Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 9

Project Training Movilization Barraks

Type of Hazard Light Hazard


Static Pressure 65 PSI
Residual Pressure 33.143 PSI
Residual Flow 2440.42 GPM
Density 4.0 mm/min
Figure 11.2.3.1.1 0.1 gpm/ft2
Area 139.34 m2 1500 ft2

Flow Sprinklers 150 GPM 9.46 LPS


flow hose stream 250 GPM
TOTAL FLOW 400 GPM
104

Coverage Area Per Sprinkler 225 ft2 NFPA 13


Total Sprinklers needed 7 units
Flow Per Sprinkler 21.43 GPM 1.35 LPS
Nominal K-factor 5.60

Initial Pressure System 27.85 mca 39.547 PSI


Pressure farthest node
19.84 mca 28.17 PSI ¡OK!
(calculated with EPANET)
Difference of pressures 8.01 mca 11.37 PSI

minimum working pressure for a farthest node


14.64 PSI
sprinkler

highest pressure required at a fixture 14.64 PSI


friction losses + height losses 11.37 PSI
backflow preventer 0.00 PSI
Check valves 5.00 PSI
Exterior line losses 4.81 PSI

Minimum Working Pressure 35.83 PSI


Available Pressure 59.78 PSI ¡OK!
1500
250
5

26 1.64

Q=V*A

Q/A=V 4.375
5.833333333
94.63
15.77
0.32
Project Training Movilization Barraks
Type of Hazard Light Hazard
Static Pressure 48 PSI
Residual Pressure 20 PSI
Residual Flow 2440.42 GPM
Density 4.0 mm/min
Figure 11.2.3.1.1 0.1 gpm/ft2
Area 139.34 m2 1500 ft2

Flow Sprinklers 150 GPM 9.46 LPS


flow hose stream 250 GPM
TOTAL FLOW 400 GPM
104

Coverage Area Per Sprinkler 225 ft2 NFPA 13


Total Sprinklers needed 7 units
Flow Per Sprinkler 21.43 GPM 1.35 LPS
Nominal K-factor 5.60

Initial Pressure System 33.77 mca 47.9534 PSI


Pressure farthest node
24.58 mca 34.90 PSI ¡OK!
(calculated with EPANET)
Difference of pressures 9.19 mca 13.05 PSI

minimum working pressure for a farthest node


14.64 PSI
sprinkler

highest pressure required at a fixture 14.64 PSI


friction losses + height losses 13.05 PSI
backflow preventer 10.00 PSI
Check valves 5.00 PSI

Minimum Working Pressure 42.69 PSI


Available Pressure 43.41 PSI ¡OK!

48
20
Q=V*A

Q/A=V 4.375
5.833333333

2440 4.590163934 43.40983607

400
Project Boat Maintenance
Type of Hazard Light Hazard
Static Pressure 0 PSI
Residual Pressure 0 PSI
Residual Flow 0 GPM
Density 4.0 mm/min
Figure 11.2.3.1.1 0.1 gpm/ft2
Area 139.34 m2 1500 ft2

Flow Sprinklers 150 GPM 9.46 LPS


flow hose stream 250 GPM
TOTAL FLOW 400 GPM
104

Coverage Area Per Sprinkler 150 ft2 NFPA 13


Total Sprinklers needed 10 units
Flow Per Sprinkler 15.00 GPM 0.95 LPS
Nominal K-factor 5.60

Initial Pressure System 50 mca 71 PSI


Pressure farthest node
14.44 mca 20.50 PSI ¡OK!
(calculated with EPANET)
Difference of pressures 35.56 mca 50.50 PSI

minimum working pressure for a farthest node


7.17 PSI
sprinkler

highest pressure required at a fixture 7.17 PSI


friction losses + height losses 50.50 PSI
backflow preventer 12.00 PSI
Check valves 10.00 PSI

Minimum Working Pressure 79.67 PSI


Available Pressure #DIV/0! PSI #DIV/0!
Q=V*A

Q/A=V 4.375
5.833333333
Project Boat Maintenance
Type of Hazard Ordinary Hazard 2
Static Pressure 0 PSI
Residual Pressure 0 PSI
Residual Flow 0 GPM
Density 8.00 mm/min
Figure 11.2.3.1.1 0.20 gpm/ft2
Area 139.34 m2 1500 ft2

Flow Sprinklers 300.00 GPM 18.92 LPS


flow hose stream 250 GPM
TOTAL FLOW 550.00 GPM
104

Coverage Area Per Sprinkler 130 ft2 NFPA 13


Total Sprinklers needed 12 units
Flow Per Sprinkler 25.00 GPM 1.58 LPS
Nominal K-factor 8.00

Initial Pressure System 85 mca 120.7 PSI


Pressure farthest node
14.44 mca 20.50 PSI ¡OK!
(calculated with EPANET)
Difference of pressures 70.56 mca 100.20 PSI

minimum working pressure for a farthest node


9.77 PSI
sprinkler

highest pressure required at a fixture 9.77 PSI


friction losses + height losses 100.20 PSI
backflow preventer 12.00 PSI
Check valves 10.00 PSI

Minimum Working Pressure 131.96 PSI


Available Pressure #DIV/0! PSI #DIV/0!
0

Q=V*A

Q/A=V 4.375
5.833333333

You might also like