Section 7 Wall Plaster and Painting Estimation

Brick
Masonary
S.N Description unit Nos Length Breadth Height Volume
A Brick Masonary Walls
a Under the plinth (Toe Walls) nos
1 Total walls area from cad cft 214.40 4.75 1,018.40

b Ground floor Walls


1 Total walls area from cad 9" cft 1.00 114.00 10.50 1,197.00
2 Total walls area from cad 4" cft 1.00 14.60 10.50 153.25

c First Floor Wall


1 Total walls area from cad 9" cft 1.00 114 10.50 1,197.00
2 Total walls area from cad 4" cft 1.00 14.60 10.50 153.25

d Second Floor Wall


1 Total walls area from cad 9" cft 1.00 83.925 10.50 881.21
2 Total walls area from cad 4" cft 1.00 14.595 10.50 153.25

d Top Floor Wall


1 Total walls area from cad 9" cft 1.00 0.00 10.50 0.00
2 Total walls area from cad 4" cft 1.00 0.00 10.50 0.00
d Parapet Walls
1 Varahanda cft 1.00 10.01 2.00 20.02
2 Upper Terrace cft 1.00 30.40 3.00 91.20
3 Lower Terrace cft 1.00 31.11 2.00 62.22
173.43

Summary
Brick
S.N Description Masonary (cft) Plaster Paint
1 Toe Wall 1,018.40 14453.71 12427.47
2 Ground floor 1,350.25
3 First Floor 1,350.25
4 Second Floor 1,034.46
5 Top Floor 0.00
6 Parapet walls 173.43
8 Deduction from opening schedule 480.75 1450 1450
Total 4,446.04 13003.71 10977.47

External
L H A(Sqft)
GF 187.00 11.00 2057.00
FF 187.00 11.00 2057.00
SF 146.90 11.00 1615.90
Top Floor 0.00 11.00 0.00
Lower Parapet 74.60 2 149.20
Upper Parapet 72.90 3 218.70
Varahanda 24.00 2 48.00
Deduction in zero side 42.40 27.99 1186.78
Total 4959.02

Internal RFF
Walls Celling Beam
L H A(Sqft) A(Sqft) A(Sqft)
GF 187.00 10.50 1963.50 1142.88 1426.5
FF 187.00 10.50 1963.50 669.64
SF 146.90 10.50 1542.45 669.64
Top Floor 0.00 10.50 0.00 0
Staircase 52.2 10.50 156.60 213.72
Lower Parapet 74.60 2 149.20
Upper Parapet 72.90 3 218.70
Varahanda 24.00 2 48.00
Total 6041.95
TOTAL 11000.974 2026.24 1426.5