17.05.2009,Scaffolding seawater level.approval

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

JSA Number: NEW REVISED Page No 1 of 8

Job being analysed: : Erection and Dismantle of Scaffolding above Sea water Level
Department/Section doing JSA: Descon Planning JSA members: Irshad Ahmad , Nadeem Samad , Ali Raza jamali , Muneeb Imtiaz,
Waseem Sami,
Job Area/Location: Sea Water Intake Area Job performers: Descon Plant Services
NORMAL APPROVALS: POSITION Name Staff No Signature Date General Job Requirements/ Common PPE
JSA by: - Coveralls (Nomex Delta C).
Job Supervisor: - Safety Helmet (No older then 3 years
from date of issue).
EXTRA ORDINARY APPROVALS (ONLY IN VERY SPECIAL CASES REFERRED BY A JOB SUPERVISOR):
- Safety Shoes(Sole must not be smooth).
Discipline Superintendent - Safety Glasses (Dark & Clear with carry
Safety Representative case).
- Hearing Protection.
Any Other Approving Authority
- Safety Glove (Rigger Gloves).
- Chain Guard.
- Barricade/Sign the area.
- Pre-Start Safety Toolbox Talk.
- Life Jacket.

Emergency Situation /Evacuation Gas leak /Fire In case of Emergency situation all work must be stopped,
equipment to be switched off and all personnel’s must
report to the nearest muster point considering wind
direction.

1
Note: 1) If any of the tasks involves biological, physical or chemical hazards, then Industrial Hygienist must also sign this Form, against “Any Other Approving Authority” above.
2) If steps in a job are more than the space provided above, use a photocopy of this sheet to continue on the next page
3) Details on safety (PPE, Hazard etc) and environmental requirements can be found in Safety & Environment Procedures available from the Intranet/Documents & Standards.

Sequence of Basic Job Steps. Potential Hazards Risk Hazard Controls


Rank
1. Erection Dismantling of Scaffolding above 1.1 Fall of material. 1.1.1 Supervisor to ensure that a valid Permit to work along with
supported documents i.e. Safe job analysis etc is available
Sea Water level before start of job (NOTE: Common for all activities)
1.1.2 Supervisor to conduct Tool Box Meeting before start of
activity highlighting the hazards present and their control
measures accordingly
1.1.3 Tool Pouch for containing Spanner / Spirit Level etc to be
used
1.1.4 Area barricaded and safety sign posted
1.1.5 Ensure materials are not obstructing access
1.1.6 Approved container / bucket for lifting loose material i.e.
clamps.
1.1.7 Approved / Inspected / Color coded lifting arrangement for
materials (Gin Pulley, Rope, Bucket, etc.).

1.1.8 Use of tool bags. Proper housekeeping. Proper Toe


Boards to be installed.

2
Erection Dismantling of Scaffolding above Sea water 1.2 Fall of personnel 1.2.1 Only trained, third party certified and Qatar gas approved
level Scaffolders / Supervisor will erect / alter / dismantle scaffolds
1.2.2 Special life jacket to be used during erecting of
Scaffolding.
1.2.3 Approved full body harness to be worn and used.
1.2.4 Install status card - Red / green scafftag.
1.2.5 Use of erection boards during all scaffolding activities
1.2.6 Keep walk ways clear, proper housekeeping to be
observed and maintained.

1.2.7 Special care to be taken while erecting for hanging


scaffolding above sea water level

Sequence of Basic Job Steps. Potential Hazards Risk Hazard Controls.


Rank

3
Erection Dismantling of Scaffolding above Sea water
level
1.3.1 All scaffold materials to be checked before site
mobilization
1.3.2 Pre-use check before using at site by scaffold supervisor /
HSE Inspector
1.3.3 Scaffolding Structure should be prepared on solid ground,
appropriate pads will be used if required
1.3.4 Damaged or discarded material to be removed from site
1. 1.3 Failure of scaffold due to substandard
immediately.
materials.
1.3.5 Daily pre-use inspection
1.3.6 Qatar gas scaffolding and temporary access procedure
shall be implemented and followed
1.3.7 All instructions to be passed to scaffold as per the
nature/requirement of the job
1.3.8 All workers to be instructed to follow precaution measure
while erecting of scaffolding

1.4.1 Supervisor should be aware about operational equipment /


1.4 Damage to other facility or equipments.
installation which may get damaged.
1.4.2 Protect sensitive piece of equipment / material get
damaged, hit by scaffolding material.
1.4.3 Not to hit any plant installation during erection (REMAIN
VIGILANT).
1.4.4 Scaffold not to be supported by other lines or equipment.
1.4.5 Scaffolding supervisor to keep in mind other activities
going on in surroundings and inform others about his activities.
1.4.6 Supervisor should noted that while erecting of scaffolding
above sea level no others work should be done in see rounding.

4
Sequence of Basic Job Steps. Potential Hazards Risk Hazard Controls.
Rank

General requirements 2.1 Heat Stress 2.1.1 Adequate & suitably enough potable drinking water must
be provided and available at respective work locations.
2.2 Special care to be taken
2.1.2 Training/awareness must be carried-out to emphasize the
while erecting of scaffolding
ill effects of Heat Stress & the mitigating controls/prevention to
on above sea water level.
be undertaken. To rearrange working hours to avoid high temp
timing, increase resting hour’s frequency.
2.1.3 Personnel work rotation/management must be
implemented to escape from Heat Stress.

General requirements
2.2 Hearing Damage 2.2.1 Ear Plugs and enforcement.

5
General requirements 2.3 House Keeping/Stacking of materials 2.3.1 Clearance of work site, adequate stacking and
- Poor housekeeping / Improper stacking of segregation of material, regular inspections and corrective
material causing slips trips and falls actions
2.3.2 Good housekeeping shall be monitored and enforced at all
time .
2.3.3 Supervisor to ensure before leaving area, it is cleaned and
material is stacked properly
2.3.4 Dedicated housekeeping crew shall be provided
2.3.5 Buckets/trays shall be provided for clamps

Sequence of Basic Job Steps. Potential Hazards Risk Hazard Controls.


Rank

6
3.1 Manual handling injury. 3.1.1 Maintain manual handling techniques.

3.2.1 Ensure all tools tied up with lanyard / Use


3.2 Falling objects.
tools Bag or Basket.

3.2.2 Fix the lifting pulley to the mast structure


with D-shackle.

3.2.3 Rope to be long enough without knots and


kinks.

3.2.4Scaffolding nets/fans to be erected over live


3.3 Slip / Trips / Falls. line.

3.3.1 Good House Keeping (a place for everything


and everything in its place always).
3.4 Falling from scaffolding.
3.Removal Scaffolding and shifting 3.3.2Material not be obstructing access.

3.5 Wind speed.


3.4.1 Maintain manual handling Techniques.

3.6 Dehydration.
3.5.1 Check with the Fire control (allowable wind
speed up to 25 knots).
3.7 Damage of Equipment
3.6.1 Carry drinking water / rotate worker

3.7.1 Critical items to be identified along with elec-


3.8 Scaffolding collapse.
trical and instrument personal.

3.8.1Ensure all scaffolding are qualified

3.8.2Ensure SCAFTAG system is implemented.

7
Qatar Liquefied Gas Company Limited
JOB SAFETY ANALYSIS RISK SUMMARY SHEET

HIGH RISK HAZARD DESCRIPTION RISK DESCRIPTION CONTROL MEASURE


1 Climbing ladders Slip, fall, personnel injury
2 Raising/Lowering Materials Dropped object, material damage,
personnel injury
3 Break flange Leak, spill, gas release, fire,
explosion
4
5

MEDIUM RISK 1
2
3
4
5

LOW RISK 1
2
3
4
5