CHAMP UTILITIES DETECTION & ELECTRICAL SERVICES Date : 26/08/2022

Our Ref : ASPR-2208114048


120B Edgedale Plains Tel : 69165022
C/O Winstech Engineering Pte Ltd
SINGAPORE 822120 ATTENTION :
ATTN : Ching Hwee Siah Simon Have you also...
purchased Cable route plan?
submitted Cable NCE (If applicable)?
Dear Ching Hwee Siah Simon

Pulau Seringat (MK34-01743L, MK34-01741N)

We refer to your request dated 26/08/2022 and are pleased to provide the Gas Plans as attached.
You are to note the following :

a. the Gas Plans DO NOT set out and/or identify all services that may be within the relevant area(s);
b. the gas pipe positions shown in the Gas Plans are indicative.

2 We wish to draw your attention to the provisions of the Gas Act, Chapter 116A and to :

a. take all precautionary measures to prevent damaging gas pipes at your worksite;
b. contact Earthworks Surveillance & Patrolling (ESP) Section admin during office hours at Tel: 69165119 or email
espsection@spgroup.com.sg if you need advice on gas pipe damage prevention;
c. submit written notices to SP PowerGrid Ltd if you have to carry out earthworks in the vicinity of gas pipes at least
seven days prior to commencing the earthworks;
d. Obtain surveyed drawings if earthworks come within the vicinity of Gas Transmission Pipeline (GTP). This is
mandatory and it is your duty to evaluate if there is any GTP within your work area.

Please contact the following officer to purchase surveyed drawings.


Mr Abdul Rahim, Tel : 69166112
Email : abdulrahimhs@spgroup.com.sg and
gastrans@spgroup.com.sg

3 For enquiries on distribution gas pipeline matters, please submit your request together with a site plan to
gasenquiry@spgroup.com.sg or to the following address : SP PowerGrid Ltd, 24A Senoko Avenue, Singapore 758314.

4 For enquiries on GTP matters, please contact Mr Abdul Rahim as above.

5 If diversion is required, it may take between a few weeks to several months from the date of receipt of payment.
Commencement of works is subjected to road opening approval given by the relevant authorities. You are advised to avoid
the need for diversion of GTP, where possible, as it requires a lot more resources and time.

MAPPING & EARTHWORKS ADMINISTRATION SECTION


As agent for and on behalf of POWERGAS LTD
This is a computer generated letter. No signature is required.

Co. Registration No.: 200306959Z


PowerGrid Ltd
2 Kallang Sector, Singapore 349277, www.spgroup.com.sg
Legend
±

Notes for Working Near Existing Gas Mains


1)Before commencement of earthworks near to gas mains, you
are required to submit Notice for Commencement of Earthworks
(NCE) to SPPG - MEA and comply with all SPPG’s requirements.
For earthworks near to LPB, MP and/or GTP gas pipes, additional
consultation(s) with SPPG - DPOM and/or TPOM section(s) is/are
required.

2)The gas pipe positions shown in the Gas Plan are indicative and
can only be positively identified through trial holes.

3)The symbols V, SY & SP represent locations of Gas Valve, Gas


Syphon and Gas Standpipe respectively. No concealment or
covering of manhole covers is allowed.

4)A report must be made to Customer Service Centre (CSC), upon


detecting the presence of gas by using a gas detecting device or by
smell. Tel: 1800-752-1800.

5)All gas pipes shall be treated as live unless SPPG has confirmed
to you that they have been abandoned. You shall write to
GasEnquiry@spgroup.com.sg to request SPPG to conduct a gas
pipe verification test prior to removing any such gas pipe.

Confidentiality & Disclaimer


1)Information should not be disclosed or forwarded to others
without SPPG’s approval.

2)The gas plan & information given (“Documents”) herein are


strictly confidential and solely for the use of the requestor to whom
these Documents have been issued. These Documents shall in no
event, for any purpose whatsoever be reproduced, republished,
uploaded, posted, transmitted or otherwise distributed in any way.

3)This gas plan is issued for the use of the project only and is to
be destroyed after use. This gas plan is only valid for three months
from the date of purchase.

4)SPPG disclaims any liability for any damage or loss that may be
caused to or suffered by or incurred by any person directly or
indirectly as a result of any error or omission or any action taken
by any person to remove any gas pipe.
Ref No.:
G202208716
Issue To :
Ching Hwee Siah Simon
Plotted By :
PMWZ999H
Date Plotted :
26/08/2022

Scale : NOT TO SCALE