Varkla Station Upgradation-Structural drawing Submission Date

RCC Building
Station Building
Sl no Item Submission Date Remark
1 ETABS Model 11.06.2024

After submission of preliminary drawing,


kindly provide comments within 2 or 3
2 Preliminary Drawing 11.06.2024 days. Then only GFC can be started
After receiving GFC approval
architectural drawing from railway and
3 GFC drawing 21.06.2024 (tentative) sent to IIT for vetting
Quarters Building
Sl no Item Submission Date
1 ETABS Model 18.06.2024

After submission of preliminary drawing,


kindly provide comments within 2 or 3
2 Preliminary Drawing 18.06.2024 days. Then only GFC can be started
After receiving GFC approval
GFC drawing along with architectural drawing from railway and
3 updated model 29.06.2024 (tentative) sent to IIT for vetting
Substation Building
Sl no Item Submission Date
1 ETABS Model 27.06.2024

After submission of preliminary drawing,


kindly provide comments within 2 or 3
2 Preliminary Drawing 27.06.2024 days. Then only GFC can be started
After receiving GFC approval
GFC drawing along with architectural drawing from railway and
3 updated model 04.07.2024 sent to IIT for vetting
Varkala Side Entry Building
Sl no Item Submission Date
1 ETABS Model 03.07.2024

After submission of preliminary drawing,


kindly provide comments within 2 or 3
2 Preliminary Drawing 03.07.2024 days. Then only GFC can be started
After receiving GFC approval
GFC drawing along with architectural drawing from railway and
3 updated model 10.07.2024 sent to IIT for vetting
Steel Building
STEEL BUILDINGS
FOB
Sl no Item Submission Date
1 ETABS Model

After submission of preliminary drawing,


kindly provide comments within 2 or 3
2 Preliminary Drawing days. Then only GFC can be started
After receiving GFC approval
GFC drawing along with architectural drawing from railway and
3 updated model sent to IIT for vetting
Air Air concourse
Sl no Item Submission Date
1 ETABS Model

After submission of preliminary drawing,


kindly provide comments within 2 or 3
2 Preliminary Drawing days. Then only GFC can be started
After receiving GFC approval
GFC drawing along with architectural drawing from railway and
3 updated model sent to IIT for vetting
Platform truss
Sl no Item Submission Date
1 ETABS Model

After submission of preliminary drawing,


kindly provide comments within 2 or 3
2 Preliminary Drawing days. Then only GFC can be started
After receiving GFC approval
GFC drawing along with architectural drawing from railway and
3 updated model sent to IIT for vetting