Steel Tubular Piles
4.1 Concrete
Reinforcement Steel shall have a minimum steel grade f ymin = 460 N/mm2
Coating systems are to be provided to 2.0m below the mud line or to 3.0m below LAT, whichever is deeper,
to be designed for a minimum of 10 years. Cathodic protection is considered not to be required. A steel
thickness of 1mm of corrosion to the steel spud pile wall will be considered in the design based on EN
1993-5. No spud pile thickness reduction for pile below seabed as corrosion unlikely will happened.
Figure 4-1: Loss of Thickness (mm) due to corrosion for piles in fresh or seawater (EN 1993-5)