - 'i
\t
i -J
eh?¡n Calculation sheet
Reférence 0 Sheet lRevision aate Feb-1 I
Summarv of Forces
Reference Documenls
Design Documents
AAGC-C01 30-CrV-ROD-UTl-CAL-000001
AAGC-C01 30-CtV-ROD-UTl-CAL-000003
Drawings
AAGC-C0130-ClV-ROD-UTl-DRW-000052 to 63
e?.e-t<-\,- 1 * Atral:^uÅ Rec,e v,pá
Ó^ cL¿Tu Carr¡
f¡!!
-
-.-
¡f¡tæi-r?1r5r-i¡L-i,Ë
ffi ,,.
Nótc l-
7.7198 1067
l_ PE
I
I
43
3.7000
.SMH NF t, !
l .,, IMHC _ -Btr )- -smH$*- + lsl*tr: ir ,
-SMH
UMHS è v\Hc UMHS uMhlr
,rorrJ
rE a
I I
PE ¡
-à -l T E I
,/ ln
TYPE 1
€
WELL CERTIFIED SCAFFOLDING CON LLC
FogTBQ(Ufl01 re+ür{)¡stfl7
F.gO, Ilr ûr¡¡r elüg, Dl,B ¡. FAt+gñ ({)fl{ltl2
TilTfEAF¡gffiÁTES lloü+llt Eäln$e
I\ tt
G,l. c^{ailcn3 Èn¿,"ru e-¿ (vÞ,,cr,J'(ri
c 1
CALCUTATIONS
R€V 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARÉD BY: PKS
Fosrgoxoal.or le.{7r{)2!0{5t7 DESIGN DEPARIMENT
Atg,nro![ !dù9, Dt t^l. FA)t rgtl (l)3tË12
OATE:
ritflÐlRAtsßRArEs t ü+f¡l æaaDsoe 28-Jan-18
of
1.Wind Analvsis
Basic wind speed,Vb = 25.Om/sec
Site Altitude in 'm' above MSL,As = 10.0m
Height of Scaffold lncluding Bridge parapet = 10.0m
Factor,Sa = '1.01
Direction Factor,Sd =1
Seasonal Factor,Ss =1
Probability Factor,Sp = 0,745
(Duration of scaffold is less than one year)
Site Wind Speed,Vs = 18.81m/sec
Effective Wind Speed,Ve = VsxSb
= 1.78
Hence Effective Wind Speed,Ve = 33.48
Therefore the value of dynamic pressure,qs = 0.6l3xVe2
= 687.3N/mm2
say = 0 69kN/m2
Standard
900 900
@
ô
o
-.- ".,". .1
_. -¡ Base plate(150x'150)
@
ô
ó
"
l-- . -:¡ Ledger
,:, i
t"-
I
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
@4a01
FogT 3(})c rEl,:.trl{) 2664687 OEs16N DEPARTMENI
Àr.Th.û¡n!lddig,0tt L F^r+g7l(1)3€0ttl2
DATE: 28-Jan-18
$rfrEDARAEãtn rES l,lù+gñ62847t30¡
check
OL +SDt DL+SDL
No of lo.,r"r."n. sDL per (pcr lpcr
Typc ofreßmcnt C/5 ¡rca lcnrth saßlnGnt lwo rc8mant ¡crmcntl ¡crmsntl
m2 m Nos lktr¡ KN KN Tons
Pier segment 9.557 1.95 2l 457 62 519 50
Transit¡on 5.79 4 2l 536 127 563 64
Ivp¡cal sesment 5.742 4 6l 504 727 631 61
Total span 361 Total 6150 s94
2.DL + Treckform Þlinth welsht for eech sesment of ISO 28.5m span
D[+SDL Dl +SOL
No of Dl- (Scgment $ÞLpcr [Per lpc¡
lypêof æEmrnt CIS ¡rce Lcnçth ielment wrl rs3!n€nt re¡mentl ¡s8n€nt)
m2 m ilos kñt ktú KN foís
Pier segment 9.557 1.95 2 457 62 519 50
ïransitíon 5.79 4 2 536 727 663 64
Tvpical seement-1 5.142 4 2 504 727 631 61
lYpical seßment-2 5.742 2.84 3 357 90 441 4t
Total span 28.5 Total 4967 479
3.DL + Trackform Dl¡nth we¡sht for each segment of ISO 31.5m spañ
0t+sDt Dl,+SDL
lô of Dt fsc¡mcnt SDtprr lp¡r fpg
lìrD.otltrrnaÍt C/3rru¡ l¡rtrl|r ¡qrnant unl t$tEnt ¡¡lncntl ¡rgnentl
t'/tz tn f,o3 kft¡ kr[ KH folrl
Pier segment 9.557 1.95 2 457 62 519 50
Transition 5.79 4 2 536 r27 663 64
Ivoícal segment-1 5.L42 4 3 504 127 631 61
TvDical secment-2 5.1,42 3.75 2 472 119 592 57
Total span 31.5 Total 5MO s25
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PR€PARÊD BY: PKS
PGÍrcX@s0t 1e{fir{}rõða6E7 DESIGN DEPARTMENT
F-30,Ih.OrmtuIdn9.DtB l. FÐC+glt(1)3t$tl2
Iil|IED ARÁ6 ilRAIÉ] Moù +f11 62ô1ru$e
DATE: 28-Jan-18
Crue Faclo¡ç
lmpect
LJft EoulDmènt ufting SPeed
Factor
lm/mln l
v
Aree ],48 m2 Stationrry Gane,
Revolving Crane, < 90 1.O - 1,2
R¿llmountcd Crane
Statlonary Craner
Rêvolv¡nt Crane, > 90 1.3 . 1.4
Rall.mountld Cran€
tifting adl
trånsporting wlt*r
excðvatof on evèn 1,5 - 1,65
o ground
\l Lifting md tranr
porting
with mvator on ¿ 2.0
uneven ground
f'
l
CALCULATIONS
RÊV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
i POEÍ X'X @s01 lr +g7r{}2õ81t87 DESIGN DEPARTMENT
F-ge,fll.A¡rug¡iûr&ougå¡. F f +gll(l)3tHl2 DATE: 28-Jan-18
uilfïED ARAS AilRAIES t¡ù +t71 6¿t47t339
l
Ioadinos
F{Êl'il lssue A
Datê 12103198 Paae. 492
_q E
vertiGl Top gç gE
ñ
i Vertlcl fop
FlEt Horizon¡al Lsel
I
one cup dryn
è
I e =
i
I
I
I The permissible load per vertical, when using forkheads or
headplates, are shown on the following pages with separate
graphs for top lifts and base lifts. Thís information applíes
I
for jacks unbraced. The strengÌth of the jack is automatically
allowed for by reading off against the appropriate vðlue of
extension and horizontal load.
Values are given for the case of the horizontal in the first
cup from the top or bottom of the vertical and for the
horizontal in the second cup. The horizontal ín the f¡rst cup
is to be prefened. The permissible loads per vertical are
shown on pages 493 to 505.
The tables below show the permissible loads per vertical for
all main lifts. The values apply regardless of the type of
formwork to be supported.
Internal VeÉicals
tift (m) Vertical Load lkNl
1.8m B.Yt 2.5m & 2-7m Brvs
1.00 57.O s7.o
1.50 55.0 54.0
2.OO 4fJ.o 36.O
2.SO 26.O 25.0
Ets
=o
EÊ utt 600 9{}0 1200 1800 2500
Êa lm)
¡ñ
dBå
tn q7n 57.O 57.0 57.O
1-ç 55_5 s4-s 53.5 52.O 51-O
Vêrticâl Base
tãu ¿.9 Jð"U llf-u 14_S 34,O ?2.O
@ SGB
CALCULATIONS
REV Z
Sectio¡r 6 BS ã973;r993
of bay 0.90
UDL 16.13 kN/m
lv,.- '.-';,rl
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED 8Y: PKS
Fogf Eo¡cc¡a{0t ttt;+9fi{41?sat87 DESIGN DEPARTMENT
F-g9,nrq¡illr¡t¡rg,Dttå1, F x+elr(¡)tE0äf2
DATE: 28-lan-18
rt{flEÅ8,Ä! El{RArE ilù +e7r 62ôa7l33e
VARIO GT 24
MUTTIFLEX Statie V*ll¡r;s, Ixample I
G i ¡'r{ rir {.}v 8rv i {.? v\,r'
Gf 21 Vr20 The following marlmun section proportlos and supportlorcos arc æsumed;
StEt¡cValuos
gf!{ vl¡t
turm Sb6år Forc€ O oD ¡4.ô tN l1-o kN
û:13.O kN
turd 86ndñg trlomeor M l0 kNm 5OlNm
Momsil of lne(rð l. SOOO cñ' 4290 cnr¡
Fraruràl Sl¡ado¡h E¡- AOO kNm: {29 lNñ:
6.9 ko/ñ 5.9 kq/ñ
ffir
TIÜe: Job Rot:
Shê€t No: 1 of
Customer: Prepd-by: Date: 28-JaÈ1B
Eench: Chkd. by: DetÊ:
E¡EAM BENDINGANALYSIS
E¡ôam Lângth 3.9O m
Mom€nt of ln€rlla 858-OO cm4 Elastic Modulus IOO0O N/mm2
APPLIËD LOADING
D¡slributed Loåds
End 1 End 2 End 1 Éîd2
16.01 l6"to kN/m o.ooo 3.9OO m
str
Tlllei Job R6f:
Shêet No: 2 ot
Customer: Prepd.by: Dåte: 2&.Jan-18
Branch: Chkd. by: Date:
BEAM BENDINGANALYSIS
BENDING MOMENT DISTRIBUTION - Max. Sag 0.9 kN.m - Max. Hog 1.3 kN.m
sag
Hog
Hog
sag
CALCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
i
Po{rf !O)ú@L{,t ÌG*|¡rl{{)268{887 OESIGN D€PARTMENT
l
F99, th. O¡.rr ùddns omAl. FÁX +Elt (4) 3EÐ.l2
tt{ß80á¡.C86ffi4'fE3 l,loö:+f7162û17HFe
DATE: 28-Jan-l8
I
I
BS 6973:1993 Scction 6
i
Table l3(å) Propert¡es ofscâffold boârds* T'lxis såfety cæfficient ¡È relrted to the hêight of the
- scaflbld, and the ¡econmended value for thie iactor,
(1, is det€rmined ns folloq.s-
c-t+l 4
whe¡e
63 x 225 t3z.O I 300 /r is the celculated moximum height of the
i ûs¡ed on ¡ msinrum w,rrkiDs srrÈ¡ð of 9-Sõ N/6Dr.
sca{fold bssed on the atÞinment of
t Bo¡ü¡lc us.d on O¿¡1, maximum allt¡wable stresse-c in the
st¡r¡rdordg (in rnì
Moment is only 30.93kNm ,¡ts very very small compared w¡th res¡ting moment due to self weight of scaffold
r weight of bridge segments.So always standrads are under compress¡on only.
CATCULATIONS
REV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
P$r¡oc@aaol ìq? +971{}2tôa47 DESI6N DEPARTMENT
F30,ïlì. O¡û! !¡fú9, DUI¡{, F rr{no380t12
U,ImDARAE gfnA'IEs líô:+glf 6284n3le
DATE: 28-Jan-18
r
PROJECT NAME: Demolition of Metro Br¡dte Sect¡on PROJECT CODE:
LOCATION / DESCRIPTION: Scaffold Design VERIFIED/ APPROVEO BY: Sebin
l
2.6s{x)
l
3.15
I 4.50
j
Hence axial load on extreem standards 1.56 kN
I
of scaffold board-450x450mm
r.¡ í
CALCULATIONS
RËV 2
WELL CERTIFIED SCAFFOLDING CON LLC PREPARED BY: PKS
PoETEOX@r{01 18.¡7t{}2684E87 OE516N DEPARTMENT
F-S,n q¡ñi8{ilñg, gt tA¡. FÁr+fl1({)380til2
DATE: 28-Jan-18
$IÍTEOáRA¡ $INAIES ilû+e71626{7$3e
ffir'
'l-¡llê: Job Rôt;
Sh€êt Nô: 13 of
Customer: Prepd.by: Þate: 28'-Jâ^-'18
Élrâñchr Chkd. bvl Dãte:
ÊIEAM E}ENE'INGANALYSIS
B€a6 Length 3^9o m
Mom€nt of n€rlla f 858-OO cm4 Elast¡c Modulus IOOOO Nlmm2
APPLIED LOADING
Distr¡butêd Loâds
Énd 1 End2 End I Éñd 2
18.40 l8-4O kN/m -.. ar o-ooo 3.9OO m
BENOTNG MOMÉNÌ OISTRIBUTION - Max. Sag 5.2 kN.m - Mâx. Hog 7-O kN-m
sag
HÞ9
¡.tf
r':: -1 '-"1