Republic of the Philippines

Department of the Interior and Local Government Form A


2022 RBME of LGU Infrastructure Projects

RBME of LGU Infrastructure Projects (RLIP) – DATA CAPTURE FORM


Form A. LGU Infrastructure Profile
2

INSTRUCTIONS | PLEASE READ


(1) To be completed by the LGU Focal Person for RLIP. (2) Please refer to the RLIP Form A Guidance Notes for instructions on
how to accomplish RLIP Form A (3) Please accomplish the Certification Page. (4) Encode data via Google Survey to be accessed
through https://tinyurl.com/RLIP2022FormA.

I. Name of Local Government Unit


✘ Municipality / City of : LAGONGLONG
✘ Province of : MISAMIS ORIENTAL
Region : 10

II. Basic Information


Please supply the requested information below according to available national data:

NGA Data Income Class 5TH CLASS


NGA Data Household Population (source: 2020 Census of Population and 24,190
Housing [CPH])
NGA Data No. of Households (source: 2020 CPH) 5,491

III. Local Government Infrastructures


Please indicate which buildings / facilities are present in the LGU and provide requested
details, as of December 31, 2021:

Size
Present
(sqm / km / HH)
1. NGA Data Bridges (Indicate in km) Total ________________
1.1. Concrete Bridge ☐ 0.060KM
1.2. Steel Bridge ☐ ________________
1.3. Mixed (Concrete and Steel) Bridge ☐ ________________
1.4. Others (Include only those which can ☐ ________________
accommodate vehicular traffic)
2. Evacuation Center Facility (EC) Total ________________
2.1. Permanent Evacuation Center (Indicate in sqm) ☒ 200sqm
a. Capacity (Indicate by # of Households [HH]) 50
2.2. Multi-Purpose Hall (Indicate in sqm) ☐ ________________
2.3. Others (Indicate in sqm) (If other buildings are
designated as EC, please indicate facility name) :
__________________________________________
3. NGA Data Roads (Indicate in km) Total 44.617KM
3.1. Paved ☒ 24.428KM
3.2. Unpaved ☒ 20.189KM
4. NGA Data Sanitation Facilities (Indicate by Total Click or tap here to
number of Household [HH]) enter text.
4.1. Open Defecation ☐ 473
4.2. Unimproved Sanitation ☐ 64
4.3. Limited Sanitation ☐ ________________
4.4. Basic Sanitation ☒ 4,346
4.5. Safely Managed Sanitation ☐ ____3,531__
5. NGA Data Water Supply System (indicate Total Click or tap here to
number of HHs) enter text.
5.1. Level I ☒ 2,162
5.2. Level II ☒ 1,181
5.3. Level III ☒ 2,350

IV. Infrastructure Budget and Spending


Please supply the requested information below:

Item Amount
1. 2022 Annual Budget Report : 141,600,874.00
(ABR)
1.1 NGA Data National Tax : 138,840,374.00
Allotment (NTA)
1.2 Special Purpose Appropriation : 27,768,074.80
for 20% Development Fund (DF)
1.3 ABR Allocations for Capital : Click or tap here to enter text.
Outlay
Capital Outlays for Infrastructure
a. Public Infrastructure : N/A
b. Buildings : N/A
c. Others:
_________________________: ________________________________________
_________________________: ________________________________________
_________________________: ________________________________________
2. 2022 Annual Investment Program : Click or tap here to enter text.
2.1. Total 20% DF : 27,768,074.80
See next page for continuation of this item.
3. 2021 Annual Investment Program : Click or tap here to enter text.
3.1. Total 20% DF : Click or tap here to enter text.
3.2. 20% DF Allocated for : 18,268,074.80
Infrastructure Projects
See next page for continuation of this item.
Republic of the Philippines
Department of the Interior and Local Government Form A
2022 RBME of LGU Infrastructure Projects

IV. Infrastructure Budget and Spending


(Disaggregated figures)

2.2. Total 2022 AIP 2.3. 2022 AIP Allocation for 2.4. 2022 AIP Allocation for 3.3. 2021 AIP Utilization for
Allocation for Infra Infra Projects under 20% Infra Projects funded Infrastructure Projects
Focus Projects Projects DF by NGAs / Foreign under 20% DF
Grants
Construction of Roads
3,000,000.00 3,000,000.00 Click or tap here to enter text. 6,000,000.00
Construction of Bridges
1,000,000.00 1,000,000.00 Click or tap here to enter text. _____________________________

Construction of Sanitation Facilities


Limited Sanitation
_____________________________ _____________________________ _____________________________ _____________________________
Basic Sanitation
_____________________________ _____________________________ _____________________________ _____________________________
Safely Managed
Sanitation _____________________________ _____________________________ _____________________________ _____________________________
Construction of Water Systems
Level I
Click or tap here to enter text. _____________________________ Click or tap here to enter text. 300,000.00
Level II
Click or tap here to enter text. _____________________________ Click or tap here to enter text. 1,000,000.00
Level III
Click or tap here to enter text. Click or tap here to enter text. Click or tap here to enter text. Click or tap here to enter text.
Construction of
Evacuation Center Click or tap here to enter text. Click or tap here to enter text. Click or tap here to enter text. _____________________________
All Other Infrastructure
Projects 23,768,074.80 23,768,074.80 25,000,000.00 12,573,093.20
TOTAL Click or tap here to enter text. Click or tap here to enter text. Click or tap here to enter text. Click or tap here to enter text.
Republic of the Philippines
Department of the Interior and Local Government Form A
2022 RBME of LGU Infrastructure Projects

V. Roads Profile
Please supply the requested information below:

Has RLIP-enrolled Road Project


✘ (Tick the box, only if your project is classified
as a “Road Project”)

Size
Item
(km)

1. Total Target Length of Roads in : 1.3695KM


Local Road Network Plan (If data is
available, source: CLUP / PDPFP /
LRNDP or similar)

Target Completion Year for Target : 2022


Length of Road Network (If data is
available, source: CLUP / PDPFP /
LRNDP or similar)

2. Total Target Length of Road to be : 1.3695KM


paved for 2022
2.1. Target Length of Road to be : 1.3695KM
paved from 2022 AIP Road
Projects
2.2. Target Length of Road to be : 0.257KM
paved from 2022 20% DF
Road Projects
2.3. Target Length of Road to be : 0.179KM
paved through RLIP-enrolled
Road Project
3. NGA Data Total Length of Roads : 0.487KM
paved in 2021
3.1. Length of Road paved from : 0.487KM
2021 20% DF Road Projects

VI. Bridges Profile


Please supply the requested information below:

Has RLIP-enrolled Bridge Project


(Tick the box, only if your project is classified
as a “Bridge Project”)

Size
Item
(km)
1. Total Target Length of Bridges : 0.032KM
Network (If data is available, source:
CLUP / PDPFP / LRNDP or similar)

Target Completion Year for above : 2022


Target Length of Bridges (If data is
available, source: CLUP / PDPFP /
LRNDP or similar)

2. Total Target Length of Bridges to : 0.032KM


be built for 2022
2.1. Target Length of Bridge/s to : 0.032KM
be built from 2022 AIP
Projects
2.2. Target Length of Bridge to be : 0.032KM
built from 2022 20% DF
Projects
2.3 Target Length of Bridge to be : N/A
built through RLIP-enrolled
Road Project

3. NGA Data Total Length of : N/A


Bridge/s built in 2021
3.1. Length of Bridge/s built from : N/A
2021 20% DF Projects

VII. Sanitation Facilities Profile


Please supply the requested information below:

Has RLIP-enrolled Sanitation Facilities


Project
(Tick the box, only if your project is classified
as a “Sanitation Facilities Project”)

Item Figure

1. Percentage of Households with : N/A


Access to Improved Facilities (Use
the ff. formula: [[Add Item 4 (c) + (d) + (e)
of Section III] / [HH in Section II, Item (c)]]
x 100 )
2. Total Target Number of HH to be : N/A
provided with Access to Improved
Facilities for 2022
2.1. Limited Sanitation : N/A
2.2. Basic Sanitation : N/A
2.3. Safely Managed Sanitation : ________________________________________

VIII. Water Supply Profile


Please supply the requested information below:

Has RLIP-enrolled Water Supply


✘ Project
(Tick the box, only if your project is classified
as a “Water Supply Project”)

Item Figure

1. Percentage of Households with : N/A


Access to Classified Water Sources
(Use the ff. formula: [HH in Section III, Item
5 / HH in Section II, Item (c)] x 100 )

2. Total Target Number of HH to be :


provided with access to Classified
Water Sources for 2022

2.1. Level I : N/A


2.2. Level II : N/A
2.3. Level III : N/A

IX. Evacuation Center Profile


Please supply the requested information below:

Has Evacuation Center Project


(Tick the box, only if your project is classified
as an “Evacuation Center Project”)

Item Figure
1. Number of Households susceptible : ___________N/A_____________________________
to Hydrometeorological Hazards
(Based on LDRRMP, LCCAP, Contingency
Plan, or similar)

Population susceptible to : _____________N/A___________________________


Hydrometeorological Hazards
If Contingency Plan is for one : ____________N/A__________
hazard, please supply for which
hazard it is (If LGU has multiple
Contingency Plans, provide only 1):
2. Capacity of Evacuation Center : ________N/A________________________________
(Indicate number of HHs which can be
accommodated in Evacuation Center)

3. Percentage of Households with : ________N/A________________________________


Access to Evacuation Center during
occurrence of hazard
4. Total Target Number of HHs to be : ________N/A________________________________
provided with Access to Evacuation
Center for 2022
5. Total Number of HHs provided : ________N/A________________________________
with Access to Evacuation Center
for 2021 (Indicate number of HHs which
can be accommodated in Evacuation
Center)

X. LPMC Functionality Profile


Please tick as appropriate below:

Indicator Applicable

1. LPMC Organized ☐
1.1. With NGO/PO members ☐
2. Training on project monitoring conducted at ☐
least once in year 2021
3. Duly-approved Annual Work and Financial ☐
Plan submitted
4. Monitoring visits and/or field inspections ☐
conducted
4.1. Met in the 1st semester ☐
4.2. Met in the 2nd semester ☐

XI. CPES and CPES IU Functionality Profile


Please tick as appropriate below:

Indicator Applicable / Value

1. Constructors’ Performance Evaluation System ☐


(CPES) – Implementing Unit (IU) established
2. Accredited Personnel as Constructors Performance Evaluators (CPE)
2.1. In-house CPES Evaluators ☐
2.2. Third Party CPES Evaluators ☐
3. CPES Evaluation / Rating and Report ☐
submitted to CIAP in 2021
3.1. No infrastructure project implemented in ☐
2021

XII. Other Exceptional LGU Infrastructure Development and


Infrastructure Monitoring Initiatives
Please provide details on exceptional LGU infrastructure development and infrastructure monitoring
initiatives:

_________________________________N/A__________________________________________________________

XIII. Survey
Please provide responses as appropriate below:

For LGUs with no infrastructure projects included under their 2022 AIP’s 20%
Development Fund component, what are the reasons given for this?

___________________________N/A__________________________________________________________

RBME of LGU Infrastructure Projects (RLIP)

CERTIFICATION
for Form A. LGU Infrastructure Profile

We, the undersigned, certify that the infrastructure development data and related
information contained in the RLIP Form A: LGU Infrastructure Profile are accurate,
based on locally-available records from the Local Government Unit (LGU).

Local Government Unit Name and Location


City / ✘ Municipality of : LAGONGLONG
✘ Province of : MISAMIS ORIENTAL
Region : 10
SIGNATORIES

Prepared by:

JEAN DABLO ACHACOSO


MPDC

Noted by:

JAY ALBERT C. PUERTAS


Municipal Mayor