FLR-EHS-009 Weekly Report

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

URC Construction (P) Ltd FLR-EHS- 010

Weekly Report on EHS Activities Rev 02/Jan15


Site Name
Site-in-Charge
Safety Personnel
Regional head
Accident Statistics Month: Year
Reportable Accident (cum) Non Reportable Accident: (cum)
Total man power
worked (cum):
Man-hours worked (cum):
Safe man days
worked (cum):
Man days lost (cum):
Reportable Accident: An Accident with man days lost more than 2days, Non Reportable Accident: An Accident with man days lost less then 2days
No of First-aid Injuries
Note; If any First aid, please attach the details with amount
Training details Number Of persons attended
1 Tool box / PEP Talk
2 Induction
3
SAFETY COMMITTEE
Date of
inspection
Date of meeting
Note : Attach Minutes of meeting
SITE AND LABOUR CAMP INSPECTION REPORT
S.NO Points observed Status Signature Remarks

Note: if the space is not enough attach separate sheets


SAFETY PROMOTION
S. No Activity

P & M department
Vehicle / Machinery type & REG. NO /ID No Fit Unfit

Note:if the space is not enough attach separate sheets and If found any unfit Vehicle / Machinery, send the relevant check list

Electrical Department Yes No NA Remarks


Are construction switchboards properly constructed and set up?

Prepared by Authorized by
Nagarajan.V Annamalai.M
(AM – EHS) (AGM – EHS)
URC Construction (P) Ltd FLR-EHS- 010
Weekly Report on EHS Activities Rev 02/Jan15
Are there enough switchboards for the job?
Are ELCBs (safety Switches) fitted?
Are the correct type socket outlets being used?
Are portable outlet devices suitable?
Is construction cabling identified and protected from mechanical damage?
Are electric tools and flexible leads in a safe condition?
Has the electrical installation been tested?
Have ELCBs been tested?
Are portable generators suitable?
Are extension leads being used safely?
Are plant and temporary structures a safe distance from power lines?
Is electrical installation and repair work being done safely?
Earthling of electrically operated equipment?
Provision of Shed /Canopy/ cover of distribution board and sub-distribution
board?
Insulation of cables and joints?
Whether cables layed properly?
Fire extinguishers in main distribution board room?
Whether Men working don't switch on board and other related warning
boards and tags displayed on panels during maintenance?

Other unsafe Act/Condition

Site P&M In charge Site Electrical In charge

Name: Name:

Site-in-Charge Safety Personnel

Name: Name:
Note: This report must be send to H.O on or before Tuesday of following week.

Prepared by Authorized by
Nagarajan.V Annamalai.M
(AM – EHS) (AGM – EHS)