Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

CHAPTER IV

CLOSING

A. Conclusion
The conclusions that can be drawn from this report are:
1. One of the curriculums at SMK N egeri 1 Bireuen is Dual System Education
(PSG) or Field Work Practice (PKL). So all students of SMK N 1 Bireuen are
required to take part in this activity until it is finished.
2. Field Work Practices aim to be able to understand the principles of work
procedures in the industrial world directly and be able to put into practice all
the theories learned at school to be applied directly in the business/industrial
world.
3. Understanding working drawings really determines the quality or results of a
product.
4. In making a product, we must be able to calculate all costs so that we can
obtain satisfactory results from the work we make.

B. Suggestion
The suggestions that the author can convey are as follows:

1. KL activities as well as possible in order to get maximum results


2. The industry is expected to always accept and guide P KL students well, so
that the students are more skilled at work.
3. that SMK N egeri 1 Bireuen will further improve cooperation with industry,
both in terms of communication and by increasing the number of industries
that are willing to accommodate SMK N egeri 1 Bireuen students to carry out
this P KL .

10

You might also like