F6 WORKPLACE INSPECTION
Conducted by: HSE and Site Manager
SERVICE: 132/33KV S/S#:8239 FOR WADI SAFAR PROJECT CODE: 4400015523 Date: 30-1-2024
COMPANY: MAETEL Nº WORKERS 57
JOB DESCRIPTION:
Excavation, Backfilling, compaction, concrete pouring, shuttering, scaffolding, HVAC work, GIS work, Cable
pulling, Raised floor installation, GIB installation etc.
WORKPLACE Na Yes No SPECIFIC TRAINING REQUIRED Na Yes No
Clothing AV(Vest)
Safety helmet with chinstrap Various EPIS Na Yes No
Electrical wiring in good condition Crane. Official accreditation to handle crane system.
Signed: Signed:
HS Supervisor
GENERAL FEATURES:
ELECTRICAL RISK NA Yes No PROCESS / CORRECTIVE ACTIONS
Preventive Resource
Name: LOTO (Lock out/ Tag out)
Authorized Worker
Name: Uttam Kumar
Qualified Worker Name: Venkatesh Gadi
EPI's ELECTRICS:
Dielectric helmet with display
Dielectric footwear without metal
components
Thermal protection gloves
Insulating Gloves (00:500V / 0:1000 /
1: 7500 / 2:17000 / 3:26500 /
4:36000)
Mechanical gloves
Fireproof Clothing (Shirt, Pants, and
CAT-2 uniforms
Jacket)
Download
Compliance 5 GOLDEN RULES:
Cutting off voltage sources
Block
Voltage absence verification
Grounding and short-circuiting
Safety signs
OVERALL REVIEW:
Delimit:
Beaconing/restricting the work area in lifting maneuvers, to prevent falling objects on workers at lower levels, avoid collisions between machinery, etc.
Order and cleanliness:
The work area should be kept neat and free of elements to prevent accidents, stepping on objects, and maintaining all free passage for emergency evacuation.
Manual ladders (according to activity):
The ladder should be firmly resting on the floor, with non-slip studs. An operator holding it from the ground, if possible anchored at the top to avoid movement.
Additional protection shall be used for heights greater than 2 m (foot distance to ground).
ADDITIONAL OBSERVATIONS/RECOMMENDATIONS:
1. Scaffold tag was blank.
2. Excess scaffolding materials obstructed the workers’ movement.
3. Cement water made the access slippery and muddy.