Sr. No Parameters Guidelines for Scoring Matrix Details required Max Marks
Obtained
1 Performance Management - 150 100
Scoring Matrix (Evidence to be shown for audit reference):
KRAs in Place in line with functional/ business ● Completion by 30th April : 100% of Score (i) Evidence that KRA's were in place
a aligned targets: ● 15th May : 75% of Score. for all positions at the beginning of 50 0
i) Approved KRAs in system ● 31st May : 50% of Score the financial year
● Beyond 31st May : NIL
Succession Planning:
Succession planning is done for key positions
(Manager & Above) and approved by Business Please share succession planning
Head / Group HR Head.
b Identification of Manager & Above for Succession & Approval signed off by Business Head / Group 40 40 New Plant Marks change 20 to 40
Identified Successor's should have a signed IDP in
place for development. HR Head
Businesses to demonstrate the progression on
grooming.
Actual trainings
All the employees to be covered under training.
Training MIS to be provided
a) Structured Induction & Familization Program for ● Structured induction program organized at Unit Level provided
c Staff is in place. (20 Marks) covering all relevant documents. Record documented. Skill Development centre plan v/s 60 60 DoJo center avilable
b) Associate Induction Program is in place ● Skill Development Centre actual- check record
(20 Marks)
C) Skill Development centre at Unit Level. (20
Marks)
Training for Consistent High Potential Employees a) Please map list of training days
(HIPOs) : a) MIS to be maintained and documented as part of IDP done by High Performers on a
management. quarterly basis ( Training should be
d 20 0
a) Minimum one-man days of relevant training to other than mandatory trainings)
'Leadership / Managerial Effectiveness' as per IDP
on quarterly basis. (20 Marks)
Skill Matrix Process to be in place for all Associates Progress to be evident and documented. Entities to also frame IDPs
/ Contract Associates Population. Radar diagram - based on Skill Matrix Exercise.
e Please share skill matrix in place 20 10
equivalent to be in place.
Corrective steps to be documented which could
be Training, Rotation and other actions to be
documented
Key HR Processes :
Following key HR Processes are system enabled:
1) Recruiting & On boarding. (10 Marks)
2) Employees KRAs (20 Marks) - To be seen in the system. a)Evidence of all HR processes to be
3) Learning Management (10 Marks) - Sample Reports from various processes to provided that the same are system
a 4) Attendance of All Employees ( Onroll & Offroll) 100 100
(20 Marks) be generated and seen as evidence. enabled.
5) Leave management
system (10 Marks)
6) Confirmation & Regularisation (20 Marks)
7) E-separation (10 Marks)
Scoring Matrix:
Scoring Matrix:
● Below 85 % Achievement of BP : Nil
● 85% - 90% Achievement of BP : 25% marks
Overall Manpower Cost :
● 90% - 95% Achievement of BP : 50% marks
A) Manpower Cost as per BP. should be in line Monthly Basis MIS for Vapco Copco
b ● 95% - 100% Achievement of BP : 80% marks 50 50
with the budget Tracker
● > 100% Achievement of BP : 100% marks
7 Record in Personal Files as per sequence in check list, attached in Personal file 10 5 Evidence Required
8 Recruitment MIS with TAT (Requisition to offer date) at Unit Level 10 10 Physical Record Verification Available
9 Record of Induction of new employees at Unit Level 5 5 Physical Record Verification
Record of Police verification / verification from Sarpanch, in case of
10 10 10 Physical Record Verification
Contractual Associates
Record of Internal Induction of Contractual Associates including attendance
11 10 10 Record not available
sheet
Clearance of Back Ground Verification Bill within 30 days of receipt of bill at (If Pending Cases 0: 10Marks, 1-3: 5Marks,
12 10 10 No bill pending
Unit 4-5: 2Marks, <5: 0Marks)
Clearance of Pre-employment medical check up bill within 30 days of receipt (If Pending Cases 0: 10Marks, 1-3: 5Marks,
13 10 5
of bill at Unit 4-5: 2Marks, <5: 0Marks)
B) Employee Life cycle 80 80
i Confirmation / Regularization
Confirmation / Regularisation document creation date in Zing System (should (If Pending Cases 0: 5Marks, 1-3: 3Marks, 4-
1 5 5 Corporate Process
be 1 month before confirmation / regularization date) 5: 1Marks, <5: 0Marks)
Issuance of Confirmation / Regularization Letter on time & uploaded in Zing (If Pending Cases 0: 5Marks, 1-3: 3Marks, 4-
2 5 5 Corporate Process
System & documented in personal files. 5: 1Marks, <5: 0Marks)
(If Pending Cases 0: 5Marks, 1-3: 3Marks, 4-
3 Regularization Process - Revised Structure & Designation of employee system 5 5
5: 1Marks, <5: 0Marks)
In case confirmed employee, change in notice period clause in Zing System, as (If Pending Cases 0: 5Marks, 1-3: 3Marks, 4-
4 5 5 Corporate Process
per appointment term 5: 1Marks, <5: 0Marks)
ii Increment - Staff & Associates
(If Pending 0: 5Marks, 1-3: 3Marks, 4-5:
5 Increment / Promotion letters in Personal files- last 4 years 5 5
1Marks, <5: 0Marks)
(If Pending 0: 5Marks, 1-3: 3Marks, 4-5:
6 CTC & PI data - match in Zing System as per last Increment/Promotion letter 5 5
1Marks, <5: 0Marks)
(If Pending 0: 5Marks, 1-3: 3Marks, 4-5:
7 Associates Increment on due date & verify salary with payroll 5 5
1Marks, <5: 0Marks)
8 Contractual Associates Minimum Wages in place 5 5 Physical Record Verification
iii Exit Process- Staff & Associates
Exit Interview Report for Left Employee ( Exit Interview cross functional within
9 5 5 Physical Record Verification
unit)
2 Salary Template submission at Corporate- Payroll Team on or before 27th of 5 5 Physical Record Verification
each month
Usage of Payroll software for salary preparation & Reports generation on
3 5 5 Physical Record Verification
regular basis. To check salary sheet
4 Leave Registers EL / CL / SL - updation in Zing System 5 5 Physical Record Verification Corporate Process
5 Compensatory off - to check as per policy 5 5 Physical Record Verification
6 Salary to Employee is paid on Time i.e. 7th of Each month 5 5 Physical Record Verification
7 Records for Loan to employees 2 2 Physical Record Verification
8 EMI of Loan deductions from salary 3 3 Physical Record Verification
I HR Best Practices 130 102.5
1 Attendance Award Policy being followed 5 5 Physical Record Verification
13 Mode of Communication to invite all for event Verbal / E-mail / Notice Board 5 2.5 Physical Site Verification Through Notice Board
(If Verbal-0, if e-mail-2, if notice board-2, if e-mail & notice board-5)
14 Monthly Meeting/Celebration at Plant- Record + Photographs 5 5 Physical Site Verification Monthly MRM at conference Hall
15 Yearly celebration of Annual Day / Long Service Award- check date of last 5 5 Physical Site Verification
celebration
16 Family visits plan v/s actual 5 5 Physical Site Verification Not aware the scheme
Insurance Policies
17 Deductions as per GMC endorsement sheet in salary 5 5 Report from Corp
18 Foreign Delegate coverage in GMC/GPA, as per his Employment Contract 5 5 Report from Corp
19 Coverage of new employees and trainees in GPA 5 5 Report from Corp
20 List of pending cases - GMC / GPA/ GPA-Contractor 5 5 (If 0:3, 1-3:2, 4-5: 1, <5: 0)
21 Settlement of Death Claims if any (GPA/ FSG) 5 5 Report from Corp
III General 50 43.7
Monthly Report Submission within timeline at Corp ( HR MIS, MNP, T&D,
1 10 6.2 Report from Corp
Compliance etc.)
2 List of Observation identified by GSA Auditor (Internal Audit) , & Status of 10 10 If No Audit by GSA 100% Marks
Completion
3 Renewal of Advisor's Agreement on due date 10 10 Agreement Copies
4 Legal Cases, if any (to check documentation) 10 10 Legal Cases Proper File record
5 Apprenticeship Plan V/s Actual 10 7.5 Below Target Out of 36 we have 20
400 356.2
Rating Scale : A Grade if Plant achieve - 80% & above, B Grade if Plant achieve -60% & Above but less then 80%,
C Grade if falls below 60%
RATING SCALE 89.05% A GRADE
Note :
In above sheet if any criteria is NOT APPLICABLE to plant, then please mark as 100% in Marks Obtained
HR COMPLIANCE
Maximum Marks
Sr. No. Description Remarks
Marks Obtained
The Statutory Compliances Act/Rules - Marks 350
(a). Factories Act/Rules - 240 Marks 240
1 Is Building Plan approved as per latest Layout / Drawings ? 5 5 Share copy of same 0
2 Have we obtained stability certificate for buildings? 5 5 Share copy of same 0
3 Is Cess and Other dues all paid ? 5 5 Share copy of same 0
4 Is the Factory License Valid as on date ? And the Manpower & H.P are within limit as 5 5 Share copy of same 0
per Factory License.
5 Do we have valid Fire NOC for the Plant ? 5 5 Share copy of same 0
6 Is the Plant having valid Pollution Certificate CTE, CTO & HWM ? 15 10 Share copy of same 5
7 Do we have NOC for Ground Water Extraction, (If applicable) 5 5 Share copy of same 0
8 Are we providing cool drinking water if more than 250 employees ? 2 2 0
9 Is the crèche provided according to the prescribed provisions ? 5 5 0
10 Are dangerous/movlng parts of transmission machinery properly guarded ? 5 5 0
11 Have we obtained testing certificate of compressors/lifting tackles/hoists? 5 0 Share current copy of same 5
12 Have we Exhibited list of Fire Extinguishers with expiry date & Location 5 5 0
13 Have we exhibited Fire Safety plan / On Site Emergency Plan of the factory? 5 5 0
Is Rubber mats provided under/in front of the electrical panel installed in the ETP
22 5 5 0
plant area, near main gate of the factory to minimize the hazard of electrocution.
Has the factory furnished the information to Deputy Director/Asstt. Director (IS&H)
23 about the name and quantities of chemicals used and stored in the factory and brief 5 5 0
description of the processes carried on in the factory
Is the Factory has the work permit system, which is to be issued by the competent
person to the workers, who are engaged on repair, maintained or cleaning purposes,
24 5 5 0
declaring the plant and machinery is free of any dangerous fumes, liquid and gas and
safe to work
27 Are we carrying out Medical examination of employees once in Six months for Eye, 5 5 0
Ear, blood test, ECG etc.
28 Have we conducted Vision test for forklift drivers/electricians? 5 5 0
29 Is Medical examination of canteen workers got done ? Share Test Reports. 5 0 5
30 Have we exhibited Health and Safety/ environment policy of factory in the notice 5 5 0
board?
36 Are the canteen accounts got audited at least once in twelve months from registered 2 2 Share current copy of same 0
accountant and auditors ?
37 Is Menu & Rate list been displayed in the canteen ? 5 5 0
40 Is the Welfare Officer appointed and working in accordance with the prescribed rules 2 2 Share current copy of same 0
(if applicable)
Is Ambulance provided if more than 500 employees and a full time Doctor with
41 qualified compounders? Check Ambulance for Paper- RC, fitness, Pollution & 5 5 0
sufficient Petrol in Ambulance.
42 Do we have the facility of rest rooms with lockers ? 3 0 3
43 Do we maintain Form-4 (Display of names of LO,LI,LWO) 3 0 3
Are we maintaining Register of White washing, Adult workers leave with wages,
Accident Register, Health Register form-17, Registers of Contractors, Advance
46 15 15 0
Register, fine /deductions, Register of overtime, Inspection Book of PF, ESIC, H&S,
Labour Inspection, Compensatory Off Register, ESIC Accident Register
47 Are we keeping the records for 3 years for inspection? 3 3 0
48 Have we displayed the abstract of Factories Act/Rules near entrance? 3 0 3
(b). Contract Labour Act/Rules - 30 Marks 0 30
1 Has the Unit valid Registration Certificate for engaging Contract Labour? 3 3 0
2 Do we ensure that the contractors renew their License every year? 3 3 0
3 Do the contractors maintain attendance/wages registers/register of advance? 2 2 0
4 Do the contractors maintain Register of persons employed by them? 2 2 0
5 Are the contractors keeping the registers/records relevant to the employment 3 kms 2 0 2
nearer to the work place?
6 Do the contractors maintain register of fines/deductions/overtime? 2 0 2
7 Do the contractors issue service certificate to their workers on termination? 2 0 2
file:///conversion/tmp/activity_task_scratch/769639221.xls Page 7 of 9
8 Have they issued Wage slips to their workers before wages disbursement ? 2 2 0
9 Are the contract employees covered under ESI/WC Act? 3 3 0
10 Have we entered into legal agreement with the contractors? 3 3 0
11 Are we ensuring submission of Annual Return / half yearly returns by contractors? 3 3 0
12 Have we displayed the abstract of the contract labour Act/Rules? 3 0 3
(c). PF Act/Rules - 7 Marks 0 7
1 Have we obtained PF Nomination in Form-2 from the employees? 1 1 0
2 Do we ensure for timely submission of Contribution for all employees 1 1 0
Are we maintaining reconciliation sheet (due vs actual contribution) for PF /ESIC of
3 3 2 1
Contractor Part employees to ensure not pay any short or excess payment ?
4 Have we displayed the abstract of the EPF Act/Rules? 2 0 2
(d). ESIC Act/Rules -3 Marks 0 3
1 Are we ensuring coverage of all employees under ESI Scheme if applicable and have 1 1 0
they been given ID Cards?
2 Have we displayed the abstract of the ESI Act/Rules? 2 0 2
(e). Payment of Wages Act/Rules - 3 Marks 0 3
1 Are we maintaining Register of wages for employees & ensure disbursement before 1 1 0
7th of Each month ?
2 Have we displayed the abstract of the Act/Rules? 2 0 2
(f). Minimum Wages Act/Rules - 4 Marks 0 4
1 Are we paying Minimum wages as per latest govt Notification ? 1 1 0
2 Are we maintaining Muster roll Register? 1 1 0
3 Have we displayed the abstract of the Act/Rules? 2 0 2
(g). Payment of Bonus Act/Rules - 3 Marks 0 3
1 Are we ensuring that the bonus is paid to everyone who have worked for 30 days & 1 1 0
above?
2 Have we displayed the abstract of the Act/Rules? 2 0 2
(h). Payment of Gratuity Act/Rules -4 Marks 0 4
1 Have we ensured Notice in Form A regarding opening/change/closure of the Unit? 1 1 0
2 Have we displayed the Notice of person authorised to receive notices ? 1 0 1
3 Is form F for Gratuity maintained ? 1 1 0
4 Have we displayed the abstract of the Act/Rules? 1 0 1
(i). The Industrial Employment Standing Orders Act/Rules - 7 Marks 0 7
1 Do We have Certified Standing Order ? 5 0 5
2 Are we displaying certified standing orders in English & vernacular if more than 100 2 0 2
employees?
(j). Environmental Act/Rules - 14 Marks 0 14
1 Is the height of DG stack is as per CPCB norms? 2 2 0
2 Do we dispose Hazardous Waste through SPCB authorised agency ? 2 0 2
3 Are we entered into legal agreement with SPCB authorized party for all kinds of 2 0 2
hazardous waste generated? (If applicable)
4 Are all hazardous waste generated stored in designated storage area? 2 0 2
5 Is paint stripping done as per norms? 2 2 0
6 Do we maintain log book of STP/ETP? 2 2 0
Are MSDS displayed and information furnished to Asstt. Director (IS&H) chemical
7 about the name & quantities of chemicals used & stored in the factory and brief 2 2 0
description of the process carried on in the factory?
(k). Prevention of Sexual Harassment - 10 Marks 0 10
1 Have we formed Internal Committee and displayed the same in the visible area In 2 0 2
English / Vernacular Language?
Do you conduct periodic workshops or seminars to sensitize employees about the
2 stance of your organization on sexual harassment and about the consequences of 2 0 2
engaging in any conduct that amounts to sexual harassment
3 Are we having Quarterly Basis IC Meetings & maintaining Minutes of Meeting. 2 0 2
4 Are we filing & Submitting annual returns? 4 0 4
(l). Maternity Act/Rules - 2 Marks 0 2
1 Are confirmed women employees given 26 weeks maternity leave? 1 1 0
2 Have we displayed the abstract of the Act/Rules? 1 0 1
(m). National & Festival Holidays Act - 2 Marks 0 2
1 Have we displayed the paid Holidays notice duly approved by the Labour/Factory 1 1 0
Inspector?
2 Have we submitted the National & Festival Holiday list to area Inspector/ Officer 1 1 0
(n). Equal Remuneration Act/Rules - 2 Marks 0 2
1 Have we ensured equal work equal pay for men & women? 1 1 0
2 Have we maintained the Register in Form D? 1 1 0
(o). Workmen's' Compensation Act/Rules - 2 Marks 0 2
1 Have we ensured submission of Annual Returns? 1 1 0
2 Have we exhibited the abstract of the Act/Rules? 1 0 1
(p). Labour welfare Fund Act/Rules - 2 Marks 0 2
1 Have we ensured deduction of contribution of Welfare fund and remitted with the 1 1 0
details once a year?
2 Have we remitted the unpaid wages/other payments in Labour welfare fund as per 1 1 0
the Act?
(q). Petroleum Act/Rules - 6 Marks 0 6
1 Is the license for storage of petroleum products obtained? 2 2 0
2 Is the certificate for testing of tanks from competent person obtained? 2 2 0
Rating Scale : A Grade if Plant achieve - 80% & above, B Grade if Plant achieve -60% & Above but less then 80%, C Grade if falls below 60%
RATING SCALE 70.29% B GRADE
Note :
In above sheet if any criteria is NOT APPLICABLE to plant, then please mark as 100% in Marks Obtained
file:///conversion/tmp/activity_task_scratch/769639221.xls Page 8 of 9
Audit Checks % Grade
HR Management 78.00% B GRADE
HR Process 89.05% A GRADE
HR Compliance 70.29% B GRADE