17.05.2009,Scaffolding seawater level.approval
17.05.2009,Scaffolding seawater level.approval
17.05.2009,Scaffolding seawater level.approval
Job being analysed: : Erection and Dismantle of Scaffolding above Sea water Level
Department/Section doing JSA: Descon Planning JSA members: Irshad Ahmad , Nadeem Samad , Ali Raza jamali , Muneeb Imtiaz,
Waseem Sami,
Job Area/Location: Sea Water Intake Area Job performers: Descon Plant Services
NORMAL APPROVALS: POSITION Name Staff No Signature Date General Job Requirements/ Common PPE
JSA by: - Coveralls (Nomex Delta C).
Job Supervisor: - Safety Helmet (No older then 3 years
from date of issue).
EXTRA ORDINARY APPROVALS (ONLY IN VERY SPECIAL CASES REFERRED BY A JOB SUPERVISOR):
- Safety Shoes(Sole must not be smooth).
Discipline Superintendent - Safety Glasses (Dark & Clear with carry
Safety Representative case).
- Hearing Protection.
Any Other Approving Authority
- Safety Glove (Rigger Gloves).
- Chain Guard.
- Barricade/Sign the area.
- Pre-Start Safety Toolbox Talk.
- Life Jacket.
Emergency Situation /Evacuation Gas leak /Fire In case of Emergency situation all work must be stopped,
equipment to be switched off and all personnel’s must
report to the nearest muster point considering wind
direction.
1
Note: 1) If any of the tasks involves biological, physical or chemical hazards, then Industrial Hygienist must also sign this Form, against “Any Other Approving Authority” above.
2) If steps in a job are more than the space provided above, use a photocopy of this sheet to continue on the next page
3) Details on safety (PPE, Hazard etc) and environmental requirements can be found in Safety & Environment Procedures available from the Intranet/Documents & Standards.
2
Erection Dismantling of Scaffolding above Sea water 1.2 Fall of personnel 1.2.1 Only trained, third party certified and Qatar gas approved
level Scaffolders / Supervisor will erect / alter / dismantle scaffolds
1.2.2 Special life jacket to be used during erecting of
Scaffolding.
1.2.3 Approved full body harness to be worn and used.
1.2.4 Install status card - Red / green scafftag.
1.2.5 Use of erection boards during all scaffolding activities
1.2.6 Keep walk ways clear, proper housekeeping to be
observed and maintained.
3
Erection Dismantling of Scaffolding above Sea water
level
1.3.1 All scaffold materials to be checked before site
mobilization
1.3.2 Pre-use check before using at site by scaffold supervisor /
HSE Inspector
1.3.3 Scaffolding Structure should be prepared on solid ground,
appropriate pads will be used if required
1.3.4 Damaged or discarded material to be removed from site
1. 1.3 Failure of scaffold due to substandard
immediately.
materials.
1.3.5 Daily pre-use inspection
1.3.6 Qatar gas scaffolding and temporary access procedure
shall be implemented and followed
1.3.7 All instructions to be passed to scaffold as per the
nature/requirement of the job
1.3.8 All workers to be instructed to follow precaution measure
while erecting of scaffolding
4
Sequence of Basic Job Steps. Potential Hazards Risk Hazard Controls.
Rank
General requirements 2.1 Heat Stress 2.1.1 Adequate & suitably enough potable drinking water must
be provided and available at respective work locations.
2.2 Special care to be taken
2.1.2 Training/awareness must be carried-out to emphasize the
while erecting of scaffolding
ill effects of Heat Stress & the mitigating controls/prevention to
on above sea water level.
be undertaken. To rearrange working hours to avoid high temp
timing, increase resting hour’s frequency.
2.1.3 Personnel work rotation/management must be
implemented to escape from Heat Stress.
General requirements
2.2 Hearing Damage 2.2.1 Ear Plugs and enforcement.
5
General requirements 2.3 House Keeping/Stacking of materials 2.3.1 Clearance of work site, adequate stacking and
- Poor housekeeping / Improper stacking of segregation of material, regular inspections and corrective
material causing slips trips and falls actions
2.3.2 Good housekeeping shall be monitored and enforced at all
time .
2.3.3 Supervisor to ensure before leaving area, it is cleaned and
material is stacked properly
2.3.4 Dedicated housekeeping crew shall be provided
2.3.5 Buckets/trays shall be provided for clamps
6
3.1 Manual handling injury. 3.1.1 Maintain manual handling techniques.
3.6 Dehydration.
3.5.1 Check with the Fire control (allowable wind
speed up to 25 knots).
3.7 Damage of Equipment
3.6.1 Carry drinking water / rotate worker
7
Qatar Liquefied Gas Company Limited
JOB SAFETY ANALYSIS RISK SUMMARY SHEET
MEDIUM RISK 1
2
3
4
5
LOW RISK 1
2
3
4
5