Professional Documents
Culture Documents
ENG.ANAS
ENG.ANAS
removing the gypsum board and the for ceiling tiles and supply and LS 0% 3,000
apply the new
Removing damaged paint, evacuating moisture from the wall, and restoring it using LS 0% 700
putty and painting the wall in the same color
Completely remove the window silicone, clean the work area before starting LS 0% 2,000
to apply new silicone, and apply a waterproofing test for the windows
Removing the silicone of the main wooden door and applying new LS 0% 300
silicone. Performing a waterproofing inspection
SUPTOTAL 13,500
PAYMENT METHOD
ADVANCE PAYMENT 50%
DURING WORK 30 %
HAND OVER 20%